HomeMy WebLinkAbout6675 N � 13 � 21 - ON
- � . �. p�b
�-iRSTA�CAN���. 118�I���II�NIIIII�IIdIIN�11�1118N�aIINl�ll�ll��ll — —
Return Address: �\ �Q�N8032900'I 080
Auburn City Clerk aiza�2are�:ze am
City of Aubum KING COUNTY,wa
25 West Main St.
_
Auburn, WA 98001 -
RECORDER'S COVER SHEET
Document Title(s) (or transactions contained therein):
Rezone (Orclinance No. 6675)
Reference Number(s) of Documents assigned or released:
�Additional reference#'s on page of document
Grantor(s)/Borrower(s) (Last name frst, 4hen first name and initials)
Auburn, City of
Grantee/AssigneelBeneficiary: (Last name first)
1. Auburn, City of
Legal Description (abbreviated: i.e. lot, block, pla4 or section, township, range)
See parcel numbers
❑Additional legal ison page of dooument.
Assessor's Properly Tax Parcel/Account Number
5401600175 ::�,,:: a:,A�:,,��:<�,,::��>;�!���f
rer;,;� as an acccrncdation only.
5401600200 tt has not bee:, exarnincd as to
5401600235 P{oper execution or as to its
e��ict upon title
5401600260 _
0921059073
❑AssessorTauJF not yet assigned
ORDINANCE NO. 6 6 7 5
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE CITY-
INITIATED REZONING OF FOUR PARCELS TOTALING
APPROXIMATELY 1.34 ACRES LOCATED EAST OF C ST
NW, BETWEEN W MAIN ST AND 3RD ST NW FROM DUC,
DOWNTOWN URBAN CENTER TO M1, LIGHT INDUSTRIAL,
AND THE CITY-INITATED REZONING OF AN
APPROXIMATELY 0.98-ACRE PARCEL ON THE SOUTH
SIDE OF SE 310T" ST, WEST OF 124TH AVE SE FROM R-
20, RESIDENTIAL ZONE 20 UNITS TO THE ACRE, TO I,
INSTITUTIONAL TO IMPLEMENT THE COMPREHENSIVE
PLAN AND AMENDING THE CITY'S ZONING MAPS
WHEREAS, the City Council of the City of Auburn, Washington, adopted, on
August 18, 1986, a Comprehensive Plan by Resolution No. 1703, which ineluded a Map
establishing the location of the Comprehensive Plan Land Use Designa#ions throughou.t
the City; and
WHEREAS, on April 17, 1995, the City Council of the City of Auburn adopted
Comprehensive Plan Amendments by Resolution No. 2635 to comply with the
Washington State Growth Management Act; and
WHEREAS, on September 5, 1995, the City of Aubum reaffirmed tha# action
with the adoption of Ordinance No. 4788; and
WHEREAS, on December 14, 2015, the City Council of the City of Auburn
adopted a substantially revised Comprehensive Plan by Ordinance No. 6584 to comply
with the periodic update required by the Washington State Growth Management Act;
and
WHEREAS, on February 5, 2018, the City of Auburn reaffirmed that action with
the adoption of Resolution No. 5341; and
--------------------------
Ordinance No. 6675
February 12, 2018
Page 1
WHEREAS, the City initiated a rezone application (File #REZ18-0001) on
December 18, 2017, for four parcels located east of C ST NW identified by King
County, Washington tax parcel numbers 5401600175, 5401600200, 5401600235, and
5401600260 and for a parcel located south of SE 310th ST identified by King County,
Washington tax parcel number 0921059073; and
WHEREAS, the environmental impacts of proposed rezone were considered in
accordance with procedures of the State Environmental Policy Act; and
WHEREAS, after proper notice published in the City's official newspaper at least
ten (10) days prior to the date of hearing, the City of Auburn Planning Commission on
Februa.ry 6, 2018 conducted a public hearing on the proposed City-Initiated Rezone;
and
WHEREAS, at the public hearing the City of Auburn Planning Commission heard
public testimony and took evidence and exhibits into consideration; and
WHEREAS, thereafter the City of Auburn Planning Commission made a
recommendation to the City Council on the proposed City-Initiated Rezone; and
WHEREAS, on, February 26, 2018, the Auburn City Council considered the
proposed City-Initiated Rezone; as recommended by the City of Auburn Planning
Gommission; and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, DO ORDAIN AS FOLLOWS:
Section 1. The City Council ('`Council") adopts and approves the City-Initiated �
Rezone to change four parcels totaling approximately 1.34 acres located east of C ST
NW from "DUC, Downtown Urban Center", to "M-1, Light Industrial" and to change an
--------------------------
Ordinance No. 6675
February 12, 2018
Page 2
approximately 0.98-acre parcel located south of SE 310th St from "R-20, Residential
Zone 20 Units to the Acre" to "I, Institutional" and directs that the rezone application and
all related documents be filed along with this Ordinance with the Auburn City Clerk and
be available for public inspection.
Section 2. The,Zoning Map amendment is herewith designafed as a basis for
the exereise of substantive authority under the Washington State Environmental Policy
Act (SEPA) by the City's responsible environmental official in accordance with RCW
43.21 C.060.
Section 3. The Council adopts the Findings of Fact and Conclusions of Law in
the Planning Commission's recommendations, as set forth below:
FINDINGS OF FACT
Procedural:
1, Applicant. The Applicant is the City of Auburn. �
2. Hearinq. A public hearing was held by the Planning Commission on the
proposed rezone on February 6, 2018 at 7:00 p.m. at the City Council Chambers at
Auburn City Hall.
Substantive:
3; Site%Proposal Description. The City as a.pplicant has requested a rezone
of five parcels in two locations; four privately-owned, developed parcels totaling
approximately 1.34 acres changing from "DUC, Downtown Urban Center" to "M1, Light
Industrial" to recognize and be more compatible with developed status ofthe properties.
The other location is an approximately 0.98-acre city-owned parcel changing from "R-
� 20, Residential Zone 20 Units to the Acre" to "I, Institutional" in response to recent City
ownership as a developed park. The underlying comprehensive plan land use map
designations of the parcels were amended to "Light Industrial" and to "Institutional",
respectively, by City Ordinance No. 6667 adopted on December 18, 2017.
4. Characterisfics of the Areas. For the first group of parcels, the land use
designations and zoning for the subject properties have not been re-evaluated for many
years and therefore have not considered the continued appropriateness of the land use
--------------------------
Ordinance No. 6675
February 12, 2018
Page 3
designations. The boundaries of the DUC, Downtown Urban Center zoning district were
originally adopted in 2007 when the city was desirous of establ.ishing a downtown
center zoning classification over a large area. While the justification for the
establishment of the boundaries cannot be precisely recreated, it may have been
contemplated that the properties would redevelop, but this has not happened.
The contiguous sites are located at the northern margin of the "Downtown Urban
Center" Comprehensive Plan designafion and bordered to the north and the east by
� properties with an industrial designation. The sites align in a row north to south and are
bordered by public streets of C ST NW to the west, 3rd ST NW to the north and by the
Burlington Northern railroad to the east. The automobile body shop of A-1 Collision
borders the sites to the south.
The finro largest parcels, Parcel No. 5401600175 (0.7 acres) and Parcel No.
5401600235 (0.34 acres) have been developed for more than 25 years with structures
and facilities that are more appropriate charaeterized as ``industrial uses" than suburban
downtown development. The configuration and location of the properties sandwiched
befinreen transportation corridors makes them less suitable for redevelopment as
downtown service or retail type uses geared to leisure shopping and that would be
subject to strict architectural and site design requirements. Also, due to the number of
recent zoning inquiries, the City staff has increasing become aware of the difficulty of
fhe property owner in finding tenants that can occupy the former farm supply building
and meet the zoning use regulations of the DUC zoning district. Also, few uses are
capable of using the building with few physical alterations in order to avoid triggering
consistency with Downtown Design Standards and significant upgrades.
Related to the second site, in 1996 the 0.98-acre property was part of a larger
2.23=acre property ownership by Schneider Homes Inc. that was proposed fo�
development as the `Pasafino Apartments' while in unincorporated King County prior to
annexation to the City of Auburn. In 1996 a `Petition for Annexation Agreement and
Declaration of Covenant' was executed between the City and Schneider Homes Inc. in
order for the City to provide water and sewer services to the proposed apartment
development located outside the city, but within the city's established utility service
area. An `Amended Petition for Annexation Agreement and Declaration of Covenant'
was executed on April 21, 1997. The Agreements provided that as a condition of the
City providing water and sewer utility services, Schneider Homes Inc. would develop a
park, and after annexation, convey the developed park land to the City of Auburn
without obligation or cost. At the time of transfer, the city parks department would
assume maintenance responsibility. The property was annexed to the City of Auburn
effective in 2008 by Ordi.nance No. 6121; however, the transfer of ownership of the park
land did not take place for many more years since the park land was not a separate
parcel that could be deeded separately to the City. A Boundary Line Adjustment (BLA)
application (File #BLA14-0005) was filed by Schneider Homes Inc. in May of 2014 to
establish the park land as a separate parcel. The processing of the BLA was delayed
due to changes in property ownership interest on the part of Schneider Homes Inc. for
Ordinance No:6675
February 12, 2018
Page 4
refinancing purposes. The BLA was subsequently approved by the Gity and recorded
on November 2, 2016 (Recording #20161102900004) and the property subsequently
conveyed to the City. The park is depicted as "Village Square Park° on the city website.
It was previously appropriate to have the Comprehensive Plan land use
designation of"Multiple °Family Residential° applicable to the site when it was privately-
owned and part of a larger parcel that is mainly developed with apartments. However,
now that Parcel No. 0921059073 is a separate parcel (as a result of the boundary line
adjustmenf), owned by the City and developed for park purposes, it is appropriate for it
to have the zoning classification be "I, Institutional" to implement and correspond wifh ,
the "Institutional''land use designation of the Comprehensive Plan. '
5. Adverse _Impacts. There are no significant adverse impacts associated
with the proposal. A Determination of Non-Significance (DNS) was issued under City
file SEP17-D014 on September 19, 2017. The comment period ended October 3, 2017!
and the appeal period ended October 17, 2017. No comments or appeals were
received.
CONCLUSIONS OF LA1N
Procedural: �
1. Authoritv of the Planning Commission. ACC 18.68.030(B)(2) grants the
Planning Commission with the authority to review and make a reeommendation to the
Gity Council on rezone requests if the rezone is initiated by the City.
Substantive:
2. C_omprehensive Plan Land Use Map Desiqnation. The Comprehensive
Flan Land Use Map designation for the four the four parcels is ``Light Industrial" and the
Land Use Map designation for the other parcel is "Institu#ional",
3. Case Law Review Criteria and Application. The Auburn City Code does
not include any criteria for rezone applications. Washington appellate courts have
imposed some rezone criteria, requiring that the p�oponents of a rezone must establish
that conditions have substantially changed since the original showing and that the
rezone must bear a substantial relationship to the public health, safety, mora.ls or
welfare. See Ahmann-Yamane, LL-C v. Tabler, 105 Wn. App. 103, 111 (2001). If a
rezone implements the Comprehensive Plan, a showing that a change oficircumstances
has occurred is not required. Id. at 112.
The proposed rezone from "DUC, Downtown Urban Center" to "M1, Light
Industrial" and from "R-20, Residential Zone 20 Units to the Acre'' to "I, Institutional"
clearly meets the judicial criteria for a rezone. There is no question that the proposal is
necessary to implement the eomprehensive plan, as the comprehensive plan land use
map designations for the parcels are "Light Industrial" and the Land Use Map
Ordinance No. 6675
February 12, 2018
Page 5
designation for the other parcel is "Institutional", respectively. The proposed zoning
appropriately implements the land use designations.
The rezone bears a substantial relationship to the public health, safety, morals
and welfare because it will not result in any significant adverse impacts as determined
in Finding of Fact No. 5 while at the same time being consistent with the developed
status of the properties and uses.
Section 4. Upon the passage, approval, and publication of this Ordinance as
provided by law; the City Clerk of the City of Auburn shall cause this Ordinance to be
recorded in the office of the King County Recorder.
Section 5. If any section, subsection, sentence, clause, phrase or portion of this
Ordinance or any of the Zoning Map amendments adopted herein, is for any reason
held invalid or unconstitutional by any Court of competent jurisdiction, such portion shall
be deemed a separate, distinct and independent provision, and such holding sha11 not
affect the validity of the remaining portions thereof.
Section 6. The Mayor is hereby authorized to implement such administrative
procedures as may be necessary to carry out the directives of this legislafion.
Section 7. This Ordinance shall take effect and be in force five days from and
after its passage, approval, and publication as provided by law.
MAR 5 2018
INTRODUCED: -•
_ . _
PASSED:
. MAR . 5 2D1$
APPROVED: MAR 5 2018
NA CY BAC , Mayor
--------------------------
Ordinance No. 6675
February 12, 2018
Page 6
ATTEST:
��� -
Danielle E. Daskam, -
City Clerk
APPR D A FORM:
�`
D iel B. Hei ,
City Attorney � `
�" � � e�� .�
Published: Yl�(� � ���-��'�''t�
Ordinance No. 6675
February 12, 2018
Page 7