Loading...
HomeMy WebLinkAbout5380 RESOLUTION NO. 5380 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, CLARIFYING WHEN FACILITY EXTENSION FEES WILL BE PAID, AND AMENDING THE CITY'S FEE SCHEDULE WHEREAS, The City's Fee Schedule, establishes fees for Facility Extensions for certain water, sewer, storm, and street improvements; and WHEREAS, based on Public Works staffs experience, developers are not clear when some of those fees must be paid; and WHEREAS, staff recommends clarifying this matter. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, RESOLVES as follows: Section 1. Section B.4 "Facility Extension Fees" is amended as set forth in Exhibit A. Section 2. The Mayor is authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. This Resolution shall take effect and be in full force upon passage and signatures. Dated and Signed this —\ day of �e,_g?�a ,zr\ , 2018. CITY OF AUBURN O644 ANCY i ' S, MAYOR Resolution No. 5380 September 4, 2018 Page 1 of 2 ATTEST: Shawn Campbell, MMC, City Clerk APPROVED AS TO FORM: 111 144 - Steven L. Gress, City A ey Resolution No. 5380 September 4, 2018 Page 2 of 2 Resolution 5380 Exhibit A I'aC t o rtv 0o GVW•2 4. •k %bend F d` sr,rv£ sig �dCF �' p fro [dSP ; ••0,A r� The Facility Extension Application Fee is $569.00, plus $172.00 for each Facility (Water, Sanitary Sewer, Storm Drainage, Street, private street and private storm systems within private streets). Facility Extension Fees are the summation of the following categories (a+b+c+d), or $1,710.00, whichever is greater. a. For the combined linear footage of water, sewer, storm drainage and private storm drainage within private streets: The first 0 lineal feet(LF)to 1000 LF is charged at$5.70 per LF plus, The next 1001 LF to 2500 LF is charged at$2.90 per LF plus, Any additional over 2500 LF is charged at$1.70 per LF. b. For the linear footage of streets and private streets: The first 0 LF to 500 LF will be charged at$7.10 per LF plus, The next 501 LF to 1000 LF will be charged at$4.20 per LF plus, Any additional over 1000 LF will be charged at$1.10 per LF. c. For non-linear extensions such as pump stations or traffic signals, the extension fee will be determined by the City Engineer based on a.n estimate of the City's labor Cost associated with the plan review, inspection, and administration of the application. d. For that portion of the water or sewer facility located outside City Limits, but within existing County (King or Pierce) right-of-way, an additional fee of$457.00 plus $5.10 per LF of the combined water and sewer extension located in the existing County right-of-way applies. Facility Extension Fees will be paid as follows: a. Forty percent(40%) - •- '••- : - --- - - -- •f the estimated fee will be paid when the applicantapplies for second review or, if no second review is needed, before the City issues a notice of plan approval. b. The remaining balance will be paid by the applicant before.the City signs the facility extension agreement. - - -=• .e°. - - -. - - - t t • - - -- - - - -- - : (After plan approval, but prior before to-the start of construction.? Additional Review: Each additional plan review beyond a 3'd review prior to plan approval will require an additional fee of$527.00 be paid at the time of the additional review submittal. If the review requires more than 8 hours of staff time to complete an additional fee of$66.00 per hour will be charged and must be paid prior to plan approval. Additional plan review required by changes, additions or revisions to plans during construction will require an additional fee of$264.00 be paid at the time the additional review is submitted and prior to any review being completed. If the review requires more than 4 hours of staff time to complete an additional fee of$66.00 per hour will be charged and must be paid prior to plan approval.