Loading...
HomeMy WebLinkAbout5382 RESOLUTION NO. 5 3 8 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR TO ACCEPT A FEDERAL GRANT AMENDMENT TO BE ADMINISTERED BY THE WASHINGTON STATE MILITARY DEPARTMENT FOR THE RESERVOIR 1 SEISMIC CONTROL VALVE PROJECT WHEREAS, the City was previously awarded and accepted a Washington State Military Department Hazard Mitigation Grant (Grant No. D16-010) for the Reservoir 1 Seismic Control Valve Project (Project) through Resolution 5285; and WHEREAS, the City applied for and received approval from the Washington State Military Department for additional grant funding in the amount of$270,390.00 to finance the design and construction of the Project; and WHEREAS, the federal grant amendment requires a local match in the amount of$38,627.00, which is available in the 460 water fund, and WHEREAS, installation of seismic control valves at City's water reservoirs is identified in the City's Comprehensive Water Plan (October 2015); and WHEREAS, it is in the best interest of the City to use the additional grant monies to finance the capital safety improvements to the City's Reservoir 1 site. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: Section 1. The Mayor is authorized to execute an amendment to the Project grant agreement between the City and the State of Washington for the receipt and utilization of additional hazard mitigation grant funds for the Project. Resolution No. 5382 September 17, 2018 Page 1 of 2 In addition, the Mayor is hereby authorized to execute any necessary additional amendments to the Project grant as may be needed for to complete the Project. Section 2. The Mayor is authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. This Resolution shall take effect and be in full force upon passage and signatures. Dated and Signed this \---V day of �,, 2018. CITY OF AUBURN • � 6, OR N CYBA�' ATTEST: c�v-,,,,, d Shawn Campbell, MMC, City Clerk APPROVED AS TO FORM: N' etai____ Steve Gross, City Attorney Resolution No. 5382 September 17, 2018 Page 2 of 2 BUDGET STATUS SHEET Project No: CP1709 Project Title: Reservoir 1 Seismic Control Valve Project Manager: Kevin Thompson 0 Amend Parametrix Task Initiation Date: _6123117 0 Resolution No.5382 Date:September 10,2018 Advertisement Date: 0 Contract Award Award Date: Q Change Order Approval 0 Contract Final Acceptance The"Future Years"column indicates the projected amount to be requested in future budgets. Funds Budgeted (Funds Available) Funding Prior Years 2017(actual) 2018 2019 Total Hazard Mitigation Grant* 22,368 423,022 445,390 460 Fund-Water 3,195 80,428 83,623 Total 25,563 503,450 529,013 *Includes Hazard Mitigation Grant amendment approval,through Resolution 5382,adding$270,390 to the total grant amount. Estimated Cost(Funds Needed) Activity Prior Years 2017(actual) 2018 2019 Total Design Engineering-City Costs 9,163 22,197 31,360 Design Engineering-Consultant Costs 16,400 40,501 56,901 Construction Estimate 0 148,480 200,000 348,480 Construction Contingency(15%) 0 0 52,272 52,272 Construction Engineering-City Costs 0 5,000 15,000 20,000 Construction Engineering-Consultant Costs 0 5,000 15,000 20,000 Total 25,563 221,178 282,272 529,013 Fund.Budget Status Prior Years 2017(actual) 2018 2019 Total *460 Funds Budgeted() (25,563) (503,450) 0 (529,013) 460 Funds Needed() 25,563 221,178 282,272 529,013 *460 Fund Project Contingency() 0 (282,272) 0 0 460 Funds Required 0 0 I 0 0 *(#)in the Budget Status Sections indicates Money the City has available. H:\PROJ\CP1709-Reservoir 1 Seismic Control Valve\4.00 City Council-Committee\Council Resolution-Budget Amendment\Sept 2018 Resolution\Budget Status Sheet.pdf.xis 1 of 1 N lIMIE land Br 6 N ikin 2nd % y o lir!" SSE rz ! E,r R rirm_________t., .r, T.,- , i„Ed t. 0 im r � ADg BU•y�NOTpN ina 8th VrNORTN 1011kj- .... -" 6th. ST- SE 14 les MIT RIM '' r ® 9th LES II WHITE 18 x COVE LAKE ST c)tilati sr PARK WELL 1 SE A YMCA a C) ®PROJECT 12th ST tE LOCATION SE RI Ai BI = SCENIC SE v a I^ y D R a 14TH sE SES t 14 FA 16th ST s� SE iii 17th ST SE NI ? r , 16th ST Mar, r' tip.sa �`aF'. r. C.5 18th S m VP` [i_ SE;27F.,_ 19th iTa a S _ �' ti w _ �i F pU7� ?a 20th `°` �" '0 I Mc -- MUCKLESHOOT N. EIN 21st SE / c:: ± WAUGH o;, _ PARK��••> / II :T a 24th ST SE • 24 4y. as 25th :T SE WELL 4 25th ST SE BB! re `,,, 26th sr se P ,,, Mt 4 BP Sth 'T SE �g V LAN • . _ �S�' ROTARY sr SE a G N PAIN i�1��. a 27th ST SE $ t., „� sr �,+� -► ¢ RIM0 4 y R 28th p �,r RIVE D 1_ _: oi; v y. ` 9th ST II , 1 so ,. 1 17 MAIN n'� AUBURN '� GAME .• FARM MI 32n• SE WELL 3A/38 ' 33rd ST SE N STUCK RIVER 351j t : N 36th r ' I t 38TH 0'o y ,E ,, 37th ST SE SPPARK • -� .' DPL 9E * RESERVOIR 1 SEISMIC CONTROL VALVE PROJECT CITY OF "WASHINGTON VICINITY MAP /At AUT 218 NOT TO SCALEVP ,