HomeMy WebLinkAbout5486 RESOLUTION NO. 5486
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING AND ADOPTING THE
MODIFICATION OF THE 2020-2025 TRANSPORTATION
IMPROVEMENT PROGRAM OF THE CITY OF AUBURN
WHEREAS, RCW 35.77.010 requires that the legislative body of each City
prepare and adopt a comprehensive Transportation Improvement Program for
the ensuing six years, but only after conducting a public hearing; and
WHEREAS, a public hearing to review the 2020-2025 Transportation
Improvement Program for the City of Auburn was held on January 21, 2020 at
the hour of 7:00 p.m. in the Council Chambers of the Auburn City Hall, pursuant
to notice published in the legal newspaper of the City of Auburn on January 9,
2020.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, RESOLVES as follows:
Section 1. The modifications to the 2020-2025 comprehensive
Transportation Improvement Program are adopted, which will be in substantial
conformity with the attached Exhibit "A."
Section 2. The Mayor is authorized to implement such administrative
procedures as may be necessary to carry out the directives of this legislation.
Section 3. This Resolution shall take effect and be in full force on
passage and signatures.
Resolution No. 5486
January 21, 2020
Page 1
Dated and Signed this 21st day of January, 2020.
CITY OF AUBURN
ANCY :L US, MA OR
ATTEST: APPROVED AS TO FORM:
Shawn Campbell, MMC, City Clerk Kendra Comeau, City Attorney
Resolution No. 5486
January 21, 2020
Page 2
Resolution 5486, Exhibit A
Page 1 of 2
Six Year Transportation Improvement Plan
TIP# P-3
ARTERIAL PRESERVATION FUND(105)
Project Title: 2nd Street SE Preservation STIP#AUB-N/A
Project No: TBD
Project Type: Preservation
Project Manager: TBD LOS Corridor ID#N/A
Description:
This project will reconstruct 2nd Street SE between A Street SE and Auburn Way S.The reconstruction will utilize full depth reclamation techniques.The project will also
remove fixed objects within the clear zone,remove barriers to ADA access,and install new LED street lighting.
Progress Summary:
Grant funding for this project was awarded by TIB in 2019.The design phase will be started in 2020 and construction completed during 2021.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2019 YE Budget Forecast Project Cost
Funding Sources: Prior to 2019 Estimate 2020 2021 2022 2023 2024 2025 Beyond 2025 Total Project Cost
Arterial Preservation Fund - - 46,000 347,502 - - - - - 393,502
Secured Grant - - 69,000 521,253 - - - - - 590,253
Other - - - - - - - - - -
Total Funding Sources: - - 115,000 868,755 - - - - - 983,755
Capital Expenditures:
Design - - 115,000 - - - - - - 115,000
Right of Way - - - - - - - - - -
Construction - - - 868,755 - - - - - 868,755
Total Expenditures: - - 115,000 868,755 - - - - - 983,755
1
Resolution 5486, Exhibit A
Page 2 of 2
Six Year Transportation Improvement Plan
TIP# N-10
ARTERIAL STREET FUND(102)
Project Title: M Street SE Sidewalk Improvements STIP#AUB-N/A
Project No: TBD
Project Type: Non-Motorized
Project Manager: TBD LOS Corridor ID#N/A
Description:
The project will design and construct sidewalks along the M Street SE corridor between Auburn Way S and 8th Street SE.The project will complete the missing sections
of sidewalk along the west side of M Street SE between Auburn Way S and 8th Street SE, and will complete the missing segments of sidewalk along the east side
between Auburn Way S and 12th Street SE.The project will construct approximately 2,000 linear feet of new sidewalk to match adjacent widths.The project will also
construct ADA compliant curb ramps, relocate existing utility poles and overhead signage to provide ADA access.
Progress Summary:
Grant funding for the project was awarded by TIB in 2019.The design phase will be started in 2020 and construction completed during 2021.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2019 YE Budget Forecast Project Cost
Funding Sources: Prior to 2019 Estimate 2020 2021 2022 2023 2024 2025 Beyond 2025 Total Project Cost
Unrestricted Street Revenue - - 14,980 209,562 - - - - - 224,542
Secured Grant - - 30,020 419,980 - - - - - 450,000
Traffic Impact Fees - - - - - - - - - -
Other - - - - - - - - - -
Total Funding Sources: - - 45,000 629,542 - - - - - 674,542
Capital Expenditures:
Design - - 45,000 - - - - - - 45,000
Right of Way - - - - - - - - - -
Construction - - - 629,542 - - - - - 629,542
Total Expenditures: - - 45,000 629,542 - - - - - 674,542
1
Prin
10/14/2019
TIP# P-3 - 2nd Street SE Preservation Map Created Date:
by City of Auburn eGlS
Imagery Date:May 2015
t
l
n
> �
i l�
} /i
4 f
I 1
s�
T 164W � :•;.
•
I r4
•
`
---- - -
t
L
r
1 . _._hr
- IJ ,T mm -
E MAIN ST s
ai' I in � I
3 >•
0 1 7ili
. "1 — t3l S3 SFr
U A
.
a 1 11
I
1x i ;� __ 0
_ _
10
ilaiim..........;j!
2x S o4WUQ 43
II1
ll
i
-- ,,4 4 + _ �-- _
'...._ ......, III " I _ 4TH ST SF__1 —_
N.,,,(\.,4„,. I) I fee' L , - 7
1 i:, ,,,-. „..... „:. 4..„.,..,., j ,,,,
munii _47.-7-_& .,. . 1,,.
, .,
-., two-_ 4 i t,.....4_4, 1 _4_4_,..4_,,,_1_, _i._._+—q-4--t--i--4--I-1--I--i----+–+--i I 1 1 A 1
666.7 0 333.3 666.7 Feet Information shown is for general reference
purposes only and does not necessarily
I in = 333 it I.4,��� p represent exact geographic or cartographic
NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet A data as mapped.The City of Auburn makes no
warranty as to its accuracy.
Printed Date: 12/18/2019
TIP# N-10 - M Street SE Sidewalk Improvements Map Created by City of Auburn eGlS
Imagery Date:May 2015
1 ,q
I W_
.-AIH.SI_..5E- - 4111 S T ,,I-
__ W -S 1 11-.S T SE A Ck
„
/y
7TH ST SE/
81NSTSF� ,
i
9TH ST.7_
+1 I-.
114 I yr- LES WYE I:
COMMUNITY
CAMPUS ►+
4 I I_1
1
12TH STSL , I
11TH S,T SE 17TH ST SE , ,11TH ST SE
19TH ST SL i., k?.)
GF
r, W
`u if,
4 > at UQV RN
: I , 1 ST SE
1,333.3 0 666.7 1,333.3 Feet Information shown is for general reference
1 I I purposes only and doesa hic necessarilyrcartographic
exact geographic or cartographic
NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet data as mapped.The City of Auburn makes
0
no warranty as to its accuracy.