Loading...
HomeMy WebLinkAbout5486 RESOLUTION NO. 5486 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, APPROVING AND ADOPTING THE MODIFICATION OF THE 2020-2025 TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF AUBURN WHEREAS, RCW 35.77.010 requires that the legislative body of each City prepare and adopt a comprehensive Transportation Improvement Program for the ensuing six years, but only after conducting a public hearing; and WHEREAS, a public hearing to review the 2020-2025 Transportation Improvement Program for the City of Auburn was held on January 21, 2020 at the hour of 7:00 p.m. in the Council Chambers of the Auburn City Hall, pursuant to notice published in the legal newspaper of the City of Auburn on January 9, 2020. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, RESOLVES as follows: Section 1. The modifications to the 2020-2025 comprehensive Transportation Improvement Program are adopted, which will be in substantial conformity with the attached Exhibit "A." Section 2. The Mayor is authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Section 3. This Resolution shall take effect and be in full force on passage and signatures. Resolution No. 5486 January 21, 2020 Page 1 Dated and Signed this 21st day of January, 2020. CITY OF AUBURN ANCY :L US, MA OR ATTEST: APPROVED AS TO FORM: Shawn Campbell, MMC, City Clerk Kendra Comeau, City Attorney Resolution No. 5486 January 21, 2020 Page 2 Resolution 5486, Exhibit A Page 1 of 2 Six Year Transportation Improvement Plan TIP# P-3 ARTERIAL PRESERVATION FUND(105) Project Title: 2nd Street SE Preservation STIP#AUB-N/A Project No: TBD Project Type: Preservation Project Manager: TBD LOS Corridor ID#N/A Description: This project will reconstruct 2nd Street SE between A Street SE and Auburn Way S.The reconstruction will utilize full depth reclamation techniques.The project will also remove fixed objects within the clear zone,remove barriers to ADA access,and install new LED street lighting. Progress Summary: Grant funding for this project was awarded by TIB in 2019.The design phase will be started in 2020 and construction completed during 2021. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Activity: 2019 YE Budget Forecast Project Cost Funding Sources: Prior to 2019 Estimate 2020 2021 2022 2023 2024 2025 Beyond 2025 Total Project Cost Arterial Preservation Fund - - 46,000 347,502 - - - - - 393,502 Secured Grant - - 69,000 521,253 - - - - - 590,253 Other - - - - - - - - - - Total Funding Sources: - - 115,000 868,755 - - - - - 983,755 Capital Expenditures: Design - - 115,000 - - - - - - 115,000 Right of Way - - - - - - - - - - Construction - - - 868,755 - - - - - 868,755 Total Expenditures: - - 115,000 868,755 - - - - - 983,755 1 Resolution 5486, Exhibit A Page 2 of 2 Six Year Transportation Improvement Plan TIP# N-10 ARTERIAL STREET FUND(102) Project Title: M Street SE Sidewalk Improvements STIP#AUB-N/A Project No: TBD Project Type: Non-Motorized Project Manager: TBD LOS Corridor ID#N/A Description: The project will design and construct sidewalks along the M Street SE corridor between Auburn Way S and 8th Street SE.The project will complete the missing sections of sidewalk along the west side of M Street SE between Auburn Way S and 8th Street SE, and will complete the missing segments of sidewalk along the east side between Auburn Way S and 12th Street SE.The project will construct approximately 2,000 linear feet of new sidewalk to match adjacent widths.The project will also construct ADA compliant curb ramps, relocate existing utility poles and overhead signage to provide ADA access. Progress Summary: Grant funding for the project was awarded by TIB in 2019.The design phase will be started in 2020 and construction completed during 2021. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Activity: 2019 YE Budget Forecast Project Cost Funding Sources: Prior to 2019 Estimate 2020 2021 2022 2023 2024 2025 Beyond 2025 Total Project Cost Unrestricted Street Revenue - - 14,980 209,562 - - - - - 224,542 Secured Grant - - 30,020 419,980 - - - - - 450,000 Traffic Impact Fees - - - - - - - - - - Other - - - - - - - - - - Total Funding Sources: - - 45,000 629,542 - - - - - 674,542 Capital Expenditures: Design - - 45,000 - - - - - - 45,000 Right of Way - - - - - - - - - - Construction - - - 629,542 - - - - - 629,542 Total Expenditures: - - 45,000 629,542 - - - - - 674,542 1 Prin 10/14/2019 TIP# P-3 - 2nd Street SE Preservation Map Created Date: by City of Auburn eGlS Imagery Date:May 2015 t l n > � i l� } /i 4 f I 1 s� T 164W � :•;. • I r4 • ` ---- - - t L r 1 . _._hr - IJ ,T mm - E MAIN ST s ai' I in � I 3 >• 0 1 7ili . "1 — t3l S3 SFr U A . a 1 11 I 1x i ;� __ 0 _ _ 10 ilaiim..........;j! 2x S o4WUQ 43 II1 ll i -- ,,4 4 + _ �-- _ '...._ ......, III " I _ 4TH ST SF__1 —_ N.,,,(\.,4„,. I) I fee' L , - 7 1 i:, ,,,-. „..... „:. 4..„.,..,., j ,,,, munii _47.-7-_& .,. . 1,,. , ., -., two-_ 4 i t,.....4_4, 1 _4_4_,..4_,,,_1_, _i._._+—q-4--t--i--4--I-1--I--i----+–+--i I 1 1 A 1 666.7 0 333.3 666.7 Feet Information shown is for general reference purposes only and does not necessarily I in = 333 it I.4,��� p represent exact geographic or cartographic NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet A data as mapped.The City of Auburn makes no warranty as to its accuracy. Printed Date: 12/18/2019 TIP# N-10 - M Street SE Sidewalk Improvements Map Created by City of Auburn eGlS Imagery Date:May 2015 1 ,q I W_ .-AIH.SI_..5E- - 4111 S T ,,I- __ W -S 1 11-.S T SE A Ck „ /y 7TH ST SE/ 81NSTSF� , i 9TH ST.7_ +1 I-. 114 I yr- LES WYE I: COMMUNITY CAMPUS ►+ 4 I I_1 1 12TH STSL , I 11TH S,T SE 17TH ST SE , ,11TH ST SE 19TH ST SL i., k?.) GF r, W `u if, 4 > at UQV RN : I , 1 ST SE 1,333.3 0 666.7 1,333.3 Feet Information shown is for general reference 1 I I purposes only and doesa hic necessarilyrcartographic exact geographic or cartographic NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet data as mapped.The City of Auburn makes 0 no warranty as to its accuracy.