HomeMy WebLinkAbout6765 ORDINANCE NO. 6765
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AMENDING CHAPTERS 3.10
AND 3.12 OF THE AUBURN CITY CODE RELATING TO
PUBLIC CONTRACTING AND PURCHASING
WHEREAS, after reviewing the City Code related to Public Contracting and
Purchasing, it is appropriate to amend contract authorization limits consistent with
Washington state law;
WHEREAS, City staff determined that Chapters 3.10 and 3.12 of the Auburn City
Code ("ACC") require updates to the language used for consistency with the remainder
of the ACC;
WHEREAS, City staff recommend consolidating subsections within former ACC
3.10.025 for clarity;
WHEREAS, ACC 3.10.028 is revised to update current City processes for capital
projects;
WHEREAS, the emergency purchasing authorizations are modified for
consistency with Chapters 39.04 and 38.52 RCW;
WHEREAS, it is also appropriate to amend the City Code to make it consistent
with state law and reflect current City Council practices.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, DO ORDAIN as follows:
Section 1. Amendment to City Code. Chapters 3.10 and 3.12 of the Auburn
City Code are amended to read as shown in Exhibit A.
Ordinance No. 6765
March 19, 2020
Page 1 of 2 Rev.2019
Section 2. Implementation. The Mayor is authorized to implement those
administrative procedures necessary to carry out the directives of this legislation.
Section 3. Severability. The provisions of this ordinance are declared to be
separate and severable. The invalidity of any clause, sentence, paragraph, subdivision,
section, or portion of this ordinance, or the invalidity of the application of it to any person
or circumstance, will not affect the validity of the remainder of this ordinance, or the validity
of its application to other persons or circumstances.
Section 4. Effective date. This Ordinance will take effect and be in force five
days from and after its passage, approval, and publication as provided by law.
INTRODUCED:��
PASSED:( ,,..�
APPROVED:
CIC � 'CKUS, M OR
ATTEST: APPROVED AS TO FORM:
Shawn Campbell, MMC, City Clerk Kendra Comeau, City Attorney
Published: Livrt a, inn 64,01 t fa-v/0
Ordinance No. 6765
March 19, 2020
Page 2 of 2 Rev.2019
Auburn City Code Page 1 of 13
Chapter 3.10
PURCHASING POLICY
Sections:
3.10.010 Purohaae ordor.
3.10.0210 Contract authorization limits.
3.10.0203 ontract Amendments.
. . • .
.. ..
3.10.029-030 Competitive negotiations.
. .
3.10.0450 Emergency purchases–Authorization.
3.10.0560 Sole source purchases of equipment and materials–Authorization.
3.10.010 Purchase order.
• .. -
•. ,
Ord.6117§ 1,2008;Ord.5190§ 1,2000.)
3.10.012-0 Contract authorization limits.
A. The following authorization approval limits shall apply for all city contracts. For contracts with total dollar
amounts up to$10,000,authority rests at the department director(or designee)level.All contracts over
$10,000,up to$3100,000,and contracts that have been individually and separately listed in the city's annual
budget shall be approved and signed by the mayor(or designee).For all unbudgeted expenditures not
individually and separately listed in the city's annual budget in excess of$3100,000,approval shall be
obtained from the mayor and the city council.
B. For purposes of this section,a contract is"individually and separately listed"if it is:
1. Expressly identified,in writing,defining or describing the expenditure or project as a line-item in the
budget;
2. Identified by express reference to the CFP or TIP project,or other specific project in the budget.
C. If a contract does not provide for cash consideration,the responsible department will estimate the value of
the contract as if there was cash consideration.Authorization authority will be based on that estimated value.
Ordinance#6765,Exhibit A
Auburn City Code Page 2 of 13
D. If a contract does not provide for cash consideration,but requires the city to indemnify the other party,the
responsible department, in consultation with the risk manager,shall determine the value of the city's possible
indemnification risk.Authorization authority will be based on that estimated value.
E. Unless the value is$ 00050,000 or less,or unless required for a budgeted project,or unless otherwise
authorized in this code or otherwise expressly authorized by the city council,all contracts that convey an
interest in real estate shall be approved by the city council.
(Ord.6679§ 1,2018;Ord.6528§2,2014;Ord.6147§ 1,2008;Ord.5778§2,2003;Ord.5490§ 1,2000.)
3.10.020 . . . . - . - - .Contract Amendments
A. ' _ ••. . . ._ - . - . - - - •- ' •_ - • -- • ._. .
•
1"• • _, • _. _• . _ . .. . - .. __, • . Z.••, . . _. _
testing.
2.03.030 and 3.10.020. Except as specified in Section B herein,Council action will be required to authorize
amendments to contracts that are either not included in the budget or exceed the approved budget as follows:
1. When the original contract is under$5100,000 and was not included in the budget and the total of the
amendment(s)will increase the total contract amount to more than$5100,000.
2. When the original contract is$5100,000 or more and was not included in the budget and the total of
the amendment(s)will increase the total contract amount by more than$5100,000 and the amendment(s)
are also not budgeted.
3. When the original contract was included in the budget and the total of the amendment(s)to the
contract will increase the total contract amount to more than$5100,000 above the amount included in the
budget.
C. Council action is required for the initial authorization of contracts for on call services. For contracts
Ordinance#6765,Exhibit A
Auburn City Code Page 3 of 13
3.10.026 Public work projects Contract amendment Conditions.
AB. C trued•n contracts Which have been initially by the city council or the mayor or mayor's
designee may be amended_<iclininistrativel b the mayor/designees by change order,letter of instruction,or
other - all a••ro•ri•te form u• to the : • - - authorized total maximum con r. amounts s-t fo h
below:
1. Awarded contract amount plus up to 20 percent of authorized contingency for contracts originally
awarded for up to$200,000.
2. Awarded contra t amount •lu • to 15 •-r ent or '.40 000 of authorized contin.enc whi h-v-r i
greater,for contracts originally awarded for between $200,000 and$500,000.
3. Awarded contract amount plus up to 10 percent or$75,000 of authorized contingency whichever is
greater, for contracts originally awarded for between$500,000 and$1,000,000.
4. Awarded contract amount plus un to five percent or$100,000 of authorized contingency,whichever is_
greater,for contracts originally awarded for between$1,000,000 and$5,000,000,
5. Awarded contract amount us up to two and one-half percent or$250,000 of authorized contingency,_
whichever is greater, for contracts originally awarded for over$5,000,000.
Council approval is required to increase the authorized total maximum contract beyond the limits set forth
above.
. .-
- . . . . ... . - s\-/•:Pf•:�•...0�.:.7.f•....-...��.�lal.,�,.... ...,..�7.all!\47t!:.::.!ll =1.-Z!S4i1:� a:.
811,.1.17 ..S<•-1. .!\4!\-1!Si•f:\:•••.:I:l�.t!f S}:j !S.\lRf1 1,2-.72!ilZf_\\Z\4S19My:!•11i4.7i4(!kAI•!:•�:1!}R�-L
obtained fro th if\-t:ocmcil,
C. No ad • 'strati e action is authorized,the result of which would be to amend a contract to increase the
:1h.;•srn--l�>;a1%• •:.:L)J11►-ze llzc:\siz:ll:a.s:..e:A Wa•r:\9:11.1:1.-1!izWA;L:Aunt ;COL, ,
1.y the city c cit
(Ord.6679§2,2018;Ord.6147§ 1,2008;Ord.5640§ 1,2002;Ord.5525 § I.2001,Ord.5490§ 1,2000.)
3.10.026 Public work projects Contfaet-amendment Conditions.
:.
Ordinance#6765,Exhibit A
Auburn City Code Page 4 of 13
. .-_ . .- _- • - - _ _. : • -$10,000-v-h-iehe er i rentor. for eontraett-
.. ..
•„t: :.: • - - „ ... • '
•
• .. �i
• _ . . ' _ :: •:- "'oh would be to am.;nd a contract to inerca.:e the
(Ord.6679§3,2018;Ord.6117§ I,2008;Ord.5525§ I,2001.)
• .. - _.. .
.. - - - ::,"•:--, .. , .- _ - - - - _. _. -: ;•.:
e. :. : • . •. . . II.. •.'. .• ...
3.10.029030 Competitive negotiations.
Competitive negotiations can be used as an alternative to the competitive bidding procedures for the
acquisition of electronic data processing and telecommunications systems,energy-saving or energy-related
equipment or services,or when it is determined in writing that the use of competitive bidding is neither
practicable nor advantageous to the city of Auburn consistent with RCW 39.04.270._
"Electronic data processing"includes,but is not limited to,systems which comprise a combination of
equipment or units to provide input of source data,and storage and processing of data and output in
predetermined form,including a central processing unit(CPU)or main frame. (Ord.6147§ 1,2008;Ord.5490§ 1,
2000.)
Ordinance#6765,Exhibit A
Auburn City Code Page 5 of 13
3.10.030 Administrative procedures authority.
directions of this legislation. (Ord.614-7§ 1,2008;Ord.5490§ 1,2000.)
3.10.0430 Emergency purchases—Authorization.
A.The mayor is hereby-authorized to make emergency purchases or enter into emergency contracts as
permitted by RCW 39.04.280 and Chapter 38.52 RCW in unforeseen circumstances beyond the control of the
city that either: (a)Present a real,immediate threat to the proper performance of essential functions;or(b)will
likely result in material loss or damage to property,bodily injury,or loss of life if immediate action is not
taken.,such emergencies being:
D. In other cases as allowed by state law._
B. The Mayor will declare an emergency in writing authorizing a purchase or contract without competitive bid
or negotiation.The declaration must be entered of record not later than two weeks following the award of the
contract. The declaration shall include the factual basis for the emergency purchase or contract,which shall be
filed with the City Clerk and open to public inspection.
-(Ord.6147§ 1,2008;Ord.5525§ 1,2001.)
3.10.0560 Sole source purchases of equipment and materials—Authorization.
The mayor is hereby authorized to waive competitive bidding requirements for purchases of equipment or
material when the purchase is limited to a single source of supply as determined by the city engineer,pursuant
to RCW 39.04.280.A"single source of supply"his defined as either(A)only one available brand,
manufacturing company,or vendor from which the city may purchase the needed material;or(B)city engineer
has determined that it is in the public's best interest to purchase only one particular brand,type,or model of
material for maintenance and/or quality performance reasons. (Ord.6679§9,2018.)
Ordinance#6765,Exhibit A
Auburn City Code Page 6 of 13
Chapter 3.12
PUBLIC CONTRACTS
Sections:
3.12.010 Definitions.
3.12.020 Bid solicitation.
3.12.030 Bid opening.
3.12.040 Rejection of bids.
3.12.050 Disqualification of bidders.
3.12.060 Award.
3.12.070 Contractor's bond.
3.12.080 Contractor evaluation form.
3.12.090 Small works roster.
3.12.100 Limited public works process.
3.12.110 On-call contracting.
3.12.120 Publication,printing,and notices.
For statutory provisions requiring public bidding on certain public contracts of second-class cities,see RCW 35.23.352;for
provisions making RCW 35.23.352 applicable to code cities,see RCW 35A.40.200 and 35A.65.010.
Prior legislation: 1957 code§ 1.30.030;Ords.3689 and 4327.
3.12.010 Definitions.
The following definitions shall apply throughout this chapter:
A. "Public work"shall be as defined in RCW 39.04.010,as currently enacted or hereinafter amended.All
public work,including maintenance,when performed by contract shall comply with the provisions of Chapter
39.12 RCW.A"public work"shall include all scope of work necessary to result in a complete operating
facility.The total scope of work necessary will not be subdivided for the purpose of avoiding public bidding.
B. "Contract"shall mean a contract in writing for the execution of public work for a fixed or determinable
amount duly awarded in conformance with this code.
C. "Improvements"refers to a public work.
D. "Responsible bidder"means a contractor who meets the criteria in RCW 39.04.350 and the requirements
of ACC 3.12.050.(Ord.6545§ 1,2014;Ord.4924§2, 1997;Ord.4581 §2, 1992.)
Ordinance#6765,Exhibit A
Auburn City Code Page 7 of 13
3.12.020 Bid solicitation.
A. Formal Advertisement Required. Except as otherwise authorized in Chapters 39.04 and 39.28 RCW or
RCW 35.23.352,relating to emergency public works,or other applicable general state law,as now enacted or
as hereafter amended,all public work and improvements shall be done by contract pursuant to public notice
and call for competitive bids whenever the estimated cost of such public work or improvement,including the
cost of materials,supplies,equipment and labor,will exceed the limits for competitive bid as stated in RCW
35.23.352 as now enacted or as hereafter amended,provided the city may use a small works roster pursuant to
RCW 35.23.352.The breaking of any project into units or accomplishing any projects by phases is prohibited
if it is done for the purpose of avoiding the maximum dollar amount of a contract that may be let using the
small works roster process.
Where formal bidding is required,a call for bids shall be issued in accordance with the provisions herein
before any contract is let for the performance of any public work.
B. Formal Advertising Procedures. For projects requiring formal advertisement per this section,a notice of a
call for bids,stating the nature of the contract to be let and the time on or before which sealed bids for the same
must be filed with the city clerk,shall be given by posting notice thereof on the bulletin board in the lobby of
City Hall.The notice shall also be published in the official newspaper,and a newspaper of general circulation
most likely to bring responsive bids,at least 13 days prior to the last date upon which bids will be received.
The notice shall generally state the nature of the work to be done,where the plans and specifications may be
seen or obtained,and a specified hour and date when such bids shall be opened,and that the sealed bids be
filed with the city clerk within the time specified therein.The clock within the city clerk's office shall be the
official time used for determining receipt of bids.
C. Council Approval. Issuance of solicitations for bids shall require city council consent approval unless the
solicitation is for a project identified in the city's current approved budget at the time of bid solicitation or if
the estimated contract amount is within the budget authority of the mayor as provided in Chapter 3.10 ACC.
D. For the purposes of determining whether or not bidding contractors must declare the names of
subcontractors for certain work based on the amount of the contractor's expected costs per RCW 39.30.060,
the expected costs of the contract shall be the engineer's estimate of the contract work plus the amount of any
work added by addenda to the bid documents,plus any applicable sales tax computed at the rate in place at the
time of bid opening.
E. For contracts not required to be formally advertised,the city shall issue an invitation to bid,request for
quote or other form as determined appropriate by the city engineer.Nonformal advertised contracts may
conform to the small works roster or limited public works process described in RCW 39.04.155 or other
procurement process as deemed appropriate by the city engineer.(Ord.6679§4,2018;Ord.6545§ 1,2014;Ord.
5866§ 1,2004;Ord.4924§2, 1997;Ord.4581 §2, 1992.Formerly 3.12.011 and 3.12.020.)
Ordinance#6765,Exhibit A
Auburn City Code Page 8 of 13
3.12.030 Bid opening.
A. For contracts utilizing a formal advertisement process per ACC 3.12.020,bids shall be opened and
publicly read aloud by the city clerk at the time and location as set forth in the contract advertisement.
B. For contracts not utilizing a formal advertisement process,the city engineer shall determine whether a
public reading of the bids is required and indicate this in the new invitation to bidders or request for quote
documents. (Ord.6679§5,2018;Ord.6545§ I,2014.)
3.12.040 Rejection of bids.
The city shall have the power to reject any or all bids,to determine and to waive any irregularities or
informalities that do not materially affect the substance of the bid itself,and to make further calls for bids in
the same manner as the original call;or,if in its judgment the project can be done by the city at less cost than
the lowest bid submitted,it may do so without making further call for bids or awarding any contract therefor.
If no bid is received on the first call,the city may re-advertise and make a second call,or may enter into a
contract by negotiation without further calls,or may purchase the supplies,material or equipment and perform
such work or improvement with in-house forces. (Ord.6545§ 1,2014.)
3.12.050 Disqualification of bidders.
A bidder may be deemed not responsible and the proposal rejected,unless contract terms specify otherwise,if:
A. The bidder does not meet the mandatory bidder responsibility criteria in RCW-39.04.350-1(1)as it is now
or as amended;or
B. Evidence of collusion exists with any other bidder or potential bidder.Participants in collusion will be
restricted from submitting further bids;or
C. The bidder,in the opinion of the city,is not qualified for the work or to the full extent of the bid,or to the
extent that the bid exceeds the authorized prequalification amount as may have been determined by a
requalification of the bidder;or
D. An unsatisfactory performance record exists based on past or current contracting work for the city or for
others,as judged from the standpoint of conduct of the work;workmanship;or progress;affirmative action;
equal employment opportunity practices;termination for cause;of disadvantaged business enterprise,minority
business enterprise,or woman's business enterprise utilization;or
E. An unsatisfactory safety record exists based on past or current contracting work;or
Ordinance#6765,Exhibit A
Auburn City Code Page 9 of 13
F. There is uncompleted work,with the city or others,which in the opinion of the city might hinder or
prevent the prompt completion of the work bid upon;or
G. The bidder failed to settle bills for labor or materials on past or current contracts,unless there are
extenuating circumstances acceptable to the city;or
H. The bidder has failed to complete a written public contract or has been convicted of a crime arising from a
previous public contract,unless there are extenuating circumstances acceptable to the city;or
I. The bidder is unable,financially or otherwise,to perform the work,in the opinion of the city;or
J. A bidder is not authorized to do business in the state of Washington;or
K. More than one proposal is submitted for the same project by a bidder under the same or different names;or
L. Any other reasons deemed proper by the city.(Ord.6545§ 1,2014;Ord.4924§2, 1997;Ord.4581 §2, 1992.
Formerly 3.12.022.)
3.12.060 Award.
_ . _ . . . . . . - -- . - . .. , :; e . . , . Reserved
3.12.070 Contractor's bond.
A. Whenever the city shall contract with any person or corporation to do any work,the city shall require the
person or persons with whom such contract is made to make,execute,and deliver to the city clerk a sufficient
bond,with a surety company as surety,conditioned that such person or persons shall faithfully perform all the
provisions of such contract and pay all laborers,mechanics,subcontractors and material suppliers,and all
persons who supply such person or persons,or subcontractors,with provisions and supplies for the carrying on
of such work. Said security company in accordance with RCW 39.08.010 shall be bound by the laws of the
state of Washington and subject to the jurisdiction of the state of Washington.The provisions of RCW
39.08.010 through..39.08.030 shall not apply to any money loaned or advanced to any such contractor,
subcontractor or other person in the performance of any such work.
B. For contracts using the limited public works process,the city may waive the payment and performance
bond requirements of Chapter 39.08 RCW and retainage requirements of Chapter 60.28 RCW,thereby
assuming the liability for the contractor's nonpayment of laborers,mechanics,subcontractors,materialmen,
Ordinance#6765,Exhibit A
Auburn City Code Page 10 of 13
suppliers,and taxes imposed under RCW Title 82 that may be due from the contractor for the limited public
works project;however,the city shall have the right of recovery against the contractor for any payments made
on the contractor's behalf.The city engineer shall have the authority to waive the payment and performance
bond requirements and retainage requirements based on their evaluation of the project and determination of
risk.
C. On contracts of$150,000 or less,upon request by the contractor,the city may,in lieu of the bond,retain
10 percent of the contract amount for a period of 30 days after the date of final acceptance,or until receipt of
all necessary releases from the Department of Revenue,Employment Security Department,and the
Department of Labor and Industries,receipt of all affidavits of wages paid for the prime and subcontractors,
and settlement of any liens filed under Chapter 60.28 RCW,whichever is later.
D. For the purposes of determining the time frame required for notices of claims against retainage and release
of retainage,the city engineer shall have the authority to take affirmative action to determine that a contract is
complete and to accept the contract work.(Ord.6679§7,2018;Ord.6545§ 1,2014;Ord.5866§ 1,2004;Ord.4924§2,
1997;Ord.4581 §2, 1992.Formerly 3.12.040.)
Note: See RCW 39.08.010.
3.12.080 Contractor evaluation form.
A. After work is performed by a contractor,the city shall evaluate the contractor's work performance as to
certain criteria but not limited to the following:
1. Progress of the work,including:
a. The ability,capacity and skill of the contractor to perform the work;
b. Whether the contractor performed the work promptly and within the time specified without delay
or interference;
2. Quality of the work;
3. Equipment;
4. Administration/management/supervision;
5. Coordination and control of subcontractors;
6. Whether the contractor provided a safe working environment for their employees and the general
public;
7. Whether the contractor stood behind their service or work performed.
Ordinance#6765,Exhibit A
Auburn City Code Page 11 of 13
B. A copy of the contractor evaluation form will be sent to the contractor and any contractor responses will be
added to the evaluation.The contractor evaluation form may be used by the city to determine whether or not
the contractor is a responsible bidder who should be considered for further public works projects.The city may
also complete evaluations for subcontractors utilizing the same process described herein for contractors and
then utilize the subcontractor evaluations to determine bidder responsibility and in determining whether or not
to approve a contractor's request to sublet. (Ord.6679§8,2018;Ord.6545§ 1,2014;Ord.4924§3,1997.Formerly
3.12.025.)
3.12.090 Small works roster.
A. . •. ' - .-• . -•--••: . . .. - .. .' .•-_ - - ,
.. . , • !, .
B•.—Number of Small Work Rosters. The city may create a single general small works roster,or may create a
small works roster for different specialties or categories of anticipated work. Said small works rosters may
make distinctions between contractors based upon different geographic areas served by the contractor.
EB. Contractors on Small Works Roster(s). The small works roster shall consist of all responsible contractors
who have requested to be on the roster(s),and where required by law are properly licensed or registered to
perform contracting work in the state of Washington.Contractors desiring to be placed on a roster or rosters
must keep current records of any applicable licenses,certificates,registrations,bonding,insurance,or other
appropriate matters on file with the city as a condition of being placed on a roster or rosters.The city reserves
the right to exclude a contractor from the roster if they are deemed to be not responsible or to remove a
contractor from the roster at such time as the city becomes aware of specific facts that would deem the
contractor to be not responsible.
DC. Publication of Small Works Roster.
1. At least once a year,the city shall publish in a newspaper of general circulation within the jurisdiction
a notice of the existence of the roster or rosters and solicit the names of contractors for such roster or
rosters.Responsible contractors shall be added to an appropriate roster or rosters at any time that they
submit a written request and necessary records.
2. The city will utilize the statewide electronic database developed and maintained by the Municipal
Research and Services Center of Washington(MRSC Rosters)or successor agency.
Ordinance#6765,Exhibit A
Auburn City Code Page 12 of 13
ED. Quotations for Small Works Roster Projects. The city shall obtain telephone,written or electronic
quotations for public works contracts from contractors on the appropriate small works roster(s)to assure that a
competitive price is established and to award contracts to the lowest responsible bidder,as defined in RCW
39.04.010 and 39.04.350,and ACC 3.12.050,as follows:
1. A contract awarded from a small works roster need not be advertised. Invitations for quotations shall
include an estimate of the scope and nature of the work to be performed as well as materials and
equipment to be furnished.However,detailed plans and specifications need not be included in the
invitation.This subsection does not eliminate other requirements for architectural or engineering
approvals as to quality and compliance with building codes.
2. Quotations may be invited from all appropriate contractors on the appropriate small works roster(s).
As an alternative,quotations may be invited from at least five contractors on the appropriate small works
roster(s)who have indicated the capability of performing the kind of work being contracted,in a manner
that will equitably distribute the opportunity among the contractors on the appropriate roster.
3. For the purpose of this section,"equitably distribute"means that the city may not favor certain
contractors on the appropriate small works roster(s)over other contractors on the appropriate roster(s)
who perform similar services.At the time bids are solicited,the city shall not inform a contractor of the
terms or amount of any other contractor's bid for the same project.
4. A written record shall be made by the city of each contractor's bid on the project and of any
conditions imposed on the bid.Immediately after an award is made,the bid quotations obtained shall be
recorded,open to public inspection,and available by telephone inquiry. (Ord.6545§ 1,2014;Ord.5866§ 1,
2004;Ord.4924§2, 1997;Ord.4581 §2, 1992.Formerly 3.12.030,3.12.032 and 3.12.034.)
3.12.100 Limited public works process.
If a work,construction,alteration,repair,or improvement project does not exceed the current statutory limit in
RCW 39.04.155(3),the city may award such a contract using the limited public works process.
Public works projects awarded under the limited public works process are exempt from the other requirements
of the small works process provided under ACC 3.12.090.
For limited public works projects,the city shall solicit electronic or written quotations from a minimum of
three contractors from the appropriate small works roster and shall award the contract to the lowest responsible
bidder,as defined under RCW 39.04.010 and 39.04.350,and ACC 3.12.050.After an award is made,the
quotations shall be open to public inspection and available by electronic request.
For limited public works projects,the city may waive the payment and performance bond requirements of
Chapter 39.08 RCW and the retainage requirements of Chapter 60.28 RCW,thereby assuming the liability for
the contractor's nonpayment of laborers,mechanics,subcontractors,materialmen,suppliers,and taxes imposed
Ordinance#6765,Exhibit A
Auburn City Code Page 13 of 13
under RCW Title 82 that may be due from the contractor for the limited public works project.However,the
city shall have the right of recovery against the contractor for any payments made on the contractor's behalf.
The city shall maintain a list of the contractors contacted and the contracts awarded during the previous 24
months under the limited public works process, including the name of the contractor,the contractor's
registration number,the amount of the contract,a brief description of the type of work performed,and the date
the contract was awarded.(Ord.6545§ 1,2014;Ord.5866§ 1,2004.Formerly 3.12.036.)
3.12.110 On-call contracting.
The city may use unit priced conrr, ct, dc.eribed in RCW 35.21 152 or a job order contractor as described in
RCW 39.10.420 and following the procedures as identified in Chapter 39.10 RCW. (Ord.6545§ 1,2014.)
3.12.120 Publication, printing, and notices.
The city shall comply with the requirements of state law for publication,printing and notices as now exist or
hereafter amended and relating to all public printing for the city and the publication of legal notices by the city.
(Ord.6545§ 1,2014;Ord.4581 §2, 1992.Formerly 3.12.050.)
Ordinance#6765,Exhibit A