HomeMy WebLinkAbout5561 RESOLUTION NO. 5561
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, RELATED TO THE COAL
CREEK SPRINGS TRANSMISSION MAIN REPLACEMENT
PROJECT; AUTHORIZING AN APPLICATION FOR THE
DRINKING WATER STATE REVOLVING FUND LOAN AND,
IF APPROVED, ACCEPTANCE AND EXPENDITURE OF
LOAN PROCEEDS
WHEREAS, the City of Auburn ("City"), Washington, provides drinking water to its
customers within its water service area from its own water supplies; and
WHEREAS, Coal Creek Springs ("CCS") is the City's largest source of supply of
drinking water, accounting for approximately 60 percent of the total water produced for
the City; and
WHEREAS, water from CCS is conveyed to Auburn's Howard Road Corrosion
Control Facility through a 24-inch diameter transmission main ("the CCS Transmission
Main"), portions of which were reconstructed in 1964; and
WHEREAS, approximately 870 feet of the CCS Transmission Main consists of
steel pipe originally constructed in 1925 that crosses under the White River; and
WHEREAS, a 2014 evaluation of the CCS Transmission Main identified concerns
about the structural integrity of the steel pipe under the White River, and failure of the
CCS Transmission Main would be catastrophic for the City's water supply; and
WHEREAS, the City intends to construct a replacement transmission pipeline over
the White River suspended from a bridge as described in the City's Comprehensive Water
Plan adopted in October of 2015; and
Resolution No. 5561
November 3, 2020
Page 1 of 3 Rev.2018
WHEREAS, the Drinking Water State Revolving Fund ("DWSRF") makes funds
available to drinking water systems to pay for infrastructure improvements; and
WHEREAS, the infrastructure improvements funded by the DWSRF covers capital
improvements that promote public health and increase compliance with drinking water
regulations; and
WHEREAS, the City wishes to apply for a DWSRF loan to replace the CCS
Transmission Main crossing the White River.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, RESOLVES as follows:
Section 1. The Mayor is authorized to apply for a DWSRF loan for the Coal
Creak Springs Transmission Main replacement project.
Section 2. If the City's application is approved, the Mayor is authorized to enter
into a DWSRF loan agreement with the State, to accept the loan, and to enter into
contracts as necessary to expend the loan proceeds for program purposes.
Section 3. The Mayor is authorized to implement those administrative
procedures necessary to carry out the directives of this legislation, including proposing
budget amendments if necessary to account for the loan proceeds.
Resolution No. 5561
November 3, 2020
Page 2 of 3 Rev. 2018
Section 4. This Resolution will take effect and be in full force on passage and
signatures.
Dated and signed this 16th day of November, 2020.
CITY OF AUBURN
ANC 13' CKUS, MAYOR
ATTEST: APPROVED AS TO FORM:
c -.,-n
tx.).-\
Shawn Campbell, MM ClerkKendra Comeau, City Attorney
Resolution No. 5561
November 3, 2020
Page 3 of 3 Rev.2018
020
Coal Creek Springs Transmission Main Replacement Printedr Date:ceCity ofA
Map Created by City of Auburn eG15
Imagery Date:May 2015
-
11
r u iff '
ll
)♦QIII�I/i t
Mali _1 iii
rieseht
• I III / gi :i iSC'
^: I III r - iiimicw__ I mall 0 4
-, if I ! j I!El rits:).- ',. t
.146
: ..1
'' Ai k A 11101,4,:a fr ri.„../ 11.--gli ---- • . . .
si...../.....1:.
II_
\ .1111111: _,r
<
Ia
gait illi 1I 1i 1 IIi,III1 .rj
Mi��ii�1i11.I1 IN _TI ggiej a 1' s .o.i'
:Rf�— r�y.1 .
I n i,
�-IL Game Farm Park1 r
"'"\\\\
/ 1.1-wi , ‘ - , , i".,ki-r-, _
�n
ro.....
�"-'fa' jai.. Pro ect Location
_ =1
klEr,04,i \ ci
I Game Farm ,),
,,, Wilderness T"'"'"
r';r
6• M
N
qc
" (( � ► , •
5 f . . -4,4
I
. . \44,- ...,.. , , ,
"r
_ ._Ill. . 1�`f(-••J �~ \•5\ p
JI
. ,
r ,
. s ,-..., til
; -
10,666.7 0 5,333.3 10,666.7 Feet Information shown is for general reference
I I purposes a d does
c necessarily
represent exact geographic or cartographic
NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet data as mapped.The City of Auburn makes
no warranty as to its accuracy.