HomeMy WebLinkAboutUntitled RESOLUTION NO. 5600
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF AUBURN, WASHINGTON, AUTHORIZING THE
MAYOR TO EXECUTE AND ADMINISTER AN
AGREEMENT ACCEPTING TWO GRANTS FROM THE
WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION FOR THE AUBURN WAY S (SR
164) SOUTHSIDE SIDEWALK PROJECT AND THE
RIVERWALK DRIVE SE NON-MOTORIZED
IMPROVEMENTS PROJECT
WHEREAS, the City of Auburn's adopted Comprehensive Transportation Plan
establishes policies to build the City's non-motorized transportation system to enhance
and encourage pedestrian travel in Auburn; and
WHEREAS, Riverwalk Drive SE between Auburn Way S and Howard Road has a
gap in non-motorized facilities; and
WHEREAS, the City applied to the Washington State Department of Transportation
(WSDOT) for, and has been awarded, a competitive grant to partially fund a project that
will construct sidewalk on the south side of Riverwalk Drive SE to fill the gap between
Auburn Way S and Howard Road (Riverwalk Drive Project) in the amount of $635,000;
and
WHEREAS, an estimated $665,000 of local match funding is required to fully fund
the Riverwalk Drive Project; and
WHEREAS, the Riverwalk Drive Project is included in the City's current
Transportation Improvement Program (TIP) which shows anticipated City funding of
$332,500 planned from the 102 Arterial Street Fund; and
Resolution No. 5600 •
July 16, 2021
Page 1
WHEREAS, through a memorandum of understanding, the remaining required local
match funds ($332,500) are anticipated to be provided by the Muckleshoot Indian Tribe;
and
WHEREAS, Auburn Way S (SR 164) has a gap in the sidewalk along the southside
of the road between Howard Road and Muckleshoot Plaza; and
WHEREAS, the City applied to WSDOT for, and has been awarded, a competitive
grant to partially fund a project that will construct sidewalk on the south side of SR 164
between Howard Road and Muckleshoot Plaza (SR 164 Project) in the amount of
$695,000; and
WHEREAS, an estimated $150,000 of local match funding is required to fully fund
the project; and
WHEREAS, the SR 164 Project is included in the City's current Transportation
Improvement Program (TIP)which shows anticipated local match City funding of $75,000
planned from the 328 Capital Improvement Fund; and
WHEREAS, through a memorandum of understanding, the remaining required local
match funds of$75,000 are anticipated to be provided by the Muckleshoot Indian Tribe.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, RESOLVES as follows:
Section 1. The Mayor is authorized to execute and administer two grant
agreements with the Washington State Transportation of Transportation for a total of
$1,330,000 or any other amount authorized by WSDOT for the Riverwalk Drive Project
and the SR 164 Project as long as local matching funds are available.
Resolution No. 5600
July 16, 2021
Page 2
Section 2. The Mayor is authorized to negotiate, enter, and administer
agreements to spend the grant funds for the Riverwalk Drive Project and the SR 164
Project, and to implement other administrative procedures necessary to carry out the
directives of this legislation.
Section 3. That this Resolution shall take effect and be in full force on passage
and signatures.
Dated and Signed this p''day of ���,� , 2021.
CITY OF AUBURN yANCY�. CKUS, AYOR
. _ . :-,_ .
ATTEST: ``
Shawn Campbell, City Clerk
APPROVED AS TO FORM:
Kendra R. Comeau, City Attorney
Resolution No. 5600
July 16, 2021
Page 3
S R 16 4 Project Printed.Dale: 3 /2020,
Map,Cee
reated liylal41Y1
tyoAuburneG15igg � ImageryDate:M2015
,. i'''t I
[,... '. 1 E rc,y SY Sv S � � t'<'.','
E�z tl 9Y
I C "P
€ € cr ',1.,......i.;',.:.';',',::17.,:',7.'"-'
1 I`
� n .zw �
i -.,.m: v' ..': r r j e§trtu s.
.I i §' is . 7 r � +xst
•E-'7-'-'71
33 II f �i e4 ,-.".7.',,,',.-;.',..),-/...
Ew x t$ ,::'''''''''.". ;''''--,.';'•..-''''''''':‘,::'-'
"^.'w. Ka..
III
w
W
3E Y
� ''''''-•,,'''''\.
� E
h
t
E
>i
i f � yi A§Mi H S+A�'S
• E F
'4,1� � 4 x� ik ; j � i
3 e �` ; i 1.-,::
E :i. ST5 v` ftF ' :
cf
- ori 'Proposed New .' fi l
R• RFB.Location
I
��
i
�q '-
' 6 r" { „,x--,,,,
.,axe •,'-'7-'4,-----,,,..„...„._:-':
>”.
E ` • D°r �. Proposed New
Sidewalk
�, �" � � w' - t
'
1,333.3 I
0 666.7 1,333.3 Feet Information shown is for general reference
purposes only and does not necessarily
7 i n = 667 ft 1 8,000 represent exact geographic or cartographic
NAD_1983 StatePlane_Washington_North FIPS 4601_Feet data as mapped.The City of Auburn makes no
warranty as to its accuracy.
Riverwalk Drive Project Printed Date: 3/5/2020
Map Created by Cfty of Auburn eGlS
Imagery Date:May 2015
`,:41.:',,,.,„i,.., I a P '4. 1.1';a"'010:1111K^f ` u _„'''.•-=`..,,i'.1-.\'''',.
fS) 1 f t. mss.
N 1
,,.,,,,---,t. t rc .5-.',7!--_-,-',..-.....i..',.1'.
F r sa�,
3
I, cE 9S}15YYE 1 _ U 1a.
x s iI X3.5 S L F12 1 Is
z I
If3� a� a � d
�uf SYAEN Y :-:::.' ",,„„,,i4.,, .i 1'^
r °`' 8 _5 y 1
t _
r .. �
c
of e I ;
r 33
It
y sm
�_ e {
[[ 34tl 434£
.'
'b
C E,ti kora7 -` 1,,,-
F x 3; I � 1 'a _ T`
x 1 s_
Proposed I
New Sidewalk
}
� r
€at $ s 4�,.
Proposed
New RRFB ;u
�i =ia �
a�f 3 3 /if.... 13 3 } ' I x°' {.
if''—'..:.•_–;-,-,:--7--,',
s J7 I f € i Si 3 lir§
3 ac.+ `� � .,� /
3N= i - t J j
7 I ; .,,j M. 1 t , '
r
- � 1< .
tat lt2£ I a 1 .._. -IS Ca
3� k
1 . �, I °;
fel ..•���
1,009.4 0 504.7 t009.4 Feet Information shown is for general reference
purposes.only and does not necessarily
1 i n = 505 ft 1:6,056 I, represent ezactgeographic or cartographic
NAD 1986 StetePlane_Washington_North_FIPS_4601_Feet data az mapped.rhe city of Auburn makes no
warranty as to its accuracy.