Loading...
HomeMy WebLinkAboutRES 5640 RESOLUTION NO. 5640 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, RATIFYING THE MAYOR'S WATER EMERGENCY DECLARATION 2021- 04 ENDING PREVIOUSLY DECLARED WATER SHORTAGE EMERGENCY STAGES IN THE HIDDEN VALLEY/BRAUNWOOD NEIGHBORHOOD WHEREAS, the City's water supply is divided into two separate water systems: one currently serving 12 residential customers in the Hidden Valley/Braunwood neighborhood (HVB), and one serving the remainder of the City. The HVB system is an isolated water system that is not connected to the remainder of the City's water supply; and WHEREAS, to address drought conditions and high water use in HVB, the Mayor issued Declarations 2021-02 and 2021-03, declaring ACC 13.14 Stage I and Stage II water shortage emergencies in HVB on August 9 and August 23; WHEREAS, the Council ratified each of the Mayor's declarations through its passage of Resolutions 5611 and 5612; WHEREAS, following these water emergency declarations, the City's Public Works Department conducted successful education and outreach with the affected customers that resulted in sufficient water conservation efforts by the customers that mitigated the HVB water emergency. After continued review and monitoring of the water supply and consumption in HVB, the Public Works Departmen.: concluded that the water emergency in HVB has temporarily subsided and that necessary water conservation efforts by the customers in HVB are ccntinuing at this time; Resolution No. 5640 December 28, 2021 Page 1 of 2 WHEREAS, in response to the efforts from Public Works, the Mayor issued Declaration 2021-04, declaring an end to the previously declared Stage I and Stage II water emergencies in HVB and authorizing Public Works to resume normal water usage monitoring in HVB, effective December 30, 2021 . A copy of Declaration 2021-04 is attached to this Resolution; and WHEREAS, the Council intends to ratify the Mayor's Declaration 2021-04; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, HEREBY RESOLVES as follows: Section 1. The City Council ratifies the Mayor's determination in Declaration 2021-04 that the Stage I and Stage II water shortage emergencies in HVB previously declared in Mayor Declarations 2021-02 and 2021-03 are no longer in effect. The Public Works Department is authorized to reduce water conservation and education efforts in HVB and to resume normal water usage monitoring. Section 2. This Resolution shall take effect and be in full force upon passage and signatures. Dated and Signed this 3rd day of January, 2022. CITY OF AUBURN eN:y KUS, MAYOR ATTEST: APPROVED AS TO FORM: Xe,A-W\ mat^^ Shawn Campbell, MMC, City Clerk Kendra Comeau, City Attorney Resolution No. 5640 December 28, 2021 Page 2 of 2 CITY OF AUBU * Nancy Backus, Mayor WASH 1 NGTON 25 West Main Street * Auburn WA 98001 4998 * www.auburnwa.gov * 253 931-3000 WATER EMERGENCY DECLARATION 2021-04 A DECLARATION ENDING PREVIOUSLY DECLARED WATER SHORTAGE EMERGENCY STAGES IN THE HIDDEN VALLEY/BRAUNWOOD NEIGHBORHOOD WHEREAS, on August 9, 2021, I, Nancy Backus, Mayor of the City of Auburn, issued Declaration 2021-02, declaring a Stage I water emergency affecting the Hidden Valley/Braunwood (HVB) neighborhood for the reasons set forth in that declaration and pursuant to RCW 35.21.210 and ACC 13.14; and WHEREAS, the HVB water emergency continued despite my Stage I declaration, resulting in my issuing Declaration 2021-03, declaring a Stage II water emergency in HVB on August 23, 2021; WHEREAS, following these water emergency declarations, the City's Public Works Department conducted successful water conservation efforts that mitigated the HVB water emergency; WHEREAS, after continued review and monitoring of the water supply and consumption in HVB, Public Works has concluded that the water emergency in HVB has temporarily subsided and that necessary water conservation efforts by the customers in HVB are continuing at this time; NOW THEREFORE I, Nancy Backus, Mayor of the City of Auburn, declare as follows: Declaration 2021-04 Page 1 of 2 CITY OF AuBuRN Nancy Backus, Mayor * www.auburnwa.gov* 253-931-3000 WASHINGTON 25 West Main Street * Auburn WA 98001-4938 �Jww.auUu g Section 1. Pursuant to ACC 1.3.14.030.G, the Stage I and II water shortage emergencies in the HVB neighborhood that I previously declared on August 9 and 23, 2021 are no longer in effect. The City's Public Works Department is authorized to reduce its water conservation education efforts in HVB that.I ordered in those previous declarations and resume normal water usage monitoring. Section 2. Nothing in this declaration affects the City's ability to declare a future water shortage emergency in HVB, or to order or implement appropriate corresponding water use restrictions in HVB, should circumstances warrant. Declaration Effective Date: December 30, 2021 CITY OF AUBURN A AN +` 'US,MA OR Declaration 2021-04 Page 2 of 2