Loading...
HomeMy WebLinkAboutLea Hill Auburn Police SchedulePROPOSED CONSTRUCTION SCHEDULE for Lea Hill Auburn Police AM RUYLE LLC CONSTRUCTION PHASE # WKS DATES 10 FROM TO Pull Permit Start Constr.1/4/2016 Layout Walls, Trenches 2 1/4/2016 1/5/2016 Sawcut and Remove Concrete 1 1/6/2016 Wall & Soffit Framing 8 1/7/2016 1/18/2016 Wall Backing 4 1/11/2016 1/14/2016 Plumbing and Electrical Rough In 8 1/7/2016 1/18/2016 Rough In HVAC 4 1/13/2016 1/18/2016 Rough In Inspections 1/19/2016 Hang GWB 5 1/20/2016 1/26/2016 Tape GWB 5 1/27/2016 2/2/2016 Prime and First Coat Paint 3 2/3/2016 2/5/2016 ACT Ceiling and Mech Room Sound Tile 4 2/5/2016 2/10/2016 Hang Doors & Finish Carpentry 5 2/5/2016 2/11/2016 Cabinetry Install 5 2/11/2016 2/17/2016 Ceiling Lighting & Trim HVAC 3 2/18/2016 2/22/2016 Ceiling Cover Inspection 2/23/2016 Drop Ceiling Tile 3 2/24/2016 2/26/2016 Electrical and Plumbing Trim 4 2/26/2016 3/2/2016 Vinyl and Carpet Flooring 3 3/3/2016 3/7/2016 Final Paint 4 3/8/2016 3/11/2016 Hang Rubber Base 1 3/11/2016 Final Inspection 3/14/2016 Final cleanup 1 3/14/2016 Certificate of Occupancy 3/14/2016