Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Lea Hill Auburn Police Schedule
PROPOSED CONSTRUCTION SCHEDULE for Lea Hill Auburn Police AM RUYLE LLC CONSTRUCTION PHASE # WKS DATES 10 FROM TO Pull Permit Start Constr.1/4/2016 Layout Walls, Trenches 2 1/4/2016 1/5/2016 Sawcut and Remove Concrete 1 1/6/2016 Wall & Soffit Framing 8 1/7/2016 1/18/2016 Wall Backing 4 1/11/2016 1/14/2016 Plumbing and Electrical Rough In 8 1/7/2016 1/18/2016 Rough In HVAC 4 1/13/2016 1/18/2016 Rough In Inspections 1/19/2016 Hang GWB 5 1/20/2016 1/26/2016 Tape GWB 5 1/27/2016 2/2/2016 Prime and First Coat Paint 3 2/3/2016 2/5/2016 ACT Ceiling and Mech Room Sound Tile 4 2/5/2016 2/10/2016 Hang Doors & Finish Carpentry 5 2/5/2016 2/11/2016 Cabinetry Install 5 2/11/2016 2/17/2016 Ceiling Lighting & Trim HVAC 3 2/18/2016 2/22/2016 Ceiling Cover Inspection 2/23/2016 Drop Ceiling Tile 3 2/24/2016 2/26/2016 Electrical and Plumbing Trim 4 2/26/2016 3/2/2016 Vinyl and Carpet Flooring 3 3/3/2016 3/7/2016 Final Paint 4 3/8/2016 3/11/2016 Hang Rubber Base 1 3/11/2016 Final Inspection 3/14/2016 Final cleanup 1 3/14/2016 Certificate of Occupancy 3/14/2016