Loading...
HomeMy WebLinkAbout20110104132110Pierce County Public Works and Utilities Transportation Services 2702 South 42nd Street, Suite 201 Tacoma, Washington 98409-7322 (253) 798-7250 • FAX (253) 798-2740 March 5, 2009 Mayor Peter B. Lewis City of Auburn 25 West Main Street Auburn, Washington 98001-4998 Attn: Rob Roscoe, Risk Manager Brian J. Ziegler, P.E. Director Brian.Ziegier@co.pierce.wa.us Re: Letter of Understanding Related to Roadway Maintenance, Auburn Fire Station #33, Application #640475, parcel #0520051032. Dear Mr. Roscoe: Valley Regional Fire Authority (VRFA) is constructing a new fire station at the intersection of 4th Street East and 182nd Avenue East. 182nd Avenue East is a County road maintained by Pierce County; currently 4th Street East is an unopened County right- of-way.. Per September 16, 2008, correspondence from Pierce County Traffic Engineering to Cynthia Levey -Jose of Warner Engineering, additional right-of-way is needed on both roads to meet County road standards and, on 182nd Street E, to contain frontage improvements required of VRFA as part of its development. The fire station property, parcel 0520051032, is within the City of Auburn. The additional right of way required, 10 feet along the frontage of 182nd Avenue East and 30 feet along the frontage of 4th Street East as described in the September 16 correspondence, will remain within the City and will be dedicated as City right-of-way. The dedication must be completed prior to final County approval of the frontage improvement construction. To provide continuity of service, the County will maintain the road surface, shoulders, ditches, and drainage structures that are within the additional 10-foot portion of 182nd Avenue East. The County will continue to be responsible for this maintenance until such time as 182nd Avenue East is annexed into the City of Auburn. It is the County's understanding that the City and/or VFRA will maintain the private driveway approach ---into-the-fire-station-that-is-being-constructed-in the-4th-Street East right -of way. —No ---- -- financial considerations are part of this letter of understanding. Printed on recycled paper If you have questions regarding the above, please contact Steve Carstens, P.E., Pierce County Development Engineering, (253) 798-2624, or email him at scarste@co.pierce.wa.us. Sincerely, c Brian D. Stacy, P.E. County Engineer CC: Eric Robertson, Administrator, Valley Regional Fire Authority, 1101 D Street NE, Auburn, Washington 98002-4025 l Berry, Project Manager, Harris & Associates, 201 S. Division Street, Auburn, Washington 98001 Cynthia Levey -Jose, Warner Engineering, 2709 Jahn Avenue NW, Suite H-5, Gig Harbor, WA 98335. Steve Carstens, P.E., Pierce County Development Engineering Julie Kontz, Pierce County Transportation Planning and Programming File e V * tlllN /N�082I'02' st / 25.61' W?\g4 - S� M.tS Syr f' —1A 7 z�� W.l2.LL00N' 9 ,* f*Q\t4 I -In NI� IF I I_ 5015370'W 81.1fi' I F i �4t� ftN ,5L'L61 —M.S6.6LOON I 1 W LINE, E Jf)' CONbEYEO TO PIERCE CO. 6037508'W _ BY 0EE0 REN 2277811 & 2410280 — — — — A O N O O n D F1 II Z O � m O