Loading...
HomeMy WebLinkAbout84D902MUST HORTHtf<LT t I r,e PbIH-F OF RE?L AT \ 4A56 7F G4Rf{WIiE. t :L A, ^ G3 3 c I 0 PP i o a. AS wAJ MAII`I H A58 0 8 D 9 W rooe 1 �, 02 Ia.00' \��`��\ /4.� l\b�}tj}f 6"FIRE HYDRANT P 5-AT, 0H 5 AT�ON A5O '� Q "/\ \Y\ .b \ Z TPO 2, - r n 24 9 3, �- \ 3 2. TPOB S �S. s 6 \ >P SCALE: -l"m 50' I'i2'� META .iT"^'I PVC K7 K2 HO r_ K3 J r s bz`OO'ct��E I e'rA5 JALV= A50 ha � o 3g, c R>., �Q I'IZ mfzTuL G- - y 'T4FET aG. r� 14, 6LDLT 5V6. \ QA \ �e- "AIN A5O. \ 3oe \ `�S WATER MAIN CONSTRUCTION 1. INSTALL NEW 8" D.I. TEE SOUTHWEST OF EXISTING 8" x 4" REDUCER IN -- -- EXISTING 8" D.I. WATER MAIN. INSTALL APPROXIMATELY 100 LF OF NE14 8" D.1. WATER MAIN WITH NEW 8" GATE VALVE & BOX WITH CONC. BLOCKING. INSTALL 8" x 6" x 90` ELBOW AND 6" GATE VALVE & BOX WITH CONC. BLOCK- ING. INSTALL APPROXIMATELY 70 LF OF NEW 6" D.I. WATER MAIN TO NEW 5-1/4" MVO FIRE HYDRANT. INSTALL NEW 2" BLOWOFF ASSEMBLY. 2. INSTALL NEW 8" GATE VALVE & BOX IN EXISTING 8" D.I. WATER MAIN. 3. UNCOVER EXISTING 8" WATER MAIN, PROCEEDING FROM NORTH TO SOUTH. EXISTING 8" WATER MAIN TO BE ABANDONED TO THE SOUTH OF THE POINT WHERE THE EXISTING COVER OVER THE PIPE IS IN EXCESS OF 6'0". START CONSTRUCTION OF NEW 8" D.I. WATER MAIN AT THIS POINT. REMOVE EXIST- ING 6" GATE VALVE FROM FIRE HYDRANT LEAD. 4. LOCATE EXISTING WATER SERVICE LINES TO BUILDINGS N, 0 AND P. CONNECT TO NEW 8" D.I. 14ATER MAIN. S. REUSE EXISTING FIRE HYDRANT AT APPROXIMATE EXISTING LOCATION. CONNECT NEW FIRE HYDRANT LEAD TO NEW 8" D.I. WATER MAIN. REUSE EXISTING 6" GATE VALVE & BOX. APPROXIMATELY 220 LF OF NEW B" D.I. WATER MAIN REQUIRED. 6. INSTALL NEW 5-1/4" MVO FIRE HYDRANT ASSEMBLY (INCL. 6" GATE VALVE & BOX). INSTALL 8" x 10" x 90' ELBOW WITH CONC. BLOCKING. INSTALL APPROXIMATELY 120 LF OF 10" D.I. WATER MAIN. INSTALL 2" BLOWOFF. 7. INSTALL PRESSURE REDUCING VALVE (PRV.) STATIONS SIMILAR TO THE TWO EXISTING PRV'S. WET TAP EXISTING 12" D.I. WATER MAIN IN LEE HILL ROAD. CONTACT CITY OF AUBURN PRIOR TO MAKING WET TAP. 8. CONTRACTOR SHALL LOCATE AND MARK ON THE BUILDINGS THE LOCATION OF ALL WATER SERVICE LINES. EACH WATER METER, BOX AND COVER SHALL BE INSTALLED OR REINSTALLED AS REQUIRED BY THE CITY OF AUBURN !DATER DEPARTMENT. A. COORDINATE ALL 14ATER MAIN CONSTRUCTION WITH CITY OF AUBURN WATER DEPARTMENT. S. ALL WATER MAIN RELATED CONSTRUCTION TO BE ACCEPTED AND APPROVED BY THE CITY OF AUBURN. C. ITEMS 1. TO 7. ARE INTENDED TO GENERALLY DESCRIBE THE WORK REQUIRED AND NOT TO SPECIFICALLY DESCRIBE EACH ITEM OF WORK. . c« e Ae 3. M 97Gi1' i" METES I'14" eUz(. srG. o� o TRACT A \ PRll-VF_ iErATION \ VA'✓VE STATIOry y/<< NOTE ASBINDICATES THOSE ITEMS 'SAS BUILT" . \\ OTHER INFORMATION SUCH AS METER LOCATIONS AND SIZES HAVE NOT BEEN\ VERIFIED. -NOT AS BUILT- BYDATE CONFORMS TO DE IGN CONDITIONS & NOT FIELD VERIFIED -� LEGEND I QV \.. I.A Z• archRecis Z G o vi O N ,n { tz o W T Z - Q jw Q V O o V z = Q Z3 w 'Qz� o Zo Q Z N Z $ Q z V) z w 2 W J O _ D' :D O m g (n Q Lu W F Q v • Lo 0 °z U O k� L)i z 1 'g — _ � I W LO r w]lf) Q IQUl y p9 Q LL W 0 LL QQIN JOB NO. 81-24 DRAWN GCM CHECKED GAD ISSUED 8-26-81 REVISED <,�-'�I SHEET C 3 Cry 84 0 902 5 HT 2- PO�H`r 1 MH 11 �6 ARRIA6 D P3 \ p2 O P% \ t e 1 p = 00 12 45' • 2 50 MFJN 8 fir Hv�e' Ill \--� rIH 6-A G3 M=247. 76 I�Vin: 2?b.57 iQ Q L_ SANITARY SEWER CONSTRUCTION THE ENTIRE SANITARY SEWER SYSTEM SHALL BE CLEANED AND FLUSHED TO REMOVE ALL ACCUMULATED DEBRIS. PERFORM ALL CORRECTIONS ON CITY OF AUBURN PUNCHLIST. 2. THE EXISTING SECTION OF SANITARY SEWER FROM M.N. 5-A SOUTHERLY TO M.H. 5-C SHALL BE ABANDONED. REMOVE RING, COVER AND CONE FROM M.H. 5-C. FILL M.H. 5-C WITH GRAVEL OR FILL FROM SITE. BLOCK THE SOUTH INCOMING PIPE IN M.H. 5-A WITH MORTAR. 3. LOCATE EXISTING SIDE SEWERS AT BUILDINGS N AND 0. INSTALL NEW 6" DIA. P.V.C. SIDE SEWER FROM BLDG. 0 TO BLDG. N TO M.H. 5-A. CONNECT NEW 6" DIA. SIDE SEWER AT M.H. 5-A. CHANNEL M.H. 5-A AS REQUIRED. 4. TEST ALL SIDE SEWERS FROM ALL BUILDINGS TO ASSURE NO BLOCKAGES EXIST. S. UPON COMPLETION OF 1, 2 AND 3 ABOVE, THE CITY OF AUBURN WILL PERFORM, .ONE TIME AT NO CHARGE, A TV INSPECTION OF ALL 8" SANITARY SEWER LINES. REPAIR AND/OR SEAL ALL SECTIONS WHICH DO NOT MEET SPECIFICATIONS. ADJUST ALL RINGS AND COVERS TO FINAL PAVEMENT GRADE. 7. ALL WATER USED FOR FLUSHING OF SANITARY SEWER LINES SHALL BE PUMPED FROM M.H. K2 TO EXISTING ROADSIDE DITCH. 8. UPON WRITTEN ACCEPTANCE OF THE TOTAL SANITARY SEWER SYSTEM, THE CONTRACTOR SHALL REMOVE TEMPORARY BLOCK FROM M.H. N1. 9. THE SANITARY SEWER LINE SHALL BE EXTENDED TO THE NORTH ALONG THE RIGHT-OF-14AY TO A POINT OPPOSITE THE NORTHEAST CORNER OF THE PROJECT. SCALE:'1°=50' 0 02 9 \ ,41 \J C� GA�RiAGF BM INVERT EXISTING MH 5 ELEVinB"= 199.16 -NOT AS BUILT- BY_2 `DATESI CONFORMS TO DEGN CONDITIONS & NOT FIELD VERIFIED LEGEND V I �d w my N Z � N N W � � H p W � � W o N Z Q = 0 W o 0 z N = Q z3 W � a z 0 z ZQ Z N z Z $ 0 w Lli 3 cn W I— J (n Z W m LC W aa° z a a� 1 cn • a 0;? 0 z0 z az WU1Q yk� w]� Q i 0LLwru o LL <01 JOB NO. 81-24 DRAWN GCM, DJ W CHECKED GAD ISSUED 8-26-81 REVISED SHEET C 4 I' 4- O04 84 0 qo2 SNT. 3 — -- S 3043'0o"W 41003' LEGEND -f - - NErI WAT@ISIoNIN V41LIN%61tE ^ T 6Er,D W/ ta�RI 61'CII A - -- A.B. I •a .., 'I+' I " - A.B. Lam` `. _. r c 6 < „'?£V: �i FIFE Hv'%�AtrY A=• My -i� atch HIM L _ - r r o,.F "G pl,lJ6f 4C.AP W/ C.ONG. BLGL'KIrl4 _Ev ti �,-STE ERvcE DE BLOfiSew enoineersFF=Q44 FINIdIGo FLOO ilk I / � • a s:: .. ` -•-� e - - SEA VCR n/<.:zs.CR� ..E .. / f 1 F F- 2 4 C LF 1 AS6.11 LT uyFOGMAT07y _ - .. I _ F F = 242 �1 DENOTES A9-8UILT INFORMATION A.B, 1 J �- _ FU=840 FF-- E44 NOTg; A9 METeIc� ' -- - GONOOMINIUM OOGUMENTS ESTABLIOHINQ C.O. �' F X IOM1 PAIVNAE E MAAFI�AINAW-4 OF.I GANi7ARY' GFvI 2 \ r _ A•_ $ _ _. .. ILRPY AN70 THE FX5TIN4 A.B. MANHOLE N-OW4 LEA HILL PI —� - )III METFJC'. 0 49'A� / v 8Z _ A.B. ,,Dr 8 �^' � q , v i APPR,p ED CITY N DATE: I \ o `L21.2.4 A.B. - TV F F 220 - A.B. z - -{ � � A.B. F A=432 _ 4 A.B. ✓'`_ 7)81 w r i 4 50 N 3p=3 F F - 2 1 7 u `\ • _- • '' WATER �' SA.NffARY SEWER INFORrWTION 44 o - ruRfI5HED 6Y CDNTRPCTOR. - gg 41y, FF =214 NOTE . 'F RIM = W.00 F U _ 3 7 D APPROVED \ FF=212 O CITY OF AUBURN \ \ -� __ - 0 id ♦P CITY OF AUBURN I r10 Irw -- so 40 20 0 v 6D4': OFF __ ryATEN FINE 84 1:;P9o2 sH t S Q Q Q cn W �' I a, J z Lu Q � Qm0_ L2 to w (n f a I- W Q O_ W �m Uj Q �a o Qg C3 am 0 ] aQIn N � O � U W MM <p um wm Qp Q3 (10 wW 112 Qw QO U (] am JOB 140. b i4 DRAWN 78g�,, G-GV CHECKED 4AC ISSUED VMAp t- REVISED "i-Z-j5 LL -7Qt �-13-e2, 6-7-e2,9-2092 a-IO-at 10-Z4-65- SHEET c 7 B