Loading...
HomeMy WebLinkAbout77S3537III G SS— W .- • M 76 74 72 70 M IN ST. ttG' Z 0 z; Ju (1IL O _l Z veO )- 0M � O 11 i on rati INPig ids: I.■. Ines I.:: n 8- Z,T-G �J EAST MAI N ST. yPV G NOTES: 1. This project is to be built and constructed in accordance with the "Standard Specifications for Municipal Public Works Construction", 1975 Edition prepared by the Washington State Chapter,APWA and the City of Auburn Standards and Specifications. 2. Datum is USC b GS.•� mean sea level. 3. All elevations shown in parenthesis signify existing elevations and shall be verified in the field prior to commencing any construction which is dependent on the existing elevations- 4. Distances shown hereon are along center lines and to center lines of all manholes and structures. 5. Plug existing 8" sanitary sewer to the west after the new sanitary sewer is in operation. 6. Install 8" TES • Cap and seal for future connection WITH & NDEU . FLLIG. CUiR6 , GUTTER , SIDEWALK_ I PCG SURFACE TO MATCH EX15T1NG oRIVEWA.Y AREA. i PAVEME-MT I � AREA WCUTP YE MENT AREA,ON GOLD MIX PATGN 1 N(S WITH A.0 . 0VE RLAY PAVEMENT. COMPACTED TRENCH l3AGKNLL ;� •. JM 5DR 35 PuG • _ PIPE 13E00ING = bALJ .A3T MATERIAL n PIPE 0 O t 2r- U TYF1 CAL TRENCH SECTI ON N0 GALE AS QUILT L.EGEND EXIST. WSW EXIST. NEW tXa1N1TARY SE1+veR 8"5S 8`_55 METER E50X IM TELEPHONE T CATCH 5A51N R1 WATER W WATER VALVE V><3 GAS G 2 FIRE HYOFI WT YJ STORM 5EWER to' 5T— GAPPED/PLLJGG6D —�— FV,0PEKTY LINE -- p�ORI NCB Q% 5L0G . LI N E PPO BE O EDGE OF AC/PCC ------- ASPHALT GC�IJC, A.G SIGN POST 4 POIZTLAND cEM15KIT PC.C, poW E{F, POD MANHOLE UO • :.• 78 76 APPR D BY: rev. no. i dote description of revision SANITARY SEWER RELOCATION FOR THE NEW AUBURN DIRECTOR of IC WORKS CITY HALL — SANITARY SEWER IMP NO. 38 CITY OP AUBURN CONTRACT NO. 77- 03 PLAN AND PROFILE kpff consulting engineers anchorage, los angeles, portland, Seattle 0 -70 g dsn. R , I . dwn. L. N . ckd. R.I date 77 prof. no 76P 14 4. 2 5HT. I GF 77 S3537 SH-I