HomeMy WebLinkAbout5719 RESOLUTION NO. 5719
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, AMENDING THE CITY OF
AUBURN FEE SCHEDULE TO ADJUST FOR 2024 FEES
WHEREAS, the City of Auburn provides various services, a number of which entail
charging a fee; and
WHEREAS, the City Council provided for the adoption of a Fee Schedule with the
passage of Ordinance 5707; and
WHEREAS, it is appropriate to review and amend the schedule for City fees to be
charged in 2024.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, RESOLVES as follows:
Section 1. The City of Auburn Fee Schedule is amended as set forth in the
attached document.
Section 2. The Mayor is authorized to implement those administrative
procedures necessary to carry out the directives of this legislation.
Resolution No. 5719
October 4, 2023
Page 1 of 2 Rev.2020
Section 3. This Resolution will take effect and be in full force on passage and
signatures, and on January 1, 2024.
Dated and Signed this 16th day of October, 2023.
CITY OF AUBURN
ANCY A U MAYOR
ATTEST: APPR 4 '-_k FORM:
Shawn Campbell, C, City Clerk Harry Boe _ - rtings.ity Attorney
Resolution No. 5719
October 4, 2023
Page 2 of 2 Rev.2020
CITY OF AUBURN FEE SCHEDULE
FEES FOR CITY PERMITS, LICENSES, PUBLICATIONS, AND ACTIONS
Effective January 1, 2024.
A. PLANNING FEES (Per Ordinance No. 5707, Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797,
Resolution No. 3953, Resolution No. 4070, Resolution No. 4117, Resolution No. 4143, Ordinance No. 6077,
Resolution No. 4272, Resolution No. 4424, Ordinance No. 6276, Resolution No. 4552, Ordinance No. 6295,
Resolution No. 4868, Resolution No. 4880, Resolution 4964, Ordinance 6477, Resolution No. 5016, Resolution
5114,Resolution No.5181,Resolution No.5213,Resolution No.5228,Resolution No.5255, Resolution No.5312,
Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620,
Resolution No. 5681, and Resolution No. 5719.)
1. Application Fees: Applications for any action identified below shall notbe accepted for filing,
unless otherwise noted, until,the fees per, thebelow schedule have been paid to the City)
Additional Meeting Fee (beyond the specified number) $340350.00 per meeting
Additional Re-submittal Fee (applied after 3 city reviews of the $115123.00 per
application) re-submittal
Administrative Use Permits (covers 1 meeting with staff after $1,9061,963.00
which additional meeting fees apply)
Appeal of Administrative Decisions issued under Chapter $1,3181,358.00
1.25, Title 3, Title 5, Title 8, Title 14, Title 15, Title 16, Title 17,
Title 18 or Title 19 to Hearing Examiner'. Hearing Examiner
costs are included within the appeal fee and are therefore not
billed separately.
Preliminary Binding Site Plan2 (covers 2 meetings with staff $5,3165,475.00 +
after which additional meeting fees apply) $68.00/lot
Boundary Line Adjustment':
Residential (Single Family & Multi-Family) $1,5781,625.00
Non-Residential (includes mixed use projects) $2,3662,437.00
Boundary Line Elimination' $620639.00
Comprehensive Plan Map Amendments3 (covers 2 meetings $7,9578,196.00 (includes
with staff after which additional meeting fees apply) rezone application fee)
Comprehensive Plan Text Amendments3(covers 2 meetings $7,9578,196.00
with staff after which additional meeting fees apply)
Conditional Use Permits',6(covers 2 meetings with staff after
which additional meeting fees apply):
Residential (Single Family & Multi-Family) $2,1862,561.00 + Hearing
Examiner expenses.
All Other (includes mixed use projects) $3263,838.00 + Hearing
Examiner expenses.
Please note that the City of Auburn may collect a review fee on behalf of the Valley Regional Fire Authority for certain
land use and/or environmental reviews which fee is collected in addition to the City's required fees.
2 Per Auburn City Code,a modification to an approved binding site plan shall be processed in the same manner as the
original binding site plan approval. Therefore, the specified fee shall apply to a new or modified binding site plan
approval request.
3 Fees for amendments to text or maps of the Comprehensive Plan apply only where an applicant seeks an amendment
affecting specific properties rather than the City generally or property within the City generally.
Conditional Use Permits'— Minor Adjustment (covers 1
meeting with staff after which additional meeting fees apply):
Residential (Single Family & Multi-Family) $1,3721,413.00
All Other (includes mixed use projects) $2,0592,121.00
Critical Areas Review:
Required on-site mitigation, monitoring & reporting5 $ 1,17741,302.00 + actual
costs for inspection and
report preparation by
contracted professional.
Critical Areas Determinations (Exemptions or Applicability) $340350.00
City review of environmental studies, plans or reports $340350.00/study, plan or
(whether submitted with another city application or not and report
includes one re-submittal)
Critical Areas Variance— administrative $340350.00
Critical Areas Variance — hearing examiner''6 $1,2791,317.00 + total
hourly charge for Hearing
Examiner + associated
expenses to be paid by
applicant prior to issuance
of final decision.
Current Use Taxation (covers 1 meeting with staff after which $1,0531,085.00
additional meeting fees apply)
Development Agreement and Amendments $5,5215,690.00 +
$66.00/lot or dwelling unit
Architectural & Site Design Review and/or Major Modifications $2,5262,602.00
to Already Issued Design Review Decisions (covers 1
meeting with staff after which additional meeting fees apply)
Architectural & Site Design Review Minor Modification $365376.00
(applies to already issued design review decisions)
Eligible Facilities Request (EFR) Assoc. with modification of a $131138.00
wirclessa wireless communication facility (WCF)
Environmental Review (covers 1 meeting with staff after
which additional meeting fees apply):
SEPA Checklist review' (includes City issuance of DNS, $1,3881,430.00 +
MDNS, or DS as appropriate; if a DS, this fee is in addition $340350.00/required study
to the review of the EIS)
4 Per Auburn City Code, a major adjustment to an approved conditional use permit shall be processed in the same
manner as the original conditional use permit approval. Therefore, the specified fee shall apply to a new request for
conditional use permit approval or a request for a major adjustment to a previously approved conditional use permit
approval.
5 For monitoring required over multiple years, the total monitoring fee for the required monitoring period shall be paid
prior to final plat approval or issuance of Certificate of Occupancy or release of required financial security.
Revised or Supplemental SEPA Checklist review' $'161175.00 + $340350.00
(includes City issuance of Addendum, if appropriate) /required study
SEPA 3rd Party Review Actual costs
Environmental Impact Statement $11,39511,737.00 + actual
costs for preparation of
draft & final statements
including labor, materials,
mailing & other actual
costs relating to the
drafting & circulating of the
EIS.
Final Plats— Subdivisions and Final Binding Site Plans $2;9-9-93,089.00 +
(covers 2 meetings with staff after which additional meeting $58.00/lot
fees apply and 1 re-submittal)
Final Plats— Short Plats (covers 1 meeting with staff after $1,1831,528.00 +
which additional meeting fees apply and 1 re-submittal) $28.00/lot
Flexible Development Alternatives Application Review (covers $2,5262,602.00
1 meeting with staff after which additional meeting fees apply
and 1 re-submittal)
Hearing Examiner— Conduct of Hearing and Preparation of Total hourly charge for
Decision6 hearing examiner plus
associated expenses to be
paid by applicant prior to
issuance of-associated
permits
Floodplain Development Permit: Level One $'109421.00
Floodplain Development Permit: Level Two — Habitat impact $1,1701,205.00
Assessment
Floodplain Development Permit: Level Three — Habitat Impact $2,0472,108.00 + Third
Assessment & Hydraulic Analysis (Hydraulic Analysis to be Party Review Fees
Conducted by Outside Third-Party Consultant
Mitigation Plan Review Associated with a Floodplain $1,1131,146.00
Development Permit
City Acknowledgement Review of FEMA Flood Map Revision $359370.00
Application; for projects requiring public notification process
additional fee will be assessed based on additional
resubmittal fee and actual hours expended
Floodplain Development Permit Exemption Letter $233240.00
Floodplain Elevation Certificate $11511.8.00
6 The total expense for the Hearing Examiner is the responsibility of the applicant and is in addition to the relevant
application fee for applications requiring a public hearing before the Hearing Examiner (e.g. conditional use permit).
The expense for Hearing Examiner services will be determined after the Hearing Examiner has provided an invoice to
the City that itemizes expenses incurred and this will be entered in the electronic permit tracking system as a payment
due the city from the Applicant prior to final project approval.
Landscape Plan Revision, including tree removal requests, $132136.00
after initial implementation and after city acceptance of initial
maintenance period.
Landscape/zoning compliance re-inspection $123.00
Legal Lot Determinations:
Affidavit/application for "Innocent Purchasers." $1,0121,073.00
Request/application for legal lot determination. $2,1182,491.00
Mining Permits (covers 3 meetings with staff after which $1,7701,913.00
additional meeting fees apply)
Miscellaneous Administrative Decisions (be:i.e., sign area $2,1122,515.00
deviation, written code interpretations, etc.)
Specific - Work Hour/Noise Exception $362373.00
Plat Alteration or Vacations (application covers 1 meeting with $585,344.00/request +
staff after which additional fees apply) Hearing Examiner
expenses.
Plat Modification (application covers 1 meeting with staff after $1,9712,033.00/request
which additional fees apply)
Preliminary Plats — Subdivisions''s (application covers 3 $10,11210,724.00 +
meetings with staff after which additional fees apply) $132.00/lot + Hearing
Examiner expenses.
Preliminary Plats — Short Plats' (application covers 1 meeting $1,1961,631.00 +
with staff after which additional fees apply) $68.00/lot
Preliminary Site Plan Review (non-PUD) (application covers 1 $2,5262,602.00
meeting with staff after which additional fees apply)
Pre-application Meeting (application covers 1 meeting with $349:350.00 —fee will be
staff after which additional fees apply) applied towards any
related application made
within one year of the date
the pre-application
meeting was held
PUD — Major Adjustment (application covers 2 meetings with $5,1415,298.00
staff after which additional fees apply)
Public Notice Boards:
2' x 4' public notice board $105108.00
4' x 4' public notice board $178183.00
Rezone —zoning map amendment (application covers 2 $1,1771,302.00
meetings with staff after which additional fees apply)
School Impact Fee Collection:8
Per Single Family Dwelling Unit $71-73.00
Per Multi-Family Dwelling Unit $3:536.00
SEPA— see Environmental Review
7 A prior City Code amendment eliminated Planned Unit Developments (PUD). The PUD fees included herein are
applicable only to the existing previously approved PUDs.
8 The City collects an application fee to cover the reasonable cost of administration of the school impact fee program.
Shoreline (application covers 1 meeting with staff after which
additional fees apply):
Shoreline Exemption Determination $284292.00
Shoreline Conditional Use Permit6 $33,847.00 + Hearing
Examiner expenses.
Shoreline Substantial Development Permit6 $3,7353,847.00 + Hearing
Examiner expenses.
Shoreline Variance6 $3,7353,847.00 + Hearing
Examiner expenses.
Short Plat Modification (application covers 1 meeting with $1,01'11,975.00/requested
staff after which additional fees apply) modification
Site Plan Approval — PUD, Residential'(application covers 1 $2,5262,602.00 +
meeting with staff after which additional fees apply) $68.00/lot or unit
Site Plan Approval - PUD, Non-residential'(application covers $2,6282,707.00 +
1 meeting with staff after which additional fees apply) $68.00/lot or unit
Special Exception:1,6
Single Family Residential; for a single lot request (ts $340350.00 + Hearing
Hearingto Hearing Examiner) Examiner expenses
All Other Instances $1,2791,317.00 + Hearing
Examiner expenses
Special Home Occupation Permits $34935.0.00
Third Party Review of Reports $212218.00 + Actual
Costs of Consultant
Three-Party Outside Utility Extension Agreement - Site $1,3621,403.00 + plus the
Specific Review (application covers 1 meeting with staff after City's actual costs in
which additional fees apply) performing under the
terms of the agreement as
negotiated between the
parties
Type I Temporary Use Permit1 $210247.00
$63.00 per extension
request
Type II Temporary Use Permit1 $ 3642.00
$63.00 per extension
request
Variance:1
Administrative $2,6732,753.00
Single Family Residential for a single lot request (to $339349.00+ Hearing
Hearing Examiner) Examiner expenses
All other instances (includes mixed use residential) (to $41,0081,128.00 + Hearing
Hearing Examiner) Examiner expenses
Water/Sewer Certificate1 (outside of city limits for other than $4109'121.00
one single-family residence)
Zoning Certification Letter (per parcel):
Residential (Single Family & Multi-Family $7473.00
Non-Residential (includes mixed use development) $138142.00
Zoning Code Text Amendment (application covers 1 meeting $7,9578,196.00
with staff after which additional fees apply)
2. BOOKS, MAPS, MATERIALS:(pursuant to Resolution Na 3953)
Comprehensive Plan Cost of Production
Downtown Plan Cost of Production
Downtown Plan Appendices Cost of Production
Copies of Codes and Ordinances Cost of Production
Maps Cost of Production
3. ,LAND CLEARING, GRADING AND FILLING FEES (Per Ordinance No. 6146,Resolution No. 42_72
Resolution No, 4424, Resolution No. 5255, Resolution.Na 5319,Resolution Na 5388,Resolution No. 5470,
1 Resolution No. 5549,Resolution No.5620,and-Resolution No. 5681, and Resolution No. 5719.)
Land Clearing:
Application Fee (for up to 1 acre) $4109121.00
>1 to 5 acres $41094121.00 + $125.00/acre
Over 5 acres $1,0301,061.00 (includes first 5
acres) + $92.00/acre
Grading and Filling Fees:
Application Fee without FAC (for up to 500 cubic
yards):
Minor Grading Permit $1,7511,807.00
Single Family Residential for a single lot $2,6892,770.00
Non-Residential and Multi-Family $8,7729,035.00
Other (Early Clear and Grade Prior to, Utility, $7704-87,229.00
etc.)
Application Fee with FAC (for up to 500 cubic $1,1701,205.00
yards)
Over 500 cubic yards Application Fee + $0.10/cubic
yard
Additional Review:
Each additional grading plan review without FAC beyond a 3rd review prior to plan
approval will require an additional fee of$920984.00 be paid at the time of the
additional review submittal. If the review requires more than 8 hours of staff time to
complete an additional fee of$115123.00 per hour will be charged and must be paid
prior to plan approval.
9 Prices for printed materials do not include any taxes.
Additional grading plan review without FAC required by changes, additions or revisions
to plans during construction will require an additional fee of$460492.00 be paid at the
time the additional review is submitted and prior to any review being completed. If the
review requires more than 4 hours of staff time to complete, an additional fee of
$115123.00 per hour will be charged and must be paid prior to plan approval.
4. BUILDING FEES (per Ordinance'5715, Ordinance 5819,'Resolution'No. 3773;Resolution No: 3797, Resolution
No. 3818, Resolution No. 3953;Resolution No.4143, Ordinance No. 6146,, Resolution No.4272, Resolution No., a
4424;"Resolution No. 5134, Resolution Na 5255,Resolution No.5319,'Resolution No:5388, Resolution No. 5470,
:Resolution No. 5549, ResolutionNo.5620,and-Resolution•No..5681, and Resolution:No:5719.). " '
a. Building Permit Fees: Building permit fees for new structures and additions are based
upon a project's construction valuation as set forth by the International Code Council
(ICC). ICC's construction valuation table is hereby incorporated into the City of
Auburn's fees schedule. Construction valuations will be updated on January 1st of each
year. Project valuation for alterations to existing buildings and for other structures not
identified in the ICC construction valuation table are based on the fair market value of
the labor and materials of the scope of work associated with the permit. The fee for
each International Building Code, International Residential Code, Washington State
Energy Code or Washington State Indoor Air Quality Code building permit shall be as
set forth in Table 1-A, below.'
10 Please note that the City of Auburn may collect a review fee for the Valley Regional Fire Authority for certain permit
applications that is collected in addition to the City's required fees.
Table 1-A BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to$500.00 $32.00
$500.01 to$2,000.00 $32.00 for the first$500.00 plus$6.00 for each additional$100.00,or fraction thereof,to and including
$2,000.00
$2,000.01 to$25,000.00 $122.00 for the first$2,000.00 plus$18.60 for each additional$1,000.00,or fraction thereof,to and
including$25,000.00
$25,000.01 to$50,000.00 $549.80 for the first$25,000.00 plus$14.00 for each additional$1,000.00,or fraction thereof,to and
including$50,000.00
$50,000.01 to$100,000.00 $899.80 for the first$50,000.00 plus$10.00 for each additional$1,000.00,or fraction thereof,to and
including$100,000.00
$100,000.01 to$500,000.00 $1,399.80 for the first$100,000.00 plus$9.00 for each additional$1,000.00,or fraction thereof,to and
including$500,000.00
$500,000.01 to$1,000,000.00 $4,999.80 for the first$500,000.00 plus$8.00 for each additional$1,000.00,or fraction thereof,to and
including$1,000,000.00
$1,000,000.01 and up $8,999.80 for the first$1,000,000.00 plus$6.00 for each additional$1,000.00 or fraction thereof
Other Inspections and Fees:
1.Inspections outside of normal business hours $-1-751$3.00 per hour'
(minimum charge-two hours)
2.Reinspection fees assessed under provisions of Section 109.4.13
$444123.00 per hour'
3.Inspections for which no fee is specifically indicated $4-15123.00 per hour'
(minimum charge-one hour)
4.Additional plan review required by changes,additions or revisions to plans $444123.00 per hour'
(minimum charge-one hour)
5.For use of outside consultants for plan checking and inspections,or both Actual costs'
FOOTNOTES:
Or the total hourly cost to the jurisdiction,whichever is the greatest.This cost shall include supervision,overhead,equipment,hourly wages and
fringe benefits of the employees involved.
2 Actual costs include administrative and overhead costs.
b. Mechanical Permit Fees: The fee for each permit issued under provisions of the
International Mechanical Code, International Fuel Gas Code, NFPA 54 (National Fuel
Gas Code), NFPA 58 (Liquefied Petroleum Gas Code), or the mechanical device
provisions of the International Residential Code shall be as set forth in Table 2-A,
below. For new single-family dwellings a flat rate permit fee of$ 233.00 may be
charged in lieu of fees as prescribed in Table 2-A. For new multi-family dwellings, a flat
rate permit fee of$153158.00 may be charged in lieu of fees prescribed in Table 2-A.
Table 2-A MECHANICAL PERMIT FEES
Permit Issuance:
1.For the issuance of each mechanical permit
a. Residential Over the Counter**Application Fee $3£+39.00
$4
b. Commercial,Multifamily,Non-Residential Application Fee 157.00
2.In addition to the base mechanical application fee,each mechanical fixture shall include a permit fee of $13.00
Other Inspections and Fees*:
1.Inspections outside of normal business hours,per hour(minimum charge--two hours) $175183.00
2.Reinspection fees assessed under provisions of Section 109.4.13 $4-1-5123.00
3. Inspections for which no fee is specifically indicated,per hour(minimum charge--one hour) $115123.00
4.Additional plan review required by changes,additions or revisions to plans or to plans for which
an initial review has been completed(minimum charge--one hour) $444123.00
*Per hour for each hour worked or the total cost to the jurisdiction,whichever is greatest.This cost shall include supervision,overhead,equipment,
hourly wages and fringe benefits of the employees involved and include a minimum of one hour unless otherwise specified.
**Over the Counter application and permit fees are not eligible for refunds when applied for in error
c. Plumbing Code Permit Fees: For new single-family dwellings a flat rate permit fee of
$ 233.00 may be charged in lieu of fees as prescribed in Table 3-A. For new multi-
family dwellings, a flat rate permit fee of$ 158.00 may be charged in lieu of fees
prescribed in Table 3-A.
Table 3-A PLUMBING PERMIT FEES
Permit Issuance:
1. For the issuance•of each plumbing permit
a. Residential Over the Counter**Application Fee $3539.00
b. Commercial,Multifamily,Non-Residential Application Fee $152157.00
2. In addition to the base plumbing application fee,each mechanical fixture shall include a permit fee of $13.00
Other Inspections and Fees*:
1. Inspections outside of normal business hours
l 75183.00
2. Reinspection-fee $115123.00
3. Inspections for which no fee is specifically indicated $—
S.443123.00
4. Additional plan review required by changes,additions or revisions to approved plans $445123.00
*Per hour for each hour worked or the total hourly cost to the jurisdiction,whichever is greater.This cost shall include supervision,overhead,
equipment,hourly wages and fringe benefits of all the employees involved and include a minimum of one hour unless otherwise specified
**Over the Counter application and permit fees are not eligible for refunds when applied for in error
d. Other Building Permit Fees
Change of Use: The permit fee shall be equivalent to the adopted additional plan review
and reinspection fee based on a minimum of four hours.
Certificate of Occupancy: For issuance of a new or replaced Certificate of Occupancy not
associated with any other building permit, a fee of$230-237 will be required per certificate.
Commercial Re-roof Permit Fee: The permit fee shall be equivalent to the adopted
additional plan review and reinspection fee based on a minimum of three hours.
Conditional Approval: When authorized by the City, permits that are issued with
conditions due to project phasing, out of sequence issuance, pending associated
approvals, or other advanced permitting requests made by the applicant, a conditional
approval fee equivalent to the additional plan review fee based on a minimum of four hours
will be required prior to issuance.
Demolition Permit Fees: Demolition permits shall be charged a base fee of$162167.00.
Fire Permit Fee: For each fire permit fee a City of Auburn administration fee of
$115123.00 will be applied in addition to the fee collected for the Valley Regional Fire
Authority (VRFA) as identified in the VRFA Fee Schedule.
Manufactured Home: The permit fee shall be equivalent to the adopted additional plan
review and reinspection fee based on a minimum of four hours.
Permit Extensions: For permits that are granted an extension beyond the expiration date
or date of abandonment, whether issued or not, a permit extension fee is required to be
paid prior to extension. The fee shall be the lesser of$115 123 or 50% of the original
application and permit fees.
Plan Review Fees: When submitted documents are required by Section 106.3 of the
Construction Administrative Code, a plan review fee shall be paid at the time of submitting
the submittal documents for plan review. Said plan review fee shall.be 65 percent of the
building permit fee as shown in Table 1-A. The plan review fees specified in this section
are separate fees from the permit fees and in addition to permit fees.
Rack Permit Fee: The permit fee shall be equivalent to the adopted additional plan review
and reinspection fee based on a minimum of three hours.
Solar Permits — Over the Counter: The permit fee for solar installations that qualify for
the over-the-counter permitting shall be equivalent to the inspection fee based on a
minimum of two hours.
Stock Plan Site Plan Review Fee: The plan review fee for individual lot site plan that have
an approved building stock plan shall be $232239.00.
Temporary Certificate of Occupancy Fees: There shall be a fee equal to $1,5300.00 for
issuance of a temporary certificate of occupancy and a fee of$5300.00 for each
subsequent 30-day extension requested.
Work Without a Permit: Building construction and grading activities requiring permits per
ACC 15.74 that are determined to be in violation for work occurring without an approved
permit result in additional documentation, administration, research, and inspection and
require more processing time. For these cases, an additional 28100% fee will be applied to
the standard application and permit fees identified in sections 3 and 4 above.
It is possible a violation existed prior to property purchase by a new owner, was
constructed by an individual who mislead the owner, or was constructed by an individual
who was unaware of code requirements. The fact that violations may not have been
created by the current owner does not relieve Code Enforcement staff from their
responsibility to seek compliance from the property owner. When assessing permit fees,
consideration may be given based on the circumstances, severity of the violation, and
timeliness of the property owner to resolve and obtain required permits and compliance
with City code.
Building Permit Fee Reductions. The Director is authorized to waive building,
mechanical or plumbing permit fees for homeowners that are already enrolled in another
City program that is intended to benefit Iew-insemelow-income residents (e.g. housing
home repair program, utility discount program). This fee reduction may also be extended
to contractors that are applying for permits on behalf of these homeowners provided that it
can be documented that the discount is benefiting the homeowner and not supplementing
a contractor's profit.
5: FIRE IMPACT FEES.'Impact Fees By Land Use - Revenue`Credit = 20% (Per
Ordinance No. 5977,Resolution 3953,and Resolution-No, 4022)
Land Use Total Fire & EMS Adjustment Fire and EMS
Cost per Unit of (Revenue Credit) Impact Fee per
Development at 20% Unit of
Development
Residential-All calculations below are per dwelling unit- Total x Number of Units
Single Family, Duplex, Mobile $362.66 $72.53 $290.13
Home
Multi-Family $383.09 $76.62 $306.47
Non-Residential-All calculations below are per square foot- Total x Square Feet
Hotel/Motel $0.53 $0.11 $0.42
Hospital/Clinic $1.05 $0.21 " $0.84
Group Living $2.63 $0.53 $2.10
Office $0.29 $0.06 $0.23
Retail $0.62 $0.12 $0.50
Restaurant/Bar/Lounge $1.62 $0.32 $1.30
Industrial/Manufacturing $0.11 $0.02 $0.09
Leisure/Outdoors $1.08 $0.22 $0.86
Agriculture $0.71 $0.14 $0.57
Church $0.38 $0.08 $0.30
Schools/Colleges $1.07 $0.21 $0.86
Government/Public Buildings $1.81 $0.36 $0.86
Casino $3.78 $0.77 $3.01
Jails $21.99 $4.40 $17.59
6.` ADMINISTRATIVE PROCEDURESAND'MISCELLANEOUS INSPECTIONS:, Inaddition to;
any other fees specified in this chapter,there shallbe a fee schedule for certainadministrative
procedures not otherwise included as set forth in the following schedule of fees:
a. Adult Family Home Inspection $370549.00
b. Relocation (pre-inspection) Per Table 1-A
c. Housing Inspection Actual City Cost, minimum
$2 -22.00
d. Sign Permits Unless exempt by Ch. 18.56 ACC,
the fee shall accompany each
application for a sign permit. The
amount of the fee shall be based
upon the value of the sign
pursuant to Table 1-A.
7: BUSINESS LICENSE FEES
a. The annual fee for a General Business License as $103.00
defined in Chapter 5.10 of the Auburn City Code.
b. Contractors who are based outside of Auburn but that $52.00
are performing work inside of Auburn.
c. Replacement fee for commercial vehicle parking permit $10.00
issued in accordance with ACC 10.36.190.B
8. "RENTAL HOUSING BUSINESS LICENSE FEES (Per Resolution No. 4601, Ordinance No. 5882,
Resolution No. 4272,Resolution No. 4424, Ordinance 6477, Resolution No. 5620,and Resolution No. 5681):.
a. The fee for a license to operate rental housing
businesses in the City, as defined in Chapter 5.22 of
the Auburn City Code (ACC) shall be based on the total
number of units as follows:
Non-profit rental $0/year
Single Family Home or Single Condo Rental $30/year for each home
Duplex, Triplex or Fourplex $75/year for each building
Condo or Apartment Complex (5 to 24 dwelling $150.00/year
units)
Condo or Apartment Complex (25 or more dwelling $500.00/year
units)
Communal residence $150.00/year
b. The fee for a license to operate rental housing businesses in the city shall be for the license
year from January 1 to December 31, and each applicant must pay the full fee for the current
license year or any portion thereof during which the applicant has engaged in the operation of
rental housing businesses.
c. The rental housing business license fee required by this chapter is in lieu of, and not in addition
to, the general business license fee required by Chapters 5.05 and 5.10 of the Auburn City
Code (ACC); provided, however, that any person required to obtain a rental housing business
license must also obtain a general business license, at no cost, pursuant to Chapters 5.05 and
5.10 of the Auburn City Code (ACC).
Rental housing business license renewals shall be for the period January 1 through December 31 of
each year.
9. INDIVIDUAL LICENSE°.REGULATIONS (Per Ordinance No. 6749, Resolution No. 5470,and Resolution
<No.5549,and Resolution No25620)
The fee licensing under ACC 5.20.030 shall be as follows:
Type Fee Term
Initial Renewal
Dance Hall and Operator $350.00 $350.00 1/1 — 12/31
Marijuana Related Businesses $500.00 $500.00 1/1 — 12/31
A duplicate license shall be issued by the business license clerk, as designated by the
mayor, to replace any license previously issued which has been lost, stolen, defaced, or
destroyed.
10 Technology Fee: A.3% technology fee has been added to all fees outlined in sections
t'3,.4, 6, and 7 above.
B. ENGINEERING AND PUBLIC WORKS FEES
1. Transportation Impact Fee Rate•Schedule:. (Per Ordinance No.5763 as amended by Resolution No.3953,
Ordinance No. 6005,=Resolution;.No:.4103, Resolution No. 4424,'Resolution 4964, Resolution No.•5114, Resolution No..
5181, Resolution No: 5255'Resolution No. 5319,,Resolution'No. .5388,,Resolution No. 5470,,Resolution No. 5549,
Resolution No.'5620iai i-Resolution:No: 5681, and'Resolution No. 5719.) ..
Land Use ITE Independent Trip Non-Downtown Downtown Fee
Land Variable Rate Fee Rate Rate
Use
Code
Industrial
General Light 110 sf/gfa 0.65 $ 4$8.28 -
Industrial
Industrial Park 130 sf/gfa 0.34 $4:05$4.33 -
Manufacturing 140 sf/gfa 0.74 $3.97$4.24 -
Warehousing 150 sf/gfa 0.18 $3.32$3.56 -
Mini- 151 sf/gfa 0.15 $1.64$1.76 -
Warehouse/Storage
Residential
Single-Family 210 du 0.94 $6,575.616145.7 $5,326.254978.0
Detached Housing 2 3
Single Family 215 du 0.57 $3,987.343726.6 $3,229.753018.5
Attached Housing 6 6
Accessory Dwelling N/A du 0.49 $3,419.323195:-7 $2,769.652588.5
Unit 8 8
Multi-Family— Low 220 du 0.51 $3,771.483524.9 $3,054.902855.1
Rise 2 8
Multi-Family Mid-Rise 231 du 0.39 ' $2,884.082695.5 $2,336.102183.3
2 7
Mobile Home Park 240 du 0.58 $3,245.843033.6 -
3
Senior Adult Housing 251 du 0.30 $1,678.881569.1 $1,359.891270.9
—Single Family 2 9
Senior Adult Housing 252 du 0.25 $1,399.074307,6 $1,133.241059.1
— Multi Family 0 6
Congregate Care 253 du 0.18 $1,007.33941.47 $815.94762.59
Facility
Assisted Living 254 bed 0.24 $1,343.101255.3 $1,087.911016.7
0 9
Continuing Care 255 du 0.19 $1,063.29993.78 $861.27801.96
Retirement
Community
Lodging
Hotel 310 room 0.59 $4,716.851408.4 $3,570.87$3,820.
8 65
Motel 320 room 0.36 $2,878.082689.9 -
2
Recreational
Health/Fitness Club 492 sf/gfa 3.45 $16.0314.98 $11.86409
Land Use ITE ' Independent Trip Non-Downtown Downtown Fee
Land Variable Rate Fee Rate Rate
Use
_ Code
Recreational 495 sf/gfa 2.50 $11.6210.86 $8.60&93
Community Center
Institutional
Elementary School 520 student 0.14 $380.55355.67 : $281.60263.19
Middle School/Jr. 522 student 0.15 $647.57605.23 $479.20'M7.87
High
High School 525 student 0.14 $828.25774.10 $612.905 3
School District Office 528 sf/gfa 2.04 $18.7217.19 $12.7311.89
Junior/Community 540 student 0.11 $650.77608,22 $481.54150.08
College
Church 560 sf/gfa 0.49 $3.623.39 $2.682.51
Day Care Center 565 sf/gfa 11.12 $44.4541.55 $32.8930.74
Medical
Hospital 610 sf/gfa 0.86 $6.886.13 $5.575,1-
Nursing Home 620 beds 0.14 $783.48732.26 $634.625933
Clinic 630 _ sf/gfa 3.69 $20.6549,30 $16.7315.63
Animal Hospital/Vet 640 sf/gfa 3.53 $19.7643:46 $16.0011.96
Clinic
Office
General Office 710 sf/gfa 1.44 $13.2112.35 $8.988,40
(>5,000sf)
Small Office 712 sf/gfa 2.16 $19.8218.52 $13.4712.59
(<5,000sf)
Medical Office- 720 sf/gfa 3.93 $28.2826.13 $19.2317.97
Standalone
Medical Office- 720 sf/gfa 2.84 $20.44940 $13.9048,99
Hospital Campus
Post Office 732 sf/gfa 11.21 $28.5726.70 $19.4318.16
Retail
Free Standing 813 sf/gla 4.33 $12.9012.06 $9.558.92
Discount Superstore
Free Standing 815 sf/gla 4.86 $16.9315.82 $12.5311.71
Discount Store
Hardware/Paint Store 816 sf/gla 2.98 $7.497.00 $5.54545
Shopping Center 820 sf/gla 3.40 $9.428,80 $6.976:54-
(>150k)
Shopping Plaza (40- 821 sf/gla 9.03 $25.0223.38 $18.5117.30
150k) -with
supermarket
Shopping Plaza (40- 821 sf/gla 5.19 $14.3813.11 $10.649-:94
150k) -without
supermarket
Strip Retail Plaza 822 sf/gla 6.59 , $18.2617.06 $13.5112.63
(<40k)
Land Use ITE Independent Trip Non-Downtown Downtown Fee
Land Variable Rate Fee Rate Rate
Use
Code
Car Sales— New 840 sf/gla 2.42 $17.8016.61 $13.1712.31
Car Sales— Used 841 sf/gla 3.75 $27.5825.78 $20.41,19.08
Automobile Parts 843 sf/gla 4.90 $9.498787 $7.0265 6
Sales
Tire Store 848 sf/gla 3.75 $11.87444 $8.798.21
Supermarket 850 sf/gla 8.95 $24.0422.17 $17.7916.63
Convenience Store 851 sf/gla 49.11 $62.5358.11 $46.2713.23
Home Improvement 862 sf/gla 2.29 $5.585.21 $4.133.86
Store
Drugstore w/o Drive- 880 sf/gla 8.51 $13.5912.70 $10.06940
Through
Drugstore w/ Drive- 881 sf/gla 10.25 $17.7646.60 $13.1442,28
Through
Marijuana Dispensary 882 sf/gla 18.92 $139.16430.06 $102.9896.25
Services
Drive-in Bank 912 sf/gfa 21.01 $40.9438.27 $30.3028.32
Fast Casual 930 sf/gfa 12.55 $40.7538.08 $30.1528.18
Restaurant
Fine Dining 931 sf/gfa 7.80 $29.6827.74 $21.9720.53
Restaurant
High Turnover (Sit- 932 sf/gfa 9.05 $23.7122.16 $17.55148
Down) Restaurant
Fast Food Restaurant 933 sf/gfa 33.21 $67.7063.28 $50.1046.83
w/o Drive-Through
Fast Food Restaurant 934 sf/gfa 33.03 $66.0261.70 $48.8545.66
w/ Drive-Through
Coffee Shop w/o 936 sf/gfa 32.29 $21.9420.51 $16.2415.18
Drive-Through
Coffee Shop w/ Drive- 937 sf/gfa 38.99 $26.5021.76 $19.6118.33
Through
Coffee Shop w/ 938 # Lanes 15.08 $10,247.569 7. $7,583.207087.1
Drive-Through (No 64 3
Seating)
Automobile Parts and 943 sf/gfa 2.06 $6.345.93 $4.694.39
Service Center
Service Station 944 vfp 13.91 $27,412.2325620 $20,285.0548968
:44 788
Service Station w/ 945 vfp 18.42 $27,537.9525737 $20,378.0819015
Market (2-4k) :60 53
Lakeland PUD (Per Ordinance No. 4867 as amended by Resolution No. 2955, Ordinance No. 6176, Resolution No.
5181, and Resolution No. 5388, Resolution No. 5549, Resolution No. 5681, and Resolution No. 5719.)
Detached Single- N/A du n/a $1,609A9$1,722. -
Family Residential 13
Unit
Land Use ITE Independent Trip Non-Downtown Downtown Fee
Land Variable Rate Fee Rate Rate
Use
Code
Attached Single- N/A du n/a $1,014.67$1,117. -
Family/Multi-Family 78
Unit
Senior-Family Unit N/A du n/a $85 $384.11 -
Commercial/Retail N/A sf/gfa n/a $4-1.8$4.47 -
Units
Administrative Fee for Review of Independent Fee Calculation $460.00490.00
Notes:
A. Basic trip rates are based on the ITE Trip Generation Manual, 11th Edition.
B. Impact fee rate calculation is based upon the following methodology:
— Basic Trip Rate = PM Peak Hour Trip Generation (per unit of measure)
— Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x Per Trip Fee/(divide
by) 1,000 for rate per square foot (where applicable) = Impact Fee Rate (per unit of measure)
C. For land uses not specifically identified here, trip generation rates could be derived from ITE
or a special study by the applicant.
D. sf/GFA= Square feet Gross Floor Area; sf/GLA= Square Feet Gross Leasable Area;
VFP=Vehicle Fueling Position.
E. Projects eligible for the Downtown Fee Rate are those located entirely within the Downtown
Urban Center boundary as identified in the Comprehensive Plan.
F. Traffic Impact fees assessed for Single Family Residential Units include home occupations,
adult family homes, family home childcares, and such occupations commonly found within
single family residences. It does not include occupations that would require a Special Home
Occupation Permit pursuant to ACC18.60.
2. Truck-Dependent Land Use Supplementary Transportation Impact Fee Rate Schedule: (Per
Resolution No.4122,Resolution No.4424,Resolution No.5181,Resolution No.5319,Resolution No.5388,Resolution No.
5470, Resolution.No. 5549, Resolution'No. 5620,Resolution No.5681,and Resolution.No. 5719.)
ITE Land Independent Truck Impact Fee Rate
Land Use Use Code Variable Trip Rate (per sf)
Industrial
Light Industry/Manufacturing/ 110, 130, sf/gfa 0.06 $0.13$0.14
Warehousing 140, 150
Heavy Industry 120 sf/gfa 0.04 $0.09$0.09
Retail
Shopping Center 820, 821 sf/gla 0.01 $0.02'.0.02
Car Sales 840, 841 sf/gfa 0.09 $845$0.16
Supermarket 850 sf/gfa 0.33 $0,74$0.76
Free-Standing Discount 813, 815 sf/gfa 0.10 $0722$0.23
Store/Superstore
Home Improvement Store 862 sf/gfa 0.37 $00$0.86
Services
Restaurant 930, 931, sf/gfa 0.63 $1.36$1.46
932
Fast Food Restaurant 933, 934 sf/gfa 2.87 $628$6.64
Notes:
A. ITE Land Use Code based on ITE Trip Generation, 10th Edition
B. Impact fee rate calculation is based upon the following methodology:
- Truck Trip Rate = Daily Truck Trip Generation (per unit of measure)
- Truck Trip Rate x Per Trip Fee = Impact Fee Rate (per unit of measure)
C. For land uses not specifically identified in the table, trip generation rates could be derived
from a special study by the applicant.
D. sf/gfa=square feet of gross floor area
'3. Facility Extension Fees: (Per Ordinance No. 5791 and amended.by Ordinance Na 5819, Resolution No.3953,
Resolution No. 4272,,Resolution Na:4424, Resolution Na:5114, Resolution Na 5319, Resolution 5380, Resolution No.
5388,Resolution No. 5470, Resolution No. 5549,Resolution No.5620,Resolution No. 5681, and Resolution No..5719)
Application Fee:
Base fee plus $1,803750.00 for each facility (water, sanitary sewer, storm drainage, street, private
street/fire lanes and private storm systems within private streets).
The base fee varies by project type as follows:
Residential $59788.00
Commercial* $2,99744.00
Multi-Family** $4,86.170.00
Short Plat $65,000825.00
Plat $9,641360.00
* Includes multi-use projects in the Downtown Urban Center and projects outside City
limits that extend City utilities.
** Includes multi-use projects outside the Downtown Urban Center.
Review and Inspection Fee: Summation of the following categories (a+b+c).
a. For the combined linear footage of water, sanitary sewer, storm drainage and private storm
drainage within private streets, streets, and private street/fire lanes, $6.750 per lineal feet.
b. For non-linear extensions such as pump stations or traffic signals, the review and inspection
extension fee will be determined by the City Engineer based on an estimate of the City's costs
associated with the review and inspection costs with staff time at a rate of$1234-.00 per hour
and outside support services charged at actual cost.
c. For that portion of a City utilities extension located outside City Limits, additional fees may be
assessed equal to the City's costs associated with permits from other jurisdictions required to be
paid for by the City.
Facility Extension Fees will be paid as follows:
a. Application fee (including base fee and per facility charge) due with application.
b. 30% of the estimated Review and Inspection Fee and any outstanding application fees
will be paid when the applicant applies for second review or, if no second review is
needed, before the City signs the facility extension agreement.
c. Remaining balance of Review and Inspection Fees and any other outstanding application fees
will be paid by the applicant before the City signs the facility extension agreement.
Additional Review:
Each additional plan review beyond a 3rd review, prior to plan approval, will require an
additional fee of$98428.00 be paid at the time of the additional review submittal. If the
review requires more than 8 hours of staff time to complete, an additional fee at a rate of
$1231-5.00 per hour will be charged and must be paid prior to plan approval.
Additional plan review required by changes, additions or revisions to plans during
construction will require an additional fee of$468492.00 be paid at the time the additional
review is submitted and prior to any review being completed. If the review requires more
than 4 hours of staff time to complete, an additional fee at a rate of$12345.00 per hour will
be charged and must be paid prior to plan approval.
For each deviation, deferral, or appeal submitted for review, the applicant will be charged
a $49260.00 fee, regardless of the City's approval or rejection of the request. If the review
of the request requires more than 4 hours of staff time to complete, an additional fee at a
rate of$1231-5.00 per hour will be charged and must be paid prior to delivery of the City's
determination.
Additional Inspection:
Fees to inspect work beyond the Authorized Construction Period, re-inspect previously inspected
work that was found to be incomplete or deficient, and inspection of non-linear extension work
are applied a rate of$1231-5.00 per hour during normal business hours and $1875.00 per hour
during non-business hours (weeknights, weekends, and holidays).
4. Right-of-Way Use Permit Fees: (Per Ordinance No. 6125, Resolution No..5255,Resolution No. 5319,
Resolution No.5388, Resolution No. 5470,Resolution No. 5549, Resolution No: 5620,:Resolution No.5681,and_.
Resolution No.5719.)
Type A—Banner(Application Fee Only, No permit fee) $697.00
Type B —Short Term (Application Fee Only, No permit $697-.00
fee)
Type C — Long Term (Application Fee) $27685.00
Type C— Long Term —Surface Encroachment (Permit $1362.00 per year
Fee)
Type C — Long Term — Surface Encroachment Per Estimated Value of the encroachment
(Leasehold Excise Tax (LET) Collection) area as determined by the City Engineer
_and the current LET Rate set by the State.
Type C — Long Term — Non-Surface Encroachment $697.00 per year
(Permit Fee)
Type D — Hauling (Application Fee) $1362.00
Type D — Hauling (Permit Fee) Estimated staff time for inspection and
oversight @ $116124.00 per hour during
normal business hours and $1-76188.00per
hour during non-business hours
(weeknights, weekends, and holidays).
Police support to be contracted separately
as needed.
Administrative Amendment (Application Fee, applies $138142.00
to requested changes to Right-of-Way Use Permits
that have been issued that do not change the intent of
the permitted use or include areas beyond the intent of
the original use)
Additional Application Fee for permits that require a $116120.00
parking plan, traffic control plan, and/or pedestrian
detour plan
5. ,,Franchise Agreements:"(Per Ordinance No:"6546, Resolution Na 5114,Resolution Na 5255, Resolution No:
5319,Resolution No. 5388; Resolution No:5413, Resolution Na,5424,Resolution Na 5470, Resolution No, 5549;,.°
Resolution No. 5620„Resolution No. 5681,and Resolution,No: 5719.)
Application/Renewal/Amendment Application Fee $6,4600.00 Nonrefundable Initial Fee +
(ACC 13.36.040, ACC 20.06.120, ACC 20.06.130) plus the City's actual costs incurred in
excess of$6,4600. Initial Fee is due at
time of application any additional costs
beyond the initial fee is due prior to the
effective date of the agreement.
Annual Administration Fee (ACC 20.04.170) Actual City Costs
Annual CATV Franchise Fee (ACC 13.36.230) 5% of Gross Revenue for the prior three
months.
Other Annual Franchise Fee (ACC 20.06.100) Statutorily Permissible Percent of Gross
Revenue
Small Wireless Facility Application Fee (ACC $500.00 for Existing, Relocated, or
20.02.010, ACC 20.14.020) Replaced Structure for up to five sites or
$1,000.00 for each New Structure
(These fees include all City permitting
costs except the Franchise
Application/Renewal/Amendment-and
Administration Fee.)
Late Payment. In the event any quarterly payment is Simple interest at 12% annually on the total
made after noon on the date 10 days after the date amount past due
due
Assignment or transfer of Franchise $3,3200.00
6. Right-of-Way Vacations: (Per Resolution;No:4143,Resolution No:.5114;Resolution Na 5319, Resolution No.
5388, Resolution No.:5470, Resolution No. 5549; Resolution No. 5620;Resolution No. 5681, and Resblution No. 5719.)
Application Fee $1,935.001995.00
Land Value Compensation Per ACC 12.48.085
Amendment Request (applicable when changes $ 997.00
are requested after initial City Council approval
but prior to vacation taking effect)
7. Utility System”Development Fees: (Per Ordinance Na."5819 and amended by Resolution No. 3797,
Resolution Na 3953, Resolution No. 4272 Resolution No...4424,Resolution,No. 5114,,Resolution Na. 5134, Resolution
No. 5181, Resolution Na 5255,Resolution No. 5319,.Resolution No:"5388;.Resolution Na 5470, Resolution No,$549, ;
Resolution No. 5620, Resolution Na'5681,and Resolution Na 5719.)
For`all utilities, a charge in lieu of assessment or-payback`charges may be applicable for the
proportionaishare of the utility line being connected to.:.
a. Water Utility: Connection fees are comprised of a Permit Fee and the System Development
Charge as follows:
Meter Water Service Installation Permit Fee System
Size Existing Water Water Service &Meter Box Installed by City(2) Development
(In Service& Meter Paved Street Unpaved Street Charge (SDC)
Inches) Box(1)
3/4 or less $534547.00 $5,0025.152.00 $3,3'173,447.00 $8,895.009,553.00
3/or less $8,895.009,553.00
with $534547.00 $6,7756.978.00 $571-205,274.00
Firelinee3)
1 $590608.00 $505 212.00 $3,4053_,507.00 $8,895.009,553.00
1 with $590608.00 $6,8337,038.00 $5,1775,332.00 $9,553.008;895:00
Fireline(3)
1-1/2 $1,'1331,476.00 $8;6868,647.00 $7,0307,241.00 $2976-1&0031,810.00
2 $1;4491,492.00 $8,7028,963.00 $7,0177,258.00 $47-406-0050 914.00
3 Actual Cost By Applicant By Applicant $91,900.00101,923.00
4 Actual Cost By Applicant By Applicant $148;264:00159,236.0
0
6 Actual Cost By Applicant By Applicant $296,444.00318,381.0
0
8 Actual Cost By Applicant By Applicant $417/1,330.00509,430.0
0
10 Actual Cost By Applicant By Applicant $681,918.00732,380.0
0
(1)Installation of a water meter done by the City and the service either already exists or has been
installed by the Applicant.
(2)Installation of the entire water service is done by the City.
(3)Applies only to Single-Family Residential meter.
b. Sanitary Sewer Utility: Connection fees are comprised of a Permit Fee and the System
Development Charge as follows:
Type Permit Fee System Development
Charge (SDC)
New Connection(4) $249242.00 $3,300.003,544.00 per
RCE(5)
Grinder Pump (New $331341.00 $3,300.043,544.00,per
Connection)(4) RCE(5)
Tenant Improvement(4) $8385.00 $3,300.003,544.00 per
net increase in RCE's(5)
(4)All construction is the responsibility of the Applicant. If a new connection or repair
requires work within City right-of-way, a Construction Permit (CON -see Section 9) is
required in addition to the Sewer Permit.
151RCE, Residential Customer Equivalent -An RCE shall be as defined by the King County
Department of Natural Resources as follows:
Single Family Home 1,500-2,999 square feet(sq ft)—1.0 RCE Duplex—1.62 RCE
Single Family Home less than 1,500 sf—0.81 RCE Triplex—2.43 RCE
Single Family Home,3,000 sf or larger—1.16 RCE Fourplex—3.24 RCE
Accessory Dwelling Unit(Attached or Detached)—0.59 RCE Five or more units—0.63 RCE's per unit
Mobile home spaces—1.0 RCE per space
For micro housing and for commercial,industrial and other non-residential uses,the number of RCE's is calculated
based on the number and type of water fixtures installed as part of the development.
NOTE: In addition to City sanitary sewer connection fees, King County will impose a-sanitary
sewer connection fee (King County Capacity Charge)for improvements in King County's regional
sewer system, in accordance with King County Code 28.84.050. King County will bill customers
directly for this charge once the sewer work is complete. This charge is not to be paid to the City.
c. Storm Drainage Utility: (Per Resolution No. 4566 and amended by Resolution No. 5181, Resolution No. 5255,
Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620,
Resolution No. 5681, and Resolution No. 5719.)
Connection fees are comprised of a Permit Fee and the System Development Charge as follows:
Type Permit Fee(s) System
Development
Charge (SDC)
Single Family Level 1 $265273.00 $1,6'19.001,759.0
Residence& Level 2 $549535.00 0 per Parcel
Duplexes (on
Individual Level 3(7) Base Fee=$11,84312,198.00 for up to 10,000 SF of disturbed
Parcels)
area
Cumulative Additional Fee#1 =Base Fee+$519535.00 for
10,001 SF up to 43,560 SF(1 Acre)of disturbed area
Cumulative Additional Fee#2=Cumulative Additional Fee#1 +
$1-32136.00 •erwhole or •artial Acre disturbed over 1 Acre
Other Parcels Level 1 $265273.00 $4 649:081,759.0
0 per ESU(8)
Level 2 $5535.00
Level 3(7) Base Fee=$1,8431,898.00-for up to 10,000 SF of disturbed
area
Cumulative Additional Fee#1 =Base Fee+$549535.00 for
10,001 SF up to 43,560 SF(1 Acre)of disturbed area
Cumulative Additional Fee#2=Cumulative Additional Fee#1 +
$132136.00 per whole or partial Acre disturbed over 1 Acre
(6)Permit levels are determined as follows:
• Level 1 permits are for all projects that are not located in a Critical Area and add or replace less than 2,000
square feet of hard surface area; and/or disturb less than 7,000 square feet of land.
Note: Single-family residential projects disturbing 500 square feet or less may not require a permit.
• Level 2 permits are for all projects that add or replace 2,000 to 4,999 square feet of hard surface area; or
disturb 7,000 square feet or more of land.
• Level 3 permits are for all projects that add 5,000 square feet or more of hard surface area, or convert 3/4
acres or more of native vegetation to lawn/landscaped area, or convert 2.5 acres or more of native
vegetation to pasture, or the new plus replaced hard surface area is 5,000 square feet or more and the
value of improvements exceeds 50% of the assessed value of existing improvements.
(7)Level 3 permit is calculated as the Base Fee plus the Cumulative Additional Fees described herein.
(8)ESU, Equivalent Service Unit-A configuration of development of hard surfaces (which include impervious
surfaces, permeable pavements, and vegetated roofs)estimated to contribute an amount of runoff to the
City's storm drainage system which is approximately equal to that created by the average single family
residential parcel. Although gravel surfaces are considered a hard surface under ACC 13.48.010, gravel
surfaces are not included in the calculation of the SDCs. One ESU is considered equal to 2,600 square feet of
parcel coverage by hard surfaces. Per ACC 13.48.010.
When calculating the total SDC, a credit of 1 ESU will be given for each single-family residential or two-family
residential parcel conversions to non-single-family use. For all others,wWhen calculating the total SDC, a
credit will be applied for the existing hard surface area except existing gravel surfaces.
8.: ,Other Utility Fees: (Per Ordinance No. 5819,•Ordinance No.5944, Resolution No,3797, Resolution No. 3953,
Resolution No: 4424, Resolution No: 5114, Resolution No. 5134, Resolution No. 5255, Resolution No.5319,Resolution`
No. 5388, Resolution No. 5424,Resolution No. 5470,Resolution'No.5549, Resolution:No. 5620, Resolution No: 5681,
and Resolution No. 5719.)
Fireline Connection Permit $177182.00
Hydrant Installation Permit and Inspection Fee $384313.00
Hydrant Use Monthly Rate (applies to Type A and B permits): Per Current Utility
3-inch water meter monthly rate, plus Rate Schedule
Actual usage at Commercial water rate
Hydrant Permit (Type A and Type B)Administration Fee $260268.00
Fire Hydrant Meter Wrench Fee (Type A Permit)(') $6862.00
Hydrant Meter with RPBA, Valve, and Wrench (Type B Permit)— Refundable $24863
Deposit(2)
Dedicated Hydrant Use and Hydrant Meter Penalties and Charges:
Failure to record "Start" read properly(2a) $286295.00
Failure to record "Finish" read properly(2a) $286295.00
Failure to submit monthly water consumption report to the city(2b) $4412.00
Nonpayment of bill within 10 calendar days of reminder notice(2b) $4412.00
Non-return of hydrant meter with RPBA assembly after request for $4412.00
return(2b)
Using a hydrant without Trained Hydrant Operator Card on hand(2a) $5759.00
Using a hydrant without obtaining Trained Hydrant Operator Card(2a) $286295.00
Using a hydrant without Hydrant Permit documentation on hand(2a) $5759.00
Using a hydrant without obtaining Hydrant Permit(2a) $286295.00
Loaning out a hydrant meter with RPBA assembly to an unauthorized $286295.00
party(2a
Using a tool other than the city-supplied hydrant wrench to operate a $5759.00
hydrant(2a)
Damage to hydrant or infrastructure (reimbursement to city for repair or At Actual Cost
replacement)
Nonresponse to revocation of permit or trained hydrant operator $4412.00
certificate(2b)
Disassembly or tampering of hydrant, hydrant meter assembly or hydrant $286295.00
meter with RPBA assembly(2a)
Water Use Charge for Unreturned Hydrant Meter (if equipment not returned $866892.00
for final reading)
Water Meter Test Fee, 2" or less $276284.00
Water Meter Test Fee, greater than 2" At Actual Cost
Water Meter Removal Fee (3/4" to 1") • •-- •- -• - • $386398.00
Water Meter Removal Fee (1-1/2"to 2") (service line remains) $773796.00
Water Meter Removal Fee (3" and larger) (service line remains) At Actual Cost
Water Service Abandonment Permit (City abandons at main, removes meter $3,7133,824.00
and box)
Water Meter Relocation Permit by City Same as Water
Service Installation
Permit Fee, see
7.a.
Water Service Alteration/Repair Permit on Private Property (by Applicant) $4-89112.00
Backflow Permit for Premises Isolation (internal or external) $105108.00
Utility Fees with Demolition Permit
Water Meter Lockoff/Unlock Demo Fee (all sizes), per meter $8689.00
Fire Line Shutoff/Turn-on Demo Fee $8689.00
Fire line Abandonment Permit (at main or other City-approved location, by $105108.00
Applicant, also may require Construction permit if in ROW)
Fire line Abandonment Permit (at main or other City-approved location, by Same as Water
City), based on size of connection at main Service Installation
Permit Fee, see
7.a.
Backflow Assembly Abandonment Demo Fee, per assembly $8385.00
Side Sewer Cap Demo Fee (to cap side sewer before building demolition), $105108.00
per sewer connection
Storm Inspection Demo Fee (to cap storm pipes before building demolition), $26284.00
per parcel
Hydraulic Modeling (payment of estimated fees required in advance) At Actual Cost
King County Right-of-Way Permit At Actual Cost,
$10101.071.00
Deposit
Hourly Rate for Negotiation, Development, Administration, and Execution of $115118.00
Special Agreements for Utility Service (Franchise Agreements, Service Area
Agreements)
Re-Locate Fee (if<45 days from initial locates) $251262.00
Side Sewer Repair Permit on Private Property $105108.00
Side Sewer Repair Permit in Right-of-Way(3) $4-99205.00
Side Sewer Cap Permit (not associated with demolition) $105108.00
Side Sewer Relocation/Replacement Permit $165170.00
Oil/Water Separator Permit $251262.00
Grease Interceptor Permit(3) $2511262.00
Storm Drainage Repair Permit— Existing Private System on Private Property $105108.00
Storm Drainage Repair Permit— Existing System in Public Right-of- $199205.00
Way/Easement(3)
Storm Retrofit Permit— Non-Single Family on Private Property $2301.00
Utilities Payback Administration Fees:
Application Feee4):
Base Fee (BF) $2,5322.608.00
Per Benefited Parcel (BP) $6769.00
Application Fee Calculation = BF+ (BP x Number of Benefited
Parcels)
Payment Processing Fee(per parcel)(5) $122126.00
Outside Professional Services, including Area of Special Benefit Analysis Time & Materials
Recording fee will be billed to the Developer after recording is complete for At Actual Cost
actual cost.(6)
$52.00
Delinquent shut off $52.00
Late charge 1% per month of
e
$16.08-mom,
whichever-i-s
greater
$5.36.00-plus
Meter Cost, if
applicable
$10,1.00
Delinquent meter pull $208.00
Unauthorized fire line or water hook up $10,1.00 a day fine
from date of
dissevery
Refusal of access per day $31.00
GlesingiFina $46,04
New account setup $26.00
Bill-tenant l�1T1 to^ant $26.00
• _ _- .. _ _ . • _• _• $52.00
Escrow estimate& $26.00
(1)Non-refundable fee. Wrench is only for withdrawing water at City-designated hydrant fill stations. Applicant will be
charged the Hydrant Use Monthly Rate and all monthly reported water use at Commercial water rates until applicant
returns wrench and notifies City in writing that applicant is no longer using water from City-designated hydrants.
(2)Each year,the hydrant meter with RPBA,Valve,and Wrench must be returned to City for annual maintenance and
testing no later than the date specified by the City at the time of application. The deposit amount will be forfeited if the
equipment is not returned to the City by the deadline. If needed,the City will re-issue a hydrant meter to the applicant
under the same permit. In that instance,the applicant will be billed for any damages to the returned meter;the deposit will
be applied to the re-issued hydrant meter. Upon final return of the equipment to the City,the cost of repairing any
damages will be deducted from the deposit.
(2a)Maximum penalty, per day, location,violator and incident.
(2b)Per calendar day.
(3)If repair or new construction requires work within City right-of-way, including a new connection to the City's system,a
Construction Permit(CON-see Section 9)is required in addition to the permit.
(4)Payback Agreement Application Fee includes mailing costs.
(5)Fee to be deducted from the amount due to the developer when payback is collected for a parcel.
(6)Fee to be billed after recording. Outstanding recording fees will be deducted from the amount due to the developer
when payback is collected for a parcel.
9. Construction/Excavation Permits (for work within the public rights-of-way including
constructionof utilities, sidewalks and driveways that are not part of Facility Extensions
(FAC)): (Per.Ordinance No. 5817, Resolution Na 3953,Resolution Na 4272, Resolution No. 4424,Resolution.No.
5319, Resolution No. 5388, Resolution No. 5470, Resolution No.,5549, Resolution No.5620,Resolution No. 5681, and
Resolution No. 5719.)
Basic Fee (BF) $1882.00
Basic fee covers permit intake, admin, limited review and inspection
time.
Daily Review and Inspection Rate (DIR)
Normal Business Days (weekdays) $500185.00
Non-Business Days (includes weeknights, weekends, and holidays)) $74523.00
Fee Calculation:
Permit Fee = BF + (DIR x Estimated Days In Right of Way)*
*For projects that are expected to involve significant review and inspection time, after hours work, or
the review and inspection scope or duration requirements cannot be accurately estimated, the city
engineer may establish a deposit account to manage permittee deposits in advance of permit
issuance for reimbursing actual labor costs of administering the permit. Such deposit accounts will
not be interest bearing and will be closed at the end of the permitted work when a final accounting
of the permit administration cost shall be calculated, and a final bill or credit issued to the permittee.
, The Public Works Director is authorized to waive construction permit fees for projects that are
' funded through the City's Nneighborhood Ggrant Program. A fee waiver does not eliminate the
requirement to apply for and obtain a permit.
10. Memorial Sign Program: (Per Ordinance No: 6137,,Ordinance No. 6149,Resolution No. 5319, Resolution No.
5388,Resolution No. 5470, Resolution No. 5549, Resolution No:"5620, Resolution No.'5681, and Resolution No. 5719.)
Memorial Sign $192198.00
11. Special Permits:' (Per Ordinance:No. 5817 and amended by Resolution No. 3953, Resolution No. 4272,
Resolution No. 4424,Resolution,No..5319, Resolution No. 5388, and Resolution No. 5470.)
Special Permit fees are assessed per Section 9. Construction/Excavation Permits
12. Street Payback Agreements: (Per Ordinance No. 6319, Resolution No. 4624,Resolution No. 5319,
Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No: 5681, and Resolution No..5719.)
Street Payback Administration Fees:
Application Fee(1):
Base Fee (BF) $2,608532.00
Per Benefited Parcel (BP) $697.00
Application Fee Calculation =BF+ (BP x Number of Benefited
Parcels)
Payment Processing Fee(per parcel)(2) $1262.00
Outside Professional Services, including Area of Special Benefit Analysis Time & Materials
Recording fee will be billed to the Developer after recording is complete for At Actual Cost
actual cost.(3)
(1)Payback Agreement Application Fee includes mailing costs.
(2)Fee to be deducted from the amount due to the developer when payback is collected for a parcel.
(3)Fee to be billed after recording. Outstanding recording fees will be deducted from the amount due to the developer
when payback is collected for a parcel.
13; Mitigation and Impact Fees for Exempt Wells: (Per Resolution No. 5352"and RCW90.94.0320.)
Mitigation and Impact fees for properties that will be served by new $500.00
exempt wells drilled on or after January 19, 2018.*
*$350.00 of the $500.00 fee shall be sent to the Washington State Department of Ecology for
mitigation enhancements in the well's drainage basin, with the remaining $150.00 to be retained by
the City to cover its administrative costs.
14. Sidewalk Repair;Program.Fee: (Per Resolution,No. 5620, Resolution No. 5681, and
Resolution No. 5719.)
Application fee (includes recording): $100
Fee for sidewalk repair: $342.00 per Square Foot for sidewalk and residential driveway apron
(excluding curb/qutter and approach), and $16.00 per Square Foot for residential driveway apron
approach (as required to for residential driveway apron repair) repairs required by ACC 12.12.234 to
be included in the City's annual Sidewalk Repair and Accessibility Program. This fee does not
include tree removal; but includes removal of roots located under the sidewalk to be repaired.
15. Technology'Fee: (Per Resolution No. 5549, and Resolution No. 5620.)`
A 3% technology fee is included in all fees listed above except fees listed in Sections 1, 2, 12, 13,
and system development charges in section 7.
C. ANIMAL LICENSING FEES AND PENALTIES (Per Resolution No. 4868, Resolution No. 5701, and Resolution
No. 5719):
AVHS SERVICE FEES
ALTERED ANIMAL WITH CURRENT COA LICENSE
IMPOUNDS ALTERED ANIMAL ADDITIONAL FEES
(within 24-month period) (may also include vaccines fee if not current)
1"Impound $25 +$15 rabies+$16 additional vac/deworming
+$10 Flea treatment+$20 daily board
2nd Impound $50+Microchip +$10 Flea treatment+$20 daily board
3rd Impound $100 +$10 Flea treatment+$20 daily board
4th Impound $200 +$10 Flea treatment+$20 daily board
5th+Impound $350 +$10 Flea treatment+$20 daily board
UNALTERED ANIMAL WITH CURRENT COA LICENSE
IMPOUNDS UNALTERED ANIMAL ADDITIONAL FEES
(within 24-month period) (may include vaccines fee if not current)
1"Impound $45 +$15 rabies+$16 additional vac/deworming
+$10 Flea treatment+$20 daily board
2nd Impound $90+Microchip +$10 Flea treatment+$20 daily board
3rd Impound $180+S/N Surgery +$10 Flea treatment+$20 daily board
ALTERED ANIMAL WITHOUT CURRENT COA LICENSE
IMPOUNDS ALTERED ANIMAL ADDITIONAL FEES
(within 24-month period) (may also include vaccines fee if not current)
1"Impound $40 +$30 license+$15 rabies+$16 additional vac/deworming
+$10 Flea treatment+$20 daily board
2nd Impound $80+Microchip +$10 Flea treatment+$20 daily board
3rd Impound $160 +$10 Flea treatment+$20 daily board
4th Impound $320 +$10 Flea treatment+$20 daily board
5th+Impound $580 +$10 Flea treatment+$20 daily board
UNALTERED ANIMAL WITHOUT CURRENT COA LICENSE
IMPOUNDS UNALTERED ANIMAL ADDITIONAL FEES
(within 24-month period) (may also include vaccines fee if not current)
15t Impound $65 +$60 license+$15 rabies+$16 additional vac/deworming
+$10 Flea treatment+$20 daily board
2"d Impound $130+Microchip +$10 Flea treatment+$20 daily board
3rd Impound $260+S/N Surgery +$10 Flea treatment+$20 daily board
LICENSING TRAP RENTALS
Unaltered Dog/Cat $60 Trap Rental w/$75 deposit $5/day
Altered Dog/Cat $30
Senior Citizen Dog/Cat Altered $15
Disabled Citizen Dog/Cat Altered $15
Juvenile Dog/Cat Unaltered<6 mo $15
Replacement Tag $5
Page 26
AVHS MANDATED SERVICES FEES
MANDATED SERVICE FEE
Microchip $55
Cat Neuter $115
Cat Spay $115
Dog Neuter<24.9 lbs. $160
Dog Neuter 25-49.9 Ibs. $180
Dog Neuter 50-74.5 Ibs. $195
Dog Neuter 75-99.9 Ibs. $220
Dog Neuter>100 lbs. $370
Dog Spay<24.9 lbs. $160
Dog Spay 25-49.9 lbs. $180
Dog Spay 50-74.5 lbs. $195
Dog Spay 75-99.9 lbs. $220
Dog Spay>100 lbs. $370
Feline Pregnant/Obese $55-$125
Canine Pregnant/Obese $65-$135
Cryptorchid Neuter $65-$135
Injectable Pain Medication $40
Take-Home Pain Medication $25
Elizabeth Collar $15
SURRENDER FEES FEE
Dog/Cat within Auburn City Limits $105
Dog/Cat Litter(2 or more)within Auburn City Limits $165
Dog/Cat outside Auburn $175
Dog/Cat Litter(2 or more)outside Auburn $225
Small Domestic Reptile(Bearded Dragon,Gecko,Terrestrial Turtle) $65
Small Exotic Bird $75
Small Rodent(Guinea Pig,Hamster,Rat,Rabbit) $75
Snake(Under 6ft) $95
Ferret,Chinchilla,Sugar Glider $95
Disposal<25 lbs. $35
Disposal<25-50 lbs. $45
Disposal>50 lbs. $65
Shelter Approved Owner Request Euthanasia Dog $95
Shelter Approved Owner Request Euthanasia Cat $85
ADOPTIONS FEE ADOPTIONS FEE
Puppy 2-9 months $350 Senior Dog 7+years $95
Puppy 2-6 months $500 Kittens 2-9 months $225
Puppy 7-10 months $400 2 Kittens 2-9 months $350
Small Breed Dog 10mo-6yrs $325 Cat 10mo-6yrs $95
Medium Breed Dog 10mo-6yrs $250 Senior Cat 7+years $25
Large Breed Dog 10mo-6yrs $175 Working Cat $0
Page 27
D. AUBURN MUNICIPAL AIRPORT FEES (Per Ordinance No. 5707, amended by Ordinance No. 5715
and Ordinance No. 5819, and amended by Resolution No. 3784, Resolution 3797, Resolution No. 3841, Resolution
No. 3953, Resolution No. 4117, Resolution No. 4270, Resolution No. 4414, Resolution 4734, Resolution No. 4880,
Resolution No. 5016,Resolution No.5114,Resolution No.5181,Resolution No.5213,Resolution No.5255,Resolution
No. 5319, Resolution No. 5388, Resolution No. 5424, Resolution 5470, Resolution No. 5549, Resolution No. 5620,
Resolution No. 5681, and Resolution No. 5719.)
1. Lease Fees. .
Lease Type:
Open D-G $218.00 259.00
Open C $295.00 308.00
Closed J $416.00 466.00
Closed H $17'1.00 495.00
Closed Y & Z $551.00 576.00
Closed Y1 &Z22 $708.00 740.00
Outside Tiedowns $87.00
Storage Rows H-D $159.00 166.00
Storage Units (185 sq. ft. — Buildings Y&Z) $110.00 146.00
Storage Units (298 sq. ft. — Building Z) $171.00 179.00
Storage Units (380 sq. ft. — Buildings Y&Z) $216.00 226.00
Upon Completion of J & G Upgrades $495.00
A security surcharge of$10.00 per month is charged, in addition to the base monthly rental
fees provided in this section, for each tie-down, each hangar door and each storage rental
area, which security surcharge fees are to be used for the provision of increased security at
the Auburn Municipal Airport (approved by Ordinance No. 5500 on January 16, 2001). For
the purposes hereof, each tie-down consists of the structures/facilities necessary to
accommodate one (1) regular sized light aircraft. Furthermore, the hangar doors to which the
security surcharge applies includes all hangars located at the Auburn Municipal Airport,
including those hangars built on land owned by the City but leased to private parties, and
those hangars owned in a condominium type ownership.
The above lease and security surcharge amounts are subject to applicable leasehold taxes,
which shall be paid by the tenant. The total charges, including the above lease rates plus
lease hold tax and surcharge shall be reflected in monthly billing rates. Tenants shall be
given notice as required by Ordinance or lease agreements. The Airport Lease rates shall be
effective January 1, 20234.
Payments. Payments are due on the first of each month, past due as of the 5th and late as of
the 16th. Payments not received by the 15th incur a $25.00 late fee. Payments not received
after 30 days from the due date incur an additional $25.00 delinquency fee each month
payment is delinquent. Any instance where a check is tendered for payment and non-
sufficient funds exist to settle the transaction, a fee shall apply as set forth in the City of
Auburn Fee Schedule.
Automatic gate electronic cards. One automatic gate electronic card will be issued to
each City rental tenant free of charge. Any additional electronic cards requested by a tenant
are subject to a $25.00 fee. An additional $25.00 replacement fee will be assessed against
the tenant for all lost or damaged electronic cards. All electronic cards must be returned to the
airport at the time of lease expiration.
Page 28
Each lease shall include an initial payment of first and last months' rent plus a damage
deposit in the amount of two times the monthly base rate, with the exception of an Outside
Tie-Down Lease which shall include an initial payment of first months' rent only. Each lease
agreement shall also include terms that authorize the City to apply the damage deposit to
outstanding charges on termination.
[2. Daily Transient"Parkin (overnight).. -
Tie Down $5.00
Open "T" $25.00
Enclosed Hangar $35.00
1A 3;!;Base Parking Fe Designated Spaces � —71
..m__..e
A base vehicle parking fee of$72.00 75.00 per month per designated space is
charged. There are designated spaces available on a first come basis for pilots to park or
store a vehicle for an extended period of time. All airport rules and regulations apply. A
monthly storageagreement must be completed and appropriate fees paid. The storage of
vehicles is for the convenience of the users of the Auburn Airport and is month-to-month.
Additional Air ort.Fees P 7_
Gate Cards (each lease gets one card at no charge.) $25.00
Monthly Aeronautical Business Fee $75.00
Initial Hangar Waitlist Fee $50.00
Annual Hangar Waitlist Fee $25.00/year
Resale Fuel Flowage Fee (Jet A Retailers) $0.05/gallon
Conference Room Rental Fee $25.00/hour
Gate Remote $50.00
Waiver of Fees for Governmental Entities.or.Governmental Affiliated Entities
The Mayor is authorized to waive a portion or all of any (otherwise) required fees for hangar
space rental - if space is available -for governmental entities or government affiliated entities
that provide community service(s) and public benefit(s)to residents, citizens and businesses
of Auburn.
Page 29
E. POLICE DEPARTMENT FEES (Per Ordinance No. 5715 amended by Ordinance No. 6216, 5819,
Resolution No.3797,Resolution No.3953,Resolution No.4117,Resolution No.4272,Resolution No.4424, Ordinance
6216, Ordinance 6276, Resolution No. 4552, Resolution No. 5016, Resolution No. 5114, Resolution No. 5255,
Ordinance No. 6216, Ordinance No. 6252, Ordinance No. 6345, Ordinance No. 6607, Resolution No. 5470, Resolution
No. 5549, and Resolution No. 5719.)
_Type _.. ..._ .._ __Fees-
-- -- -- -• '=-- == - - - -=- _ _ $
Visa Letter $10.00
Fingerprinting Fees (fee not charged where taking of as set by the FBI
fingerprints is required by city)
Laminated Concealed Pistol License $5.00
Annual Alarm Registration Fees:
Residential $24.00
Commercial $24.00
Residential Low Income Senior Citizen/Disabled $12.00
Citizen
Late Registration Fee $25.00
Auburn Security Alarm License $10.00/each registered alarm
user to a maximum of$100.00
annually
Late License Fee $25.00
Reinstatement Fee $100.00 plus $10.00/permitted
user
False Alarm Service Fees
Burglar False Alarm Service Fee* $100.00
Robbery, Panic and Burglary Crime in Progress False $200.00
Alarm Fee* $200.00
Supplemental Fee for Non-permitted Alarm System,
each alarm $100.00
Fee for false alarm caused by Monitoring Company or
Alarm Installation Company employee $100.00
First Dispatch Report during time of suspension
Each dispatch thereafter $25.00
Late Fee $25.00
Appeals $25.00
*The alarm administrator will waive the first false alarm
fee following the installation of an alarm system at a
particular address.
Page 30
Traffic School Fee $125.0011
Animal Impound Fees
Fee to recover from impound all animals not permitted to
be sheltered by Auburn Valley Humane Society:
Rabbits and Poultry $25/per day held
Goats and Sheep $30/per day held
Pot-Bellied pigs and Cattle $35/per day held
Horses, mini-Equine, Donkeys, and Mules $40/per day held
Stallions $50/per day held
All fees related to transport, house, and care of TBD
impounded animal
" A 3% transaction fee will be applied if paid by credit card.
Page 31
F. CITY CLERK FEES (Per Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797, Resolution No.
4244,Resolution No. 5016, Resolution No. 5114,Resolution No. 5312,Resolution No. 5549,Resolution No. 5620,
and Resolution No. 5681, and Resolution No. 5719.)
Fees for public records —collection
Non-certified photocopies of public records, printed $0.15 per page plus postage
copies of electronic public records when requested by
the person requesting records. The maximum size for
photocopies is 11x17.
Certified copies of public records. The maximum size $5.00 per document, plus
for photocopies is 11x17. $0.15 per page, plus postage
Non-certified copies of documents larger than 11x17. Actual cost charged by third
party vendor.
Scanned public records into an electronic format. $0.10 per page
Electronic files.or attachments uploaded to email, cloud- $0.05 per each 4 electronic
based storage service or other means of electronic files
delivery.
Transmission of public records in an electronic format. $0.10 per gigabyte
Digital Storage Media or Device; Container or Envelope Actual Cost
Used to Mail Copies to Requestor, and Postage.
Customized service charge for requests requiring the use Varies by request
of information technology expertise per RCW
42.56.120(3).
Police body camera video redactions (redacting, altering, $51.60 per hour
distorting, pixelating, suppressing, or otherwise
obscuring) per RCW 42.56.240(14).
Police Report/Collision Report (fee not charged where $13.25
requested by victim or party involved)
Page 32 •
G. CITY CEMETERY FEES (Per Ordinance 5715, Resolution No. 3797, Resolution No. 3953, Resolution No.
4027, Resolution No. 4103, Resolution No.4117, Resolution No. 4272 Resolution No. 4424, Resolution No.4552,
Resolution No. 4675, Resolution 4778, Resolution No. 4880, Resolution 5114, Resolution No. 5134, Resolution
No. 5181, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No.
5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681, and Resolution No. 5719.)
Type__ Pees
T e
Graves
Section 9A and 9B 3 5.00$3,395.00
All other adult graves 2,'0$2,895.00
Child's Place $'100.00$425.00
Double Depth (includes 2 burial spaces /2 liners) 64900$6,590.00
Section 9A and 9B (Quads and Upright monument plots) $7,995.00 each
Plaza Estates (Upright Plots) $9,995.00 each
Ground Cremation Plots
Centennial Urn Garden (single) $1,095.001,195.00
Centennial Urn Garden (double) $1,995.00$2,195.00
Section 9 Upright Section Urn Plots (up to 2 urns) $3,295.00
Niches
Mausoleum (top rows available only)—single Sold Out
Centennial Columbarium II (1 or 2 urns)— Row 2 $2,'195.00$2,595.00
Centennial Columbarium II (1 or 2 urns)— Row 1 $2,295.00$2,395.00
Chapel of Memories— Interior Niches* Range From
12 x 12 Single $3,095.00 - $4,195.00
12 x 18 Double $3,895.00 - $6,795.00
12 x 24 Family (up to 3 urns) $7,195.00 - $9,195.00
*The above niche prices include one bud vase per niche. Inurnment
will be $695.00-$795.00 per occasion. See guidelines for additional
pertinent information. A single inscription on the glass front is $300
$350.00 plus tax. Urn's to be purchased separately.
Chapel of Memories— Exterior Niches*
Rows 4, 5, & 6 $2,895.00$2,995.00
Rows 2 & 3 $2,595.00$2,695.00
Rows 1, 7, & 8 $2,295.00$2,395.00
*If the niche (external) is to be used as a double niche, the inurnment,
inscription and tax will be due when a second urn is placed. (Row 1 is
the bottom row)
OVERTIME WILL BE CHARGED AT$175.00 PER HOUR AFTER 4:30 P.M., MONDAY THROUGH
FRIDAY. THE SATURDAY SERVICE CHARGE IS $850.00 FOR FULL INTERMENT AND $475.00 FOR
CREMATION SERVICES.
Extended Land Use $595.00
Memorial Plaque $175 additional for inscription + tax $295.00$495.00
Services
"Chapel of Memories" rental for services $350.00
Opening and Closing — Ground Burials
Page 33
LinerNault $1,195.00$1,595.00
Children's Place $495.00
Opening and Closing —Cremation
Cremation Plot $ 95.00$895.00
Niche $695.00$795.00
Opening and Closing — Entombment $1,495.00
Marker Services
Flat Grass:
Inscription $390.00$350-+ tax
Setting Fee $395.00$295.08-+ tax
Resetting Fee $225.00$450.00--+ tax
New-Inspection Fee for outside sales $450.00
Niche Shutters
Granite Inscription $495.00 + tax
Glass Inscription $350.00 + tax
Upright
Setting Fee $525.00 $175.00 + tax
Inscription $495.00 $150.00 + tax
Resetting Fee $350.00$ 00+ tax
Vase Setting Fee $55.00 + tax
Recording Fee $100.00
Overtime Charge—per hour $175.00
Saturday Service Fee
Full Interment $850.00
Cremation $475.00
Materials
Flower Vases: (prices include vase setting fee)
Standard Galvanized $200.00 + tax
Deluxe Cast Zinc (gray or bronze zinc) $275.00$325.00
Deluxe Wall (brass) $275.00$325.00
Liners: Concrete Liner $895.00$795.00+ tax
Mountain View Vault $1,895.00$1,995.00+
tax
Vault Installation $995.00 + tax
Liner Installation $550.00 + tax
Double Depth $1,,100.00$1,795.00 +
tax
Urn Encasement $450.00$409.88-+ tax
Forestwalk Informal Cremation Garden
Phase I: Single 3' Single Ground Plot $1,795.00$1,995.00
Phase I: Double 4' Plots $2,595.00$2,795.00
Phase II: Double 4' Double Ground Plot $2,595.00 $2,795.00 -
$3,995.00
ForestWalk Ossuary Scattering $600.00
Granite Memorials Start At $695.00$595.00 + tax
Page 34
H. PARKS, ARTS AND RECREATION (Per Resolution No. 3797 and amended by Resolution No. 3953, Resolution No. 4117, Resolution No.4272, Resolution
No. 4424, Ordinance No. 6276, Resolution No. 4552, Resolution No.4880, Resolution No. 5016, Resolution No. 5181, Resolution No. 5228, Resolution No. 5255,
Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, and Resolution No. 5549, Resolution No. 5620, Resolution No. 5681, and Resolution No. 5719.)
LES GOVE MULTI-PURPOSE BUILDING Resident Non-Resident
Monday- Sunday $25.00/hour $30.00/hour
LES GOVE GYMNASIUM Resident Non-Resident Auburn Other
Non-Profit Non-Profit
Gymnasium (athletics practice, birthday $50.00/hour $60.00/hour $40.00/hour $50.00/hour
parties, etc.)
Gymnasium (tournaments, trade shows, $80.00/hour $95.00/hour $65.00/hour $80.00/hour
fairs, etc.)
Damage Deposit $300.00 $300.00 $300.00 $300.00
Optional Cleaning Fee $275.00 $275.00 $275.00 $275.00
SENIOR ACTIVITY CENTER Resident Non-Resident Auburn Other
Non-Profit Non-Profit
Millennium Room $90.00/hour $110.00/hour $65.00/hour $85.00/hour
(includes basic kitchen use)
Available Friday evenings, Saturday and
Sunday.
Full Facility Rental Package Friday night& $1,350.00 $1,650.00 $1,000.00 $1,300.00
Saturday: 4 hours Friday and up to 12 hours
of use on Saturday
Full Facility Rental Package Full Day $1,100.00 $1,400.00 $850.00 $1,100.00
Saturday or Full Day Sunday: up to 12 hours
of use on either day
1/3 Millennium Room $50.00/hour $60.00/hour $40.00/hour $50.00/hour
Lions Room $40.00/hour $50.00/hour $30.00/hour $40.00/hour
Monday- Friday
Damage & Cleaning Deposit (for Full Facility $300.00 $300.00 $300.00 $300.00
Page 35 .
and Millennium room rentals)without alcohol
Damage & Cleaning Deposit(for Full Facility $500.00 $500.00 $500.00 $500.00
and Millennium room rentals)with alcohol
($1,000,000.00 excess liability insurance
required)
Optional cleaning fee (fee required with use $275.00 $275.00 $275.00 $275.00
of alcohol in facility)
Kitchen with room rental. $30.00 (1-4 hours) $30.00 (1-4 hours) $30.00 (1-4 hours) $30.00 (1-4 hours)
$90.00 (5-12 hours) $90.00 (5-12 hours) $90.00 (5-12 hours) $90.00 (5-12 hours)
Kitchen- Private and Commercial Use $25.00/hour $30.00/hour $25.00/hour $30.00/hour
AUBURN COMMUNITY& EVENT CENTER Resident Non-Resident Auburn Other
Non-Profit Non-Profit
Full Community Room $130.00/hour $160.00/hour $100.00/hour $130.00/hour
2/3 Rooms of Full Community Room $100.00/hour $130.00/hour $80.00/hour $100.00/hour
1/3 Room of Full Community Room $65.00/hour $85.00/hour $50.00/hour $70.00/hour
Full Community Room (up to 12 hours) $1,350.00 $1,650.00 $1,000.00 $1,300.00
Classroom $20.00/hour $25.00/hour $15.00/hour $20.00/hour
Kitchen with room rental. $30.00 (1-4 hours) $30.00 (1-4 hours) $30.00 (1-4 hours) $30.00 (1-4 hours)
$90.00 (5-12 hours) $90.00 (5-12 hours) $90.00 (5-12 hours) $90.00 (5-12 hours)
Kitchen- Private and Commercial Use $25.00/hour $30/hour $25.00/hour $30.00/hour
Damage & Cleaning Deposit for Full Facility $300.00 $300.00 $300.00 $300.00
without alcohol
Damage & Cleaning Deposit for Full Facility $500.00 $500.00 $500.00 $500.00
with alcohol ($1,000,000.00 excess liability
insurance required)
Optional cleaning fee (fee required with use $275.00 $275.00 $275.00 $275.00
of alcohol in facility)
THE REC Resident Non-Resident Auburn Other
Non-Profit Non-Profit
Full Facility (Includes Rec Room & Lobby) $100.00/hour $130.00/ hour $80.00/ hour $100.00/hour
Rec Room $60.00/hour $75.00/hour $45.00/hour $60.00/hour
Page 36
Damage & Cleaning Deposit for Full Facility $300.00 $300.00 $300.00
without alcohol
POSTMARK CENTER FOR THE ARTS Resident Non-Resident Auburn Other
Non-Profit Non-Profit
Full Facilit 12 months in advance $1050.00 full day $1300.00 full day $800.00 full day $1050.00 full day
Gallery Space (3 hour minimum, 6 Month in $100.00 per hour $125.00 per hour $75.00 per hour $100.00 per hour
advance)
Classroom (3 hour minimum) $20.00 per hour $25.00 per hour $15.00 per hour $20.00 per hour
Cafe 1-4 hours $30.00 $30.00 $30.00 $30.00
Cafe 5+ hours $90.00 $90.00 $90.00 $90.00
Staffin. for Classroom 3 hour minimum $25.00 per hour $25.00 per hour $25.00 per hour $25.00 per hour
Damage & Cleaning Deposit for Full Facility $300.00 $300.00 $300.00 $300.00
without alcohol
Damage & Cleaning Deposit for Full Facility $500.00 $500.00 $500.00 $500.00
with alcohol ($1,000,000.00 excess liability
insurance required)
Optional cleaning fee (fee required with use $275.00 $275.00 $275.00 $275.00
of alcohol in facility)
Page 37
WILLIAM C. WARREN BUILDING Resident Non-Resident
• $45.00/hour $55.00/hour
WHITE RIVER VALLEY MUSEUM Resident Non-Resident
Muckleshoot Room (2 hour minimum) $40.00/hour $40.00/hour
Full Museum (2 hour minimum) $125.00/hour $125.00/hour
Gara•e 2 hour minimum '50.00/hour '.50.00/hour
BACKYARD IDEA GARDEN $60.00/Half Day $75.00/Half Day
$100.00/Full Day $125.00/Full Day
GRASS FIELDS Resident Non-Resident
Youth $8.00/hour $11.00/hour
Adult $16.00/hour $21.00/hour
Field Lights $20.00/hour $20.00/hour
Field Maintenance $30.00 per field $30.00 per field
BASEBALL/SOFTBALL/ FASTPITCH TOURNAMENTS 1 Day 2 Day
Youth $800.00 $1,100.00
Adult $1,000.00 $1,400.00
Field Lights $20.00/hour $20.00/hour
Damage Deposit $250.00 per
tournament
SYNTHETIC TURF FIELDS Resident Non-Resident
Youth Soccer $31.00/hour $41.00/hour
Adult Soccer $4.1.00/hour $51.00/hour
Field Lights $20.00/hour $20.00/hour
Youth Baseball $41.00/hour $51.00/hour
Adult Baseball $51.00/hour $66.00/hour
GAME FARM WILDERNESS PARK CAMPGROUNDS Resident Non-Resident
$40.00/night $40.00/night
GAME FARM WILDERNESS PARK DAY CAMP Resident/ Non-Profit
Non-Resident
$75.00/day $50.00/day
PICNIC SHELTERS Resident Non-Resident
GAME FARM PARK Half Day* Full Day* Half Day* Full Day*
Single quadrant(max: 25)
Monday- Friday $30.00 $50.00 $40.00 $65.00
Saturday - Sunday N/A N/A N/A N/A
Full day
Mon-Sun (Full Shelter) 1-99 $120.00 $200.00 $150.00 $250.00
Mon-Sun (Full Shelter) 100-199 $180.00 $300.00 $225.00 $375.00
Page 38
Mon-Sun (Full Shelter) 200+ (must also rent N/A $375.00 N/A $475.00
amphitheater)
Amphitheater $75.00 $125.00 $100.00 $175.00
ISAAC EVANS PARK $60.00 $100.00 $75.00 $125.00
LEA HILL PARK $60.00 $100.00 $75.00 $125.00
ROEGNER PARK $60.00 $100.00 $75.00 $125.00
GAME FARM WILDERNESS PARK $60.00 $100.00 $75.00 $125.00
LES GOVE PARK $60.00 $100.00 $75.00 $125.00
SUNSET PARK
Mon-Sun Single Quadrant (max: 25) $30.00 $50.00 $40.00 $65.00
Mon-Sun (Full Shelter) 1-99 $120.00 $200.00 $150.00 $250.00
Mon-Sun (Full Shelter) 100-199 $180.00 $300.00 $225.00 $375.00
Mon-Sun (Full Shelter) 200+ NA $375.00 NA $475.00
PLAZA PARK* Resident Group Non-Resident Group _
Hourly rate $60.00 $75.00
Full day rate $360.00 $450.00
*Additional hourly fees may be applied based on event/staffing needs
Re-ccs e-rnt Non-Reside-nt
AUBURN AV€ THHEATER
Weekdays Mon_Thur $200 $2154/0
$300.00 $370.00
Rate Schedule considers one day to be an 8 hour block of time.
- -- - -- • . *- - .. . *e --•- -• - - $588:00 $60900
or partial refund of deposit apply to approval of
Check Out List, including theater, equipment plot
restoration.
y commercial rate for meetings $15.00/hour $55.00/hour
J
and stage
Equipment not included: Use of any theatrical $400:0.8/ $40 070-041014
$1,000,000 excess liability insurance required Upon request Upon request
Custodial-€ee $1-4.580 $445410
Sound & Light Technician $30.00/hour $30.00/hour
Stage Hand $208044ew $20:-0-0/hoLr
Theater House Manager $30.08/ho r $30-88/heu
Rental Rate Schedule for Commercial Filming Resident Non-Resident
Page 39
Permit Fee $50.00
Still Photography/Training and Industrial Films, etc $50.00 per 1/2 day $100.00 per day
Broadcast, Film, TV, Commercial, etc. $75.00 per 1/2 day $150.00 per day
Electricity/Water Access, Park Maintenance Staff, Hourly staff cost
Vehicle Access
Damage Deposit $100.00
Impact Fees:
Park Impact Fees $3,500.00 per residential dwelling unit
Page 40
I. MULTIMEDIA DUPLICATION (Per Resolution No. 3953 and Resolution No. 4552.)
Pro..... duct � Cost
�_..
DVD Copy $10.00 per disk
CD Copy $5.00 per disk
•
Page 41
J. INFORMATION SERVICES AND GIS12 (Per Resolution No. 4272, Ordinance 6276, Resolution No.
4552, and Resolution No. 4593)
Much of the City's geographic data is available for sale per the prices below plus Washington
State sales tax. A signed public records request form is required. Most public records requests
can be completed within seven to ten business days and will be delivered in ESRI Shapefile
format without Metadata.
I2Prockla -
Maps
Existing Map $5.00 + tax
Custom Maps (any non-existing map) $50.00 per hourly + tax
Data
Digital Data Requests $50.00 per hour14 + tax
Miscellaneous
CD-Rom $5.00 + tax
All other requests for data or information not specifically $50.00 per hour+ tax
listed
12 Hourly charge to complete any of the below(one hour minimum charge).
13 Hourly charge includes the cost of processing and providing custom map requests.
14 Hourly charge includes the cost of processing and providing digital data requests.
Page 42
K. PROPERTY MANAGEMENT FEES (per Resolution No. 5388, Resolution No. 5424, Resolution No.
5470, Resolution No. 5549, Resolution No. 5620, and Resolution No. 5719.)
COMMERCIAL PARKING LOT FEES
LOT NON-PROFIT ORGANIZATION OTHER ORGANIZATION
(must submit IRS status with
application)
*$275 minimum flat fee + additional per space/daily fee
Lot 1 — Kiss & Ride $0 / per space / per day $2.75 / per space / per day
(21 stalls)
Lot 2 — 11 A St NW $0 / per space / per day $2.75 / per space / per day
(47 stalls)
Lot 43 — B St $0 / per space / per day $1.75 / per space / per day
(60 stalls)
Lot 54 — Safeway $0 / per space / per day $1.75 / per space / per day
(122 stalls)
Lot 55 — D St $0 / per space / per day $1.25 / per space / per day
(20 stalls)
Facilities Lease Application Review Fees (excluding applications $500.00
for City of Auburn owned or leased property that the City solicits for
lease or sublease)
Sublease/Assignment of Lease $2,500.00
Small Cell Lease/Sublease Application Review Fee $1,500.00 or max
permissible by law,
whichever is less.
Page 43
L. RETURNED CHECK PAYMENT FEE
Any instance where a payment is made and non-sufficient funds or other circumstances exist to
settle the transaction, a $35.00 fee shall apply.
Page 44
M. UTILITY ACCOUNT FEES (per Resolution No. 5719.)
Convenience shut off $50.00
Delinquent shut off $50.00
Late charge 1% per month of outstanding bill or
$15.00 minimum, whichever is
greater
Unauthorized turn on/off $100.00
Delinquent meter pull $200.00
Closing/Final billing $15.00
New account setup $25.00
Bill tenant $25.00
After-hours water turn on/off $50.00
Escrow estimates $25.00
Lien Filing Fee $90.00
Meter Damage/Tamper Repair Permit $536.00 plus Meter Cost, if
applicable
Unauthorized fire line or water hook up $104.00 a day fine from date of
discovery
Refusal of access per day $31.00
Page 45
N. WAIVER OF FEES (Per Resolution No. 5181).
1. The Mayor is authorized to waive any fees for permits, licenses, publications and
actions as authorized by Sections 2.03.030, 5.10.030 and 12.60.020 of the City Code.
2. The Mayor is also authorized to reduce, and is vested with to discretion to reduce
in compelling cases, by up to 50% any fees for permits, publications and actions where the
applicant — the party responsible for payment of such fees — is an organization exempt from
taxation under 26 US 501(c)(3), and where the permit(s), publication(s) and/or action(s) relate
directly to the provision of charitable services to residents of the City of Auburn. Charitable
services are defined as events or services provided to the residents of Auburn free of charge and
where the City is a sponsor of the specific event or service. For the purposes hereof, "compelling
cases" mean instances where there is an extraordinary need (greatly beyond current and ordinary
need)for the charitable services that would be able to be provided. The intent of this authorization
is to empower the Mayor with sole discretion to waive some fees in unique situations where there
is a greatly increased need for new charitable services to be provided, and where the reduction
of fees to the City will not detrimentally impact the City's ability to provide municipal services. This
waiver does not include Impact Fees, System Development Charges, any fees related to
Franchise or Public Way Agreements, Right-of-way Vacations, Right-of-Way Use Permits, Facility
Extensions, Police Department Fees, Animal Licensing Fees and Penalties, Banner Permit Fees,
or Cemetery or Parks fees.