Loading...
HomeMy WebLinkAboutCP1619 - Droll - 1st Amendment.pdf - DocuSign Envelope ID: BC145155-CB9B-4558-A884-1F12B3CED26B AMENDMENT No. 1 to the CITY OF AUBURN AGREEMENT for SERVICES with ROBERT W.DROLL, LANDSCAPE ARCHITECT, PS for CP1619— 104th AVENUE PARK DEVELOPMENT For good and valuable consideration, the parties agree to amend the above agreement in the following manner: ■ Section 5, "Compensation" is amended as follows: "As compensation for the Provider's performance of the services provided for in this Agreement, the City shall pay the Provider the fees and costs specified in Exhibit"B" [sum of$227,919.30.] These payments shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, overhead,profit, and incidentals necessary to complete the work. The Provider shall submit to the City an invoice or statement of time spent on tasks included in the scope of work, and the City upon acceptance of the invoice or statement shall process the invoice or statement in the next billing/claim cycle, and shall remit payment to the Provider, subject to any conditions or provisions in this Agreement or Amendment. The Agreement number must appear on all invoices submitted. Copies of original supporting documents shall be supplied to the city upon request. The not-to-exceed amount for this agreement is $227,919.30. The Provider will not undertake any work or otherwise financially obligate the City in excess of this amount without prior written authorization." ■ Section 6, "Time for Performance, Term, and Termination of Agreement", is amended as follows: "The Provider shall not begin any work under this Agreement until authorized in writing by the City. The Provider shall perform the services in accordance with the direction and scheduling provided on Exhibit"A",unless otherwise agreed to in writing by the parties. All work performed under this Agreement shall be completed by May 30, 2024." ■ Exhibit A is amended to add the following scope of work: Task 1.10— Major Plan Changes in Response to Review Comments: 1. Revise entry walkway and 104th Ave. shoulder design. 2. Pathway redesign and coordination per Hydraulic Analysis requirements. 3. Revise site plan to accommodate dispersion area requirements and 104th Ave Stormwater. 4. Prepare for anticipated construction challenges with water table. 1 DocuSign Envelope ID: BC145155-CB9B-4558-A884-1F12B3CED26B ■ Section 11, Administration of Agreement, is amended as follows: "This Agreement shall be administered by Bob Droll, on behalf of the Provider, and by the Mayor of the City, or designee, on behalf of the City. Any written notices required by the terms of this Agreement shall be served on or mailed to the following addresses: Thaniel Gouk Robert W. Droll, Landscape City of Auburn Architect, PS 25 West Main St Bob Droll Auburn WA 98001-4998 4405 7th Ave. SE, Suite 203 Phone: 253.931.4011 Lacey, WA 98503 Fax: 253.931.4005 Email: bob@rwdroll.com Email:tgouk@auburnwa.gov Phone: 360.456.3813" • Exhibit B is stricken and replaced with the following: 104th Avenue Park Auburn Parks&Recreation Department Exhibit C-Scope&Fee Amendment Proposal to Complete Protect Task Subtotal(including Bob Droll,ASLA Landscape Tech Clerical CeoEngnneers Crass Indicator 10%Suhconsaltant Engineers Engineering Administration Fee) Ihrs subtotal hrs subtotal hrs subtotal I1.00 10O°/0 Design Submittal 1.01 Plans-General/Misc.work required to respond to $ 12,280.00 4 $ 680.00 80 $ 9,600.00 S - S 2,000.0C comments,some of which require changes to stormwatcr handling at the property's SE corner and around site access 1 02 Plans-Grading $ 3,220.00 2 $ 340.00 24 $ 2,880 00 S - 11 03 Picnic Shelter Plans/Details $ 1,920.0G $ - 16 $ 1,920.00 1i - 1 04 Earthwork Map to Earthwork Services forcutlfill $ 720.00 $ - 6 $ 720.00 $ - 1 05 Estimate of Probable Costs Update $ 2,6110.013 4 $ 680.00 16 $ 1,920.00 $ - I1 06 Project Manual&Specifications $ 7,920.00 24 $ 4,080.00 32 $ 3,840 00 $ - 11.07 Permits $ 5,140.0G 2 $ 340.00 40 $ 4,800.00 $ - 11.08 Project Management $ 7,600.00 32 $ 5,440.00 16 $ 1,920.00 4 $ 240.00 11.09 Electrical Plan $ 2,640.00 $ - 2 $ 240.00 $ - $ 2,400.00 11.10 Hydraulic Analysis Report response to comments $ 5,240.00 $ - 2 $ 240.00 $ - $ 5,000.00 Subtotal $ 49,280.00I Task 1.01-Mahar Plan Chanees in Resoonse to Review Comments: Work performed to date in excess of original $ 19,246.00 1.Revise entry walkway and 104th Ave.Shoulder Design contract 2.Pathway redesign and coordiantlon per hydraulic Analysis requirements Professional Services Subtotal $ 68,526.00 3.Revise site plan to accomodate dispersion area requirements and 104th Ave Stormwater 4.Prepare for anticipated construction challenges with water table Direct Expenses(incl.Earthwork Services) $ 500.00 11WD Professional Services Total $ 69,026.00 Deduct Bidding&Professional Services Fee from $ 24,763.00 Original Contract 'Contract Amendment 1 Total $ 44,263.00 1 Original Contract $ 183,656.30 Original Contract+Contract Amendment 1 $ 227,919.30 I Total Additional Modifications to Original Contract A.Extend Contract Time to 12(31/25 B_Change RWD Contract Administration to Philip Van DeVauter 2 DocuSign Envelope ID: BC145155-CB9B-4558-A884-1F12B3CED26B All other provisions of the Agreement and of any previous amendments remain in full force and effect. Executed this 27th day of February , 2024 CITY OF AUBURN ROBERT W. DROLL,LANDSCAPE ARCHITECT, PS Do�by: DocuSig ned by: � CA _� L6jih� PV'b�, Or Nancy Backus, Mayor Bob Droll, President 3