HomeMy WebLinkAboutTier 2 Review, William CarlisleFROME
City of Auburn
Community Services - Human Services Division
25 W Main ST
Auburn, WA 98001
Site -Specific Environmental Review
(Tier 2 Review) I Program: Auburn Housing Repair
��w6uz;y
WAIN
*40A
4R.t:.
N�'FiK�74
Items named in the project description in SECTION A are considered "rehabilitation activities" per Federal
Regulations: 24 CFR Part 58.35 (a) (3) and are subject to further environmental determination. In contrast,
"routine maintenance" items are categorically excluded from environmental assessment under the National
Environmental Policy Act (NEPA) and not subject to compliance requirements of the related federal
environmental laws in 24 CFR 50.4 and 24 CFR 58.5, including the National Historic Preservation Act of 1966
(also see the "Environmental Determination" section of the Housing Repair Work Order). Update this
document as site -specific reviews are completed. Complete each site -specific review according to the
written strategies outlined in the broad -level review, which is maintained in the general environmental
review file.
Specific Laws and authorities to consider during the site -specific review:
• Historic Preservation [36 CFR Part 800] (Section B)
• Flood Disaster Protection Act (Section C)
• Contamination & Toxic Substances (Section D)
ATTACHMENTS CHECKLIST:
Attach the following site -specific back-up documentation to this Environmental Review:
❑✓ Copy of work order outlining project description & estimated cost
❑� Documentation of Age of Home:
o For Single Family Home and Multi -Family Units: copy of the King County Parcel
Viewer property detail report
o For Manufactured homes: copy of the vehicle certificate '
0 For Houses > 45 Years of age:
o Copy of Washington State Historic Preservation Office (SHPO) Determination
❑✓ FEMA flood map with approximate location of property marked
o For properties where a FEMA flood map has not been printed, attach proof and
alternate location map
❑✓ NEPAssist report showing EPA facilities within a 0.5-mile radius of property and EPA
inspection reports of nearby hazardous waste sites
❑✓ Signed Toxic Chemicals & Radioactive Materials Site Visual Inspection Checklist
SECTION A: PROJECT DESCRIPTION AND SCOPE OF WORK:
Client Name:
William Carlisle
Project ID:
Furnace replacement
Address:
4040 Auburn Way S, #4 Auburn WA
Dwelling Type:
Mobile/Manufactured Home
Estimated Cost:
$ 6,500.00
Project
Description:
Replace gas furnace
Page 1 of 5
Form Updated 10/8/2020
REHABILITATION ACTIVITIES: Check all that apply to project description listed above:
(Definitions modified from HUD Guidance Notice CPD-16-02 last updated 2/8/2016)
Site Building Exterior: Roof:
❑ Construction of new ❑ Applying new exterior siding ❑ Complete replacement of roof
walkways, driveways or with new shingles, tiles, roll
parking areas or roofing, membrane or new
replacement thereof metal roof
Windows and Doors:
❑ Replacement of windows
❑ Replacement of exterior
doors
❑ Adding storm windows or
storm doors
Circulation:
❑ Rebuilding of stair or
constructing new stair
❑ Installation of new access
ramp
❑ Elevator replacement
HVAC:
0 Installation of new furnace or
heat distribution system
❑ Installation of central air
conditioning
Interior Walls & Ceilings: Flooring: Bathroom:
❑ Installation of new drywall or ❑ Installation of new wood floor ❑ Complete or substantial
paneling bathroom remodel
Life Safety:
❑ Making substantial
physical changes to a
building to comply with
fire and life safety codes
Electrical/Lighting:
❑ Major rewiring of building
❑ Installation of new
electrical service
❑ Replacing or moving
electrical panels
SECTION B: HISTORIC PRESERVATION
Plumbing:
❑ New water or sewer
connection
❑ Installation of new
plumbing system
Does the project involve a structure that is less than 45 years old with no "new" ground
disturbing activities?
Actions such as digging up a broken sewer pipe in order to repair or replace it does not require
additional review unless new ground is disturbed. "New" ground disturbing activities involve
digging that is done deeper or wider than original installation or placement. If deeper, wider or
new digging is required, a "No" response would be given and an EZ-I form described below will
be required.
QYes. Please provide documentation and proceed with the checklist.
No. Consultation with the State Historical Preservation Officer is required.
This process usually takes two weeks but may take longer than 45 days if the home is
determined historic. If the project does not involve ground disturbance, complete form
EZ-2. If the project disturbs soil as described above, complete form EZ-1:
httr)://www.oaho.wa.gov/Daces/Documents/EnvironmentaIReview.htm
Page 2 of 5
SECTION C: FEMA FLOODPLAIN MANAGEMENT & FLOOD INSURANCE
FIRM Map information
Community Map Name:
AUBURN, CITY OF
FIRM Map Number
53033C
Panel Number:
1266G
Year:
2020
Is the project located in a FEMA designated floodway?
(Repairs can be funded in floodplains, just not in floodways)
FEMA FIRM (Flood Insurance Rate Maps) can be obtained here: http://www.fema.gov/
OYes. Stop here. Federal financial assistance cannot be used in a floodway.
Project activity is not eligible.
No. Proceed with this checklist.
Is project located in a FEMA designated 100-year floodplain?
Visit this site for FIRM the Maps: http://www.fema.aov/
0 Yes. Project will have to maintain flood insurance on the property and contents if
Federal Funds are utilized. Please attach a copy of the individual or community
(NFIP) flood insurance.
ONo. Floodplain insurance is not required. Proceed with this checklist.
SECTION D: TOXIC CHEMICALS & RADIOACTIVE MATERIALS
Is the property free of hazardous materials, contamination, toxic chemicals and gasses
and radioactive substances where a hazard could affect the health and safety of
occupants? (Housing Repair Staff conducted site inspection with no issues)
Visit httips://nepassistfool.epa.gov/nepassist/nepamap.aspx & attach relevant documentation:
O Yes
0 No
Number of Hazardous Facilities within a 0.5-mile radius: 2
Page 3 of 5
ADDITIONAL CONSIDERATIONS:
City of Auburn Policy and CDBG Regulations require the completion of environmental review
before bids are sought or rehabilitation work starts. City of Auburn Housing Repair Program
staff certifies that no work on this project will begin until Housing & Human Services/CDBG
Program staff sign off on the Tiered Environmental Review for Activity/Project that is
Categorically Excluded Subject to Section 58.5 Pursuant to 24 CFR Part 58.35(a) form or a
release letter from HUD if the project cannot convert to exempt. If a private contractor is used
on this project, a Notice to Proceed shall be issued to the contractor after the ER is
completed. If City staff does the work, the start date shall be noted on the Work Order.
DETERMINATION:
❑✓ This project converts to Exempt, per Section 58.34(a)(12), because it does not
require any mitigation for compliance with any listed statutes or authorities, nor
requires any formal permit or license (Status "A" has been determined in the status
column for all authorities); This (now) EXEMPT project may now be initiated; OR
This project cannot convert to exempt because one or more statutes/authorities
require consultation or mitigation. Complete consultation/mitigation requirements,
publish NOI/RROF and obtain Authority to Use Grant Funds (HUD 7015.16) per
Section 58.70 and 58.71 before initiating the project; OR
❑ The unusual circumstances of this project may result in a significant environmental
impact. This project requires preparation of an Environmental Assessment (EA).
Prepare the EA according to 24 CFR Part 58 Subpart E.
DATE: 3/22/23
PREPA fR SIGNATURE
NAME, TITLE: Joel Asbjornsen, Housing Repair Program Coordinator
DATE: V4%3§-&k
RESPONSIBLE ENTI(COFF
VIAL SIGNATURE
NAME, TITLE: Nancy Ba-Zris, Mayor
RECOMMENDED COURSE OF ACTION:
According to 24 CFR 58.35(b), the City does not have to submit an RROF and certifications.
Furthermore, 24 CFR 58.35(b) states no further approval from HUD or the State is needed to carry out
exempt activities and projects. Therefore, the City will proceed to implement the above described
project without any further notification or approval from HUD. If an activity or project cannot convert
to exempt, the City will publish NOI/RROF (with a 7 day comment period) and obtain Authority to Use
Grant Funds (HUD 7015.16) per Section 58.70 and 58.71 before initiating the project. If the City
determines that a project or activity will result in a significant environmental impact, the City will
prepare an Environmental Assessment (EA) according to 24 CFR Part 58 Subpart E.
Page 4 of 5
TOXIC CHEMICALS & RADIOACTIVE MATERIALS
SITE VISUAL INSPECTION CHECKLIST
(Submit this form when requesting ER)
CLIENT NAME: William Carlisle
PROPERTY ADDRESS: 4040 Auburn Way S, #4 Auburn WA
Were any of the following items observed on the site?
Comments
Distressed vegetation
Yes No
0
Vents or Fill Pipes
Yes No
®'
Storage/Oil Tanks or
Questionable Containers
Yes No
0
Pits, Ponds or Lagoons
Yes No
0
Stained Soil or Pavement
Yes No
0
Pungent, Foul or Noxious Odors
Yes No
Dumped Material or Soil
Yes No
Mounds of Dirt, Rubble, Fill, etc.
Yes No
0 e
GOB.- A ,�1,111
• /� %
3/22/23
Date
Page 5 of 5