HomeMy WebLinkAboutCP2406 Change Order 2, Auburn Ave Theater Demo, Rivers Edge Environmental ServicesCITY OF AUBURNCONTRACT CHANGE ORDER AGREEMENT NO. 2 Contract 24-021.2.3.4.5.10Item Sch.Sec. No.Item DescriptionQuantity (+/-)UnitsUnit Price ($)Total Price (+/-)CO2-1AUnderground Storage Tank Removal 1LS4561.944,561.94$ CO2-2ACrushed Surfacing Base Course250TON47.1311,782.50$ 11A2-03Unsuitable Foundation Excavation, Including Haul-150CY60.76(9,114.00)$ 12A2-03Gravel Borrow, Including Haul-100TON37.13(3,713.00)$ Subtotal 3,517.44$ 362.30$ TOTAL3,879.74$ Total incl. Tax1. Total Cost this C/O3,879.74$ 2. Total Cost Previous C/O12,283.01$ 3. Original Contract Amount 364,559.21$ 4. Revised Contract Amount 380,721.95$ Contractor: Project Manager: DateCity Engineer: DateApproved by: DateDateApproved as to form: DateCity Attorney Washington State Sales Tax (10.3%) on applicable itemsThe Contract time is extended by working days.Mayor, City of AuburnCounterparts: This agreement may be executed in multiple counterparts, each of which shall be one and the same Agreement and shall become effective when one or more counterparts have been signed by each of the parties and delivered to the other party.This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all indirect costs, and time adjustment to perform the above described changes. All other costs are non-compensable. All other terms and conditions of the Contract remain unchanged.345,169.50$ 3,517.44$ 11,136.00$ 330,516.06$ Base AmountContract No.:Project Name:CP2406 - Auburn Avenue Theater DemolitionContractor: Rivers Edge Environmental ServicesREDUCE bid item #12 Gravel Borrow, Including Haul. As listed in the table below. 17115 SE 270th Place, STE 106Covington, WA. 98042Summary of Proposed Changes:The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments are a supplement to the contract. All work, materials, measurements and unit bid prices for the type of construction involved shall be in accordance with the contract documents of the above named project unless stated otherwise in this change order.ADD 10 working days to the Contract for the Work to remove existing concrete slab and foundations at the vacant lot to the south of Auburn Avenue Theater Building. Compensation for this added Work was provided for under the Minor Change item.REDUCE bid item #11 Unsuitable Foundation Excavation, Including Haul. As listed in the table below. ADD pay item CO2-1 as listed in the table below. The added Work includes excavating, pumping, rinse, and disposal of Underground Storage Tank in accordance with local and state laws and Ecology requirements. No working days are added as a result of this added Work.ADD pay item CO2-2 as listed in the table below. The added Work items shall conform to the Contract Specifications.ENG-028, Revised 01/21Page 1 of 1Docusign Envelope ID: 2864CD67-4447-44F0-BCD0-5B097DF87DE3 11/25/2024 11/25/2024 11/26/2024 11/26/2024 11/26/2024