HomeMy WebLinkAboutGRA23-0016 - AS BUILT PLANSPARCEL NUMBER. JG4350-0090
ADDRESS 3_4 THST SE
AUBURN WA BENZ
ZONING RES CONSERVANCY
MA%%IMPERVIOUS ALLOWED: 25%
TOTAL IMPERVIOUS. 9%
OWNER(S) - Vad M A Ynlive Kuxtma
..117:FTF.1�'•�PI1�.. .
CONTRACTOR Channel
1L1=11111yPh To in 6I
I'll 10S CY
NET IMPORTEXPORT=74 CY
TOTAL EARTHWORK= ISIS CY
TOTAL DISTURBED Al=6192 SF
TOTAL NEW B REPIACED HARD SURFACE =0 SF S
TOTAL NEW HARD SURFACE =O Sic ,. 423347TH ST SF
w.
NOTE GRAVEL IS DEFINED ASA 'HARDDMUST BESURFACE7 BY
INCLUDED
DEPARTMENT QUANTITIES
NO MUST BE INCLUDED IN
THESE PERMIT QUANTITIES
4�
CONSTRUCTION SEQUENCE
s-
1. CCNTACTTHE CITYOF AUBURN AND SCHEDULE A1[
2, FLAG OR FENCE CIFARING LIMITS
3. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
PER COA STANDARD DETAIL E43 OR E4W,
4, GRADE AND INSTALL CONSTRUCTION ENTRANCE PER
COA STANDARD DETAIL E-0I. IF APPLICABLE
6. MAINTAIN EROSION CONTROL MEASURES IN
ACCORDANCE WITH THE CITY OF AUBURN STANDARDS
AND MANUFACTURER'S REMMMEN WTIONS
]. MAINTAIN AND MODIFY EROSION CONTROL
MEASURES AS SITE CONDITIONS CHANGE TO ENSURE
SITE IS ALWAYS IN COMPLIANCE WITH THE CITY TESC
MINIMUM REQUIREMENTS.
B. UPON COMPLETION OF THE PROJECT, ALL DISTURBED
AREAS MUST BE STABILIZED AND TEMPORARY EROSION
AND SEDIMENT CONTROL Bell REMOVED.
RECORD DRAWING CERTIFICATION
THESE DRAWINGS CONFORM TO THE
CONTRACTOR'S CONSTRICTION RECORDS.
INSPECTOR C Yt4it"A
DEV. REVIEW ENG.f !e 7,162024
J
t,
ASwaB
PAWECT REF GRA23-0016
THESE PLANS ARE APPROVED FOR
CONFORMANCE WITH THE CITY OF
AUBURN'S REQUIREMENTS L�
APPROVED BY3V
DATE APPROVED
VED' 5252023
LEGEND:
—x—X— SILT FENCE
^,^vi CLEARINGLIMITS
-----�!-y--��--- EXISTING UTILITY LINE
TREE TO BE REMOVED)
�Y�❑Y'' CATCH BASIN (TO BE PROTECTED)
Ines
All En1ubM landuch" areas shell apply BMP T513
Post CormWcmin Sol QuiMry, and OepN
Distomea handicaps press will receive wepa bawler
with earn we tap
Silt Fence is to be mill br Temlwarary Emewn S
Senbmenl C[MmI ITESC) measures atCbarinp
Limb
NON -BUILDING RELATED PERMITS
STM23-0027-LEVEL I STORM
Construction entrance needs to be
0
40 20 0 _ 40' 0" 40 80
SCALE IN FEET
DING PERMITS ONLY. THE SCOPE OF
tK MUST MEET THE CRITERIA OUTLINED IN
CITY OF AUBURN ENGINEERING DESIGN
NDARDS, CHAPTER 3, APPENDIX E.
V/
T
0
MO
� I
N
N�
�LL^'
V
►I
wa
W U
U Q
� g
W
i 0
0 F
U)
1 OF2
GENERALNDTES
1. CWSTRUCTION SHALL CONFORM TOTHE CITY OF AUSURN'S ENGINEERING DESIGN AND
CONSTRUCTION STANDARDS. EXCEPT AS OTHERWISE APPROVED BY DEVIATION. AND BE IN
ACCORDANCE WITH THE APPRWED PLANS. ANY CHANGES FROM THE APPROVED PLAN WILL REQUIRE
APPROVAL FROM THE OWNER, ENGINEER OF RECORD. AND THE CITY.
2, ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE VASHINGTON STATE DEPARTMENT OF
TRANSPORTATION (WSWT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE. AND MUNICIPAL
CONSTRUCTION (CURRENT EDITION); EXCEPT WHERE SUPPLEMENTED OR MODIFIED BY THE CITY
CONSTRUCTIONSTANDARDSMANUAL THEABOVEDWUMENTSSHALLBEAVALABLEATTHEJOBSITE
DURING CONSTRUCTION.
3. A PRE -CONSTRUCTION MEETING SHA L BE REQUIRED PRIOR TO THE START OF ALL CONSTRUCTION
CONTACT THE PUBLIC WORKS DEPARTMENT AT 253931J010. TO SCHEDULE A MEETING.
4. UNLESSSTATEDOTHERWISE. LOCATIONSSHOWN FOR EXISTINGUTILITIESMEAPPROXIMATE THE
CONTRACTOR IS CAUTIONED THAT OVERHEAD UTILITY LINES MY HOT BE SHOWN ON THE MEMOS. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE TRUE ELEVATIONS AND LOCATIONS
OF ALL UNDERGROUND UTILITIES AND THE EXTENT OF ANY HAZARD CREATED BY OVERHEAD UTILITY
LINES IDENTIFICATION. LOCATION. MANKIND. AND RESPONSIBILITYFOR UNDERGROUND FACILITIESOR
UTILITIES. IS GOVERNED BY THE PROVISIONS OF CHAPTER 19In REVISED CODE OF WASHINGTON
(RCWI. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL CALL ONE -CALL 1811) FOR
UTILITY LOCATIONS (WATER. SANITARY SEWER, STORM SEWER. GAS. POWER, TELEPHONE, AND CABLE).
BMPT 1 ANO DEPTH
EXCERPT FROM THE DEPARMENT OF ECOLOG YS STORMWATER MANAGEMENT MANUAL
FORWESTERNWASHINGTON
BOLE GUAUTTY
ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY
IMPERVIOUS SURFACE. INCORPORATED INTO A DRAINAGE FACILITY OR ENGINEERED
AS STRUCTURAL FILL OR SLOPE SHALL. AT PROJECT COMPLETION, DEMONSTRATE THE
FOLLOWING'.
1, A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF IM DAY WEIGHT
IN PLANTING BEDS. AND 5%ORGANIC MATTER CONTENT IN TURF AREAS. AND A PH
FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL THE TOPSOIL
LAYER $HALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOM
LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE
CRITERIA SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST A
INCHES WITH HOME INCORPORATION OF THE UPPER IMTER9LL TO AVOID STRATIFIED
LAYERS, WHERE FEASIBLE.
2. MULCH PLANTING BEDS WITH 21NCHES OF ORGANIC MATERIAL.
3. USE COMPOST AND OTHER MATERIALS THAT MEET THE FOLLOWING ORGANIC
CONTENT REQUIREMENTS.
A. THE ORGANIC CONTENT FOR 'PREAPPROVED' AMENDMENT RATES CM BE
5. IF A PROPOSED ROUTE IS NOT INCLUDED ON THESE PLANS, A PROPOSED ROUTE AND SCHEDULE FOR
MET ONLY USING COMPOST MEETING THE COMPOST SPECIFICATION FOR BMP
HAVUNG MATERIAL TO THE SITE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO THE
T7.30 BIORETENTION, WITH THE EXCEPTION THAT THE COMPOST MAY HAVE UP
STARTOFCONSTRUCTION. IF THE CITY BELIEVES THAT THE PROPOSED HAUL ROUTE WILL ADVERSELY
TO 35% MOSOLIDS OR MANURE THE COMPOST MUST ALSO HAVE AN ORGANIC
IMPACT THE STREET NETWORK. A SEPA AMENDMENT MAY BE REQUIRED TO EVALUATE THE IMPACTS
MATTER CONTENT OF 40%TO 0%, AND A CARBON TO NITROGEN RATIO
AND DETERMINE MITIGATION REQUIREMENTS BEFORE BEGINNING WORK HAULINGMAYBELIMTEDTO
BELOW 25A, THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS SEA FM
APPROPRIATE OFFiEAK HOURS OR ALTERNATIVE ROUTES, AS DETERMINED BY THE CITY.
PLANTINGS COMPOSED ENTIRELY OF PUNTS NATIVE TO THE PUGET SOUND
LOWLANDS REGION
6, THE CONTACTOR SHALL BE RESPONSIBLE FOR PUBLIC SAFETY ON AND AROUND THE PROJECT
PRIOR TO THE START OF WORK. ALL METHODS AND EQUIPMENT USED FOR TRAFFIC CONTROL AND
B. CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED
STREET MAINTENANCE SHALL BE SUBMITTED TO THE CITY FOR APPROVAL. CONTRACTORSANDTHEIR
MATERIAL MEETING(A)ABOVE. OR OTHER ORGANIC MATERIALS AMENDED TO
SURETY SHALL BE LIABLE FOR INJURIES AND DAMAGES TO PERSONS AND PROPERTY SUFFERED
MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT
BECAUSE OF CONTRACTORS OPERATIONS OR NEGLIGENCE CONNECTED WITH THEM.
EXCEEDING THE CONTAMINANT LIMITS IDENTIFIED IN TABLE 22GB.TESTING
PARAMETERS. IN WAG 17335 FUD
T. ALL CONSTRUCTION SURVEYING FOR EXTENSIONS OF PUBLIC FACILITIES SHALL BE DONE UNDER THE
DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR OR A WASHINGTON LICENSED
THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE
PROFESSIONAL CIVIL ENGINEER.
ESTABLISHED
O. CERTIFIED DRAWINGS ARE REQUIRED PRIOR TO PROJECT ACCEPTANCE. REFERTOTHECITY'S
'DEVELOPMENT RECORD CONSTRUCTION DOCUMENT' HANDOUT,
1. WITHIN THE CITY OF AUBURN, ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES
INDICATED ON THE PLANS MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING
AND'OR OTHER CONSTRUCTION ACTIVITIES THESE FACILITIESSIYLLL BE WINTNNEDMID UPGRADED.
IF NECESSARY, TO ENSURE THAT SEDIMENTiMEN WATER AND STORM DRAINAGE RUNOFF DOES NOT
IMPACT THE ADJACENT PROPERTIES, NATURAL DRAINAGE WAYS, OR THE EXISTING CITY STORM
DRAINAGE SYSTEM
2 THE SOURCES FOR ALL MATERIAL IMPORTED TO THE SITE SHALL BE APPROVED BY THE CITY
3. THE STORM DRAINAGE DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED), SEDIMENTATION
AND EROSION CONTROL FACILITIES DEPICTED ON THE APPROVED DRAWINGS ARE INTENDED TO BE
MINIMUM REWIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. ADDITIONAL DRAINAGE AND
EROSION CONTROL FACILITIES MAY BE REQUIRED AS SITUATIONS WARRANT DURING CONSTRUCTION.
THE IMPLEMENTATION, MAINTENANCE. REPLACEMENT AND ADDITIONS TO THESE CONTROL SYSTEMS
SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
4, THE TEMPORARY EROSION CONTROL FACILITIES, INCLUDING ALL PERIMETER CONTROLS AND THE
DETENTION (RETENTION IF INFILTRATION SYSTEM IS USED). CONTROL PONDS, SHALL REMAIN IN PUCE
UNTIL FINALSITECONSTRUCTION IS COMPLETED AFTNCTFYAPPROVM-THECONTRACTORWILLBE
RESPONSIBLE FOR REMOVING ALL TEMPORARY FACILITIES
5, THE CONTRACTOR WILL BE REQUIRED TO WATER THE SITE, AS NECESSARY, TO REDUCE DUST
EMISSIONS AS A RESULT OF CONSTRUCTION ACTIVITY
B NO TRACKING IN THE ROADWAY IS ALLOWED IF SEDIMENT IS TRACKED ONTO THE ROAD. THE ROAD
ENABLE BE THOROUGHLY AND IMMEDIATELY CLEANED BY SHOVELING OR PICKUP SWEEPING
TRANSPORT SEDIMENT TO A CONTROLLED SEDIMENT DISPOSAL AREA. KEEP STREETS CLEAN AT ALL
TIMES.
T. ALL AREAS OF ACTIVE EARTHWORK WHICH HAVE THE POTENTIAL FOR EROSION AND SEDIMENTATION.
IMPLEMENTA"OHOPTH3NS
THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE GAIN BE MET BY USING ONE OF
THE METHODS LISTED BELOW-
1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM
COMPACTION DURING CONSTRUCTION.
2. MEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT 'P RE -APPROVED'
RATES, OR AT CUSTOM CILCULATED RATES BASED ON TESTS OF THE SOIL AND
AMENDMENT.
3. STOCKPILE EXISTING TOPSOIL DURING GRADING, MID REPLACE IT PRIOR TO
PLANTING. STOCKPILED TOPSOIL MUST ALSO BE AMENDED IF NEEDED TON EEI TILE
ORGANIC MATTER OR DEPTH REQUIREMENTS, EITHERAT A DEFAULT 'PRE -APPROVED'
4, IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE
REQUIREMENTS
MORE THAN ONE METHOD MAYBE USED ON DIFFERENT PORTIONS OF THE SAME SITE.
SOIL THATALAUDYWETS THEDEPTHAND ORGANIC MATTER WALITYSTANDAROS,
AND IS NOT COMPACTED, DOES NOTNEED M BEAMENO .
MUAT
Ims W x�H
vkpIBEVF e
ayNcnalNl
an
t
vuMal
Rmmi M1wn GUNSNneaeM Ra 'Far lmp I dOwNy and
apto HIM, Wviny i.IS 13,0 mwwi x r Man>3emadl MmW M Wapem NJT T08CNE
aEmcR N �ti
10 Planting Bed Cross -Section
DEPARTMENT OF RwWBJum3010
ECOLOGY pN„eaeel.wn,...e.,,.pa.L.PN.pnl.nmpB.mpn;N�InmN:mmpNdi..d...
Slele di WaMlnplan ImXaIknNMWly.aNU blmmn
THAT WILL REMAIN UN -WORKED FOR MORE THAN TWO (2) DAYS SHALL BE STABILIZED IMMEDIATELY
3- PVC MANIMLE) (CLMO)
W(CHECIC VALVES
MONITORING PORT/
LATERAL CLEANOUT
RESERVE
SAND FILTER
-191
tNORIT
MAPLE TREE
3" PVC PUMP LINE (CUM)
0118 LINEAL FEET
4 BEDROOM
RESIDENCE
J
>/3'
3'
4',
Q 1000 GALLON SEPTIC TANK
0 LOW GALLON PUMP TANK
+rF 4" PVC TIGHTLINE (ASTM 3034)
------ 1.25" PVC LATERAL (CL200)
----100% RESERVE DRAINFIELD
W WATERLINE
1) DAILY SEWAGE FLOW: 570 GAL./DAY.
2) ABSORPTION AREA: 968 SQ.FT.
LINEAL FEET: 484' .
3) SEPTIC TANKIPUMP TANK MANUFACTURER:
NORTHWEST CASCADE
4) PUMP SPECIFICATIONS
-BRAND: GOULDS
SIZE:I.S HORSEPOWER
-MODEL: WE1512H
5) DOSE SPECIFICATIONS
-VOLUME: 190 GALLONS
-FREQUENCY: 3 DOSES/DAY
-DURATION:2.2 MINUTES
6) ALARM LOCATION: WITH PANEL
7) DEPTH OF COVER:
uj
WASTEWTERTANKS:10"
_
DRAINF'IELD: 12" > 0
8
TANS LID LOCATIONS
c o E
A 35' 36' 41'
E 13of 30' 37'
J
CLIENT: ALEX OGORODNIK,4233 47TH ST. SE..,ALBURN,WA 98092
PROJECT: ON-STTE SEWAGE DISPOSAL SYSTEM AS -BUILT
LOCATION: 4233 47TH ST. SE.,AUBURN, WA 98092
.. .. . .. _ __ - '.... - __ ...
LOT 9. BRA UNWOOD ESTATES.PARCEL F 104350-0090
BUILT I SCALE: 5 101620 30 40 60
1 OF 2
A080207
Retaining Wall
4233 47th ST SE, Auburn, WA 98092
Scale: 1/4"=1'
r ono
12'-2"
454'
452
450'
446'
446'
aa4'
442'
440'
4M'
4 6'
AS -BUILT