HomeMy WebLinkAbout20250701000806, Agreement for Deferral of Improvements, Einer & Caroline ThompsonInstrument Number: 20250701000806 Document:AG Rec: $309.50 Page-1 of 7
Record Date:7/1/2025 3:24 PM
Electronically Recorded King County, WA
Return Address:
City of Auburn
City Clerk
25 West Main
Auburn, WA 98001
Above this line reserved for recording information.
Project No. SDR23-0007
Reference if applicable): N/A
Grantor/Borrower: Einer and Caroline Thompson
Grantee/Assignee/Beneficiary: CITY OF AUBURN
Legal Description/STR: Section 28 — Township 21 N — Range 05 E
Assessor's Tax Parcel ID#: 282105-9024
THIS AGREEMENT made and entered into on the _ day of , 2025,
by and between the City of Auburn, a municipal corporation of the State of Washington,
hereinafter referred to as "City", and Einer and Caroline Thompson, hereinafter referred
to as "Property Owners",
Vi7"_� 4.
WHEREAS, the Property Owners are the owners of real property in the
City of Auburn, County of Z King ❑ Pierce, State of Washington, located at
the 2610 Hemlock St. SE and described as shown on Exhibit "A," attached hereto.
WHEREAS, the Property Owners desire to make certain improvements or develop
the above -referenced property; and,
WHEREAS, in connection with the improvement or development of such property,
certain street -public works improvements would need to be made or otherwise provided
for; and,
WHEREAS, the Property Owners desire to defer those street -public works
improvements to a later time, and have requested agreement by the City for such deferral;
and,
Agreement for Deferral of Improvements
BNG-202, Revised 12/23
Pagel of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-2 of 7
Record Date:7/1/2025 3:24 PM King County, WA
WHEREAS, the Asst. Director of Engineering / City Engineer of the City of
Auburn has approved the request to delay the placement of street -public works
improvements to serve the herein legally described property;
NOW THEREFORE, based upon good and valuable consideration, the sufficiency
of which is hereby acknowledged, IT IS AGREED as follows:
1. DELAY OF IMPROVEMENTS
In connection with this agreement, and in connection with the development and/or
improvement to the land of the Property Owners, the City agrees to allow the
Property Owners to delay the making, constructing, installing and providing for the
street -public works improvements identified and set forth in paragraph 4 of this
agreement.
2. CONSTRUCTION OF IMPROVEMENTS
The Property Owners hereby agree and covenant that they shall construct or
cause to be constructed the deferred improvements described below at
his/her/their expense upon determination by the City of Auburn that the
improvements have become necessary. In the event the City determines to
construct the improvements as part of a public works project the property owner,
or owners, shall make payment to the City of Auburn of the pro-rata share of the
cost of the project. Such costs shall include but are not limited to engineering,
permitting, construction, inspection and other project related expenses, which
benefit the property of the Property Owners, described on Exhibit "A" attached
hereto and incorporated herein by this reference. In the event the City determines
to construction the improvements, the Property Owners agree to allow the City,
including its contractors, employees, and others as authorized by the City, to enter
the Property for the purposes of designing and constructing the Improvements,
and/or to perform any actions reasonably related to the design and construction of
the Improvements. This City right of entry shall automatically terminate when
construction of the Improvements is complete. For purposes of this paragraph,
construction of the Improvements shall be deemed "complete" when the work is
physically complete and the warranty period, if any, has expired.
In the event that said property is subdivided or sold in the future, the Property
Owners agree to include as a condition of sale and/or a restrictive covenant the
condition that the obligations to make, construct, install or provide for the street -
public works improvements identified and set forth in paragraph 4, below, shall
apply to the subdivisions and future sales of portions of the property identified on
Exhibit "A". The condition of sale and/or restrictive covenant shall also provide that
the aforesaid pro-rata fair share of each portion of the property shall be divided
amongst the subdivided lots.
Agreement for Deferral of Improvements
ENG-202, Revised 12/23
Page 2 of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-3 of 7
Record Date:7/1/2025 3:24 PM King County, WA
3. NOTICE AND TIME OF CONSTRUCTION
The obligation of the Property Owners to make, construct, install and provide for
the street -public works improvements described and set forth in paragraph 4,
below, shall arise upon written notice to the Property Owners by the City. The time
by which the Property Owners shall make, construct, install or provide for said
improvements shall be not later than twelve (12) months after the written notice by
the City.
If notice to the Property Owners by the City for the Property Owners to make,
construct, install, and provide for the street -public works improvements set forth in
paragraph 4, below, is not commenced within ten years from the date this
agreement is executed, this agreement shall terminate without further obligation
from the Property Owners.
4. DESCRIPTION OF IMPROVEMENTS
The improvements to be included in connection with this agreement shall be as
follows:
Half street improvements along the south side of Hemlock St. SE consistent with
the City of Auburn Design Standards for a local residential street, which includes
installation of a 5-foot sidewalk, 5-foot landscape strip, curb and gutter, street
lights, and widening the roadway pavement to 24 feet wide per City of Auburn
Standards.
5. NONEXCLUSIVE REMEDIES
In addition to any and all other remedies available to the City, at law or in equity, if
the Property Owners fail to make, construct, install or provide for the
improvements, or otherwise arrange for the construction and installation of such
improvements, then the City shall be entitled and authorized to make, construct,
install or provide for such improvements and bill the Property Owners for the costs
incurred in connection therewith, and/or file a lien on the property of the Property
Owners for the amount of the City's full costs and expenses therefore, and enforce
the lien in accordance with legal process. Any such billing by the City to the
Property Owners shall be paid by the Property Owners within sixty (60) days of the
billing, unless other arrangements are made in advance.
6. BINDING ON HEIRS, ASSIGNS
This agreement shall be binding on the heirs, assigns and successors in interest
of the parties hereto, and the obligations hereunder shall run with the land
described in Exhibit "K.
7. CONSTRUCTION AND VENUE
This agreement shall be construed in accordance with the laws in the State of
Agreement for Deferral of Improvements
ENG-202, Revised 9/18
Page 3 of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-4 of 7
Record Date:7/1/2025 3:24 PM King County, WA
Washington. In the event of any litigation regarding the construction or effect of
this agreement, or the rights of the parties to this agreement, it is agreed that venue
shall be in ®King ❑Pierce County, Washington.
8. COSTS TO PREVAILING (PARTY
In the event that either party initiates any action to enforce the terms and conditions
of this agreement, the prevailing party shall be entitled to reasonable costs and
attorney's fees.
9. LOCAL IMPROVEMENT DISTRICT
The Property Owner also agrees not to protest the formation of a Local
Improvement District for any or all of the street improvements listed above, if
initiated by the City or by property owners adjacent to or benefiting the property.
10. RECORDING
An executed copy of this agreement shall be recorded among the land records of
the ®King ❑Pierce County Auditor or Recorder.
11. INDEMNIFICATION
The Property Owner shall indemnify and hold the City and its agents, employees,
and/or officers, harmless from and shall process and defend at its own expense any
and all claims, demands, suits, at law or equity, actions, penalties, losses, damages,
or costs, of whatsoever kind or nature, brought against the City arising out of, in
connection with, or incident to the execution of this Agreement and/or the Property
Owner'sperformance or failure to perform any aspect of this Agreement. No liability
shall attach to the City by reason of entering into this Agreement except as expressly
provided herein.
12. ENTIRE AGREEMENT
This agreement contains the entire understanding of the parties with respect to the
matters set forth herein and any prior or contemporaneous understandings are
merged herein. This contract shall not be modified except by written instrument
executed by the parties hereto.
IN WITNESS WHEREOF, the parties hereto have executed this agreement on the
date and year first above set forth.
Agreement for Deferral of Improvements
ENG-202, Revised 9/18
Page 4 of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-5 of 7
Record Date:7/1/2025 3:24 PM King County, WA
EXHIBIT "Alp
LEGAL DESCRIPTION
THAT PORTION OF GOVERNMENT LOT 1 IN SECTION 28, TOWNSHIP 21 NORTH,
RANGE 5 EAST, W.M., IN KING COUNTY_ WASHINGTON, DESCRIBED AS
FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID SUBDIVISION;
THENCE SOUTH ALONG THE WEST LINE OF SAID SUBDIVISION 50 FEET TO THE
TRUE POINT OF BEGINNING;
THENCE EAST PARALLEL TO THE NORTH LINE OF SAID SUBDIVISION, 192.75
FEET;
THENCE SOUTH PARALLEL TO THE WEST LINE OF SAID SUBDIVISION 149.9
FEET;
THENCE WEST TO A POINT ON THE WEST LINE OF SAID SUBDIVISION 149.9
FEET SOUTH OF THE TRUE POINT OF BEGINNING;
THENCE NORTH ALONG WEST LINE OF SAID SUBDIVSION 149.9 FEET TO THE
TRUE POINT OF BEGINNING.
SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON.
Agreement for Deferral of Improvements
ENG-202, Revised 9/18
Page 5 of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-6 of 7
Record Date:7/1/2025 3:24 PM King County, WA
1�
DATED this 4, day of
";( 2025.
A st. Diilr&tor of/ingineering / It Engineer
STATE OF WASHINGTON)
)SS
COUNTY OF KING
0 1
WNW-MVIEN A V LAW
GIVEN under my hand and official seal this day of 72025.
Notary Public in and for the State of Washington
Residing at—ILIACIP.
My appointment expires
7 T-ITP-
ENG-202, Revised 9/18
Page 6 of 7
Instrument Number: 20250701000806 Document:AG Rec: $309.50 Page-7 of 7
Record Date:7/1/2025 3:24 PM King County, WA
, ! �r
i
_.
OWNER
TITLE
STATEO N s
COUNTY OF KING
I know or have satisfactory evidence a
(- C., I. I) , " l�'. -5li-, is/are the person(s) who appeared before 'me, and said
individual(s),.
dti ! that he/she/they signed this instrument and acknowledged it
to be his/her/their free and voluntary act for the uses and pur es mentioned in this
instrument. ��� ;,��Vt , ry 4�,¢, t�r�w
�,.1 h o-. a . ",�" �" �
#" 1 w it
Revised " 8
w*gi. 7 of 7