Loading...
HomeMy WebLinkAbout5872RESOLUTION NO. 5872 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AMENDING THE CITY OF AUBURN FEE SCHEDULE WHEREAS, the City of Auburn provides various services, a number of which entail charging a fee; and WHEREAS, the City Council provided for the adoption of a Fee Schedule with the passage of Ordinance 5860; and WHEREAS, it is appropriate to review and amend the schedule for City fees to be charged in 2026. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, RESOLVES as follows: Section 1. The City of Auburn Fee Schedule is amended as set forth in the attached document. Section 2. The Mayor is authorized to implement those administrative procedures necessary to carry out the directives of this legislation. Resolution No. 5872 November 12, 2025 Page 1 of 2 Rev.2020 Section 3. This Resolution will take effect and be in full force on passage and signatures. Dated and Signed: November 17, 2025 ATTEST: Shawn Campbell, MMC, City Clerk Resolution No. 5872 November 12, 2025 Page 2 of 2 CITY OF AUBURN J4son Whalen, City Attorney Rev. 2020 CITY OF AUBURN FEE SCHEDULE FEES FOR CITY PERMITS, LICENSES, PUBLICATIONS, AND ACTIONS Effective January 1, 2026 A. PLANNING FEES (Per Ordinance No. 5707, Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797, Resolution No. 3953, Resolution No. 4070, Resolution No. 4117, Resolution No. 4143, Ordinance No. 6077, Resolution No. 4272, Resolution No. 4424, Ordinance No. 6276, Resolution No. 4552, Ordinance No. 6295, Resolution No. 4868, Resolution No. 4880, Resolution 4964, Ordinance 6477, Resolution No. 5016, Resolution 5114, Resolution No. 5181, Resolution No. 5213, Resolution No. 5228, Resolution No. 5255, Resolution No. 5312, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681, Resolution No. 5719 Resolution No. 5784,-and Resolution No. 5860 and Resolution No. 5872.) 1. APPLICATION FEES: Applications for any action identified below shall not be accepted for filing, unless otherwise noted, until the fees per the below schedule have been paid to the City.' Additional Re -submittal Fee (applied after 3 city $137.00 per reviews of the application) re -submittal Administrative Use Permits $2,124.00 Appeal of Administrative Decisions issued under $1,455.00 Chapter 1.25, Title 3, Title 5, Title 8, Title 12, Title 14, Title 15, Title 16, Title 17, Title 18 or Title 19 to Hearing Examiner'. Hearing Examiner costs are included within the appeal fee and are therefore not billed separately. Preliminary Binding Site Plane $6,265.00 + $80.00/lot Boundary Line Adjustment': Residential (Single Family & Multi -Family) $1,758.00 Non -Residential includes mixed useprojects) $2,636.00 Boundary Line Elimination' $732.00 Comprehensive Plan Map Amendments3 $8,865.00 (includes rezone a lication fee Comprehensive Plan Text Amendments3 $8,865.00 Conditional Use Permits', 6: Residential (Single Family & Multi -Family) $2,770.00 + Hearing Examiner expenses. Please note that the City of Auburn may collect a review fee on behalf of the Valley Regional Fire Authority for certain land use and/or environmental reviews which fee is collected in addition to the City's required fees. 2 Per Auburn City Code, a modification to an approved binding site plan shall be processed in the same manner as the original binding site plan approval. Therefore, the specified fee shall apply to a new or modified binding site plan approval request. 3 Fees for amendments to text or maps of the Comprehensive Plan apply only where an applicant seeks an amendment affecting specific properties rather than the City generally or property within the City generally. All Other (includes mixed use projects) $42152.00 + Hearing Examiner expenses. Conditional Use Permits4 — Minor Adjustment: Residential (Single Family & Multi -Family) $1,529.00 All Other includes mixed useprojects) $2,295.00 Critical Areas Review: Required on -site mitigation, monitoring & reporting5 $4,653.00 + actual costs for inspection and report preparation by contracted professional. Critical Areas Determinations (Exemptions or $379.00 Applicability) City review of environmental studies, plans or $379.00/study, plan or report reports (whether submitted with another city application or not and includes one re -submittal) Critical Areas Variance — Administrative $379.00 Critical Areas Variance or Reasonable Use $1,425.00 + total hourly charge Provision — hearing examiner', 6 for Hearing Examiner + associated expenses to be paid by applicant prior to issuance of final decision. Current Use Taxation $1,174.00 Development Agreement and Amendments $6,510.00 + $75.00/lot or dwelling unit Architectural & Site Design Review and/or Major $2,815.00 Modifications to Already Issued Design Review Decisions Architectural & Site Design Review Minor Modification $407.00 (applies to already issued design review decisions Eligible Facilities Request (EFR) Assoc. with $150.00 modification of a wireless communication facility (WCF) 4 Per Auburn City Code, a major adjustment to an approved conditional use permit shall be processed in the same manner as the original conditional use permit approval. Therefore, the specified fee shall apply to a new request for conditional use permit approval or a request for a major adjustment to a previously approved conditional use permit approval. 5 30% of required on -site mitigation, monitoring & reporting will be paid prior to the applicant submitting for a second review or, if no second review is needed, before the City approves any associated permits. Remaining balance of any other outstanding fees will be paid by the applicant before the City issues associated permits. Environmental Review: SEPA Checklist Review' — SFR and Middle $1,200.00 Housing (includes City issuance of DNS, MDNS, or DS as appropriate; if a DS, this fee is in addition to the review of the EIS) $2,900.00 SEPA Checklist Review' — All other projects (includes City issuance of DNS, MDNS, or DS as appropriate; if a DS, this fee is in addition to the review of the EIS) Revised or Supplemental SEPA Checklist review' — $400.00 SFR and Middle Housing (includes City issuance of Addendum, if appropriate) $1,000 Revised or Supplemental SEPA Checklist review' — All other projects (includes City issuance of Addendum, if appropriate) $379.00 SEPA Exempt Determination SEPA 3rd Party Review Actual costs Environmental Impact Statement $12,695.00 + actual costs for preparation of draft & final statements including labor, materials, mailing & other actual costs relating to the drafting & circulatin of the EIS. Final Plats — Subdivisions and Final Binding Site Plans $3,342.00 + $63.00/lot Final Plats — Short Plats $1,653.00 + $31.00/lot Hearing Examiner — Conduct of Hearing and Total hourly charge for hearing Preparation of Decisions examiner plus associated expenses to be paid by applicant prior to issuance of associated permits Flood lain Development Permit: Level One $456.00 Floodplain Development Permit: Level Two — Habitat $1,304.00 impact Assessment c The total expense for the Hearing Examiner is the responsibility of the applicant and is in addition to the relevant application fee for applications requiring a public hearing before the Hearing Examiner (e.g. conditional use permit). The expense for Hearing Examiner services will be determined after the Hearing Examiner has provided an invoice to the City that itemizes expenses incurred and this will be entered in the electronic permit tracking system as a payment due the city from the Applicant prior to final project approval. Floodplain Development Permit: Level Three — Habitat $2,280.00 + Third Party Review Impact Assessment & Hydraulic Analysis (Hydraulic Fees Analysis to be Conducted by Outside Third -Party Consultant Mitigation Plan Review Associated with a Floodplain $1,240.00 Development Permit City Acknowledgement Review of FEMA Flood Map $401.00 Revision Application; for projects requiring public notification process additional fee will be assessed based on additional resubmittal fee and actual hours expended Floodplain Development Permit Exemption Letter $379.00 Floodplain Elevation Certificate $128.00 Landscape Plan Revision, including tree removal $342.00 requests, after initial implementation and after city acceptance of initial maintenance period. Land sca e/zon i ng compliance re -inspection $133.00 Legal Lot Determinations: Affidavit/application for "Innocent Purchasers." $1,161.00 Request/application for legal lot determination. $2,695.00 Mining Permits $5,315.00 Miscellaneous Administrative Decisions (i.e., sign area $2,721.00 deviation, written code interpretations, etc.) Specific - Work Hour/Noise Exception $404.00 Plat Alteration or Vacations $5,781.00/request + Hearing Examiner expenses. Plat Modification $2,199.00/re uest Preliminary Plats — Subdivisions', s $11,600.00 + $143.00/lot + HearingExaminer expenses. Preliminary Plats — Short Plats' $5,009.00 + $74.00/lot Preliminary Site Plan Review non-PUD $2,815.00 Pre -application Meeting $379.00 — fee will be applied towards any related application made within one year of the date the pre -application meeting was held Public Notice Actual cost of publication, mailings, labor, and any additional costs PUD — Major Adjustment' $5,731.00 ' A prior City Code amendment eliminated Planned Unit Developments (PUD). The PUD fees included herein are applicable only to the existing previously approved PUDs. Public Notice Boards: 2' x 4' public notice board $175.00 or at cost from sign vendor 4' x 4' public notice board $200.00 or at cost from sign vendor Rezone — zoning map amendment $4,653.00 School Impact Fee Collection-8 Per Single Family Dwelling Unit $80.00 Per Multi -Family Dwelling Unit $39.00 SEPA — see Environmental Review Shoreline: Shoreline Exemption Determination $379.00 Shoreline Conditional Use Permits $4,162.00 + Hearing Examiner expenses. Shoreline Substantial Development Permits $4,162.00 + Hearing Examiner expenses. Shoreline Variances $4,162.00 + Hearing Examiner expenses. Short Plat Modification $2,137.00/re uested modification Site Plan Approval — PUD, Residential' $2,815.00 + $74.00/lot or unit Site Plan Approval - PUD, Non-residential' $2,928.00 + $74.00/lot or unit Special Exception:'s Single Family Residential; for a single lot request $379.00 + Hearing Examiner (to Hearing Examiner) expenses All Other Instances $1,425.00 + Hearing Examiner expenses Special Home Occupation Permits $655.00 Third Party Review of Reports $237.00 + Actual Costs of Consultant Three -Party Outside Utility Extension Agreement - Site $1,518.00 + plus the City's actual Specific Review costs in performing under the terms of the agreement as ne otiated between the parties Type I Temporary Use Permit' $268.00 $69.00 per extension request Type II Temporary Use Permit' $695.00 $69.00 per extension request 8 The City collects an application fee to cover the reasonable cost of administration of the school impact fee program. Variance:' Administrative $2,978.00 Single Family Residential for a single lot request (to $378.00+ Hearing Examiner Hearing Examiner) expenses All other instances (includes mixed use residential) $4,465.00 + Hearing Examiner to Hearing Examiner expenses Zoning Certification Letter (per parcel): Residential (Single Family & Multi -Family $80.00 Non -Residential includes mixed use development) $154.00 Zoning Code Text Amendment 1$8,865.00 2. LAND CLEARING, GRADING AND FILLING FEES (Per Ordinance No. 6146, Resolution No. 4272 Resolution No. 4424, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Grading, Land Clearing, and Filling Fees: Application Fee without FAC (for up to 500 cubic yards): Minor Grading Permit $1,955.00 Single Family Residential for a single lot $2,997.00 Non -Residential and Multi -Family $9,772.00 Other (Early Clear and Grade Prior to, Utility, $7,819.00 etc.) Application Fee with FAC (for up to 500 cubic $1,304.00 yards) Over 500 cubic yards Application Fee + $0.10/cubic yard Additional Review: Each additional grading plan review without FAC beyond a 3rd review prior to plan approval will require an additional fee of $1,144.00 be paid at the time of the additional review submittal. If the review requires more than 8 hours of staff time to complete an additional fee of $143.00 per hour will be charged and must be paid prior to plan approval. Additional grading plan review without FAC required by changes, additions or revisions to plans during construction will require an additional fee of $572.00 be paid at the time the additional review is submitted and prior to any review being completed. If the review requires more than 4 hours of staff time to complete, an additional fee of $143.00 per hour will be charged and must be paid prior to plan approval. 3. BUILDING FEES (per Ordinance 5715, Ordinance 5819, Resolution No. 3773, Resolution No. 3797, Resolution No. 3818, Resolution No. 3953, Resolution No. 4143, Ordinance No. 6146, Resolution No. 4272, Resolution No. 4424, Resolution No. 5134, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719 Resolution 5784 and Resolution No. 5860. a. Building Permit Fees: Building permit fees for new structures and additions are based upon a project's construction valuation as set forth by the International Code Council (ICC). ICC's construction valuation table is hereby incorporated into the City of Auburn's fees schedule. Construction valuations will be updated on January 1 st of each year. Project valuation for alterations to existing buildings and for other structures not identified in the ICC construction valuation table are based on the fair market value of the labor and materials of the scope of work associated with the permit. The fee for each International Building Code, International Residential Code, Washington State Energy Code or Washington State Indoor Air Quality Code building permit shall be as set forth in Table 3-A, below.9 Table 3-A BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $500.00 $32.00 $500.01 to $2,000.00 $32.00 for the first $500.00 plus $6.00 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,000.01 to $122.00 for the first $2,000.00 plus $18.60 for each additional $25,000.00 $1,000.00, or fraction thereof, to and including $25,000.00 $25,000.01 to $549.80 for the first $25,000.00 plus $14.00 for each additional $50,000.00 $1,000.00, or fraction thereof, to and including $50,000.00 $50,000.01 to $899.80 for the first $50,000.00 plus $10.00 for each additional $100,000.00 $1,000.00, or fraction thereof, to and including $100,000.00 $100,000.01 to $1,399.80 for the first $100,000.00 plus $9.00 for each $500,000.00 additional $1,000.00, or fraction thereof, to and including $500,000.00 $500000.01 to $4,999.80 for the first $500,000.00 plus $8.00 for each $1,060,000.00 additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,000.01 and up $8,999.80 for the first $1,000,000.00 plus $6.00 for each additional $1,000.00 or fraction thereof 9 Please note that the City of Auburn may collect a review fee for the Valley Regional Fire Authority for certain permit applications that is collected in addition to the City's required fees. Other Inspections and Fees: 1. Inspections outside of normal business hours..............................$214.50 per hour' (minimum charge — two hours) 2. Reinspection fees assessed under provisions of Section 109.4.13 $143.00 per hour' 3. Inspections for which no fee is specifically indicated ................... $143.00 per hour' (minimum charge — one hour) 4. Additional plan review required by changes, additions or revisions to plans $143.00 per hour' (minimum charge — one hour) 5. For use of outside consultants for plan checking and inspections, or both .... Actual COsts2 FOOTNOTES: ' Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 2 Actual costs include administrative and overhead costs. b. Mechanical Permit Fees: The fee for each permit issued under provisions of the International Mechanical Code, International Fuel Gas Code, NFPA 54 (National Fuel Gas Code), NFPA 58 (Liquefied Petroleum Gas Code), or the mechanical device provisions of the International Residential Code shall be as set forth in Table 3-13, below. For new single-family dwellings a flat rate permit fee of $252.00 may be charged in lieu of fees as prescribed in Table 3-13. For new multi -family dwellings, a flat rate permit fee of $200.00 may be charged in lieu of fees prescribed in Table 3-13. Table 3-13 MECHANICAL PERMIT FEES Permit Issuance: 1. For the issuance of each mechanical permit a. Residential Over the Counter" Application Fee.................................$43.00 b. Commercial, Multifamily, Non -Residential Application Fee................$170.00 2. In addition to the base mechanical application fee, each mechanical fixture shall include apermit fee of......................................................................................................$15.00 Other Inspections and Fees*: 1. Inspections outside of normal business hours, per hour (minimum charge -- two hours) ......................................................................................................................... $214.50 2. Reinspection fees assessed under provisions of Section 109.4.13 ............. $143.00 3. Inspections for which no fee is specifically indicated, per hour (minimum charge -- one hour)................................................................................................................ $143.00 4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge -- one hour) ........... $143.00 * Per hour for each hour worked or the total cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved and include a minimum of one hour unless otherwise specified. ** Over the Counter application and permit fees are not eligible for refunds when applied for in error c. Plumbing Code Permit Fees: For new single-family dwellings a flat rate permit fee of $252.00 may be charged in lieu of fees as prescribed in Table 3-C. For new multi- family dwellings, a flat rate permit fee of $200.00 may be charged in lieu of fees prescribed in Table 3-C. Table 3-C PLUMBING PERMIT FEES Permit Issuance: 1. For the issuance of each plumbing permit a. Residential Over the Counter** Application Fee..................................$43.00 b. Commercial, Multifamily, Non -Residential Application Fee................$170.00 2. In addition to the base plumbing application fee, each plumbing fixture shall include a permitfee of.........................................................................................................$15.00 Other Inspections and Fees*: 1. Inspections outside of normal business hours .......................................... $214.50 2. Reinspection fee ................................................ $ 143.00 3. Inspections for which no fee is specifically indicated ............................... $143.00 4. Additional plan review required by changes, additions or revisions to approved plans ..........................................................................................................................$143.00 *Per hour for each hour worked or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of all the employees involved and include a minimum of one hour unless otherwise specified ** Over the Counter application and permit fees are not eligible for refunds when applied for in error d. Other Building Permit Fees Change of Use: The permit fee shall be equivalent to the adopted additional plan review and reins ection fee based on a minimum of four hours. Certificate of Occupancy: For issuance of a new or replaced Certificate of Occupancy not associated with any other building permit, a fee of $256.00 will be required per certificate. Commercial Re -roof Permit Fee: The permit fee shall be equivalent to the adopted additional plan review and reins ection fee based on a minimum of three hours. Conditional Approval: When authorized by the City, permits that are issued with conditions due to project phasing, out of sequence issuance, pending associated approvals, or other advanced permitting requests made by the applicant, a conditional approval fee equivalent to the additional plan review fee based on a minimum of four hours will be required prior to issuance. Demolition Permit Fees: Demolition permits shall be charged a base fee of $181.00. Fire Permit Fee: For each fire permit fee a City of Auburn administration fee. of $143.00 will be applied in addition to the fee collected for the Valley Regional Fire Authority (VRFA) as identified in the VRFA Fee Schedule. Manufactured Home: The permit fee shall be equivalent to the adopted additional plan review and reins ection fee based on a minimum of four hours. Permit Extensions: For permits that are granted an extension beyond the expiration date or date of abandonment, whether issued or not, a permit extension fee is required to be paid prior to extension. The fee shall be the lesser of $143.00 or 50% of the original application and permit fees. Plan Review Fees: When submitted documents are required by Section 106.3 of the Construction Administrative Code, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be 65 percent of the building permit fee as shown in Table 1-A. The plan review fees specified in this section are separate fees from the permit fees and in addition to permit fees. Rack Permit Fee: The permit fee shall be equivalent to the adopted additional plan review and reins ection fee based on a minimum of three hours. Solar Permits — Over the Counter: The permit fee for solar installations that qualify for the over-the-counter permitting shall be equivalent to the inspection fee based on a minimum of two hours. Over the counter application and permit fees are not eligible for refunds for applications made in error. Stock Plan Site Plan Review Fee: The plan review fee for individual lot site plan that have an approved building stock plan shall be $259.00. Temporary Certificate of Occupancy Fees: There shall be a fee of $0.30 per square foot with a minimum charge of $600 and a maximum of $3,000 for issuance of a temporary certificate of occupancy and a fee of 30% of the original temporary certificate of occupancy fee for each subsequent 30-dayextension requested. Work Without a Permit: Building construction and grading activities requiring permits per ACC 15.74 that are determined to be in violation for work occurring without an approved permit result in additional documentation, administration, research, and inspection and require more processing time. For these cases, an additional 100% fee will be applied to the standard application and permit fees identified in sections 3 and 4 above. It is possible a violation existed prior to property purchase by a new owner, was constructed by an individual who misled the owner, or was constructed by an individual who was unaware of code requirements. The fact that violations may not have been created by the current owner does not relieve Code Enforcement staff from their responsibility to seek compliance from the property owner. When assessing permit fees, consideration may be given based on the circumstances, severity of the violation, and timeliness of the property owner to resolve and obtain required permits and compliance with City code. Building Permit Fee Reductions. The Director is authorized to waive building, mechanical or plumbing permit fees for homeowners that are already enrolled in another City program that is intended to benefit low-income residents (e.g. housing home repair program, utility discount program). This fee reduction may also be extended to contractors that are applying for permits on behalf of these homeowners provided that it can be documented that the discount is benefiting the homeowner and not supplementing a contractor's profit. 4. FIRE IMPACT FEES. Impact Fees By Land Use — Revenue Credit = 20% (Per Ordinance No. 5977, Resolution 3953 Resolution No. 4022 and Resolution No. 5860. Land Use Fire and EMS Impact Fee per Unit of Development Residential— All calculations below are per s uare foot —Total x Square Feet Single Family, Duplex, Mobile Home $0.72 Min. $406.08 Multi -Family $0.72 Min. $406.08 Non -Residential — All calculations below are per s uare foot — Total x Square Feet Hotel/Motel $0.42 Hospital/Clinic $0.42 Group Living $0.42 Office $0.25 Retail $0.68 Restaurant/Bar/Lounge $0.42 Ind ustrial/Manufactu ring$0.08 Leisure/Outdoors $0.42 Agriculture $0.42 Church $0.42 Schools/Colleges $0.32 Government/Public Buildings $0.42 Casino $0.42 Jails $0.42 5. ADMINISTRATIVE PROCEDURES AND MISCELLANEOUS INSPECTIONS: In addition to any other fees specified in this chapter, there shall be a fee schedule for certain administrative procedures not otherwise included as set forth in the following schedule of fees: a. Adult Family Home Inspection $593.00 b. Relocation (pre -inspection) Per Table 1-A c. Housing Inspection Actual city cost based on the adopted additional plan review and reins ection fee. d. Sign Permits Unless exempt by Ch. 18.56 ACC, the fee shall accompany each application for a sign permit. The amount of the fee shall be based upon the value of the sign pursuant to Table 1-A. 6. BUSINESS LICENSE FEES a. The annual fee for a General Business License as defined in Chapter 5.10 of the Auburn City Code. $112.00 b. Contractors who are based outside of Auburn but that are performing work inside of Auburn. $112.00 c. Replacement fee for commercial vehicle parking permit issued in accordance with ACC 10.36.190.B $15.00 d. Unlicensed Penalty Fee: An unlicensed penalty fee will be assessed for businesses in operation without a current business license. $200 / year of operation without a license. 7. RENTAL HOUSING BUSINESS LICENSE FEES (Per Resolution No. 4601, Ordinance No. 5882, Resolution No. 4272, Resolution No. 4424, Ordinance 6477, Resolution No. 5620 Resolution No. 5681 Resolution 5784, and Resolution No. 5860 and Resolution No. 5872.): a. The annual fee for a license to operate rental housing businesses in the City, as defined in Chapter 5.22 of the Auburn City Code (ACC) shall be based on the total number of units as follows: Non-profit rental Single Family Home or Single Condo Rental Duplex, Triplex or Fourplex Condo or Apartment Complex (5 to 24 dwelling units) Condo or Apartment Complex (25 or more dwelling units) Communal residence $0/year $32.00/year $81.00/year $161.00/year $536.00/year $161.00/ ear eaGh year. 8. INDIVIDUAL LICENSE REGULATIONS (Per Ordinance No. 6749, Resolution No. 5470, and Resolution No. 5549 and Resolution No. 5620 Resolution 5784 and Resolution No. 5860): The fee licensing under ACC 5.20.030 shall be as follows: Type Fee Term Initial Renewal Dance Hall and Operator $380.00 $380.00 1/1 — 12/31 Marijuana Related Businesses $541.00 $541.00 1/1 — 12/31 A duplicate license shall be issued by the business license clerk, as designated by the mayor, to replace any license previously issued which has been lost, stolen, defaced, or destroyed. 9. Technology Fee: (Per Resolution No. 5549 Resolution No. 5620 and Resolution No. 5860.) A 4% technology fee is included in all fees outlined in sections 1, 2, 3, and 5 above. B. ENGINEERING AND PUBLIC WORKS FEES 1. Transportation Impact Fee Rate Schedule: (Per Ordinance No. 5763 as amended by Resolution No. 3953, Ordinance No. 6005, Resolution No. 4103, Resolution No. 4424, Resolution 4964, Resolution No. 5114, Resolution No. 5181, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681, Resolution No. 5719, Resolution No. 5833-mod Resolution No. 5860 and Resolution No. 5872.) Transportation Impact Fee Due = Fee Assessment — Fee Credit Fee Assessment = Fee Rate x Independent Variable Quantity Fee Credit = the highest of the following, subject to verification and ACC 19.04 requirements: • Fee that would be assessed using the current fee rates for existing permitted use on subject property • Fee that would be assessed using the current fee rates for previous permitted use after 2001 on subject property when previous use was within existing structure(s) or structure(s) demolished within 5-years of application date. • Total previous transportation impact fees paid by subject property. rer I rip i-ees Downtown Fee Per Trip $3,824.00 Outside Downtown Fee Per Trip $6,022.00 Notes ' Downtown fee applies to properties and projects located entirely within the Downtown Urban Center as defined by the current Downtown Plan. Fee Rates° ITE Independent FEE RATE: FEE RATE: FEE RATE: FEE RATE: Land Variables Non- Non- Downtown Downtown Land Use Use Downtown' Downtown wl Transit Code2 w/ Transit Proximity'," Proximity', Industrial General Light Industrial 110 sf/GFA $8.32 $8.32 $5.28 $5.28 Industrial Park 130 sf/GFA $4.35 $4.35 $2.76 $2.76 Manufacturing 140 sf/GFA $9.47 $9.47 $6.01 $6.01 Warehousing 150 sf/GFA $2.30 $2.30 $1.46 $1.46 Mini-Warehouse/Storage 151 sf/GFA $1.77 $1.77 $1.12 $1.12 Residential' Single -Family Detached 210 du $6,604.13 $5,349.34 $4,193.65 $3,396.86 Housing maximum fee Single -Family Detached 210 sf $3.85 $3.12 $2.44 $1.98 Housin 8,9 Single -Family Attached 215 du $4,004.63 $3,243.75 $2,542.96 $2,059.80 Housing maximum fee Single -Family Attached 215 sf $3.85 $3.12 $2.44 $1.98 Housing" Multi -Family — Low Rise 220 du $3,787.84 $3,068.15 $2,405.30 $1,948.29 maximum fee ITE Independent FEE RATE: FEE RATE: FEE RATE: FEE RATE: Land Variables Non- Non- Downtown Downtown Land Use Use Downtown' Downtown w/ Transit Code2 w/ Transit Proximity'.6 Proximit 7 6 Multi Family -Low 220 sf $2.88 $2.34 $1.83 $1.48 Rise 8,9 Multi -Family Mid -Rise 221 du $2,896.58 $2,346.23 $1,839.34 $1,489.87 maximum fee Multi -Family Mid-Rise8,9 221 sf $2.65 $2.15 $1.69 $1.37 Calculated Calculated Calculated Calculated @ 50% of @ 50% of @ 50% of @ 50% of the fee that the fee that the fee that the fee that Accessory Dwelling Unit N/A du would be would be would be would be charged to charged to charged to charged to the the the the principal principal principal principal unit unit unit unit Mobile Home Park 240 du $3,259.91 $2,640.53 $2,070.06 $1,676.75 Senior Adult Housing- 251 du $1,686.16 $1,365.79 $1,070.72 $867.28 Single Family Senior Adult Housing - 252 du $1,405.13 $1,138.16 $892.27 $722.74 Multi Family Congregate Care Facility 253 du $1,011.70 $819.47 $642.43 $520.37 Assisted Living 254 bed $1,348.93 $1,092.63 $856.58 $693.83 Continuing Care 255 unit $1,067.90 $865.00 $678.12 $549.28 Retirement Community Lodging Hotel 310 room $4,737.31 $3,837.22 $3,008.21 $2,436.65 Motel 320 room $2,890.56 $2,341.35 $1,835.52 $1,486.77 Recreational Health/Fitness Club 492 sf/GFA $16.10 $11.91 $10.22 $7.57 Recreational Community Center 495 sf/GFA $11.67 $8.63 $7.41 $5.48 Institutional Elementary School 520 student $382.20 $282.83 $242.70 $179.60 Middle School/Jr. High 522 student $650.38 $481.28 $412.99 $305.61 High School 525 student $831.84 $615.56 $528.22 $390.88 Junior/Community 540 student $653.59 $483.65 $415.03 $307.12 College School District Office 528 sf/GFA $18.80 $12.78 $11.94 $8.12 Church" 560 sf/GFA $3.64 $2.69 $2.31 $1.71 Day Care Center10 565 sf/GFA $44.64 $33.04 $28.35 $20.98 Medical Nursing Home 620 beds $786.87 $637.37 $499.67 $404.73 Hospital 610 sf/GFA $6.91 $5.59 $4.38 $3.55 Clinic10 630 sf/GFA $20.74 $16.80 $13.17 $10.67 ITE Independent FEE RATE: FEE RATE: FEE RATE: FEE RATE: Land Variables Non- Non- Downtown Downtown Land Use Use Downtown' Downtown w/ Transit Code2 w/ Transit Proximity'-' Proximity', Animal HospitalNet Clinic10 640 sf/GFA $19.84 $16.07 $12.60 $10.21 Officef0 General Office 710 sf/GFA $13.27 $9.02 $8.43 $5.73 > 10, 000s Small Office 712 sf/GFA $19.90 $13.53 $12.64 $8.59 <_10,OOOs Medical Office - 720 sf/GFA $28.40 $19.31 $18.03 $12.26 Standalone Medical Office - Hospital 720 sf/GFA $20.52 $13.96 $13.03 $8.86 Campus Post Office 732 sf/GFA $28.69 $19.51 $18.22 $12.39 Retail10 Free Standing Discount 813 sf/GFA $12.96 $9.59 $8.23 $6.09 Superstore Free Standing Discount 815 sf/GFA $17.00 $12.58 $10.80 $7.99 Store Hardware/Paint Store 816 sf/GFA $7.53 $5.57 $4.78 $3.54 Shopping Center (>150k) 820 sf/GLA $9.46 $7.00 $6.01 $4.44 Shopping Plaza (40- 821 sf/GLA $25.12 $18.59 $15.95 $11.81 150k) - with supermarket Shopping Plaza (40- 150k) - without 821 sf/GLA $14.44 $10.69 $9.17 $6.79 supermarket Strip Retail Plaza (<40k) 822 sf/GLA $18.33 $13.57 $11.64 $8.62 Car Sales - New 840 sf/GFA $17.88 $13.23 $11.35 $8.40 Car Sales - Used 841 sf/GFA $27.70 $20.50 $17.59 $13.02 Automobile Parts Sales 843 sf/GFA $9.53 $7.05 $6.05 $4.48 Tire Store 848 sf/GFA $11.92 $8.82 $7.57 $5.60 Supermarket 850 sf/GFA $24.15 $17.87 $15.33 $11.35 Convenience Store 851 sf/GFA $62.80 $46.47 $39.88 $29.51 Home Improvement 862 sf/GFA $5.60 $4.14 $3.56 $2.63 Store Drugstore w/o Drive- 880 sf/GFA $13.65 $10.10 $8.67 $6.41 Through Drugstore w/ Drive- 881 sf/GFA $17.84 $13.20 $11.33 $8.38 Through Marijuana Dispensary 882 sf/GFA $139.76 $103.42 $88.75 $65.67 Services10 Drive-in Bank 912 sf/GFA $41.12 $30.43 $26.11 $19.32 Fast Casual Restaurant 930 sf/GFA $40.92 $30.28 $25.99 $19.23 Fine Dining Restaurant 931 sf/GFA $29.81 $22.06 $18.93 $14.01 ITE Independent FEE RATE: FEE RATE: FEE RATE: FEE RATE: Land Variables Non- Non- Downtown Downtown Land Use Use Downtown' Downtown w/ Transit Code' w/ Transit Proximity',6 Proximity', High Turnover (Sit- 932 sf/GFA $23.82 $17.62 $15.12 $11.19 Down) Restaurant Fast Food Restaurant 933 s9GFA $68.00 $50.32 $43.18 $31.95 w/o Drive -Through Fast Food Restaurant w/ 934 sf/GFA $66.30 $49.06 $42.10 $31.16 Drive -Through Coffee Shop w/o Drive- Through 936 sf/GFA $22.04 $16.31 $13.99 $10.36 Coffee Shop w/ Drive- 937 sf/GFA $26.61 $19.69 $16.90 $12.50 Through Coffee Shop w/ Drive- 938 DTL $10,292.00 $7,616.08 $6,535.47 $4,836.25 Through (No Seating) Automobile Parts and 943 sf/GFA $6.37 $4.71 $4.04 $2.99 Service Center Gasoline/Service Station 944 VFP $27,531.10 $20,373.01 $17,482.38 $12,936.96 Gasoline/Service Station 945 VFP $27,657.36 $20,466.45 $17,562.56 $12,996.30 with Market 2-4k Gasoline/Service Station 945 VFP $34,173.81 $25,288.62 $21,700.54 $16,058.40 with Market 4-5.5k Gasoline/Service Station 945 VFP $40,389.96 $29,888.57 $25,647.82 $18,979.39 with Market 5.5-10k Trip generation rates, factors, and fee City Review Fee - $0 determined by City using data provided by Applicant. Land Use Type Not Fee determined by Independent Trip Listed 3 Generation Study prepared by Applicant's Engineer in accordance City Review Fee = $510 with the ITE Manual, subject to City Engineer review and approval. Notes: ' Downtown fee applies to properties and projects located entirely within the Downtown Urban Center as defined by the current Downtown Plan. 2 Institute of Transportation Engineers Trip Generation Manual, current edition. 3 Contact the City's Public Works Department at 253-931-3010 or visit www.auburnwa/gov/TIF for more information and guidance when the land use type is not listed in the fee schedule. 4 Except as Noted Otherwise, Fee Rate = Basic Trip Rate x New Trip Factor x Trip Length Adj. Factor x Truck Factor x Proximity to Transit Factor (when applicable) x Per Trip Fee = 1,000 (for Land Use with Independent Variable measured in square feet) Idu = dwelling unit; sf = square footage of residential dwelling unit less garages and detached storage areas; sf/GFA = Square feet Gross Floor Area and where Gross floor area (GFA) means the sum of the area of each floor level of a building (expressed in square feet), including cellars, basements, mezzanines, penthouses, corridors, lobbies, stores, and offices, that are within the principal outside faces of exterior walls, not including architectural setbacks or projections. Included are all areas that have floor surfaces with clear standing head room (six feet six inches minimum) regardless of use. With the exception of buildings containing enclosed malls or atriums, GFA is equal to the gross leasable area (GLA) and gross rentable area; sf/GLA = Square Feet Gross Leasable Area where Gross leasable area (GLA) means the total floor area designed for tenant occupancy and exclusive use, including any basements, mezzanines, or upper floors, expressed in square feet. For the purposes of the trip generation calculation, the floor area of any parking garages within the building shall not be included within the GLA of the entire building. GLA is the area for which tenants pay rent; it is the area that produces income for the property owner.; VFP = Vehicle Fueling Position; DTL = drive through lanes. 6 Land Use is within '/z mile walking distance to frequent transit or Auburn Station as identified by the current Comprehensive Transportation Plan with Level of Transit Service 1 designation. Traffic Impact fees assessed for Single Family Residential Units include home occupations, adult family homes, family home childcares, and such occupations commonly found within single family residences. It does not include occupations that would require a Special Home Occupation Permit pursuant to ACC18.60. 8 Subject to maximum fee for specified land use. 9 Fee Rate = Maximum Fee for Single Family Detached = Regional Average Dwelling Unit Size x ITE Manual Average Number of Occupants Adjustment; where: • Regional Average Dwelling Unit Size = 1,717 square feet; and • ITE Manual Average Number of Occupants Adjustment = ratio of average number of occupants for housing type to average occupants for single family attached and detached housing = 1 for single family detached and attached, 0.75 for Multifamily Low Rise, and 0.69 for Multifamily Mid Rise 10 Payment Program available when applied for and agreement executed prior to building permit issuance subject to conditions and limitations of ACC 19.04 and the following: • Maximum term = 24 months • Maximum total amount financed = $15,000 • Intererst rate = Fixed at agreement execution at prime rate 2. Transportation Impact Fee Trip Rate Adjustment Factors (Per Resolution No. 5860): Fee Rates in Section 1 were calculated using these adjustment factors. Land Use ITE Land Use, Code Basic Trip Rate2 New Trip Factor Avg. Trip Length. Trip Lengths Adj. Factor Truck Adj. Factor Proximity to Transit Factor6 Industrial General Light Industrial 110 0.65 1.00 5.10 1.70 1.25 1.00 Industrial Park 130 0.34 1.00 5.10 1.70 1.25 1.00 Manufacturing 140 0.74 1.00 5.10 1.70 1.25 1.00 Warehousing 150 0.18 1.00 5.10 1.70 1.25 1.00 Mini-Warehouse/Storage 151 0.15 1.00 5.10 1.70 1.15 1.00 Residential Single -Family Detached Housing maximum fee 210 0.94 1.00 3.50 1.17 1.00 0.81 ITE Land Basic New Avg. Trip Length Truck Proximity to Land Use Use Trip Trip Trip Adj. Factor Adj. Transit Code l Rate' Factor3 Length° Factor Factor6 Single -Family Detached 210 N/A N/A N/A N/A N/A N/A Housing Single -Family Attached 215 0.57 1.00 3.50 1.17 1.00 0.81 Housing maximum fee Single -Family Attached 215 N/A N/A N/A N/A N/A N/A Housing Multi -Family - Low Rise 220 0.51 1.00 3.70 1.23 1.00 0.81 maximum fee Multi -Family - Low Rise 220 N/A N/A N/A N/A N/A N/A Multi -Family Mid -Rise 221 0.39 1.00 3.70 1.23 1.00 0.81 maximum fee Multi -Family Mid -Rise 221 N/A N/A N/A N/A N/A N/A Accessory Dwelling Unit N/A N/A N/A N/A N/A N/A N/A Mobile Home Park 240 0.58 1.00 2.80 0.93 1.00 0.81 Senior Adult Housing - 251 0.30 1.00 2.80 0.93 1.00 0.81 Single Family Senior Adult Housing - 252 0.25 1.00 2.80 0.93 1.00 0.81 Multi Family Congregate Care Facility 253 0.18 1.00 2.80 0.93 1.00 0.81 Assisted Living 254 0.24 1.00 2.80 0.93 1.00 0.81 Continuing Care 255 0.19 1.00 2.80 0.93 1.00 0.81 Retirement Community Lodging Hotel 310 0.59 1.00 4.00 1.33 1.00 0.81 Motel 320 0.36 1.00 4.00 1.33 1.00 0.81 Recreational Health/Fitness Club 492 3.45 0.75 3.10 1.03 1.00 0.74 Recreational Community 495 2.50 0.75 3.10 1.03 1.00 0.74 Center Institutional Elementary School 520 0.14 0.80 1.70 0.57 1.00 0.74 Middle School/Jr. High 522 0.15 0.80 2.70 0.90 1.00 0.74 High School 525 0.14 0.80 3.70 1.23 1.00 0.74 Junior/Community College 540 0.11 0.80 3.70 1.23 1.00 0.74 School District Office 528 2.04 0.90 5.10 1.70 1.00 0.68 Church 560 0.49 1.00 3.70 1.23 1.00 0.74 Day Care Center 565 11.121 1.00 1 2.00 1 0.67 1 1.00 1 0.74 Medical Nursing Home 620 0.14 1.00 2.80 0.93 1.00 0.81 Hospital 610 0.86 0.80 5.00 1.67 1.00 0.81 Clinic 630 3.69 1.00 2.80 0.93 1.00 0.81 Animal Hos italNet Clinic 640 3.53 1.00 2.80 0.93 1.00 0.81 Office General Office >10,000s 710 1.44 0.90 5.10 1.70 1.00 0.68 ITE Land Basic New Avg. Trip Length Truck Proximity to Land Use Use, Trip Trip Trip Adj. Factor Adj. Transit Code Rate2 Factor' Length Factor Factor6 Small Office 712 2.16 0.90 5.10 1.70 1.00 0.68 510,OOOs Medical Office - 720 3.93 0.75 4.80 1.60 1.00 0.68 Standalone Medical Office - Hospital 720 2.84 0.75 4.80 1.60 1.00 0.68 Campus Post Office 732 11.21 0.75 1.70 0.57 1.00 0.68 Retail Free Standing Discount 813 4.33 0.71 2.10 0.70 1.00 0.74 Superstore Free Standing Discount 815 4.86 0.83 2.10 0.70 1.00 0.74 Store Hardware/Paint Store 816 2.98 0.74 1.70 0.57 1.00 0.74 Shopping Center >150k 820 3.40 0.66 2.10 0.70 1.00 0.74 Shopping Plaza (40-150k) 821 9.03 0.66 2.10 0.70 1.00 0.74 - with supermarket Shopping Plaza (40-150k) 821 5.19 0.66 2.10 0.70 1.00 0.74 - without supermarket Strip Retail Plaza (<40k) 822 6.59 0.66 2.10 0.70 1.00 0.74 Car Sales - New 840 2.42 0.80 4.60 1.53 1.00 0.74 Car Sales - Used 841 3.75 0.80 4.60 1.53 1.00 0.74 Automobile Parts Sales 843 4.90 0.57 1.70 0.57 1.00 0.74 Tire Store 848 3.75 0.72 2.20 0.73 1.00 0.74 Supermarket 850 8.95 0.64 2.10 0.70 1.00 0.74 Convenience Store 851 49.11 0.49 1.30 0.43 1.00 0.74 Home Improvement Store 862 2.29 0.58 2.10 0.70 1.00 0.74 Drugstore w/o Drive- 880 8.51 0.47 1.70 0.57 1.00 0.74 Through Drugstore w/ Drive- 881 10.25 0.51 1.70 0.57 1.00 0.74 Through Marijuana Dispensary 882 18.92 0.80 4.60 1.53 1.00 0.74 Services Drive-in Bank 912 21.01 0.65 1.50 0.50 1.00 0.74 Fast Casual Restaurant 930 12.55 0.57 2.85 0.95 1.00 0.74 Fine Dining Restaurant 931 7.80 0.56 3.40 1.13 1.00 0.74 High Turnover (Sit -Down) 932 9.05 0.57 2.30 0.77 1.00 0.74 Restaurant Fast Food Restaurant w/o 933 33.21 0.51 2.00 0.67 1.00 0.74 Drive -Through Fast Food Restaurant w/ 934 33.03 0.50 2.00 0.67 1.00 0.74 Drive -Through Coffee Shop w/o Drive- 936 32.29 0.17 2.00 0.67 1.00 0.74 Through Coffee Shop w/ Drive- 937 38.99 0.17 2.00 0.67 1.00 0.74 Through ITE Land Basic New Avg. Length Truck Proximity to Land Use Use TripTripTripTrip Adj. Factors Adj. Transit Code l Rate' Factor3 Length" Factor Factors Coffee Shop w/ Drive - Through (No Seating) 938 15.08 0.17 2.00 0.67 1.00 0.74 Automobile Parts and Service Center 943 2.06 0.70 2.20 0.73 1.00 0.74 Gasoline/Service Station 944 13.91 0.58 1.70 0.57 1.00 0.74 Gasoline/Service Station 945 18.42 0.44 1.70 0.57 1.00 0.74 with Market 2-4k Gasoline/Service Station 945 22.76 0.44 1.70 0.57 1.00 0.74 with Market 4-5.5k Gasoline/Service Station 945 26.90 0.44 1.70 0.57 1.00 0.74 with Market 5.5-10k Land Use Type Not Listed 7 Notes: Institute of Transportation Engineers Trip Generation Manual, current edition. 2 Basic Trip = 1-hour peak vehicle trip rate between 4pm and 6pm from ITE 3 New Trip Factor = Percent of trips that are new trips per ITE expressed in decimal form 4In miles 5 Trip Length Adjustment Factor = Average Trip Length = Citywide Average Trip Length; where: Citywide Average Trip Lenth = 3 miles 'Applied to land use within '/2 mile walking distance to frequent transit or Auburn Station as identified by the current Comprehensive Transportation Plan with Level of Transit Service 1 designation. For Land Use types not listed, basic trip rates and adjustments factors will be assessed using the most similar Land Use types in the Fee Schedule and/or the ITE Manual and, as required or approved by the City Engineer, trip data and/or an Independent Trip Generation Study provided by the Applicant. Contact the City's Public Works Department at 253-931-3010 or visit www.auburnwa/gov/TIF for more information and guidance. 3. Facility Extension (FAC) Fees: (Per Ordinance No. 5791 and amended by Ordinance No. 5819, Resolution No. 3953, Resolution No. 4272, Resolution No. 4424, Resolution No. 5114, Resolution No. 5319, Resolution 5380, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719 Resolution 5784 and Resolution No. 5860.) Application Fee: The application fee varies by project type as follows: Residential $646.00 Commercial* $3,242.00 Multi-Famil ** $5,202.00 Short Plat*** $6,490.00 Plat*** $10,428.00 * Includes multi -use projects in the Downtown Urban Center and projects outside City limits that extend City utilities. ** Includes multi -use projects outside the Downtown Urban Center. *** Includes unit lot subdivisions. Base Review Fee: $1,950.00 for each facility (water main, private water main, sanitary sewer, storm drainage, street, private street/fire lanes and private storm systems within private streets) Review and Inspection Fee: Summation of the following categories (a+b+c+d). a. For the combined linear footage of water main, private water main, sanitary sewer, storm drainage and private storm drainage within private streets, streets, and private street/fire lanes, $7.25 per lineal feet. b. For non -linear extensions such as pump stations or traffic signals, the review and inspection extension fee will be determined by the City Engineer based on an estimate of the City's costs associated with the review and inspection costs with staff time at a rate of $143.00 per hour and outside support services charged at actual cost. c. For that portion of a City utilities extension located outside City Limits, additional fees may be assessed equal to the City's costs associated with permits from other jurisdictions required to be paid for by the City. d. City provided material such as street light control nodes, utility structure covers, and other material that may be provided by the City for the completion of the FAC construction are charged at actual City cost. Facility Extension Fees will be paid as follows: a. Application fee due with application. b. Base Review Fee, 30% of the estimated Review and Inspection Fee, and any outstanding application fees will be paid when the applicant applies for second review or, if no second review is needed, before the City signs the facility extension agreement. c. Remaining balance of Review and Inspection Fees and any other outstanding application fees will be paid by the applicant before the City signs the facility extension agreement. Additional Review: Each additional plan review beyond a 3►d review, prior to plan approval, will require an additional fee of $1,144.00 be paid at the time of the additional review submittal. If the review requires more than 8 hours of staff time to complete, an additional fee at a rate of $143.00 per hour will be charged and must be paid prior to plan approval. Additional plan review required by changes, additions or revisions to plans during construction will require an additional fee of $572.00 be paid at the time the additional review is submitted and prior to any review being completed. If the review requires more than 4 hours of staff time to complete, an additional fee at a rate of $143.00 per hour will be charged and must be paid prior to plan approval. For each deviation, deferral, or appeal submitted for review, the applicant will be charged a $572.00 fee, regardless of the City's approval or rejection of the request. If the review of the request requires more than 4 hours of staff time to complete, an additional fee at a rate of $143.00 per hour will be charged and must be paid prior to delivery of the City's determination. Additional Inspection: Fees to inspect work beyond the Authorized Construction Period, re -inspect previously inspected work that was found to be incomplete or deficient, and inspection of non -linear extension work are applied a rate of $143.00 per hour during normal business hours and $213.00 per hour during non -business hours (weeknights, weekends, and holidays). 4. Right -of -Way Use Permit Fees: (Per Ordinance No. 6125, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Type A — Banner (Application Fee Only, No permit fee $75.00 Type B — Short Term (Application Fee Only, No permit $75.00 fee Type C — Long Term (Application Fee $308.00 Type C — Long Term — Surface Encroachment (Permit $147.00 per year Fee Type C — Long Term — Surface Encroachment Per Estimated Value of the encroachment (Leasehold Excise Tax (LET) Collection) area as determined by the City Engineer and the current LET Rate set by the State. Type C — Long Term — Non -Surface Encroachment $75.00 per year Permit Fee Type D — Hauling (Application Fee $147.00 Type D — Hauling (Permit Fee) Estimated staff time for inspection and oversight @ $143.00 per hour during normal business hours and $213.00 per hour during non -business hours (weeknights, weekends, and holidays). Police support to be contracted separately as needed. Administrative Amendment (Application Fee, applies $154.00 to requested changes to Right -of -Way Use Permits that have been issued that do not change the intent of the permitted use or include areas beyond the intent of the original use Additional Application Fee for permits that require a $130.00 parking plan, traffic control plan, and/or pedestrian detour plan 5. Franchise Agreements: (Per Ordinance No. 6546, Resolution No. 5114, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5413, Resolution No. 5424, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Application/Renewal/Amendment Application Fee $7,139.00 Nonrefundable Initial Fee + plus (ACC 13.36.040, ACC 20.06.120, ACC 20.06.130) the City's actual costs incurred in excess of $7,139.00. Initial Fee is due at time of application any additional costs beyond the initial fee is due prior to the effective date of the agreement. Annual Administration Fee ACC 20.04.170 Actual City Costs Annual CATV Franchise Fee (ACC 13.36.230) 5% of Gross Revenue for the prior three months. Other Annual Franchise Fee (ACC 20.06.100) Statutorily Permissible Percent of Gross Revenue Small Wireless Facility Application Fee (ACC $500.00 for Existing, Relocated, or 20.02.010, ACC 20.14.020) Replaced Structure for up to five sites or $1,000.00 for each New Structure (These fees include all City permitting costs except the Franchise Application/Renewal/Amendment and Administration Fee. Late Payment. In the event any quarterly payment is Simple interest at 12% annually on the total made after noon on the date 10 days after the date amount past due due Assignment or transfer of Franchise $3,569.00 6. Right -of -Way Vacations: (Per Resolution No. 4143, Resolution No. 5114, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Application Fee $2,158.00 Land Value Compensation Per ACC 12.48.085 Amendment Request (applicable when changes $1,079.00 are requested after initial City Council approval but prior to vacation taking effect 7. Utility System Development Fees: (Per Ordinance No. 5819 and amended by Resolution No. 3797, Resolution No. 3953, Resolution No. 4272, Resolution No. 4424, Resolution No. 5114, Resolution No. 5134, Resolution No. 5181, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 aP4 Resolution No. 5860 and Resolution No. 5872.) For all utilities, a charge in lieu of assessment or payback charges may be applicable for the proportional share of the utility line being connected to. a. Water Utility. Connection fees are comprised of a Permit Fee and the System Development Charge as follows: Meter Size (In Inches) Water Service Installation Permit Fee System Development Charge (SDC) Existing Water Service & Meter Box0) Water Service & Meter Box Installed by City(2) Paved Street Unpaved Street 3/4 or less $592.00 $5,572.00 $3,728.00 $9,725 010,127.00 3/a or less with Fireline(3) $592.00 $7,547.00 $5,704.00 $ 0810,127.00 1 $657.00 $5,637.00 $3,793.00 $9--725-W10127.00 1 with Fireline(3) $657.00 $7,613.00 $5,767.00 $9;725.5010,127.00 1-1/2 $1,596.00 $9,353.00 $7,832.00 $32,3834G33,723.00 2 $1,614.00 $9,695.00 $7,850.00 $51,830.-W53,974.00 3 Actual Cost By Applicant By Applicant $103,75940108, 551.0 0 4 Actual Cost By Applicant By Applicant $' 62Tv 102 =168,808. 00 6 Actual Cost By Applicant By Applicant $324,112.W337,521.0 0 8 Actual Cost By Applicant By Applicant $519,600:50540, 555.0 0 10 Actual Cost By Applicant By Applicant $745,563.00776,407.0 0 ')Installation of a water meter done by the City and the service either already exists or has been installed by the Applicant. (2)Installation of the entire water service is done by the City. (3)Applies only to Single -Family Residential meter. b. Sanitary Sewer Utility: Connection fees are comprised of a Permit Fee and the System Development Charge as follows: Type Permit Fee System Development Charge (SDC) New Connection(4) $269.00 $3,609.003,590.00 per RCE(5) Grinder Pump (New $369.00 $3,609.003,590.00 per Connection(4) RCE(5) Tenant Improvement(4) $92.00 $3,609.003,590.00 per net increase in RCE's(5) (4)AII construction is the responsibility of the Applicant. If a new connection or repair requires work within City right-of-way, a Construction Permit (CON - see Section 9) is required in addition to the Sewer Permit. (5)RCE, Residential Customer Equivalent - An RCE shall be as defined by the King County Department of Natural Resources as follows: Single Family Home 1,500-2,999 square feet (sq ft) —1.0 RCE Duplex —1.62 RCE Single Family Home less than 1,500 sf — 0.81 RCE Triplex — 2.43 RCE Single Family Home, 3,000 sf or larger —1.16 RCE Four lex — 3.24 RCE Accessory Dwelling Unit (Attached or Detached) — 0.59 RCE Five or more units — 0.63 RCE's per unit Mobile home spaces —1.0 RCE per space For micro housing and for commercial, industrial and other non-residential uses, the number of RCE's is calculated based on the number and type of water fixtures installed as part of the development. NOTE: In addition to City sanitary sewer connection fees, King County will impose a sanitary sewer connection fee (King County Capacity Charge) for improvements in King County's regional sewer system, in accordance with King County Code 28.84.050. King County will bill customers directly for this charge once the sewer work is complete. This charge is not to be paid to the City. c. Storm Drainage Utility: (Per Resolution No. 4566 and amended by Resolution No. 5181, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860.) Connection fees are comprised of a Permit Fee and the System Development Charge as follows: Type Permit Fee(6) System Development Charge SDC Single Family Level 1 $295.00 $1 ,7&1.001,772.0 Residence & Level 2 $578.00 0 per Parcel Duplexes (on Individual Parcels) Level 3 �'� Base Fee = $1,974.00 for up to 10,000 SF of disturbed area Cumulative Additional Fee #1 = Base Fee + $556.00 for 10,001 SF up to 43,560 SF (1 Acre) of disturbed area Cumulative Additional Fee #2 = Cumulative Additional Fee #1 + $141.00 per whole or partial Acre disturbed over 1 Acre Other Parcels Level 1 $295.00 $1,791.001, 772.0 0 per ESUM Level 2 $578.00 Level 3 (7) Base Fee = $1,974.00 for up to 10,000 SF of disturbed area Cumulative Additional Fee #1 = Base Fee + $556.00 for 10,001 SF up to 43,560 SF (1 Acre) of disturbed area Cumulative Additional Fee #2 = Cumulative Additional Fee #1 + $141.00 per whole or partial Acre disturbed over 1 Acre (6)Permit levels are determined as follows: • Level 1 permits are for all projects that are not located in a Critical Area and add or replace less than 2,000 square feet of hard surface area; and/or disturb less than 7,000 square feet of land. Note: Single-family residential projects disturbing 500 square feet or less may not require a permit. • Level 2 permits are for all projects that add or replace 2,000 to 4,999 square feet of hard surface area; or disturb 7,000 square feet or more of land. • Level 3 permits are for all projects that add 5,000 square feet or more of hard surface area, or convert'/< acres or more of native vegetation to lawn/landscaped area, or convert 2.5 acres or more of native vegetation to pasture, or the new plus replaced hard surface area is 5,000 square feet or more and the value of improvements exceeds 50% of the assessed value of existing improvements. (')Level 3 permit is calculated as the Base Fee plus the Cumulative Additional Fees described herein. MESU, Equivalent Service Unit - A configuration of development of hard surfaces (which include impervious surfaces, permeable pavements, and vegetated roofs) estimated to contribute an amount of runoff to the City's storm drainage system which is approximately equal to that created by the average single family residential parcel. Although gravel surfaces are considered a hard surface under ACC 13.48.010, gravel surfaces are not included in the calculation of the SDCs. One ESU is considered equal to 2,600 square feet of parcel coverage by hard surfaces. Per ACC 13.48.010. When calculating the total SDC, a credit of 1 ESU will be given for each single-family residential or two-family residential parcel conversions to non -single-family use. For all others, when calculating the total SDC, a credit will be applied for the existing hard surface area except existing gravel surfaces. 8. Other Utility FeeS: (Per Ordinance No. 5819, Ordinance No. 5944, Resolution No. 3797, Resolution No. 3953, Resolution No. 4424, Resolution No. 5114, Resolution No. 5134, Resolution No. 5255, Resolution No. 5319, Resolution No. 5388, Resolution No. 5424, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Hydrant Installation Permit and Inspection Fee $339.00 Hydrant Use Monthly Rate (Type A, Type B, and Type C): Per Current Utility 3-inch water meter monthly rate, plus Rate Schedule Actual usage at Commercial water rate Hydrant Permit (Type A, Type B, and Type C) Administration Fee $290.00 Fire Hydrant Meter Wrench Fee (Type A)0) $81.00 Lost or Stolen Fire Hydrant Wrench $81.00 Hydrant Meter with RPBA, Valve, and Wrench (Type B) — Refundable $3,245.00 Deposit(2) Hydrant Meter and Wrench (Type C) — Refundable Deposit $3,081.00 Lost or Stolen Hydrant Meter (Type C) Deposit Forfeited +$500.00 (2b) Lost or Stolen Hydrant Meter with RPBA (Type B) Deposit Forfeited +$500.00 (2b) Failure to return Hydrant Meter with RPBA for inspection by the deadline Deposit Forfeited (Type B +$500.00 (2b) Failure to submit annual backflow test by due date (Type C) Deposit Forfeited Non -return of hydrant meter with RPBA assembly after request for return $13.00/calendar (Type B day +$500.00 (2b) Loaning out a hydrant meter with RPBA assembly or hydrant meter to an $319.00 unauthorized party (2a) (Type B and Type C Using a hydrant without Backflow Test Report on hand(2a) (Type C) $319.00 Dedicated Hydrant Use and Hydrant Meter Penalties and Charges (Type A, B, or C): Failure to record "Start" read properly(2a) $319.00 Failure to record "Finish" read properly(2a) $319.00 Failure to submit monthly water consumption report to the city dayy + $) $500.00 lenda 500 Nonpayment of bill within 10 calendar days of reminder notice $13.00/calendar day Using a hydrant without Trained Hydrant Operator Card on hand(2a) $63.00 Using a hydrant without obtaining Trained Hydrant Operator Card(2a) $319.00 Using a hydrant without Hydrant Permit documentation on hand(2a) $63.00 Using a hydrant without obtaining Hydrant Permit (2a) $319.00 Using a tool other than the city -supplied hydrant wrench to operate a $63.00 hydrant(2a) Damage to hydrant or infrastructure (reimbursement to city for repair or At Actual Cost replacement) Nonresponse to revocation of permit or trained hydrant operator $13.00/calendar day certificate Disassembly or tampering of hydrant, hydrant meter assembly or $319.00 hydrant meter with RPBA assembl (2a) Water Meter Test Fee, 2" or less $307.00 Water Meter Test Fee, greater than 2" At Actual Cost Water Meter Removal Fee (3/4" to 1 ") $431.00 Water Meter Removal Fee (1-1/2" to 2") $860.00 Water Meter Removal Fee (3" and larger) At Actual Cost Water Service Abandonment Permit (City abandons at main, removes meter $4,136.00 and box Water Meter Relocation Permit by City Same as Water Service Installation Permit Fee, see 7.a. Backflow Permit for Premises Isolation (internal or external) $116.00 Utility Fees with Demolition Permit Water Meter Lockoff/Unlock Demo Fee (all sizes), per meter $97.00 Fire Line Shutoff/Turn-on Demo Fee $97.00 Fire line Abandonment Permit (at main or other City -approved location, by $116.00 Applicant, also may require Construction permit if in ROW Fire line Abandonment Permit (at main or other City -approved location, by Same as Water City), based on size of connection at main Service Installation Permit Fee, see 7.a. Meter Damage/Tamper Repair Permit $574.00 plus Meter Cost, if applicable Unauthorized fire line or water hook up $111.00 a day fine from date of discovery Refusal of access per day $33.00 Backflow Assembly Abandonment Demo Fee, per assembly $92.00 Water/Sewer Certificate Application Feel (outside of city limits for other than $456.00 one single-family residence Side Sewer Cap Demo Fee (to cap side sewer before building demolition), $116.00 per sewer connection Storm Inspection Demo Fee (to cap storm pipes before building demolition), $307.00 per parcel Hydraulic Water Modeling Base Fee $307.00 Hydraulic Modeling and Analysis (payment of estimated fees required in At Actual Cost advance of beginning modeling work King County Right -of -Way Construction Permit (includes base application fee At Actual Cost, and review and inspection of utilities per King County Title 14 Roads and $1,159.00 Deposit Bridges) Hourly Rate for Negotiation, Development, Administration, and Execution of $128.00 Special Agreements for Utility Service (Franchise Agreements, Service Area Agreements) Re -Locate Fee (if <45 days from initial locates) $283.00 Side Sewer Repair Permit on Private Property $116.00 Side Sewer Repair Permit in Right-of-Way(3) $222.00 Side Sewer Cap Permit (not associated with demolition) $116.00 Side Sewer Relocation/Replacement Permit $184.00 Oil/Water Separator Permit $283.00 Grease Interceptor Permit(3) $1,364.00 Storm Drainage Repair Permit — Existing Private System on Private Property $116.00 Storm Drainage Repair Permit — Existing System in Public Right -of- $222.00 Way/Easement(3) Storm Retrofit Permit — Non -Single Family on Private Property $326.00 Utilities Payback Administration Fees: Application Fee(4): Base Fee (BF) $2,820.00 Per Benefited Parcel (BP) $75.00 Application Fee Calculation = BF + (BP x Number of Benefited Parcels) Payment Processing Fee (per parce1)(5) $136.00 Outside Professional Services, including Area of Special Benefit Time & Materials Analysis Recording fee will be billed to the Developer after recording is At Actual Cost complete for actual cost.(6) Non-refundable fee. Wrench is only for withdrawing water at City -designated hydrant fill stations. Applicant will be charged the Hydrant Use Monthly Rate and all monthly reported water use at Commercial water rates until applicant returns wrench and notifies City in writing that applicant is no longer using water from City -designated hydrants. (2) Each year, the hydrant meter with RPBA, Valve, and Wrench must be returned to City for annual maintenance and testing no later than the date specified by the City at the time of application. The deposit amount will be forfeited if the equipment is not returned to the City by the deadline. If needed, the City will re -issue a hydrant meter to the applicant under the same permit. In that instance, the applicant will be billed for any damages to the returned meter; the deposit will be applied to the re -issued hydrant meter. Upon final return of the equipment to the City, the cost of repairing any damages will be deducted from the deposit. (2a) Maximum penalty, per day, location, violator and incident. (2b) Water Use Charge for unreturned or damaged Hydrant Meter (if reading cannot be recorded due to unreturned or damaged equipment). (3) If repair or new construction requires work within City right-of-way, including a new connection to the City's system, a Construction Permit (CON - see Section 9) is required in addition to the permit. (4) Payback Agreement Application Fee includes mailing costs. (5) Fee to be deducted from the amount due to the developer when payback is collected for a parcel. (6) Fee to be billed after recording. Outstanding recording fees will be deducted from the amount due to the developer when payback is collected for a parcel. (7) Please note that the City of Auburn may collect a review fee on behalf of the Valley Regional Fire Authority for certain land use and/or environmental reviews which fee is collected in addition to the City's required fees. 9. Construction/Excavation Permits (for work within the public rights -of -way including construction of utilities, sidewalks and driveways that are not part of Facility Extensions (FAQ: (Per Ordinance No. 5817, Resolution No. 3953, Resolution No. 4272, Resolution No. 4424, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Basic Fee (BF) $204.00 Basic fee covers permit intake, admin, limited review and inspection time. Daily Review and Inspection Rate (DIR) Normal Business Days (weekdays) $572.00 Non -Business Days includes weeknights, weekends, and holidays)) $854.00 Fee Calculation: Permit Fee = BF + (DIR x Estimated Days In Right of Way)* *For projects that are expected to involve significant review and inspection time, after hours work, or the review and inspection scope or duration requirements cannot be accurately estimated, the city engineer may establish a deposit account to manage permittee deposits in advance of permit issuance for reimbursing actual labor costs of administering the permit. Such deposit accounts will not be interest bearing and will be closed at the end of the permitted work when a final accounting of the permit administration cost shall be calculated, and a final bill or credit issued to the permittee. The Public Works Director is authorized to waive construction permit fees for projects that are funded through the City's Neighborhood Grant Program. A fee waiver does not eliminate the requirement to apply for and obtain a permit. 10. Memorial Sign Program: (Per Ordinance No. 6137, Ordinance No. 6149, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Memorial Sin 1 $214.00 11. Special Permits: (Per Ordinance No. 5817 and amended by Resolution No. 3953, Resolution No. 4272, Resolution No. 4424, Resolution No. 5319, Resolution No. 5388, and Resolution No. 5470. Special Permit fees are assessed per Section 9. Construction/Excavation Permits 12. Street Payback Agreements: (Per Ordinance No. 6319, Resolution No. 4624, Resolution No. 5319, Resolution No. 5388, Resolution No. 5470, Resolution No. 5549, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Street Payback Administration Fees: Application Fees'): Base Fee (BF) $2,820.00 Per Benefited Parcel (BP) $75.00 Application Fee Calculation = BF + (BP x Number of Benefited Parcels) Payment Processing Fee (per parcel)(Z) $136.00 Outside Professional Services, including Area of Special Benefit Time & Materials Analysis Recording fee will be billed to the Developer after recording is At Actual Cost complete for actual cost.(3) (') Payback Agreement Application Fee includes mailing costs. (1) Fee to be deducted from the amount due to the developer when payback is collected for a parcel. (3) Fee to be billed after recording. Outstanding recording fees will be deducted from the amount due to the developer when payback is collected fora parcel. 13. Mitigation and Impact Fees for Exempt Wells: (Per Resolution No. 5352 and RCW 90.94.030. Mitigation and Impact fees for properties that will be served by new $500.00 exempt wells drilled on or after January 19, 2018.* *$350.00 of the $500.00 fee shall be sent to the Washington State Department of Ecology for mitigation enhancements in the well's drainage basin, with the remaining $150.00 to be retained by the City to cover its administrative costs. 14. Sidewalk Repair Program Fee: (Per Resolution No. 5620, Resolution No. 5681 Resolution No. 5719, Resolution 5784 and Resolution No. 5860. Application fee (includes recording): $304.50 Fee for sidewalk repair: $38.00 per Square Foot for sidewalk and residential driveway apron (excluding curb/gutter and approach), and $21.00 per Square Foot for residential driveway apron approach (as required to for residential driveway apron repair) repairs required by ACC 12.12.234 to be included in the City's annual Sidewalk Repair and Accessibility Program. This fee does not include tree removal but includes removal of roots located under the sidewalk to be repaired. 15. Technology Fee: Per Resolution No. 5549, Resolution No. 5620 and Resolution No. 5860.) A 4% technology fee is included in all fees listed above except fees listed in Sections 1, 2, 12, 13, ands stem development charges in section 7. 16. Recording Fee: (Per Resolution No. 5784) Unless indicated as included in other applicable fees, costs for recording documents associated with permits, actions, and applications included herein shall be charged to the permittee/applicant at the Cit 's actual cost. M. TAX FILING FEES (Per Resolution No. 5872). 1. There will be a $25 Manual Processing fee imposed on any multi -purpose tax form, whether tax is owed or not, that is filed is manually and not electronically. Businesses without access to electronic filing may submit a waiver request for review to the Finance Department.