HomeMy WebLinkAbout2025-0599 - - CP2228 CO#1 - Cornerstone Construction & Landscapes, LLC Docusign Envelope ID: E82EF96F-2265-4C09-8E6D-666C3FADC6C9
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. 1
Contract No.: Contract 25-16
Project Name: CP2228 Cemetery Development- 10th Addition
Contractor: Cornerstone Construction and Landscapes
32316 111th Place SE
Auburn, WA 98092
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments
are a supplement to the contract. All work, materials, measurements and unit bid prices for the type of construction involved shall
be in accordance with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes: Additions to original work.
1. Additional planting &straw waddle labor
2. Additional topsoil
3. Additional bark mulch
4. Additional irrigation zones
5. Deleted root control barrier
The Contract time is extended by 0 working days.
Sec. Quantity Unit Price Total Price
Item Sch. No. Item Description +�_� Units ($) (+�_
1 Aaaitionai planting &straw waaale labor 1 $ 1,0_0.00
2 Additional topsoil 1 $ 3,280.00
3 Additional bark mulch 1 $ 4,200.00
4 Aaaitionai irrigation zones 1 $ 13,500.00
5 Deleted root control barrier -1 $ (2,600.00)
Subtotal $ 19,440.00
Washington State Sales Tax(10.3%)on applicable items $ 2,002.32
TOTAL $ 21,442.32
Base Amount Total incl. Tax
1. Total Cost this C/O $ 19,440.00 $ 21,442.32
2. Total Cost Previous C/O $ - $ -
3. Original Contract Amount $ 81,047.00 $ 89,394.84
4. Revised Contract Amount $ 100,487.00 $ 110,837.16
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. All other costs are non-compensable. All other
terms and conditions of the Contract remain unchanged.
Counterparts: This agreement may be executed in multiple counterparts, each of which shall be one and the same Agreement
and shall become effective when one or more counterparts have been signed by each of the parties and delivered to the other
party. DocuSigned by:, ,
Contractor: 104 r u�e,b� 12/8/2025
—C[51)//3Uri—mi z/ Date
DocuSigned by:
Project Manager: T6A.iti,rout 12/9/2025
`-F1J1tC8311,14Db
sg ,by. Date
Parks Director (-Signed
Uut riJtafte 12/9/2025
`Signed by. one, Date
Approved by: [� 12/9/2025
Mayor,City of Auburn Date
Signed by.
Approved as to form: (-Signed
tSinAL for Cif(i affowu ) ,940 u.
—"'ACIVA2itorney Date
ENG-028, Revised 01/21 Page 1 of 1
Docusign Envelope ID: E82EF96F-2265-4C09-8E6D-666C3FADC6C9
wlsn Items are nignligntea In
yellow.
CORNERSTONE
CONSTRUCTION AND LANDSCAPES
Contact Paula for Customer Service(253)797-4024 "with an eye for detail" Licensed.Bonded.Insured.CORNECL813DK
Date: 11.6.2025 Invoice For:Thaniel Gouk for the City of Auburn-Mt View Cemetery
Phone: (253) 931-4011 Email:tgouk@auburnwa.gov
Invoice #2 for work completed from Oct 14th -Oct 31st Project # CP2228, Contract No 25-15
Cemetery Development 10th Addition Scope of Work:
Irrigation System
➢ Automatic Irrigation System Complete (original bid price) $ 13,900.00
➢ Chain link side planting bed space 5' x 123' Irrigation labor and material $ 3,000.00
➢ Southern edge of field bed space 8' x 123'_Irrigation labor and materials $ 6,200.00
➢ Boulder and tree planting bed space 4'x166' Irrigation labor and material $ 4,300.00
Planting
➢ Landscaping plants complete (original bid price) $ 17,500.00
➢ Photinia, with pickup and delivery $ 460.00
➢ Straw wattles City of Auburn has supplied straw wattles; price is for labor $ 600.00
Topsoil and Beauty Bark
➢ Bark Much (original bid price) $ 4,722.00
➢ Additional Beauty Bark and labor $ 4,200.00
➢ Topsoil (original bid price) $ 19,855.00
➢ Additional Topsoil 2,685 sqft @ 3" depth and labor $ 3,280.00
➢ Root barrier control complete (removed per cemetery request) 3,SQQ'Q4
Hydroseed
➢ Hydroseed (original bid price+ $700.00) $ 6,120.00
Mobilization & Repairs
➢ Mobilization (original bid price) $ 6,400.00
➢ Gx8 „cede,' l., J,;vim au;I 1,000.00
�' Illdll�llle wdS ddIlldged before we SL Led, Ildd LU find Iedlc dud eXL.dVdLC LIIefI fepalf 2,570.00
NOT APPROVED ON THIS CHANGE ORDER
*Invoice continued page 2*
Page 1of2
Docusign Envelope ID: E82EF96F-2265-4C09-8E6D-666C3FADC6C9
411.111
CORNERSTONE
CONSTRUCTION AND LANDSCAPES
Contact Paula for Customer Service(253)797-4024 "with an eye for detail" Licensed.Bonded.Insured.CORNECL813DK
Subcontractor NOT APPROVED ON THIS CHANGE ORDER
Subcontractor was hired to speed up project completion date; job was id with summer weather/hours
in mind. Due to start date being extended into the fall season (projec bid approved in June, paperwork
to move forward not returned to us until Auguust) and because of m tiple funeral schedule delays.
rjtJ�liliu�ial aubLuiiliaLlui Llidigea 3 39,666.M
➢ Subtotal $ 134,507.00
➢ Tax @10.3% $ 13,854.22
➢ Total $ 148,361.22
*AII Labor is based on prevailing wages*
Please make checks out to
Cornerstone CCL LLC
32316 111th PL SE Auburn WA 98092
Page 2 of 2