Loading...
HomeMy WebLinkAbout01/09/2026 NOA DNS SEP25-0021 e Seattle gimes AFFIDAVIT OF PUBLICATION Alexandria Teague City of Auburn, Finance Dept 25 W Main St Auburn WA 98001 STATE OF WASHINGTON, COUNTIES OF KING AND SNOHOMISH The undersigned,on oath states that he/she is an authorized representative of The Seattle Times Company,publisher of The Seattle Times of general circulation published daily in King and Snohomish Counties,State of Washington. The Seattle Times has been approved as a legal newspaper by orders of the Superior Court of King and Snohomish Counties. The notice,in the exact form annexed,was published in the regular and entire issue of said paper or papers and distributed to its subscribers during all of the said period. 01/09/2026 Agent Fra n!irP Flight Signature Pr n k e Ptij AI-- Subscribed and sworn to before me on 01 /d am/z e z 6 (1644.4., &4 1 Debbie Collantes ,.j (Notary Signature)Notary Public in and for the State of Washington,residing at Seattle Publication Cost: $561.60 Order No: 108317 DEBB E COLLANTES Customer No: 184 Notary Public PO#: Stott'of Washington Commission It 197558 • r. My Comm. Expires Feb 15, 2026 • Page 1 NOTICE OF APPLICATION (NOA) and Publication Cost: $561.60 SEPA DETERMINATION OF NON-SIG- 5-0021 The NIFICANCE of AuburnD is issuing) 2a Notice of Order No: 108317 Application (NOA) and Determination of Non-Significance (DNS) for the fol- Customer No: 184 lowing described protect. The protect application and listed studies may be reviewed by contacting the Department PO#: of Community Development at planning Gauburnwa.gov or by visiting www.ouburnwo.gov/londuse. Proposal: Removal of three existing equipment foundations and installation of two new equipment foundations,associated with two new replacement Spar Mills, located entirely inside the 17-06 Build- ing at The Boeing Company, Auburn, WA site. Location: The project site is located at 700 15th Street SW Auburn, WA at the Boeing Company property within the entirety of the structure on parcel 2421049069. The building is directly adjacent to the former GSA site now referred to as Auburn 18. Notice of Application: January 9, 2026 Notice of Complete: December 9, 2025 Permit Application: December 2, 2025 Application File Nos.SEP25-0021 Appli- cant/Property Owner: The Boeing Com- pany, Katrina Toole, PO BOX 3707 MC 5C-210, Seattle,WA 96124 Studies/Plans Submitted With Application: SEPA Environmental Checklist,Grading Plan Other Permits, Plans, and Approvals Needed: Grading Permits) Statement of Consistency and List of Applicable Development Regulations: This pro- posal Is subject to and shall be consis- tent with the Auburn City Code, Com- prehensive Plan, and Public Works Design and Construction Standards. SEPA Environmental Review:The City of Auburn has reviewed the proposed protect for probable adverse environ- mental impacts and expects to issue a determination of nonsignificance (DNS) for this protect.This determina- tion is based on the following findings and conclusions:The proposal is for the removal of three existing equipment foundations and installation of two new equipment foundations,associated with two new replacement Spar Mills, located entirely inside the 17-06 Build- . ing at The Boeing Company, Auburn, WA site. All work is conducted inside the 17-06 building,therefore no impacts associated with erosion are predicted. All trucks removing the existing spar mill foundations and soil material will be tarped prior to leaving the building. The optional DNS process in WAC 197- 11-355 is being used. This may be your only opportunity to comment on the environmental impacts of the proposed protect. The following conditions have been Identified that may be used to mit- igate the adverse environmental impacts of the proposal: No additional mitigation measures are required.Lead Agency: City of Auburn. The lead agency for this proposal has deter- mined that it does not have probable significant adverse impact on the envi- ronment. An environmental Impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency.This information is available to the public on request. Public Comment Period:This may be your only opportu- nity to comment on the environmental impact of the proposal.All persons may comment on this application.Comments must be in writing and submitted by 5:00 p.m. on January 26, 2026 to the mailing address of 25 W Main St., Auburn, WA, 98001 or emailed to the contact below. Any person wishing to become a party of record,shall include in their comments that they wish to receive notice of and participate in any hearings, if relevant, and request a copy of decisions once mode. Any person aggrieved of the City's determi- nation may file on appeal with the Auburn City Clerk at 25 West Main Street,Auburn,WA 98001-4998 within 14 days of the close of the comment period,or by 5:00 p.m. on February 9, 2026. For questions regarding this pro- ject, please contact Alexandria D. Teague, AICP, Planning Manager, at planningeauburnwa.gov or 253-931- 3003.Date of Notice:January 9,2026. Page 2