Loading...
HomeMy WebLinkAbout01/21/2026 DNS SEP25-0018 CP2319ToestafftecCimes AFFIDAVIT OF PUBLICATION Tammy Gallier City of Auburn, Finance Dept 25 W Main St Auburn WA 98001 STATE OF WASHINGTON, COUNTIES OF KING AND SNOHOMISH The undersigned, on oath states that he/she is an authorized representative of The Seattle Times Company, publisher of The Seattle Times of general circulation published daily in King and Snohomish Counties, State of Washington. The Seattle Times has been approved as a legal newspaper by orders of the Superior Court of King and Snohomish Counties. The notice, in the exact form annexed, was published in the regular and entire issue of said paper or papers and distributed to its subscribers during all of the said period. 01/21/2026 Agent Signaturey`GU'rgU,e'(it�GfYLc o Subscribed and sworn to before me on 4C71 /22 f IL45Z� 44�&&-X Debbie Collante: (Notary Signature) Notary Public in and for the State of Washington, residing at Seattle Publication Cost: Order No: Customer No: PO #: $208.08 108917 184 0 1X--B IE COLLANTES Notary Public State of Washington Coriunission # 197558 My Corn[T). Expires Feb 15, 2026 Page 1 NOTICE OF DETERMINATION OF NON -SIGNIFICANCE (DNS) The City of Auburn is issuing a Notice of Deter- mination of Non -Significance (DNS) for the following described project. The permit applications and listed studies may be reviewed at the Auburn Depart- ment of Community Development at One E Main St., 2nd Floor, Customer Service Center, Auburn, WA 98001 and by visiting www.auburnwa.gov/landuse. Proposal: The project will construct a roundabout at the Lea Hill Road inter- section with 104th Ave SE. The round- about will replace the existing span - wire signal. The proposed work includes repaving, the installation of bike lanes, sidewalks, restored drive- ways, three rectangular rapid flashing crosswalk beacons, new street lighting, restore bus stops, upgraded waterlines, as well as proposed stormwater collec- tion, conveyance, detention pond and treatment infrastructure. The goal of the project is to increase safety and Improve operation of the existing inter- section. A small portion of the project includes repair and maintenance to the roadway east of the roundabout that is located in the Urban Conservancy Shoreline jurisdiction. Location: Inter- section of 104th Ave SE and SE 320th Street. NW Quarter of SW Quarter of Section 8, Township 21, Range 5, WM. Notice of Application: January 21, 2026 Application Complete: January 2, 2026 Permit Application: September 11, 2025 File Nos. SEP25-0018-CP2319 Property Owner: City of Auburn Applicant: Jeff Bender, City of Auburn Public Works Department, 1 East Main Street, Auburn, WA 98002 Statement of Consis- tency & List of Applicable Development Regulations: This proposal is subject to and shall be consistent with the Auburn City Code, Comprehensive Plan, and Public Works Design and Construction Standards. Public Comment Period: All persons may comment on this applica- tion. Comments must be in writing and received by the end of the 15-day com- ment period at 5:00 on February 4, 2026 to the mailing address of 25 W Main St., Auburn, WA, 98001 or to the contact email address below. Any person wish- ing to become a party of record, shall Include in their comments that they wish to receive notice of and partici- pate in any hearings, if relevant, request a copy of decisions once made, and be made aware of appeal rights. The responsible official will reconsider the DNS based on timely comments and may retain, modify, or, if significant adverse impacts are likely, withdraw the DNS. If the DNS is retained, it will be final after the expiration of the com- ment deadline. For questions regarding this project, please contact Dinah Reed, Senior Planner, at planning@ auburnwa.gov or 253-931-3092. Date Issued: January 21, 2026. Publication Cost: $208.08 Order No: 108917 Customer No: 184 PO #: Page 2