HomeMy WebLinkAbout06-02-2026 Agenda Packet (Amended) (2)
Planning Commission
Regular Meeting
June 2, 2026 - 7:00 PM
City Hall Council Chambers
AMENDED
AGENDA
CALL TO ORDER
PUBLIC PARTICIPATION
A. The Planning Commission Meeting scheduled for Tuesday, June 2, 2026, at 7:00 p.m. will
be held in person and virtually.
Virtual Participation Link:
To listen to the meeting by phone or Zoom, please call the number below or click the link:
Phone one-tap:
+12532158782,,84921742217# US (Tacoma)
+12532050468,,84921742217# US
Join via audio:
+1 253 215 8782 US (Tacoma)
+1 253 205 0468 US
888 475 4499 US Toll Free
877 853 5257 US Toll Free
Join from PC, Mac, iPad, or Android:
https://us06web.zoom.us/j/84921742217
Webinar ID: 849 2174 2217
PLEDGE OF ALLEGIANCE
ROLL CALL
AGENDA MODIFICATIONS
PUBLIC COMMENT
A. The public can participate in-person or submit written comments in advance.
Participants can submit written comments via mail or email. All written comments must be
received prior to 5:00 p.m. on the day before the scheduled meeting and must be 350
words or less.
Please mail written comments to:
City of Auburn
Attn: Tammy Gallier, Administrative Specialist
25 W Main St
Auburn, WA 98001
Page 1 of 136
Email written comments to: planning@auburnwa.gov
If an individual requires accommodation to allow for remote oral comment because of a
difficulty attending a meeting of the governing body, the City requests notice of the need for
accommodation by 5:00 p.m. on the day before the scheduled meeting. Participants can
request accommodation to be able to provide a remote oral comment by contacting the
Community Development Department in person, by phone (253) 931-3090 or by email
(planning@auburnwa.gov.)
APPROVAL OF MINUTES
A. May 5, 2026 Draft Minutes from the Regular Planning Commission Meeting
BUSINESS ITEM #1
A. Live/Work and Daycare Text Amendment
Staff Introduction/Presentation (Reed)
Staff will provide an update on text amendments to Live/Work regulations and Daycare
Center regulations, as required by House Bill 5509.
BUSINESS ITEM #2
A. Auburn Gateway Zoning Text Amendment
Staff Introduction/Presentation (Goode)
Staff will provide an update on the text amendment to introduce light industrial uses in the
C-AG Auburn Gateway Zone.
B. Public Hearing
C. Deliberation and Vote
BUSINESS ITEM #3
A. Nonconforming Code Update
Staff Introduction/Presentation (Teague)
Staff will present the proposed updates to Chapter 18.54 “Nonconforming Structures, Land
and Uses” to Planning Commission for a recommendation to City Council.
B. Public Hearing
C. Deliberation and Vote
COMMUNITY DEVELOPMENT REPORT
ADJOURNMENT
The City of Auburn Planning Commission is a seven member advisory body that provides
recommendations to the Auburn City Council on the preparation of and amendments to land use
plans and related codes such as zoning. Planning Commissioners are appointed by the Mayor and
confirmed by the City Council.
Actions taken by the Planning Commission, other than approvals or amendments to the Planning
Page 2 of 136
Commission Rules of Procedure, are not final decisions; they are in the form of recommendations to
the City Council which must ultimately make the final decision.
Page 3 of 136
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
May 5, 2026 Draft Minutes from the Regular Planning Commission Meeting June 2, 2026
Department: Attachments: Budget Impact:
Community Development 05-05-2026 Planning
Commission Minutes
Administrative Recommendation:
Background for Motion:
Background Summary:
See Attached Draft Minutes
Councilmember: Staff: Jason Krum
Page 4 of 136
Planning Commission
Regular Meeting
May 5, 2026 - 7:00 PM
City Hall Council Chambers
MINUTES
CALL TO ORDER
Vice Chair Stewart called the meeting to order at 7:04 p.m. in the Council Chambers of
Auburn City Hall, 25 West Main Street.
PUBLIC PARTICIPATION
The City of Auburn Planning Commission Meeting was held in person and virtually.
PLEDGE OF ALLEGIANCE
Vice Chair Stewart led those in attendance in the Pledge of Allegiance.
ROLL CALL
Commissioners present: Vice Chair William Stewart, Julie Berry, Lynn Walters, and Kirk
Hiller. Chair Judi Roland was excused. Commissioner Aaron Vanderpol appeared
virtually via Zoom at 7:06 p.m.
Staff members present: Planning Services Manager Alexandria Teague, Assistant
Director of Community Development Steve Sturza, Senior Planner Dinah Reed, Senior
Planner Alyssa Tatro, Planner II Owen Goode, Senior City Staff Attorney Chandra Hein,
City Clerk Shawn Campbell, and Deputy City Clerk Rebecca Wood-Pollock.
AGENDA MODIFICATIONS
There were no modifications to the agenda.
PUBLIC COMMENT
Bonnie Helms provided comments.
APPROVAL OF MINUTES
A. 04/07/26 Draft Minutes from the Regular Planning Commission Meeting
Commissioner Walters moved and Commissioner Berry seconded to approve
the March 3, 2026, Planning Commission Meeting minutes.
MOTION CARRIED UNANIMOUSLY. 5-0
Page 5 of 136
BUSINESS ITEM #1
A. City Clerks OPMA and Parliamentary Procedures
Staff Introduction/Presentation (Wood)
City Clerk to provide an overview of OPMA and Parliamentary Procedures
Deputy City Clerk Wood and City Clerk Campbell provided the Commission
with a presentation on the Open Public Meetings Act (OPMA), Parliamentary
Procedure, and Planning Commission Rules of Procedure, including the role
and scope of the Planning Commission, actions within and outside of the
Planning Commission's authority, the order of events on the agenda, voting,
amendments, motions, questions during a meeting, and key takeaways.
The Commission discussed the order of agenda items, the voting process, and
amendments.
BUSINESS ITEM #2
A. Citywide Design Standards Update and Related Code Update
Staff Introduction/Presentation (Reed)
Staff will present the proposed updates to the Citywide Design Standards and
amended code to Planning Commission for a recommendation to City Council.
Planner Reed provided the Commission with a presentation on the Citywide
Design Standards Update and Related Code Update, including procedural
steps, background, an overview of frontage standards, transparency standards,
other prominent design standards, parking, code text amendments, and staff
recommendations.
B. Public Hearing
Vice Chair Stewart opened the Public Hearing at 7:41 p.m.
No one came forward to speak.
Vice Chair Stewart closed the Public Hearing at 7:41 p.m.
C. Deliberation and Vote
Commissioner Berry moved and Commissioner Vanderpol seconded to
recommend to Council the proposed Citywide Design Standards and Related
Code Update as presented by staff.
MOTION CARRIED UNANIMOUSLY. 5-0
BUSINESS ITEM #3
A. Downtown Design Standards Update and Associated Zoning Code
Update
Page 6 of 136
Staff Introduction/Presentation (Tatro)
Staff will present the proposed updates to the Downtown Design Standards
and amended code to Planning Commission for a recommendation to City
Council.
Planner Tatro provided the Commission with a presentation on the Downtown
Design Standards Update and Associated Zoning Code Update, including the
background and purpose of the 2024 Auburn Downtown Subarea Plan, goals,
procedural steps, public outreach, an overview of the changes, block-frontage
standards, departures, text amendments, Downtown Urban Core (DUC) zones
and districts, the impact of changes, and staff recommendations.
B. Public Hearing
Vice Chair Stewart opened the Public Hearing at 7:51 p.m.
No one came forward to speak.
Vice Chair Stewart closed the Public Hearing at 7:51 p.m.
C. Deliberation and Vote
Commissioner Vanderpol moved and Commissioner Walters seconded to
recommend to Council the proposed Downtown Design Standards Update and
Associated Zoning Code Update as presented by staff.
MOTION CARRIED UNANIMOUSLY. 5-0
BUSINESS ITEM #4
A. Density Bonus for Existing Buildings Code Update
Staff Introduction/Presentation (Goode)
The City of Auburn is updating the Density Bonus Code for Existing Buildings
as required under HB 1757. This update allows for the density bonuses
awarded under Auburn City Code 18.02.067 to expand to the Residential
Conservancy Zone, the R-1 Residential Zone, and the R-2 Residential Low
Zone. Density bonuses awarded under this code section are required to be
within existing buildings and shall not expand the square footage of the
building or the building footprint.
Planner Goode provided the Commission with a presentation on the Density
Bonus for Existing Buildings Code Update, including its purpose and effect, the
reasons for the text amendment, and staff recommendations.
B. Public Hearing
Vice Chair Stewart opened the Public Hearing at 7:58 p.m.
No one came forward to speak.
Page 7 of 136
Vice Chair Stewart closed the Public Hearing at 7:58 p.m.
C. Deliberation and Vote
Commissioner Vanderpol moved and Commissioner Walters seconded to
recommend to Council the Density Bonus for Existing Buildings Code Update
as proposed by staff.
MOTION CARRIED UNANIMOUSLY. 5-0
BUSINESS ITEM #5
A. Nonconforming Code Update
Staff Introduction/Presentation (Teague)
Staff to discuss an update to Chapter 18.54 “Nonconforming Structures, Land
And Uses”.
Manager Teague provided the Commission with a presentation on the
Nonconforming Code Update, including nonconforming uses, zoning maps,
governing standards, proposed code changes, and the next steps in the
process, sharing that the Public Hearing for this item is currently scheduled for
the next Planning Commission meeting on June 2, 2026.
The Commission discussed timeline extensions and increments,
nonconforming use and tracking, public comments received, and administrative
and community impacts.
COMMUNITY DEVELOPMENT REPORT
Assistant Director Sturza shared an update on the GSA lot progress, Sound Transit
Garage progress, and the Auburn Ave Theater ground breaking event.
ADJOURNMENT
There being no further business to come before the Planning Commission, the meeting
was adjourned at 8:19 p.m.
APPROVED this 2nd day of June, 2026.
_____________________________ _______________________________
JUDI ROLAND, CHAIR Rebecca Wood-Pollock, Deputy City Clerk
Page 8 of 136
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
Live/Work and Daycare Text Amendment
Staff Introduction/Presentation (Reed)
Staff will provide an update on text amendments to Live/Work regulations
and Daycare Center regulations, as required by House Bill 5509.
June 2, 2026
Department: Attachments: Budget Impact:
Community Development Memorandum, Chapter 18.04
ACC Text Amendment, ACC
18.23.030 Text Amendment,
ACC 18.31.125 Text
Amendment, ACC 18.35.030
Text Amendment, ACC
18.07.020 Text Amendment,
Chapter 18.31 ACC Text
Amendment, Presentation Live-
Work and Daycare
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Memorandum
Councilmember: Staff: Jason Krum
Page 9 of 136
1
Memorandum
TO: Judi Roland, Chair, Planning Commission
Bill Stewart, Vice Chair
Planning Commission Members
FROM: Alexandria Teague, Planning Services Manager
Dinah Reed, Senior Planner
Department of Community Development
DATE: June 2, 2026
RE: ZOA26-0006 – Live/Work and Daycare Code Update
I. BACKGROUND & PURPOSE
LIVE/WORK
Live/Work units are an integrated housing unit and commercial workspace, occupied and utilized by the
property owner or business owner with a place to work and live in a single unit. Live/Work and Work/Live
definitions were added as a use in City of Auburn (COA) code in 2012 via Ord. 6433 but has not had
supplemental development standards associated with the use that would set clear and objective
standards. The purpose of the text amendment is to provide specific development regulations for new
Live/Work units (buildings) and for re-purposing existing buildings into Live/Work units. Additionally,
Live/Work and Work/Live were originally separated out as different uses in the code based on the
percentage of space occupied by the nonresidential portion versus the residential portion of the unit. It
was determined that having only one version of Live/Work would simplify the use, therefore, Work/Live
has been removed as a use.
DAYCARE
House Bill (HB) 5509, an Act relating to the siting of child care centers was passed by the State Legislature
in the 2025 Regular Session. HB 5509 allows child care centers, and the conversion of existing buildings
for use as child care centers, as an outright permitted use in all zones except industrial zones, light
industrial zones, and open space zones. Cities may impose reasonable restrictions on the permit,
including pickup and drop-off areas. A city must provide for a conditional use approval of an on-site child
care center in industrial or light industrial zones, except in or around high hazard facilities.
COA code uses the term “daycare” versus the term “child care” that is used in HB 5509. Where COA uses
“daycare” it is the same as “child care”.
ACC 18.04.290 current definitions for the different types of daycares in COA code are as follows:
“Daycare center,” “nursery school,” or “preschool” means any type of group daycare programs, for
children or adults, including nursery schools for children under minimum age for education in public
schools, parent cooperative nursery schools, playgroups for preschool children, covering afterschool
care for school children, and programs which provide organized learning and education experiences,
provided such establishments are licensed by the state and conducted in accordance with state
requirements. For the purpose of this title the following shall also apply to daycare center, nursery
Page 10 of 136
2
schools or preschools:
A. “Babysitting care” means a dwelling which provides occasional custodial care to children, for
periods of less than 24 hours, who do not reside within the residence of the person providing
the care. Babysitting care is not necessarily provided in exchange for compensation.
B. “Home based daycare” means a licensed daycare that regularly provides daycare for not more
than 12 children or adults in the provider’s home in the family living quarters, for periods of less
than 24 hours.
C. “Mini daycare center” means a place, other than the home of the provider, which provides
regular custodial care for one to 12 children, for periods of less than 24 hours.
D. “Daycare center” means a place, other than the home of the provider, which provides regular
custodial care for 12 or more children, for periods of less than 24 hours.
E. “Preschool/nursery school” means a place, other than the home of the provider, which
provides regular custodial care and/or organized learning and educational experiences for
children.
II. SUMMARY OF PROPOSED CODE CHANGES
LIVE/WORK
Section ACC 18.31.125 Supplemental standards for Live/Work
This section is new and establishes the purpose for Live/Work units as well as a definition that coincides
with the definition adopted by the International Building Code (IBC). Supplemental regulations for
Live/Work units are as follows, in summary:
1) The nonresidential portion of the Live/Work unit shall be located at the front of the building and for
new development, will be required to meet the Storefront Block Frontage design standards per
Citywide Design Standards.
2) The ground floor frontage for the nonresidential portion of the Live/Work unit shall provide a public
entrance meeting the street level transparency standards for Storefronts per the Citywide Design
Standards.
3) The residential and work components shall be occupied as a single unit and no portion of the
Live/Work unit may be rented, leased, or sold separately.
4) Off-street parking shall be calculated in accordance with ACC Table 18.52.020 ”Off-Street Parking
Requirements by Land Use” for the nonresidential portion.
5) The nonresidential portion of the Live/Work unit in Residential zones is limited to “Commercial Uses”
per ACC 18.07.020.
6) The nonresidential portion of the Live/Work unit in Commercial zones is limited to “Retail, Services,
and Recreation, Education and Public Assembly” uses per ACC 18.35.030.
7) The nonresidential portion of the Live/Work unit in Special Purpose Zones is limited to “Retail,
Services, and Recreation, Education and Public Assembly” uses per ACC 18.35.030.
Section ACC 18.04.527 Live/Work unit
1) Updates the definition of a Live/Work unit to include the current adopted definition under the
International Building Code (IBC).
Section ACC 18.04.913 Work/Live unit
1) Removes the definition of Work/Live.
Section 18.07.020 Uses (Residential zones)
1) Adds Live/Work as standalone units compliant with ACC 18.31.125 (supplemental standards) as
outright permitted in all residential zones except Residential Conservancy and R-1, Residential Low.
Page 11 of 136
3
2) Adds footnote 13 that “any standalone Live/Work units vested prior to the effective date of the
ordinance codified in this chapter are outright permitted uses”.
Section 18.23.030 Uses (Commercial and Industrial zones)
1) To eliminate redundancy, removes “Apartment units, as part of a mixed-use development” and is
replaced with “Mixed-use development” in the land use table.
2) Removes Live/Work and Work/Live as part of a mixed-use development based on redundancy.
3) Removes Work/Live as a stand-alone use per the definition being eliminated.
4) Footnote 3 is amended to remove the “Work/Live” language.
Section 18.35.030 Uses (Special Purpose zones)
1) Removes the Work/Live unit from the use and adds a link to Live/Work supplemental standards for
Live/Work.
Chapter 18.31. ACC Supplemental Development Standards
1) Adds 18.31.125 Live/Work standards to Table of Contents.
DAYCARE
Section ACC 18.04.290 Daycare center, nursery school, preschool
1) Removes “or adults” in definition.
2) ACC 18.04.290(B) allows for 16 children in a “home based daycare” pursuant to WAC 110-300-0358
and RCW 43.216.692 allowing home providers to apply in writing to request waivers to serve more
than 12 but not more than 16 children.
Section 18.23.030 Uses (Commercial and Industrial zones)
1) Allows Daycares in industrial zones as a conditional use permit with the footnote that daycare
facilities shall not be allowed adjacent to or within high hazard facilities (per HB 5509).
Section 18.35.030 Uses (Special Purpose zones)
1) Adds Daycare as a permitted use in Institutional (P-1) and Open Space (OS) zones.
Section 18.07.020 Uses (Residential zones)
1) Amends Daycare uses to be outright permitted in all residential zones and removes the requirement
that Daycare Centers must be located on an arterial.
III. TEXT AMENDMENT
The text amendment is shown by strikeout/underline and is attached to this memo as Attachments 1
through 6.
IV. STAFF REQUEST
To review the proposed Live/Work and Daycare text amendments and provide feedback. To move forward
with the proposed Live/Work and Daycare text amendments to Chapter 18.04 ACC, ACC 18.23.030, ACC
18.31.125, ACC 18.35.030, ACC 18.07.020, Chapter 18.31. ACC to a public hearing on July 7, 2026.
V. ATTACHMENTS
1 Chapter 18.04 ACC Text Amendment
2 ACC Section 18.23.030 Text Amendment
3 ACC Section 18.31.125 Text Amendment
4 ACC Section 18.35.030 Text Amendment
5 ACC Section 18.07.020 Text Amendment
Page 12 of 136
4
6 Chapter 18.31 ACC Text Amendment
7 Presentation Live-Work and Daycare
Page 13 of 136
ACC 18.04.290, Daycare center, nursery school, preschool Page 1 of 2
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.04.290 Daycare center, nursery school, preschool.
“Daycare center,” “nursery school,” or “preschool” means any type of group daycare programs,
for children or adults, including nursery schools for children under minimum age for education
in public schools, parent cooperative nursery schools, playgroups for preschool children,
covering afterschool care for school children, and programs which provide organized learning
and education experiences, provided such establishments are licensed by the state and
conducted in accordance with state requirements. For the purpose of this title the following
shall also apply to daycare center, nursery schools or preschools:
A. “Babysitting care” means a dwelling which provides occasional custodial care to children, for
periods of less than 24 hours, who do not reside within the residence of the person providing
the care. Babysitting care is not necessarily provided in exchange for compensation.
B. “Home based daycare” means a licensed daycare that regularly provides daycare for not
more than 12 16 children in the provider’s home in the family living quarters, for periods of
less than 24 hours.
C. “Mini daycare center” means a place, other than the home of the provider, which provides
regular custodial care for one to 12 children, for periods of less than 24 hours.
D. “Daycare center” means a place, other than the home of the provider, which provides
regular custodial care for 12 or more children, for periods of less than 24 hours.
E. “Preschool/nursery school” means a place, other than the home of the provider, which
provides regular custodial care and/or organized learning and educational experiences for
children. (Ord. 6245 § 3, 2009; Ord. 4705 § 2, 1994; Ord. 4229 § 2, 1987.)
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Disclaimer: The city clerk’s office has the official version of the Auburn City Code. Users should
contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above.
City Website: www.auburnwa.gov
Page 14 of 136
ACC 18.04.290, Daycare center, nursery school, preschool Page 2 of 2
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Hosted by General Code.
18.04.527 Live/work unit.
“In addition to the current adopted International Building Code (IBC) definition, a Llive/work
unit” means an integrated housing unit and working space, occupied and utilized by a single
household in a structure that has been designed or structurally modified to accommodate joint
residential occupancy and work activity, and includes a complete dwelling unit . The work space
is at ground level meeting the design standards of a storefront per the Citywide or Downtown
Architectural and Design Standards. and working space reserved for and regularly used by one
or more occupants of the dwelling unit. Within a live/work unit the “work” component of a
live/work unit is secondary to its residential use. Live/work units are allowed within mixed-use
developments. (Ord. 6959 § 1 (Exh. A), 2024; Ord. 6433 § 14, 2012.)
18.04.913 Work/live unit.
“Work/live unit” means an integrated housing unit and working space, occupied and utilized by
a single household in a structure that has been designed or structurally modified to
accommodate joint residential occupancy and work activity, and includes a complete dwelling
unit and working space reserved for and regularly used by one or more occupants of the
dwelling unit. Within a work/live unit the “work” component is the primary use, to which the
residential use is secondary, while the “work” component of a live/work unit is secondary to its
residential use. Work/live units are allowed within mixed-use developments. (Ord. 6959 § 1 (Exh.
A), 2024; Ord. 6433 § 25, 2012.)
Page 15 of 136
ACC 18.23.030, Uses Page 1 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.23.030 Uses.
A. General Permit Requirements. Table 18.23.030 identifies the uses of land allowed in each
commercial and industrial zone and the land use approval process required to establish each
use.
B. Requirements for Certain Specific Land Uses. Where the last column (Standards for Specific
Land Uses) in Table 18.23.030 includes a reference to a code section number, the referenced
section determines other requirements and standards applicable to the use regardless of
whether it is permitted outright or requires an administrative or conditional use permit.
C. Uses Affected by the Airport Overlay. Refer to Chapter 18.38 ACC to determine whether uses
are separately prohibited by that chapter or will be required to comply with additional
regulations that are associated with the airport overlay.
Table 18.23.030. Permitted, Administrative, Conditional and Prohibited Uses by Zone,
Commercial and Industrial Zones
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
INDUSTRIAL, MANUFACTURING AND PROCESSING, WHOLESALING
Building contractor, light X P X P P
Building contractor, heavy X X X A P
Manufacturing, assembling and packaging –
Light intensity
X P X P P ACC 18.31.180
Page 16 of 136
ACC 18.23.030, Uses Page 2 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Manufacturing, assembling and packaging –
Medium intensity
X A X P P ACC 18.31.180
Manufacturing, assembling and packaging –
Heavy intensity
X X X X A ACC 18.31.180
Marijuana processor X X X C C Chapter 18.59 ACC
Marijuana producer X X X C C Chapter 18.59 ACC
Marijuana researcher X X X C C Chapter 18.59 ACC
Marijuana retailer X C X C C Chapter 18.59 ACC
Marijuana transporter business X X X C C Chapter 18.59 ACC
Outdoor storage, incidental to principal
permitted use on property
X P X P P ACC 18.57.020(A)
Storage – Personal household storage facility
(mini-storage)
P P X P P ACC 18.57.020(B)
Warehousing and distribution X X X P C ACC 18.57.020(C)
Warehousing and distribution, bonded and
located within a designated foreign trade
zone
X P X P P
Page 17 of 136
ACC 18.23.030, Uses Page 3 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Wholesaling with on-site retail as an
incidental use (e.g., coffee, bakery)
X P X P P
RECREATION, EDUCATION AND PUBLIC ASSEMBLY USES
Commercial recreation facility, indoor P P P P A
Commercial recreation facility, outdoor X A A P A ACC 18.57.025(A)
Conference/convention facility X A X A X
Library, museum A A X A X
Meeting facility, public or private P P X A A
Movie theater, except drive-in P P P X X
Private school – Specialized
education/training (for profit)
A P P P P
Religious institutions, lot size less than one
acre
P P A A A ACC 18.31.165
Religious institutions, lot size more than one
acre
P P A A A ACC 18.31.165
Sexually oriented businesses X P X P P Chapter 18.74 ACC
Page 18 of 136
ACC 18.23.030, Uses Page 4 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Sports and entertainment assembly facility X A X A A
Studio – Art, dance, martial arts, music, etc. P P P P A
RESIDENTIAL
Apartment units, as part of a mixed-use
development 2
X P P P X ACC 18.57.030
Apartments, standalone X X X X X
Caretaker apartment P P X P P
Indoor emergency housing or shelter P P P A A ACC 18.31.160
Live/work unit, as part of a mixed-use
development 2
X P P P X
Live/work unit, standalone 3 P P P X X ACC 18.31.125
Work/live unit, as part of a mixed-use
development 2
X P P P X
Work/live unit, standalone 3 X X X X X
Mixed-use development 2 X P P X X ACC 18.57.030
Page 19 of 136
ACC 18.23.030, Uses Page 5 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Marijuana cooperative X X X X X
Nursing home, assisted living facility P P C X X
Senior housing2 X A X X X
Supportive housing (permanent) P P P A A ACC 18.31.160
Transitional housing P P P A A ACC 18.31.160
RETAIL
Building and landscape materials sales X P X P P ACC 18.57.035(A)
Community retail establishment P P P P P
Construction and heavy equipment sales and
rental
X X X A P
Convenience store A P X P P
Drive-through espresso stands A P A P A
Drive-through facility, including banks and
restaurants
A P P P P ACC 18.52.040
Entertainment, commercial A P X A A
Page 20 of 136
ACC 18.23.030, Uses Page 6 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Groceries, specialty food stores P P P P X
Neighborhood retail establishment P P P P P
Nursery X P A P P ACC 18.57.035(C)
Outdoor displays and sales associated with a
permitted use (auto/vehicle sales not
included in this category)
P P P P P ACC 18.57.035(D)
Regional retail establishment X P P P A
Restaurant, cafe, coffee shop P P P P P
Tasting room P P P P P
Tavern P P P P A
Wine production facility, small craft distillery,
small craft brewery
P P P P P
SERVICES
Animal daycare (excluding kennels and
animal boarding)
A P A P P ACC 18.57.040(A)
Page 21 of 136
ACC 18.23.030, Uses Page 7 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Animal sales and services (excluding kennels
and veterinary clinics)
P P P P P ACC 18.57.040(B)
Banking and related financial institutions,
excluding drive-through facilities
P P P P P
Catering service P P A P P
Daycare, including mini daycare, daycare
center, preschools or nursery schools
P P P PC4 XC4
Dry cleaning and laundry service (personal) P P P P P
Equipment rental and leasing X P X P P
Kennel, animal boarding X A X A A ACC 18.57.040(C)
Government facilities; this excludes offices
and related uses that are permitted outright
A A A A A
Hospital P P X P P
Lodging – Hotel or motel P P P A A
Medical – Dental clinic P P P P X
Mortuary, funeral home, crematorium P P X P X
Page 22 of 136
ACC 18.23.030, Uses Page 8 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Personal service shops P P P P X
Pharmacies P P P X X
Print and copy shop P P P P X
Printing and publishing (of books, newspaper
and other printed matter)
A P P P P
Professional offices P P P P P
Repair service – Equipment, appliances A P P P P ACC 18.57.040(D)
Veterinary clinic, animal hospital P P P P X
Youth community support facility P X X X X ACC 18.57.040(E)
TRANSPORTATION, COMMUNICATIONS AND INFRASTRUCTURE
Ambulance, taxi, and specialized
transportation facility
X A X P P
Broadcasting studio P P X P P
Heliport X C X C C
Motor freight terminal1 X X X X X See Footnote No. 1
Page 23 of 136
ACC 18.23.030, Uses Page 9 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Parking facility, public or commercial, surface P P P P X
Parking facility, public or commercial,
structured
P P P P X
Towing storage yard X X X A P ACC 18.57.045(A)
Utility transmission or distribution line or
substation
A A A A A
Wireless communications facility (WCF) (See
ACC 18.04.912(W))
* * * * * *See ACC 18.31.100 for
use regulations and zoning
development standards.
Eligible facilities request (EFR) (wireless
communications facility) (See ACC
18.04.912(H))
P P P P P
Small wireless facilities (ACC 18.04.912(Q)) P P P P P
VEHICLE SALES AND SERVICES
Automobile washes (automatic, full or self-
service)
A P P P P ACC 18.57.050(A)
Auto parts sales with installation services A P P P P
Page 24 of 136
ACC 18.23.030, Uses Page 10 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
PERMITTED, ADMINISTRATIVE, CONDITIONAL AND PROHIBITED USES BY
ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation Standards for Specific
Land Uses C-1 C-2 C-AG M-1 M-2
Auto/vehicle sales and rental A P X P P ACC 18.57.050(B)
Fueling station A P P P P ACC 18.57.050(C)
Mobile home, boat, or RV sales X P X P P
Vehicle services – Repair/body work X P X P P ACC 18.57.050(D)
OTHER
Any commercial use abutting a residential
zone which has hours of operation outside of
the following: Sunday: 9:00 a.m. to 10:00 p.m.
or Monday – Saturday: 7:00 a.m. to 10:00 p.m.
A A A A A
Other uses may be permitted by the planning
director or designee if the use is determined
to be consistent with the intent of the zone
and is of the same general character of the
uses permitted. See ACC 18.02.120(C)(6),
Unclassified Uses.
P P P P P
1 Any motor freight terminal, as defined by ACC 18.04.635, in existence as of the effective date of the
ordinance codified in this section, is an outright permitted use in the M-1 and M-2 zones. Any maintenance,
alterations and additions to an existing motor freight terminal which are consistent with ACC 18.23.040,
Development standards, are allowed.
2 Any mixed-use development or senior housing project vested prior to Resolution No. 5187 (December 7,
2015) is an outright permitted use in the C-1 zone. Subsequently, if a nonresidential use within a vested
Page 25 of 136
ACC 18.23.030, Uses Page 11 of 11
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
mixed-use development changes, then the nonresidential use shall maintain a minimum of 10 percent of the
cumulative building ground floor square footage consisting of the uses permitted outright, administratively, or
conditionally, listed under “Recreation, Education, and Public Assembly,” “Retail,” or “Services” of the C-1 zone.
3 Any standalone live/work units or standalone work/live units vested prior to the effective date of the
ordinance codified in this chapter are outright permitted uses.
4 Childcare facilities shall not be allowed adjacent to or within high hazard facilities.
(Ord. 6977 § 1 (Exh. A), 2025; Ord. 6959 § 1 (Exh. A), 2024; Ord. 6885 § 1 (Exh. A), 2022; Ord. 6838 § 1 (Exh. A),
2021; Ord. 6799 § 6 (Exh. F), 2020; Ord. 6728 § 3 (Exh. C), 2019; Ord. 6688 § 1 (Exh. 1), 2018; Ord. 6644 § 2, 2017;
Ord. 6642 § 9, 2017; Ord. 6508 § 1, 2014; Ord. 6433 § 26, 2012.)
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Disclaimer: The city clerk’s office has the official version of the Auburn City Code. Users should
contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above.
City Website: www.auburnwa.gov
Hosted by General Code.
Page 26 of 136
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.31.125 Supplemental standards for Live/Work
A. Purpose. Live/Work units are an integrated housing unit and work space, occupied and
utilized by the property owner, business owner, or business employee with a place to work and
live in a single unit (ACC 18.04.527). A Live/Work unit can be a new building (e.g. townhouse) or
an existing unit (e.g. small commercial building with a dwelling space above or behind) and
existing single-family residences allowed in the zone.
B. Live/Work units shall meet the following standards in addition to the current Washington
State adopted International Building Code (IBC) code live/work sections.
1. The ground floor level and front of the building shall be used for nonresidential
purposes.
2. Any ‘work’ use proposed for a Live/Work unit in Residential zones are subject to ACC
18.07.020 “Permitted Use Table” and limited to the “Commercial Uses” category.
3. Any ‘work’ use proposed for a Live/Work unit in Commercial zones are subject to ACC
18.23.030 “Permitted Use Table” and limited to the “Retail” and “Services” categories.
4. Any ‘work’ use proposed for a Live/Work unit in Special Purpose Zones are subject to
ACC 18.35.030 “Permitted Use Table” and limited to the “Retail”, “Services” and
“Recreation, Education, and Public Assembly” categories.
5. For new development, the nonresidential frontage must meet the design standards of a
storefront per Citywide Design Standards.
6. For existing buildings, the ground floor frontage shall provide a public entrance and
street level transparency meeting the design standards of a storefront per the Citywide
Design Standards.
7. The residential and work components shall be occupied as a single unit.
8. No portion of the Live/Work unit may be rented, leased, or sold separately.
9. Off Street Parking is calculated for the ‘work’ use as proposed for the Live/Work unit in
accordance with ACC 18.52.020 Table of Off-street Parking Requirements by Land Use.
Page 27 of 136
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Disclaimer: The city clerk’s office has the official version of the Auburn City Code. Users should
contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above.
City Website: www.auburnwa.gov
Hosted by General Code.
18.31.010 Daycare standards.
A. The following performance standards shall apply to all child daycares. but shall not apply to
adult daycare:
1. If applicable, must be properly licensed with the state of Washington;
2. Daycare, preschool and nursery school services shall not be conducted before 5:00 a.m.
or after 9:00 p.m. in the following residential zones: RC, R-1, R-2, R-3, R-4, R-NM, R-F.
B. The provisions of subsection A of this section are not intended to reduce the requirements
of any other licensing agency or department. (Ord. 6959 § 1 (Exh. A), 2024; Ord. 6245 § 15, 2009.)
Page 28 of 136
ACC 18.35.030, Uses Page 1 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.35.030 Uses.
A. General Permit Requirements. Table 18.35.030 identifies the uses of land allowed in each
special purpose zone and the planning permit required to establish each use.
B. Requirements for Certain Specific Land Uses. Where the last column (Standards for Specific
Land Uses) in Table 18.35.030 includes a section number, the referenced section determines
other requirements and standards applicable to the use regardless of whether it is permitted
outright or requires an administrative or conditional use permit.
Table 18.35.030. Permitted, Administrative, Conditional and Prohibited Uses by Zone
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
MARIJUANA-RELATED BUSINESSES
Marijuana processor X X X
Marijuana producer X X
18.
X
Marijuana researcher X X X
Marijuana retailer X X X
Marijuana transporter business X X X
Page 29 of 136
ACC 18.35.030, Uses Page 2 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
PUBLIC
Animal shelter, public P X X
Government facilities; this excludes offices and
related uses that are permitted outright
P P C
Municipal parks and playgrounds P P P
RECREATION, EDUCATION AND PUBLIC ASSEMBLY
Campgrounds X P P
Recreational vehicle parks, private X P X
Cemetery, public P A X
Cemetery, private X A X
College, university, public A A X
Commercial recreation facility – Indoor X P X
Commercial recreation facility – Outdoor X A C ACC 18.57.025(A)
Conference/convention facility X A X
Page 30 of 136
ACC 18.35.030, Uses Page 3 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
Library, museum P P A
Meeting facility, public or private P P A
Private school – specialized education/training (for
profit)
X P X
Public schools (K-12) and related facilities P X X
Religious institutions, lot size less than one acre X P X
Religious institutions, lot size more than one acre X P X
Studio – Art, dance, martial arts, music, etc. X X X
RESIDENTIAL
Middle housing subject to the provisions in
Chapter 18.25 ACC (2 to 6 units)
X A1 X
Home occupation X P P Chapter 18.60 ACC
Live/work unit, work/live unit X A X ACC 18.31.125
Apartments (7 or more units) X A2 X
One single-unit detached dwelling X X P4
Page 31 of 136
ACC 18.35.030, Uses Page 4 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
Nursing home, assisted living facility X P X
Senior housing X A X
RETAIL
Marijuana cooperative X X X
Restaurant, cafe, coffee shop, excluding drive-
through facilities
P A X
SERVICES
Banking and related financial institutions,
excluding drive-through facilities3
X X X
Daycare, including mini daycare, daycare center,
preschools or nursery schools
XP P AP
Home-based daycare X P P
Medical services – Clinic or urgent care3 X X X
Mortuary, funeral home, crematorium X X X
Professional offices X A A
Page 32 of 136
ACC 18.35.030, Uses Page 5 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
Personal service shops X X X
Pharmacies X X X
TRANSPORTATION, COMMUNICATIONS AND INFRASTRUCTURE
Utility facilities, substations, utility transmission or
distribution line
X X A See ACC
18.02.040(E)
Wireless communications facility (WCF) (See ACC
18.04.912(W))
* * * *See ACC 18.31.100
for use regulations
and zoning
development
standards.
Eligible facilities request (EFR) (Wireless
communications facility) (See ACC 18.04.912(H))
P P P
Small wireless facilities (ACC 18.04.912(Q)) P P P
Emergency wireless communications facility
(EWCF)
X P X See ACC 18.04.912
and 18.31.100
OTHER USES THAT ARE NOT LISTED
Other uses may be permitted by the planning
director or designee if the use is determined to be
P P P
Page 33 of 136
ACC 18.35.030, Uses Page 6 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Permitted, Administrative, Conditional and Prohibited Uses by Zone
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designations Standards for
Specific Land Uses P-1 I OS
consistent with the intent of the zone and is of the
same general character of the uses permitted
Notes:
1 Minimum lot area not applicable; duplexes must meet other development standards of the I zone.
2 Minimum lot area not applicable; apartments must meet other development standards of the I zone,
dwellings; provided, that 2,400 square feet of lot area is provided for each dwelling unit.
3 Permitted within a public college or university as an amenity or service provided to students: A stand-alone
bank or medical services/clinic is not permitted.
4 One single-unit detached dwelling unit per existing legal lot. No residential subdivisions permitted in the
open space zone.
(Ord. 6959 § 1 (Exh. A), 2024; Ord. 6894 § 1 (Exh. B), 2022; Ord. 6799 § 9 (Exh. I), 2020; Ord. 6716 § 1 (Exh. A),
2019; Ord. 6677 § 3, 2018; Ord. 6642 § 11, 2017; Ord. 6434 § 1, 2012.)
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Disclaimer: The city clerk’s office has the official version of the Auburn City Code. Users should
contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above.
City Website: www.auburnwa.gov
Hosted by General Code.
Page 34 of 136
ACC 18.07.020, Uses Page 1 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.07.020 Uses.
Table 18.07.020. Permitted Use Table – Residential Zones
P = Permitted A = Administrative C = Conditional Use X = Not Permitted
Land Uses Zoning Designations
RC R-1 R-2 R-3 R-4 R-NM R-F
A. Residential Uses.
Accessory dwelling units subject to the provisions
contained in Chapter 18.32 ACC
P1 P1 P1 P1 P1 P1 P1
Accessory use, residential P P P P P P P
Adult family home P P P P P P1 P
Apartments (7 units or more) X X X P11 P P X
Bed and breakfast or short-term rentals P P P P P X P
Caretaker apartment X X X X X P X
Communal residence P P P P P X P
Foster care homes P P P P P X P
Group residence facilities (7 or more residents) X X X P P P P
Group residence facilities (6 or fewer residents) P P P P P P P
Keeping of animals4 P2 P2 P2 P2 P2 P2 P2
Live/Work, Standalone subject to the compliance
with ACC 18.31.12513
X X P P P P P
Middle housing subject to the provisions in
Chapter 18.25 ACC (2 to 6 units)
P P P P P P P
Page 35 of 136
ACC 18.07.020, Uses Page 2 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Neighborhood recreational buildings and facilities
owned and managed by the neighborhood
homeowners’ association
A6 A6 A6 A6 A6 P P
Use as dwelling units of (1) recreational vehicles
that are not part of an approved recreational
vehicle park, (2) boats, (3) automobiles, and (4)
other vehicles
X X X X X X X
Renting of rooms, for lodging purposes only, to
accommodate not more than two persons in
addition to the family or owner occupied unit8
P P P P P P P
Residential care facilities including but not limited
to assisted living facilities, convalescent homes,
continuing care retirement facilities
P P P P P P P
Single-unit detached dwellings, new P P P X X X P
Supportive housing (permanent), subject to the
provisions of ACC 18.31.160
P P P P P P P
Swimming pools, tennis courts and similar
outdoor recreation uses only accessory to
residential or park uses
P P P P P P P
Townhouses (attached) X X X X P P P
Transitional housing P P P P P P P
B. Commercial Uses.
Commercial horse riding and bridle trails A X X X X X X
Commercial recreation facility, indoor X X X X P P X
Commercial retail establishment X X A A P P A
Convenience store X X X X P P X
Mini Daycare, limited to a mini daycare, center .
Ddaycare center, preschool or nursery school
may also be permitted but must be located on an
arterial
XP P P P P P P
Page 36 of 136
ACC 18.07.020, Uses Page 3 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Grocery or specialty food store X X X A P P A
Home-based (or family) daycare as regulated by
RCW 35.63.185 and through receipt of approved
city business license
P P P P P P P
Home occupations subject to compliance with
Chapter 18.60 ACC
P P P P P P P
Marijuana cooperative X X X X X X X
Marijuana processor X X X X X X X
Marijuana producer X X X X X X X
Marijuana-related business X X X X X X X
Marijuana researcher X X X X X X X
Marijuana retailer X X X X X X X
Marijuana transporter business X X X X X X X
Mixed-use development3, 10 X X X P P P P
Personal service shop X X A P P P P
Nursing homes X X X X C C C
Privately owned and operated parks and
playgrounds and not homeowners’ association-
owned recreational area
X A A A A P P
Professional offices X X A A P9 P P
Restaurant, café, or coffee shop X X A A P P A
Neighborhood retail establishment X X A A P P P
C. Resource Uses.
Agricultural enterprise:7
When 50 percent, or more, of the total site area is
dedicated to active agricultural production during
A7 X X X X X X
Page 37 of 136
ACC 18.07.020, Uses Page 4 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
the growing season, and with 52 or less special
events per calendar year
When less than 50 percent of the total site area is
dedicated to active agricultural production during
the growing season, or with more than 52 special
events per calendar year
C7 X X X X X X
Agricultural type uses are permitted provided
they are incidental and secondary to the single-
family use:
Agricultural crops and open field growing
(commercial)
P X X X X X X
Barns, silos and related structures P X X X X X X
Commercial greenhouses P X X X X X X
Pasturing and grazing4 P X X X X X X
Public and private stables4 P X X X X X X
Roadside stands, for the sale of agricultural
products raised on the premises. The stand
cannot exceed 300 square feet in area and must
meet the applicable setback requirements.
P X X X X X X
Fish hatcheries C X X X X X X
D. Government, Institutional, and Utility Uses.
Civic, social and fraternal clubs X X X X A A A
Government facilities A A A A A A A
Hospitals (except animal hospitals) X X X X X C C
Municipal parks and playgrounds A P P P P P P
Museums X X X X A A A
Religious institutions, less than one acre lot size12 A A A A A A A
Religious institutions, one acre or larger lot size12 C C C C C C C
Page 38 of 136
ACC 18.07.020, Uses Page 5 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Transmitting towers C C C C C C C
Type 1-D wireless communications facility (see
ACC 18.04.912(W) and 18.31.100)
P P P P P P P
Eligible facilities request (EFR) (wireless
communications facility – See ACC 18.04.912(H))
P P P P P P P
Utility facilities and substations C5 C5 C5 C5 C5 C5 C5
Small wireless facilities (ACC 18.04.912(Q)) P P P P P P P
1 An accessory dwelling unit may be permitted with an existing single-unit residence pursuant to Chapter
18.32 ACC.
2 Please see the supplemental development standards for animals in ACC 18.31.220.
3 Individual uses that make up a mixed-use development must be permitted within the zone. If a use making
up part of a mixed-use development requires an administrative or conditional use permit, the individual use
must apply for and receive the administrative or conditional use approval, as applicable.
4 Proximity of pasture or livestock roaming area to wells, surface waters, and aquifer recharge zones is
regulated by the King or Pierce County board of health, and property owners shall comply with the provisions
of the board of health code.
5 Excludes all public and private utility facilities addressed under ACC 18.02.040(E).
6 Administrative use permit notis not required when approved as part of a subdivision or binding site plan.
7 Agricultural enterprise uses are subject to supplemental development standards under ACC 18.31.210,
Agricultural enterprises development standards.
8 An owner occupant that rents to more than two persons but no more than four persons is required to
obtain a city of Auburn rental housing business license and shall meet the standards of the International
Property Maintenance Code.
9 As component of mixed-use developments and/or office ground floor uses permitted up to 5,000 square
feet.
10 Commercial uses permitted outright, or allowed administratively or conditionally in this table may be
allowed as part of mixed-use development.
11 Apartment buildings and mixed-use development consisting of no more than 20 units and three stories per
lot is permitted.
12 Reference ACC 18.31.165 for standards related to homeless encampments hosted by a religious
organization.
Page 39 of 136
ACC 18.07.020, Uses Page 6 of 6
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
13 Any standalone live/work units vested prior to the effective date of the ordinance codified in this chapter
are outright permitted uses.
(Ord. 6977 § 1 (Exh. A), 2025; Ord. 6959 § 1 (Exh. A), 2024; Ord. 6799 § 5 (Exh. E), 2020; Ord. 6642 § 4, 2017; Ord.
6600 § 9, 2016; Ord. 6565 § 2, 2015; Ord. 6560 § 9, 2015; Ord. 6477 § 8, 2013; Ord. 6369 § 2, 2011; Ord. 6363 § 3,
2011; Ord. 6269 § 3, 2009; Ord. 6245 § 5, 2009.)
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Disclaimer: The city clerk’s office has the official version of the Auburn City Code. Users should
contact the city clerk’s office for ordinances passed subsequent to the ordinance cited above.
City Website: www.auburnwa.gov
Hosted by General Code.
Page 40 of 136
Chapter 18.31 ACC, Supplemental Development Standards Page 1 of 1
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
Chapter 18.31
SUPPLEMENTAL DEVELOPMENT STANDARDS
Sections:
18.31.010 Daycare standards.
18.31.020 Fences.
18.31.025 Retaining walls.
18.31.030 Height limitations – Exceptions.
18.31.040 Lots.
18.31.050 Single-unit detached siting and design standards.
18.31.060 Recreational vehicle parks.
18.31.070 Setbacks.
18.31.080 Heliports.
18.31.090 Work release, prerelease and similar facilities.
18.31.100 Wireless communications facilities siting standards.
18.31.110 Siting of small wireless facilities.
18.31.115 Wetland mitigation.
18.31.120 Repealed.
18.31.125 Live/Work standards.
18.31.130 Communal residence standards.
18.31.140 Gated residential subdivisions.
18.31.150 Secure community transition facilities.
18.31.160 Supplemental standards for transitional housing, permanent supportive
housing, indoor emergency shelters, and indoor emergency housing.
18.31.165 Homeless encampment hosted by a religious organization.
18.31.170 Reserved.
18.31.180 Performance standards.
18.31.190 Supplemental standards for residential mobile home communities.
18.31.200 Architectural and site design review standards and regulations.
18.31.210 Agricultural enterprises development standards.
18.31.220 Permitted animals.
18.31.230 Repealed.
Page 41 of 136
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
PLANNING COMMISSION MEETING
LIVE/WORK AND DAYCARE
CODE UPDATE
PRESENTED BY
DINAH REED, SENIOR PLANNER
JUNE 2, 2026
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
Page 42 of 136
PURPOSE FOR UPDATE – LIVE/WORK
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Live/Work units
Allows for residential and commercial workspace in
the same building, and
Allows for business owner to live and work in the
same space.
Were added in 2012 but did not include
supplemental standards.
Page 43 of 136
PURPOSE FOR UPDATE – LIVE/WORK
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
The supplemental development standards will apply to
new Live/Work units (buildings) and for re-purposing
existing buildings into Live/Work units.
Page 44 of 136
Shows ground level
as commercial and
open to the public.
Upper levels as living
space .
EXAMPLE OF “NEW” LIVE/WORK UNITS
Page 45 of 136
Older, smaller and
historically
significant
buildings.
Ground level is
commercial and
upper floors are
residential.
EXAMPLE OF “RE-PURPOSED” LIVE/WORK UNITS
Page 46 of 136
SUPPLEMENTAL STANDARDS FOR LIVE/WORK
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
This section is new.
1.Nonresidential portion - located
at the front of the building.
2.Ground floor frontage for the
nonresidential portion - provides
a public entrance meeting the
street level transparency
standards.
Page 47 of 136
SUPPLEMENTAL STANDARDS FOR LIVE/WORK
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
4.The residential and work components shall be occupied
as a single unit and no portion of the Live/Work unit
may be rented, leased, or sold separately.
5.Off-street parking calculated in accordance with
commercial use.
6.The uses allowed in Live/Work will be limited based on
zoning district.
Page 48 of 136
TEXT AMENDMENT FOR LIVE/WORK
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 49 of 136
TEXT
AMENDMENT
FOR
LIVE/WORK
Page 50 of 136
TEXT
AMENDMENT
FOR
LIVE/WORK
Page 51 of 136
PURPOSE FOR UPDATE – DAYCARE
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
House Bill (HB) 5509, an Act relating to the siting of child
care centers was passed by the State Legislature in the
2025 Regular Session.
COA code uses the term “daycare” versus the term “child
care” that is used in HB 5509. Where COA uses “daycare”
it is the same as “child care”.
Page 52 of 136
TYPES OF DAYCARE
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Babysitting care
Home based daycare
Mini daycare center
Daycare center
Preschool/nursery school
Page 53 of 136
TEXT
AMENDMENT
FOR DAYCARE
Page 54 of 136
TEXT
AMENDMENT
FOR DAYCARE
Page 55 of 136
TEXT
AMENDMENT
FOR DAYCARE
Page 56 of 136
TEXT
AMENDMENT
FOR DAYCARE
Page 57 of 136
STAFF REQUEST
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
To review the proposed Live/Work and Daycare text
amendments and provide feedback.
To move forward with the proposed Live/Work and
Daycare text amendments to Chapter 18.04 ACC, ACC
18.23.030, ACC 18.31.125, ACC 18.35.030, ACC
18.07.020, Chapter 18.31. ACC to a public hearing on July
7, 2026.
Page 58 of 136
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
Questions?
Page 59 of 136
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
Auburn Gateway Zoning Text Amendment
Staff Introduction/Presentation (Goode)
Staff will provide an update on the text amendment to introduce light
industrial uses in the C-AG Auburn Gateway Zone.
June 2, 2026
Department: Attachments: Budget Impact:
Community Development Memorandum, Auburn Gateway
Text Amendment Presentation,
Auburn Gateway Zoning Text
Amendment
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Memorandum
Councilmember: Staff: Jason Krum
Page 60 of 136
PLANNING COMMISSION MEMORANDUM
TO: Judi Roland, Chair, Planning Commission
Bill Stewart, Vice Chair Planning Commission
Planning Commission Members
FROM: Owen Goode, Planner II
Dept. of Community Development
DATE: June 2, 2026
RE: Auburn Gateway Text Amendment
I. BACKGROUND & PURPOSE
Vector Development Corporation (Vector) has submitted a Zoning Text Amendment relating to the Copper
Gate Plaza project, a revision to the northern half of the Auburn Gateway project, which is part of the
Northeast Auburn Special Area Plan. The Northeast Auburn Special Plan Area was originally analyzed in a
2004 Final Environmental Impact Statement (2004 Final EIS), as well as a 2011 addendum to the Final
EIS (2011 EIS Addendum). The Auburn Gateway project’s potential impacts were analyzed in a 2019
addendum to the Final EIS (2019 EIS Addendum). The 2011 addendum included an assessment of the
traffic impacts of eliminating the northern portion of D Street NE and of not constructing the eastward
extension of 49th Street NE. While the 2011 addendum included an evaluation of two phases of
construction, the 2019 addendum included an update to the phases.
Now, Vector is in the process of purchasing the properties within this area, and as the project applicant,
Vector proposes multi-family housing, mixed commercial, and light industrial development in a
configuration that would require a minor modification to the zoning regulations for the C-AG Auburn
Gateway Zone (C-AG zone), established under this amendment. This requires a new addendum to the EIS
to review the newly proposed land uses within the project. The introduction of such uses will make it
commercially viable for Vector to effectuate the purpose of the Northeast Auburn Special Area Plan and
Auburn Gateway Planned Action (Chapter 18.08 ACC).
II. SUMMARY OF PROPOSED CODE CHANGES
18.02.070 - ESTABLISHMENT OF ZONES
Zones established under Auburn City Code (ACC) Section 18.02.070 will now include the “C-AG, Auburn
Gateway zone”. The establishment of this zone is necessary to allow specific changes to be implemented
within the project area.
18.08.040 - PLANNED ACTION THRESHOLDS
Under ACC 18.08.04 “Planned action thresholds”, the code shall be revised to incorporate “Light
industrial” as an allowable land use under new subsection “d”. This also includes revisions to the “Land
Use Review Threshold” table to allow up to 400,000 square feet of light industrial uses and up to 75 feet
Page 61 of 136
Staff Member: Goode Date: June 2, 2026
2
in structure height. The current EIS addendum analyzes this newly proposed use within the project area.
The Auburn Gateway Text Amendment does not alter the floor area ratios, density requirements, building
height limits, setbacks, or other standards already expressed in Chapter 18.08 ACC. While adding a new
permissible use, this use is anticipated to result in lower density, rather than higher density, within the
Auburn Gateway District, and will conform to the height limitations in place for all other uses.
18.23.020 - INTENT OF COMMERCIAL AND INDUSTRIAL ZONES
Under ACC 18.23.020(D), the intent of the C-AG, Auburn Gateway Zone shall be revised to include light
industrial uses as a permissible use. Additional language is proposed to be removed from this section for
consistency throughout the intent of the zone.
18.23.030 – USES
Within “Table 18.23.030 Permitted, Administrative, Conditional, and Prohibited Uses by Zone,
Commercial and Industrial Zones” the following uses are proposed to now be “Permitted” or
“Administrative” uses within the C-AG Zone:
- Building contractor, light – Permitted
- Manufacturing, assembling and packaging – Light intensity – Permitted
- Manufacturing, assembling and packaging – Medium intensity – Administrative
- Storage – Personal household storage facility (mini-storage) – Permitted
- Warehousing and distribution – Permitted
- Warehousing and distribution bonded and located within a designated foreign trade zone –
Permitted
- Wholesaling with on-site retail as an incidental use (e.g., coffee, bakery) – Permitted
- Sports and entertainment assembly facility – Administrative
- Building and landscape materials sales – Permitted
- Construction and heavy equipment sales and rental – Permitted
- Convenience store – Permitted
- Drive-through espresso stands – Permitted
- Entertainment, commercial – Administrative
To maintain compatibility of all uses throughout the site, a new footnote is also added to Table 18.23.030.
Footnote 4 shall require that any building landscape materials and sales uses, or heavy equipment sales
and rental uses shall be located wholly inside the building when located within the C-AG Zone.
The proposed text amendments will support the policy of the Comprehensive Plan by providing a
foundation for a financially viable mixed-use development that utilizes horizontal mixed-use and flexibility
in uses to provide for local housing, shopping, and employment options in Copper Gate Plaza.
III. TEXT AMENDMENT
The text amendment is shown by strikeout/underline and is attached to this memo as Attachment 2.
IV. STAFF REQUEST
Planning Commission to review and provide feedback on the proposed Auburn Gateway text
amendments and proceed to a public hearing on July 7, 2026.
Page 62 of 136
Staff Member: Goode Date: June 2, 2026
3
V. DEFINITIONS (in alphabetical order)
1) ACC 18.04.025 “Administrative use” means a use permitted in a zone only after review and approval
by the planning director or designee. Administrative uses are those which typically have some
potential for impacts to neighboring properties, but which may be permitted within a zone following
review by the city to establish conditions mitigating impacts of the use and to assure compatibility with
other uses in the zone.
2) ACC 18.04.192 “Building and landscape materials sales” means a retail or wholesale establishment
selling hardware, lumber and other large building materials, plant materials, and other landscaping
materials.
3) ACC 18.04.195 “Building contractor, light” means businesses relating to the building trades including
but not limited to: plumbing, heating, air conditioning; painting, paperhanging and decorating;
electrical; carpentry and flooring; roofing and sheet metal. These types of businesses generally do n ot
have heavy equipment or building materials stored outside.
4) ACC 18.04.282 “Convenience store” means a small retail establishment that offers convenience
goods for sale, such as prepackaged food items, beverages, tobacco, personal care items, and other
household goods and often characterized by 24 hours a day operations. These stores can be part of a
fueling station or an independent facility.
5) ACC 18.04.361 “Entertainment, commercial” means spectator entertainment for commercial
purposes. This use includes theaters, concert halls, nightclubs, or comedy clubs, but does not include
cabarets, licensed under ACC 5.20.130(B), and adult entertainment, licensed under Chapter 5.30
ACC.
6) ACC 18.04.614 “Manufacturing, assembling and packaging – Light intensity” means a facility
accommodating manufacturing processes involving and/or producing: apparel; food and beverage
products; electronic, optical, and instrumentation products; ice; jewelry; and musical instruments.
Light manufacturing also includes other establishments engaged in the assembly, fabrication, and
conversion of already processed raw materials into products, where the intensity, scale, and/or
characteristics of operation and materials used are unlikely to result in externalities or effects on
surrounding land uses or the community because they can be controlled within the building. Examples
of light intensity manufacturing uses include, but are not limited to, clothing and fabric product
manufacturing and food and beverage products.
7) ACC 18.04.616 “Manufacturing, assembling and packaging – Medium intensity” means a facility
accommodating manufacturing processes that involve and/or produce building materials, fabricated
metal products, machinery, and/or transportation equipment, where the intensity, scale, and/or
characteristics of operation and materials used are greater than those classified under
“manufacturing, assembling and packaging – light intensity,” but where externalities or effects on
surrounding land uses or the community can typically be reduced or avoided when appropriately
located and developed. Examples of medium intensity manufacturing uses include lumber and wood
product manufacturing and stone and cut stone product manufacturing.
8) ACC 18.04.696 “Permitted use” means a land use that is allowed outright within a zone.
VI. ATTACHMENTS
1) Auburn Gateway Text Amendment Presentation
2) Auburn Gateway Zoning Text Amendment
Page 63 of 136
PLANNING COMMISSION
AUBURN GATEWAY
TEXT AMENDMENT
PRESENTED BY
OWEN GOODE, PLANNER II
JUNE 2, 2026
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 64 of 136
Copper Gate Plaza
Part of Northeast
Auburn Special Area
Plan
Project applicant
proposes increase in
mix of uses
BACKGROUND
Aerial Image of Project Area
Page 65 of 136
Increase viability
of commercial
uses
Availability of
access for newly
proposed uses
along Auburn Way
North Corridor
PURPOSE OF TEXT AMENDMENT
Page 66 of 136
Complimentary
mix of
commercial and
residential uses
to serve the
neighborhood
PURPOSE OF TEXT AMENDMENT
Page 67 of 136
Supports
Comprehensive
Plan to create
mixed-use
districts while
maintaining
thoughtful
criteria and
design
PURPOSE OF TEXT AMENDMENT
Page 68 of 136
Introduce Light
Industrial Use to
C-AG “Auburn
Gateway Zone”
Remove language
that limits Light
Industrial Uses in
the C-AG Zone
SUMMARY OF CODE CHANGES
C-AG Auburn
Gateway
Neighborhood
Mixed-Use
Page 69 of 136
Allow 13 new land
uses within the C-
AG Zone (Permitted
and Administrative
Uses)
Prohibit outdoor
storage for specific
land uses
SUMMARY OF CODE CHANGES
C-AG Auburn
Gateway
Neighborhood
Mixed-Use
Page 70 of 136
QUESTIONS?
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 71 of 136
18.02.070 Establishment of zones.
A. The city is divided into the following classes of zones:
1. RC, residential conservancy zone (one dwelling unit per four acres);
2. R-1, residential one unit per acre zone;
3. R-2, residential low zone;
4. R-3, residential moderate zone;
5. R-4, residential high zone;
6. R-MHC, manufactured/mobile home community zone;
7. R-F, residential flex zone;
8. R-NM, residential neighborhood mixed-use zone;
9. C-1, light commercial zone;
10. C-2, heavy commercial zone;
11. C-AG, Auburn Gateway zone;
11. M-1, light industrial zone;
12. M-2, heavy industrial zone;
13. L-F, airport landing field zone;
14. P-1, public use zone;
15. UNC, unclassified use zone;
16. I, institutional use zone;
17. DUC, downtown urban center, 125 District;
18. DUC, downtown urban center, 75 District;
19. DUC, downtown urban center, 55 District;
20. DUC, neighborhood residential district;
21. DUC, health and wellness district;
22. DUC, residential-flex district;
23. DUC, light commercial district;
Page 72 of 136
24. DUC, heavy commercial district;
25. DUC, light industrial district;
26. OS, open space zone.
B. The zones set out in subsection A of this section are established as the designations,
locations, and boundaries thereof as set forth and indicated on the zoning map.
C. The intent statement for each zone set forth in this title shall be used to guide the
application of the zones to all lands in the city of Auburn. The intent statements shall
guide interpretation and application of land use regulations within the zones, and any
change to the range of allowed uses within each zone through amendment to this title.
(Ord. 6959 § 1 (Exh. A), 2024; Ord. 6885 § 1 (Exh. A), 2022; Ord. 6677 § 1, 2018; Ord. 6245 §
2, 2009.)
18.08.040 Planned action thresholds.
Subject to the zoning regulations for the site and the mitigation measures described in this
chapter, the maximum levels of development described below have been evaluated in the
Northeast Auburn/Robertson Properties special area plan EIS, as described in the EIS (and
any addenda thereto), and are planned actions pursuant to RCW 43.21C.031. In order to
qualify as a planned action, total cumulative development within the Auburn Gateway
project area that has been permitted under this chapter shall meet all of the following
criteria:
A. Land Use.
1. The following are the primary categories of uses authorized under this planned action:
a. OƯice.
b. Retail.
c. Multifamily residential.
d. Light Industrial
2. Land Use Review Threshold. The planned action designation applies to future
development proposals within the Auburn Gateway project area which are within the range
evaluated in the Northeast Auburn/Robertson Properties special area plan EIS and the EIS
addenda as shown below.
Use Maximum Maximum
Page 73 of 136
Allowable Structure
Height
Multifamily
residences
500 dwelling
units
75 feet
Retail uses 720,000
square feet
75 feet
OƯice uses 1,600,000
square feet
75 feet
Light
Industrial
Uses
400,000
square feet
75 feet
18.23.020 Intent of commercial and industrial zones.
A. General. This section describes the intent for each of the city’s commercial and industrial
zones. These intent statements are to be used to guide the interpretation of the regulations
associated with each zone. The planning director is authorized to make interpretations of
these regulations based on their analysis of them together with clear and objective reasons
for such interpretation.
B. C-1, Light Commercial Zone. The C-1 light commercial zone is intended for lower intensity
commercial adjacent to residential neighborhoods. This zone generally serves as a transition
zone between higher and lower intensity land uses and provides retail and professional
services. This zone represents the primary commercial designation for small- to moderate-
scale commercial activities compatible by having similar performance standards and
should be developed in a manner which is consistent with and attracts pedestrian-oriented
activities. This zone encourages a broad mix of small-scale uses such as leisure shopping,
oƯice, eating and drinking establishments, entertainment and assembly uses and provides
amenities conducive to attracting shoppers and pedestrians. Building height, size, and
orientation are the primary standards that will be used to maintain the smaller, more
pedestrian scale uses within this zone.
C. C-2, Heavy Commercial Zone. The intent of the C-2 heavy commercial zone is to allow for
medium to high intensity uses consisting of a wide range of retail, commercial,
entertainment, oƯice, services, and professional uses. This zone is intended to
accommodate uses which are oriented to automobiles either as a mode or target of the
commercial service while fostering a pedestrian orientation. The uses allowed can include
outside activities, display, fabrication or service features when not the predominant portion
of the use. The uses enumerated in this classification may be larger in scale and building size
Page 74 of 136
and have more potential for impacts to surrounding properties and street systems than
those uses permitted in the more restrictive commercial classifications.
D. C-AG, Auburn Gateway Zone. The intent of the C-AG Auburn gateway zone is to provide for
a pedestrian-oriented mix of retail, oƯice, middle housing, and multifamily residential uses
in the Northeast Auburn Special Area Plan and Auburn Gateway Planned Action area, as
described in Chapter 18.08 ACC. This classification is also intended to allow flexibility in
design and the combination of uses that is responsive to market demands. The uses
enumerated in this classification anticipate a mix of multifamily residential, middle housing,
retail, and oƯice, and light industrial uses that is coordinated through a site-specific
planning process. The multifamily residential must be located in a multi-story building.
Certain heavy commercial uses permitted in other commercial classifications are not
permitted in this zone because of the potential for conflicts with multifamily residential uses,
in order to achieve a quality of environment that is conducive to this mix of uses.
E. M-1, Light Industrial Zone. The intent of the M-1 light industrial zone is to accommodate a
variety of industrial, manufacturing, commercial, and limited residential uses in an
industrial environment, and to preserve land primarily for industrial and commercial uses,
and to implement the economic goals of the comprehensive plan, and to provide a greater
flexibility within the zoning regulations for those uses which are non-nuisance in terms of air
and water pollution, noise, vibration, glare or odor. The industrial/commercial character of
this zone is intended to address the way in which industrial and commercial uses are carried
out rather than the actual types of products made. An essential aspect of this zone is the
need to maintain a quality of development that attracts rather than discourages further
investment in industrial and commercial development. While allowed, outdoor storage will
be regulated in a manner that mitigates visual impacts taking surrounding uses and vehicular
corridors into consideration.
F. M-2, Heavy Industrial Zone. The M-2 heavy industrial zone is intended to accommodate a
broad range of manufacturing and industrial uses. Permitted activity may vary from medium
to higher intensity uses that involve the manufacture, fabrication, assembly, or processing
of raw and/or finished materials. Heavy industrial uses should not be located near
residential development. While other uses may be sited within this zone, permits for such
uses should not be issued if such uses will discourage use of adjacent sites for heavy
industry, interrupt the continuity of industrial sites, or produce traƯic in conflict with the
industrial uses. (Ord. 6959 § 1 (Exh. A), 2024; Ord. 6885 § 1 (Exh. A), 2022; Ord. 6728 § 3 (Exh.
C), 2019; Ord. 6433 § 26, 2012.)
18.23.030Uses.
Page 75 of 136
A. General Permit Requirements. Table 18.23.030 identifies the uses of land allowed in
each commercial and industrial zone and the land use approval process required to
establish each use.
B. Requirements for Certain Specific Land Uses. Where the last column (Standards for
Specific Land Uses) in Table 18.23.030 includes a reference to a code section number, the
referenced section determines other requirements and standards applicable to
the use regardless of whether it is permitted outright or requires an administrative
or conditional use permit.
C. Uses AƯected by the Airport Overlay. Refer to Chapter 18.38 ACC to determine
whether uses are separately prohibited by that chapter or will be required to comply with
additional regulations that are associated with the airport overlay.
Table 18.23.030. Permitted, Administrative, Conditional and Prohibited Uses by Zone,
Commercial and Industrial Zones
PERMITTED, ADMINISTRATIVE, CONDITIONAL
AND PROHIBITED USES BY ZONE
P – Permitted
C – Conditional
A – Administrative
X – Prohibited
LAND USE
Zoning Designation
Standards for Specific Land Uses C
-1
C
-2
C-
A
G
M
-1
M
-2
INDUSTRIAL, MANUFACTURING AND PROCESSING, WHOLESALING
Building contractor, light X P XP P P
Building contractor, heavy X X X A P
Manufacturing, assembling and
packaging – Light intensity
X P XP P P ACC 18.31.180
Page 76 of 136
Manufacturing, assembling and
packaging – Medium intensity
X A XA P P ACC 18.31.180
Manufacturing, assembling and
packaging – Heavy intensity
X X X X A ACC 18.31.180
Marijuana processor X X X C C Chapter 18.59 ACC
Marijuana producer X X X C C Chapter 18.59 ACC
Marijuana researcher X X X C C Chapter 18.59 ACC
Marijuana retailer X C X C C Chapter 18.59 ACC
Marijuana transporter business X X X C C Chapter 18.59 ACC
Page 77 of 136
Outdoor storage, incidental to
principal permitted use on
property
X P X P P ACC 18.57.020(A)
Storage – Personal household
storage facility (mini-storage) P P XP P P ACC 18.57.020(B)
Warehousing and distribution X X XP P C ACC 18.57.020(C)
Warehousing and distribution,
bonded and located within a
designated foreign trade zone
X P XP P P
Page 78 of 136
Wholesaling with on-site retail
as an incidental use (e.g.,
coffee, bakery)
X P XP
4 P P
RECREATION, EDUCATION AND PUBLIC ASSEMBLY USES
Commercial recreation facility,
indoor
P P P P A
Commercial recreation facility,
outdoor
X A A P A ACC 18.57.025(A)
Conference/convention facility X A X A X
Library, museum A A X A X
Meeting facility, public or
private P P X A A
Movie theater, except drive-in P P P X X
Page 79 of 136
Private school – Specialized
education/training (for profit) A P P P P
Religious institutions, lot size
less than one acre P P A A A ACC 18.31.165
Religious institutions, lot size
more than one acre P P A A A ACC 18.31.165
Sexually oriented businesses X P X P P Chapter 18.74 ACC
Sports and entertainment
assembly facility X A XA A A
Page 80 of 136
Studio – Art, dance, martial arts,
music, etc. P P P P A
RESIDENTIAL
Apartment units, as part of
a mixed-use development 2 X P P P X ACC 18.57.030
Apartments, standalone X X X X X
Caretaker apartment P P X P P
Indoor emergency housing or
shelter
P P P A A ACC 18.31.160
Live/work unit, as part of
a mixed-use development 2 X P P P X
Page 81 of 136
Live/work unit, standalone 3 X X X X X
Work/live unit, as part of
a mixed-use development 2 X P P P X
Work/live unit, standalone 3 X X X X X
Marijuana cooperative X X X X X
Nursing home, assisted living
facility P P C X X
Senior housing2 X A X X X
Supportive housing (permanent) P P P A A ACC 18.31.160
Transitional housing P P P A A ACC 18.31.160
RETAIL
Page 82 of 136
Building and landscape materia
ls sales X P XP
4 P P ACC 18.57.035(A)
Community retail establishment P P P P P
Construction and heavy
equipment sales and rental X X XP
4 A P
Convenience store A P XP P P
Drive-through espresso stands A P AP P A
Drive-through facility, including
banks and restaurants A P P P P ACC 18.52.040
Entertainment, commercial A P XA A A
Page 83 of 136
Groceries, specialty food stores P P P P X
Neighborhood retail establishment P P P P P
Nursery X P A P P ACC 18.57.035(C)
Outdoor displays and sales
associated with a permitted
use (auto/vehicle sales not included
in this category)
P P P P P ACC 18.57.035(D)
Regional retail establishment X P P P A
Restaurant, cafe, coffee shop P P P P P
Tasting room P P P P P
Tavern P P P P A
Page 84 of 136
Wine production facility, small
craft distillery, small craft
brewery
P P P P P
SERVICES
Animal daycare
(excluding kennels and animal
boarding)
A P A P P ACC 18.57.040(A)
Animal sales and services
(excluding kennels and veterinary
clinics)
P P P P P ACC 18.57.040(B)
Banking and related financial
institutions, excluding drive-
through facilities
P P P P P
Page 85 of 136
Catering service P P A P P
Daycare, including mini
daycare, daycare
center, preschools or nursery
schools
P P P P X
Dry cleaning and laundry
service (personal) P P P P P
Equipment rental and leasing X P X P P
Kennel, animal boarding X A X A A ACC 18.57.040(C)
Page 86 of 136
Government facilities; this excludes
offices and related uses that are
permitted outright
A A A A A
Hospital P P X P P
Lodging – Hotel or motel P P P A A
Medical – Dental clinic P P P P X
Mortuary, funeral
home, crematorium
P P X P X
Personal service shops P P P P X
Pharmacies P P P X X
Print and copy shop P P P P X
Page 87 of 136
Printing and publishing (of
books, newspaper and other
printed matter)
A P P P P
Professional offices P P P P P
Repair service – Equipment,
appliances A P P P P ACC 18.57.040(D)
Veterinary clinic, animal hospital P P P P X
Youth community support facility P X X X X ACC 18.57.040(E)
TRANSPORTATION, COMMUNICATIONS AND INFRASTRUCTURE
Ambulance, taxi, and
specialized transportation
facility
X A X P P
Page 88 of 136
Broadcasting studio P P X P P
Heliport X C X C C
Motor freight terminal1 X X X X X See Footnote No. 1
Parking facility, public or
commercial, surface P P P P X
Parking facility, public or
commercial, structured
P P P P X
Towing storage yard X X X A P ACC 18.57.045(A)
Utility transmission or
distribution line or substation A A A A A
Page 89 of 136
Wireless
communications facility (WCF)
(See ACC 18.04.912(W))
* * * * *
*See
ACC 18.31.100 for use regulati
ons and zoning development
standards.
Eligible facilities request (EFR)
(wireless communications
facility) (See ACC 18.04.912(H))
P P P P P
Small wireless
facilities (ACC 18.04.912(Q)) P P P P P
VEHICLE SALES AND SERVICES
Page 90 of 136
Automobile washes (automatic,
full or self-service) A P P P P ACC 18.57.050(A)
Auto parts sales with
installation services A P P P P
Auto/vehicle sales and rental A P X P P ACC 18.57.050(B)
Fueling station A P P P P ACC 18.57.050(C)
Mobile home, boat, or RV sales X P X P P
Vehicle services –
Repair/body work X P X P P ACC 18.57.050(D)
OTHER
Page 91 of 136
Any commercial use abutting
a residential zone which has
hours of operation outside of
the following: Sunday: 9:00 a.m.
to 10:00 p.m. or Monday –
Saturday: 7:00 a.m. to 10:00
p.m.
A A A A A
Page 92 of 136
Other uses may be permitted by
the planning director or
designee if the use is
determined to be consistent
with the intent of the zone and is
of the same general character
of the uses permitted. See
ACC 18.02.120(C)(6), Unclassif
ied Uses.
P P P P P
1 Any motor freight terminal, as defined by ACC 18.04.635, in existence as of the eƯective
date of the ordinance codified in this section, is an outright permitted use in the M-1 and M-
2 zones. Any maintenance, alterations and additions to an existing motor freight
terminal which are consistent with ACC 18.23.040, Development standards, are allowed.
2 Any mixed-use development or senior housing project vested prior to Resolution
No. 5187 (December 7, 2015) is an outright permitted use in the C-1 zone. Subsequently, if a
nonresidential use within a vested mixed-use development changes, then the
nonresidential use shall maintain a minimum of 10 percent of the
cumulative building ground floor square footage consisting of the uses permitted outright,
administratively, or conditionally, listed under “Recreation, Education, and Public
Assembly,” “Retail,” or “Services” of the C-1 zone.
3 Any standalone live/work units or standalone work/live units vested prior to the eƯective
date of the ordinance codified in this chapter are outright permitted uses.
Page 93 of 136
4 Any building landscape materials and sales uses, or heavy equipment sales and rentals
uses located wholly inside a Building are permitted uses in the CAG zone. Building
landscape materials and sales uses wholly or partly outside of a Building are not permitted
in the CAG zone.
(Ord. 6977 § 1 (Exh. A), 2025; Ord. 6959 § 1 (Exh. A), 2024; Ord. 6885 § 1 (Exh. A), 2022; Ord.
6838 § 1 (Exh. A), 2021; Ord. 6799 § 6 (Exh. F), 2020; Ord. 6728 § 3 (Exh. C), 2019; Ord. 6688
§ 1 (Exh. 1), 2018; Ord. 6644 § 2, 2017; Ord. 6642 § 9, 2017; Ord. 6508 § 1, 2014; Ord. 6433
§ 26, 2012.)
Page 94 of 136
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
Nonconforming Code Update
Staff Introduction/Presentation (Teague)
Staff will present the proposed updates to Chapter 18.54 “Nonconforming
Structures, Land and Uses” to Planning Commission for a recommendation
to City Council.
June 2, 2026
Department: Attachments: Budget Impact:
Community Development Staff Report, PowerPoint
Presentation, Chapter 18.54
ACC Option 1, Chapter 18.54
ACC Option 2, Chapter 18.54
ACC Option 3, ACC Section
18.70.020
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Staff Report
Councilmember: Staff: Jason Krum
Page 95 of 136
PLANNING COMMISSION STAFF REPORT
AGENDA SUBJECT/TITLE:
Nonconforming Code Update
CITY FILE NO(s).:
ZOA26-0004
APPLICANT/AGENT/OWNERS:
City of Auburn
REQUEST:
Planning Commission hold a public hearing, deliberate, and take action to recommend that City Council
approve the proposed nonconforming code update.
LOCATION:
City-wide.
NOTIFICATION:
Hearing Notice was published in the Seattle Times and posted on the City’s Land Use Notice webpage and
physically at City Hall and City Hall Annex on May 22, 2026.
HEARING DATE:
June 2, 2026
SEPA STATUS:
A SEPA Environmental Checklist – Non-Project Action was prepared and issued with a Determination of
Non-Significance (DNS) on March 4, 2026. The appeal period expired on March 18, 2026.
STAFF:
Alexandria Teague, Planning Services Manager, Dept. of Community Development
STAFF RECOMMENDATION: Planning Commission to deliberate and take action to recommend to City
Council approval of the text amendment, Chapter 18.54 and Section 18.70.020 (related to Special
Exceptions) of Title 18 of the Auburn City Code to update the City’s nonconforming regulations.
FINDINGS OF FACT:
Background Summary:
1. Nonconforming structures, land, and uses are governed by the development regulations contained in
Chapter 18.54 of the Auburn City Code. The purpose of this Chapter is to allow for the continuance
and maintenance of legally established nonconforming structures, land, and uses.
2. A nonconforming use is one that when originally established complied with the categories of uses
established, development standards, and other applicable regulations at the time but no longer
conforms. Page 96 of 136
Staff Member: Teague Date: May 21, 2026
Page 2 of 6
3. A structure, land, and use may become nonconforming when either it 1) becomes prohibited (i.e. is no
longer allowed), 2) the applicable development standards change, or 3) the zoning district of which it
resides changes.
4. Washington State law does not contain specific standards or regulations governing nonconforming
uses. In 1998 under “Rhod-A-Zalea v. Snohomish County” the State Supreme Court stated,
“While some states' authority to terminate, alter, or extend nonconforming uses is expressly
granted or withheld in zoning enabling acts, Washington's enabling acts are silent regarding the
regulation of nonconforming uses. See R. Settle, Washington Land Use § 2.7(d). Instead, the state
Legislature has deferred to local governments to seek solutions to the nonconforming use
problem according to local circumstances. In Washington, local governments are free to preserve,
limit or terminate nonconforming uses subject only to the broad limits of applicable enabling acts
and the constitution.”
5. A legally established nonconforming structure, land, or use means it was legal or lawful when it was
established. This often means it was permitted outright or obtained a land use approval, such as an
administrative use permit or conditional use permit, and obtained other applicable permits, such as a
building permit.
6. Per ACC 18.02.120 Chapters 18.07 through 18.44 establish permitted, administrative, conditional,
and prohibited uses, by zone, for all properties within the Auburn city limits. All principal uses in a
given zone are one of four types: 1. Permitted use; 2. Administrative use; 3. Conditional use; and 4.
Prohibited use.
7. There have been numerous court cases determining that legally established nonconforming
structures, land, and uses may continue to exist or operate, and inform City regulations. Court case
“Rhod-A-Zalea v. Snohomish County” (1998) states “These rulings are consistent with the principle
that a nonconforming use has a "vested" or "protected" right to continue without being subject to
immediate termination.”
8. A vested right is related to the concept of vesting. In short, vesting means that a structure, land, or use
is subject to use controls, development, and regulations in effect at the time of a complete
application. Per Revised Code of Washington (RCW) 19.27.095(1)
“A valid and fully complete building permit application for a structure, that is permitted under the
zoning or other land use control ordinances in effect on the date of the application shall be
considered under the building permit ordinance in effect at the time of application, and the zoning
or other land use control ordinances in effect on the date of application.”
9. Per ACC 18.68.030(B) A “Zoning Text Amendment” is an application to change the text of ACC Title
18. This type of application or initiation shall be processed as a legislative non-project decision,
consistent with ACC 14.03.060. Public notice shall be provided consistent with ACC Title 14.
Page 97 of 136
Staff Member: Teague Date: May 21, 2026
Page 3 of 6
10. Special exceptions are specific deviations from development regulations granted by the Hearing
Examiner following a public hearing and are provided in Chapter 18.70 “Variances, Special
Exceptions, and Administrative Appeals”.
11. During the last Periodic Comprehensive Plan update, completed at the end of 2024, the City made
major adjustments or changes to the Zoning Ordinance (Title 18) and the Zoning Map. These changes
were completed such that the Zoning Ordinance and Zoning Map would be consistent with changes to
the City’s Comprehensive Plan and Comprehensive Land Use Map. Also, since 2024 the City has also
updated the Downtown Subarea Plan and all zones within the downtown subarea. Lastly, recent State
legislation, such as House Bill (HB) 1491 related to Transit Oriented Development within “station
areas”, will further result in changes to the Zoning Ordinance and Zoning Map.
12. The intent of this code update is to provide greater flexibility in the continuation and maintenance of
legally established nonconforming structures, land, and uses to reduce unintended hardships on
property owners and businesses while maintaining the City’s long-term vision and consistency with
the Comprehensive Plan.
13. Planning Commission received public comment from Matt McGregor of Colliers Internation on May 1st
regarding industrial vacancy periods and support for longer vacancy allowances and administrative
extensions.
14. During the last Planning Commission meeting there was discussion regarding the period in which a
nonconforming use is discontinued or becomes vacant and whether an extension process (permitted
by the director or designee) should be included in code. Given the number of vacant storefronts within
the Downtown, Staff’s recommendation is a 3-year discontinuance period without an option to renew.
Staff believes that a 3-year period provides a reasonable amount of time for a property owner to
actively market a property at a competitive market rate and reestablish the use if there is continued
demand for that use within the community. Staff further believes that if the use has not been
reestablished, or the property has not been sold or repositioned within that timeframe, it may indicate
that redevelopment consistent with the current zoning and development regulations is more
appropriate. However, based on the Planning Commission’s discussion at the regular meeting on May
5th, Staff has prepared three options for 18.54.070(B) and (C). These options are included in Exhibits
2 through 4 and summarized below under “Summary of Code Changes.”
Procedural Steps:
15. The proposed text amendment (zoning code update) has been discussed with the Planning
Commission previously at a regular meeting on May 5, 2026.
16. Pursuant to Revised Code of Washington (RCW) 36.70A, the text amendment was transmitted to the
Washington State Department of Commerce on February 6, 2026. The 60-day notice period ended on
April 7, 2026. No comments were received.
17. A Non-Project Action Determination of Non-Significance (DNS) was issued on March 4, 2026. The
appeal period expired on March 18, 2026. No appeals were received.
Page 98 of 136
Staff Member: Teague Date: May 21, 2026
Page 4 of 6
18. ACC 14.22.100 outlines the public hearing requirements by planning commission. Amendments to
the Periodic Comprehensive Plan generally comply with “area-wide” requirements.
A. The planning commission shall hold at least one public hearing on all proposed amendments
to the comprehensive plan. Notice of such public hearing shall be given pursuant to Chapter
1.27 ACC and, at a minimum, include the following:
1. For site-specific plan map amendments:
a. Notice shall be published once in the official newspaper of the city not less than
10 calendar days prior to the date of public hearing;
b. Notice shall be mailed by first class mail to all property owners of record within a
radius of 300 feet of the proposed map amendment request, not less than 10
calendar days prior to the public hearing;
2. For area-wide plan map amendments:
a. Notice shall be published once in the official newspaper of the city not less than
10 calendar days prior to the date of public hearing;
b. Notice shall be mailed by first class mail to all property owners of record within
the area subject to the proposed amendment;
c. Notice shall be posted in at least two conspicuous locations in the area subject to
the proposed amendment not less than 10 calendar days prior to the date of the
public hearing.
B. Notwithstanding the above, the director may expand the minimum noticing provisions noted
above as deemed necessary.
C. Planning Commission Recommendation. The planning commission shall conduct a public
hearing on all potential comprehensive plan amendments and shall make and forward a
recommendation on each to the city council. The planning commission shall adopt written
findings and make a recommendation consistent with those findings to the city council.
D. The city council, if it elects to amend the comprehensive plan, shall adopt written findings and
adopt said amendments by ordinance.
E. State Review. All comprehensive plan amendments considered by the planning commission
shall be forwarded for state agency review consistent with RCW 36.70A.106.
F. Any appeal of an amendment to the comprehensive plan shall be made in accordance with
Chapter 36.70A RCW.
19. A Notice of Public Hearing (NOH) was issued on May 22, 2026. Pursuant to ACC 14.22.100, the
following methods of noticing for the Planning Commission public hearing were conducted:
a. The NOH was published in the Seattle Times on May 22, 2026.
b. The NOH was posted in two general public locations (City Hall and City Annex).
c. The NOH was posted on City’s Public Land Use Notice webpage.
20. A public hearing will be conducted by the Planning Commission on June 2, 2026.
SUMMARY OF CODE CHANGES:
The proposed updates are shown in strike-through and underline in Exhibits 2 and 3. The major changes
are summarized below.
Page 99 of 136
Staff Member: Teague Date: May 21, 2026
Page 5 of 6
SECTION 18.54.060 Maintenance, damage repairs and restorations, additions, enlargements,
moving or relocation of nonconforming structures, and residential structures.
(G) – Revises the tracking period for cumulative improvements from “the lifetime of the nonconforming
use” “to within five years of the date of permit issuance”. This provides more clarity and administrative
consistency when tracking of the total value of improvements.
(I) – Allows for a legal nonconforming structure or use to expand the existing use or structure up to 10%
administratively by the Community Development Director or designee or more than 10% (not to exceed
25%) through a special exception1. Administratively approved expansion will make it easier for
nonconforming uses and structures to expand by a modest amount.
(K) – Allows for the rebuild of middle housing and apartments, in addition to single family residences. The
rebuild/replacement relief afforded to single family residences is expanded to more housing types –
middle housing (up six units) and apartments (seven units and above).
SECTION 18.54.070 Abatement of nonconforming structures and uses.
Below ACC 18.54.070 (B) and (C) are modified given three different options. These options are shown in
strike-through and underline in Exhibits 2 through 4. In each of these options only sections ACC 18.54.070
(B) and (C) are different.
Option 1 – Increases the period of which a nonconforming use or structure is discontinued or becomes
vacant from 180 days to three years. No extensions are permitted.
Option 2 - Increases the period of which a nonconforming use or structure is discontinued or becomes
vacant from 180 days to three years. Allows for administrative approval of extensions for discontinued
nonconforming uses or structures for a maximum of two years, through one-year increments, where
warranted.
Option 3 - Increases the period of which a nonconforming use or structure is discontinued or becomes
vacant from 180 days to three years. Allows for administrative approval of extensions for discontinued
nonconforming uses or structures for up to one year.
In all options, use or structure must 1) have no open code enforcement violations, 2) must be
maintained so as to not appear degraded relative to the previous condition of the property nor detract from
the surrounding neighborhood, and 3) the property owner must demonstrate an effort to actively market
the property for sale or lease at a competitive market rate for occupancy and reuse. Failure to comply with
1 through 3 will result in termination of the nonconforming status.
SECTION 18.54.080 Amortization and abatement of outdoor storage.
Revised requirements for outdoor storage yards, in the M-1, Light Industrial Zone. Rather than requiring
compliance with the landscape and screening requirements of Chapter 18.50 ACC “Landscaping and
Page 100 of 136
Staff Member: Teague Date: May 21, 2026
Page 6 of 6
Screening”, within a fixed timeframe, compliance is now triggered only when improvements are made
under ACC Section 18.54.060.
EXHIBITS:
1. PowerPoint Presentation
2. Chapter 18.54 ACC – Option 1
3. Chapter 18.54 ACC – Option 2
4. Chapter 18.54 ACC – Option 3
5. ACC Section 18.70.020
Page 101 of 136
PLANNING COMMISSION
PUBLIC HEARING
NONCONFORMING
CODE UPDATE
PRESENTED BY
ALEXANDRIA TEAGUE,
PLANNING SERVICES MANAGER
JUNE 2, 2026
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 102 of 136
WHAT ARE NONCONFORMING USES?
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 103 of 136
WHAT ARE NONCONFORMING USES CONTINUED…
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 104 of 136
18.54.010
18.54.020
18.54.030
18.54.040
18.54.050
18.54.060
18.54.070
18.54.080
Intent
Continuance
Use of nonconforming land
Nonconforming signs
Changes of use…
Maintenance…
Abatement
Amortization of outdoor storage
WHICH STANDARDS GOVERN?
CHAPTER 18.54 ACC
Page 105 of 136
PROPOSED CODE CHANGES
18.54.060(G)
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 106 of 136
PROPOSED CODE CHANGES
18.54.060(I)
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 107 of 136
PROPOSED CODE CHANGES
18.54.060(K)
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 108 of 136
PROPOSED CODE CHANGES
18.54.080
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 109 of 136
PROPOSED
CODE CHANGES
18.54.070(B) &
(C) – OPTION 1
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 110 of 136
PROPOSED
CODE CHANGES
18.54.070(B) &
(C) – OPTION 2
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 111 of 136
PROPOSED
CODE CHANGES
18.54.070(B) &
(C) – OPTION 3
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 112 of 136
QUESTIONS?
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 113 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 1 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
Chapter 18.54
NONCONFORMING STRUCTURES, LAND AND USES
Sections:
18.54.010 Intent.
18.54.020 Continuance of nonconforming structures and uses.
18.54.030 Use of nonconforming land.
18.54.040 Nonconforming signs.
18.54.050 Changes of use, tenancy, ownership or management.
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming structures,
and residential structures.
18.54.070 Abatement of nonconforming structures and uses.
18.54.080 Amortization and abatement of outdoor storage.
18.54.010 Intent.
Amendments over time to regulatory authority provided within this title may result in
structures, land and uses which no longer conform with the provisions set forth for the district
in which they are situated. Therefore it is the intent of this chapter to allow for the continuance
and maintenance of legally established nonconforming uses subject to standards and
provisions prescribed within this chapter. (Ord. 4229 § 2, 1987.)
18.54.020 Continuance of nonconforming structures and uses.
Any nonconforming structure or use lawfully existing on the effective date of this title, or any
subsequent amendments to this title, may be continued and maintained in conformance with
provisions of this chapter, provided no enlargement of area, space or volume occupied by the
nonconforming use occurs. Any nonconforming structure authorized by a valid building permit
prior to the effective date of the ordinance codified in this title, or any subsequent amendments
to this title, may be completed and used in accordance with the plans, specifications and
Page 114 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 2 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
regulations under which such permit was issued. Expiration of authorized permits will result in
a loss of vested right for construction and use of such structure. (Ord. 4229 § 2, 1987.)
18.54.030 Use of nonconforming land.
If any parcel of land with a minimum lot size or lot dimension which is less than that prescribed
for by the district in which such parcel is located, was subdivided into lots according to a plat of
record on or before the effective date of the ordinance codified in this title, or any subsequent
amendments to this title, then the fact that the parcel of land does not meet the minimum lot
size or lot dimension requirements as set forth in this title shall not prohibit the property from
being utilized; provided, that all other regulations prescribed for that district by this title are
complied with, except as provided for in Chapter 18.31 ACC. (Ord. 4229 § 2, 1987.)
18.54.040 Nonconforming signs.
Nonconforming signs shall be subject to provisions of Chapter 18.56 ACC. (Ord. 4229 § 2, 1987.)
18.54.050 Changes of use, tenancy, ownership or management.
Changes of use, tenancy, ownership or management may occur to any existing legally
established and continued nonconforming use under one or more of the following
circumstances:
A. Any part of a structure occupied by an existing legally established and continued
nonconforming use may be changed to a use which, in the opinion of the planning dDirector of
Community Development or designee, is of the same or of a more restrictive nature. When the
use of a nonconforming structure is hereafter changed to a more restrictive use, the structure
shall not thereafter be used for a less restrictive use.
B. There may be a change of tenancy, ownership or management of any existing legally
established and continued nonconforming use provided there is no change in the nature or
Page 115 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 3 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
character of such nonconforming use except as authorized within this chapter. (Ord. 4229 § 2,
1987.)
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming
structures, and residential structures.
A. Ordinary maintenance of a nonconforming structure which includes minor interior and
exterior repairs and incidental alterations is permitted. Minor maintenance and repair may
include but is not limited to painting, roof repair and replacement, plumbing, wiring,
mechanical equipment replacement, and weatherization. Incidental alterations may include
construction of nonbearing walls or partitions.
B. No structural alterations, as defined by the Uniform International Building Codes, shall be
made except as required by law or ordinance; provided, that the cost of such work shall not
exceed 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll.
C. A nonconforming structure having been damaged or partially destroyed to an extent not
exceeding 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll, may be restored to its original condition, as authorized by the
city’s building official, and its immediately preceding or existing use at the time of partial
destruction may be continued or resumed. Restoration shall begin within one year and be
completed within two years of the date of partial destruction. If restoration is not started within
one year, then the reuse and occupancy of the structure shall conform to all the regulations of
the district in which the use is located.
D. Structures or lands which are nonconforming as to use regulations shall not be enlarged or
intensified in any manner unless the enlargement within such structures or lands conforms to
all regulations of the district in which it is located, except for expansion permitted under ACC
18.54.060(H). A nonconforming use, within a nonconforming structure, shall not expand into
any portion of the nonconforming structure.
Page 116 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 4 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
E. Structures which are nonconforming as to percentage of site coverage, setbacks, building
height or density shall not be enlarged unless such enlargement conforms to the regulations of
the district in which it is located.
F. Nonconforming residential structures are allowed to provide maintenance, alterations and
additions which may exceed the requirements of this chapter; provided the total number of
dwelling units does not increase and all other development standards of the district are
complied with.
G. This chapter shall not prevent the following provided the total value of the improvements,
over the lifetime of the nonconforming usewithin five years of the date of permit issuance, does
not exceed 50 percent of the assessed value of the nonconforming use as established by the
most current county assessor’s tax roll, except for the following items: ; and, the
nonconforming use or structure is not expanded except as allowed by subsection H of this
section; provided further, that any replacement of a nonconforming structure, or parts thereof,
must comply with the appropriate development standards unless a special exception is granted
pursuant to ACC 18.70.020:
1. Strengthening or restoring to a safe condition any nonconforming structure or part
thereof which is declared to be unsafe or a hazard to the public by the order of the
Community Development Director or designeea city official charged with protecting the
public safety;
2. Lessening a hazardous situation, nuisance or other adverse environmental impact;
3. Bringing the structure or use into more conformance with this title;
4. Adapting the structure to new technologies or equipment; or
5. Improvements which do not increase the intensity of the nonconforming use.
H. Any replacement of a nonconforming structure, or parts thereof, must comply with the
appropriate development standards unless a special exception is granted pursuant to ACC
18.70.020.
IH. A nonresidential structure or use which becomes a legal nonconforming structure or use
after the effective date of the ordinance codified in this title may may expand the existing use
or structure subject to the requirements of this chapter. be permitted by means of a special
Page 117 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 5 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
exceptionA legal nonconforming structure or use may be expanded administratively up to 10%
by the director or designee. Expansions of a legal nonconforming structure or use by more than
10%, not to exceed 25%, may be permitted by means of a special exception issued by the
hearing examiner pursuant to ACC 18.70.020 to expand the existing use or structure up to 25
percent of the use or structure existing at the time of the adoption of the ordinance codified in
this title; provided further, that the addition otherwise meets the standards of this title and
other requirements of the city.
This section does not allow the expansion of a use or structure which would be inconsistent
with a previously authorized administrative use permit, conditional use permit, special property
use permit, contract rezone, or binding agreement between the city and the property owner.
This section also does not allow the expansion of any nonconforming hazardous material
storage.
JI. When a building or structure is moved to another location it must then be made to conform
to the requirements of the district to which it is moved, unless specifically allowed elsewhere by
this title.
KJ. Nonconforming single-unit detached, middle housing, and apartments single-family
residential homes and their accessory structures may be replaced and the new structure shall
either meet the development standards of the district in which the home isdwelling unit is or
are located or the new structure shall not be more nonconforming than the previous use. All
other applicable building and fire code requirements must be complied with. (Ord. 6269 § 21,
2009; Ord. 5170 § 1, 1998; Ord. 4705 § 2, 1994; Ord. 4304 § 1(43), 1988; Ord. 4229 § 2, 1987.)
18.54.070 Abatement of nonconforming structures and uses.
Nonconforming structures and uses shall be abated if one or more of the following
circumstances exist:
A. If a nonconforming use is discontinued and changed to a conforming use, any future use of
the structure or land shall be in conformity to the regulations of the district in which structure
or land is located.;
Page 118 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 6 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
B. If a nonconforming use or structure is discontinuedAny structure or portion of a
nonresidential structure, or parcel of land occupied by a nonconforming use which or becomes
vacant or unoccupied and remains unoccupied for a continuous period of 180 days more than
three years, it shall not thereafter be reestablished or occupied except by a use which conforms
to the use regulations of the district in which it is located. Failure to maintain compliance with
the criteria set forth in subsection (C) of this section during the period of vacancy or extension
shall result in termination of the nonconforming status.Residential uses in commercial or
industrial zones which are unoccupied for more than 180 days may be allowed to reoccupy if a
special exception is issued pursuant to ACC 18.70.020;
C. A discontinuedAny structure or portion of a nonresidential structure, or parcel of land
occupied by a nonconforming use which or vacant use or structure must maintain compliance
with the following:
a. The property has no open code enforcement violations; and
b. The property, including structures, landscaping, and amenities, is maintained so as
to not appear degraded relative to the previous condition of the property nor detract
from the surrounding neighborhood.
c. The property owner has demonstrated a good faith effort to actively market the
property for sale or lease at a competitive market rate for occupancy and reuse.
CD. If a nonconforming structure sustains damage or destruction which exceeds 50 percent of
the current assessed valuation of the structure as established by the county assessor’s office.
Reconstruction of such damaged structure or reuse of occupancy shall conform to all
regulations of the district in which it is located and it shall be treated as a new building. This
subsection shall not apply to single-unit detached, middle housingfamily dwellings units, and
apartments. (Ord. 5170 § 1, 1998; Ord. 4229 § 2, 1987.)
18.54.080 Amortization and abatement of outdoor storage.
All outdoor storage yards that do not comply with the landscape and screening requirements of
Chapter 18.50 ACC which are located within an M-1 zone that are adjacent to a residential zone
or are visible from a public street shall, within three years of the adoption of this titleand make
any improvements included in ACC 18.54.060, shall screen and landscape the outdoor storage
Page 119 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 7 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
pursuant to the requirements of Chapter 18.50 ACC, or the use shall be abated. (Ord. 6885 § 1
(Exh. A), 2022; Ord. 4229 § 2, 1987.)
Page 120 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 1 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
Chapter 18.54
NONCONFORMING STRUCTURES, LAND AND USES
Sections:
18.54.010 Intent.
18.54.020 Continuance of nonconforming structures and uses.
18.54.030 Use of nonconforming land.
18.54.040 Nonconforming signs.
18.54.050 Changes of use, tenancy, ownership or management.
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming structures,
and residential structures.
18.54.070 Abatement of nonconforming structures and uses.
18.54.080 Amortization and abatement of outdoor storage.
18.54.010 Intent.
Amendments over time to regulatory authority provided within this title may result in
structures, land and uses which no longer conform with the provisions set forth for the district
in which they are situated. Therefore it is the intent of this chapter to allow for the continuance
and maintenance of legally established nonconforming uses subject to standards and
provisions prescribed within this chapter. (Ord. 4229 § 2, 1987.)
18.54.020 Continuance of nonconforming structures and uses.
Any nonconforming structure or use lawfully existing on the effective date of this title, or any
subsequent amendments to this title, may be continued and maintained in conformance with
provisions of this chapter, provided no enlargement of area, space or volume occupied by the
nonconforming use occurs. Any nonconforming structure authorized by a valid building permit
prior to the effective date of the ordinance codified in this title, or any subsequent amendments
to this title, may be completed and used in accordance with the plans, specifications and
Page 121 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 2 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
regulations under which such permit was issued. Expiration of authorized permits will result in
a loss of vested right for construction and use of such structure. (Ord. 4229 § 2, 1987.)
18.54.030 Use of nonconforming land.
If any parcel of land with a minimum lot size or lot dimension which is less than that prescribed
for by the district in which such parcel is located, was subdivided into lots according to a plat of
record on or before the effective date of the ordinance codified in this title, or any subsequent
amendments to this title, then the fact that the parcel of land does not meet the minimum lot
size or lot dimension requirements as set forth in this title shall not prohibit the property from
being utilized; provided, that all other regulations prescribed for that district by this title are
complied with, except as provided for in Chapter 18.31 ACC. (Ord. 4229 § 2, 1987.)
18.54.040 Nonconforming signs.
Nonconforming signs shall be subject to provisions of Chapter 18.56 ACC. (Ord. 4229 § 2, 1987.)
18.54.050 Changes of use, tenancy, ownership or management.
Changes of use, tenancy, ownership or management may occur to any existing legally
established and continued nonconforming use under one or more of the following
circumstances:
A. Any part of a structure occupied by an existing legally established and continued
nonconforming use may be changed to a use which, in the opinion of the planning dDirector of
Community Development or designee, is of the same or of a more restrictive nature. When the
use of a nonconforming structure is hereafter changed to a more restrictive use, the structure
shall not thereafter be used for a less restrictive use.
B. There may be a change of tenancy, ownership or management of any existing legally
established and continued nonconforming use provided there is no change in the nature or
Page 122 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 3 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
character of such nonconforming use except as authorized within this chapter. (Ord. 4229 § 2,
1987.)
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming
structures, and residential structures.
A. Ordinary maintenance of a nonconforming structure which includes minor interior and
exterior repairs and incidental alterations is permitted. Minor maintenance and repair may
include but is not limited to painting, roof repair and replacement, plumbing, wiring,
mechanical equipment replacement, and weatherization. Incidental alterations may include
construction of nonbearing walls or partitions.
B. No structural alterations, as defined by the Uniform International Building Codes, shall be
made except as required by law or ordinance; provided, that the cost of such work shall not
exceed 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll.
C. A nonconforming structure having been damaged or partially destroyed to an extent not
exceeding 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll, may be restored to its original condition, as authorized by the
city’s building official, and its immediately preceding or existing use at the time of partial
destruction may be continued or resumed. Restoration shall begin within one year and be
completed within two years of the date of partial destruction. If restoration is not started within
one year, then the reuse and occupancy of the structure shall conform to all the regulations of
the district in which the use is located.
D. Structures or lands which are nonconforming as to use regulations shall not be enlarged or
intensified in any manner unless the enlargement within such structures or lands conforms to
all regulations of the district in which it is located, except for expansion permitted under ACC
18.54.060(H). A nonconforming use, within a nonconforming structure, shall not expand into
any portion of the nonconforming structure.
Page 123 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 4 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
E. Structures which are nonconforming as to percentage of site coverage, setbacks, building
height or density shall not be enlarged unless such enlargement conforms to the regulations of
the district in which it is located.
F. Nonconforming residential structures are allowed to provide maintenance, alterations and
additions which may exceed the requirements of this chapter; provided the total number of
dwelling units does not increase and all other development standards of the district are
complied with.
G. This chapter shall not prevent the following provided the total value of the improvements,
over the lifetime of the nonconforming usewithin five years of the date of permit issuance, does
not exceed 50 percent of the assessed value of the nonconforming use as established by the
most current county assessor’s tax roll, except for the following items: ; and, the
nonconforming use or structure is not expanded except as allowed by subsection H of this
section; provided further, that any replacement of a nonconforming structure, or parts thereof,
must comply with the appropriate development standards unless a special exception is granted
pursuant to ACC 18.70.020:
1. Strengthening or restoring to a safe condition any nonconforming structure or part
thereof which is declared to be unsafe or a hazard to the public by the order of the
Community Development Director or designeea city official charged with protecting the
public safety;
2. Lessening a hazardous situation, nuisance or other adverse environmental impact;
3. Bringing the structure or use into more conformance with this title;
4. Adapting the structure to new technologies or equipment; or
5. Improvements which do not increase the intensity of the nonconforming use.
H. Any replacement of a nonconforming structure, or parts thereof, must comply with the
appropriate development standards unless a special exception is granted pursuant to ACC
18.70.020.
IH. A nonresidential structure or use which becomes a legal nonconforming structure or use
after the effective date of the ordinance codified in this title may may expand the existing use
or structure subject to the requirements of this chapter. be permitted by means of a special
Page 124 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 5 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
exceptionA legal nonconforming structure or use may be expanded administratively up to 10%
by the director or designee. Expansions of a legal nonconforming structure or use by more than
10%, not to exceed 25%, may be permitted by means of a special exception issued by the
hearing examiner pursuant to ACC 18.70.020 to expand the existing use or structure up to 25
percent of the use or structure existing at the time of the adoption of the ordinance codified in
this title; provided further, that the addition otherwise meets the standards of this title and
other requirements of the city.
This section does not allow the expansion of a use or structure which would be inconsistent
with a previously authorized administrative use permit, conditional use permit, special property
use permit, contract rezone, or binding agreement between the city and the property owner.
This section also does not allow the expansion of any nonconforming hazardous material
storage.
JI. When a building or structure is moved to another location it must then be made to conform
to the requirements of the district to which it is moved, unless specifically allowed elsewhere by
this title.
KJ. Nonconforming single-unit detached, middle housing, and apartments single-family
residential homes and their accessory structures may be replaced and the new structure shall
either meet the development standards of the district in which the home isdwelling unit is or
are located or the new structure shall not be more nonconforming than the previous use. All
other applicable building and fire code requirements must be complied with. (Ord. 6269 § 21,
2009; Ord. 5170 § 1, 1998; Ord. 4705 § 2, 1994; Ord. 4304 § 1(43), 1988; Ord. 4229 § 2, 1987.)
18.54.070 Abatement of nonconforming structures and uses.
Nonconforming structures and uses shall be abated if one or more of the following
circumstances exist:
A. If a nonconforming use is discontinued and changed to a conforming use, any future use of
the structure or land shall be in conformity to the regulations of the district in which structure
or land is located.;
Page 125 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 6 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
B. If a nonconforming use or structure is discontinuedAny structure or portion of a
nonresidential structure, or parcel of land occupied by a nonconforming use which or becomes
vacant or unoccupied and remains unoccupied for a continuous period of 180 days more than
three years, it shall not thereafter be reestablished or occupied except by a use which conforms
to the use regulations of the district in which it is located, unless the director or designed
approves an extension pursuant to subsection C of this section. Failure to maintain compliance
with the criteria set forth in subsection (C)(2) of this section during the period of vacancy or
extension shall result in termination of the nonconforming status.Residential uses in
commercial or industrial zones which are unoccupied for more than 180 days may be allowed
to reoccupy if a special exception is issued pursuant to ACC 18.70.020;
C. The director or designee may administratively authorize the extension of a discontinued
nonconforming use or structure, up to two-years, in one-year increments, through a Type I
decision, allowing the nonconforming use or structure to be re-established without requiring
conforming with the use regulations of the zoning district in which the property is located,
subject to the following criteria and conditions:
1. An applicant for an extension shall make a written request for the extension a minimum of
90 calendar days prior to expiration of the discontinued nonconforming use.
2. The director or designee shall in consideration of granting an extension find:
a. The property has no open code enforcement violations; and
b. The property, including structures, landscaping, and amenities, is maintained so as
to not appear degraded relative to the previous condition of the property nor detract
from the surrounding neighborhood.
c. The property owner has demonstrated a good faith effort to actively market the
property for sale or lease at a competitive market rate for occupancy and reuse.
CD. If a nonconforming structure sustains damage or destruction which exceeds 50 percent of
the current assessed valuation of the structure as established by the county assessor’s office.
Reconstruction of such damaged structure or reuse of occupancy shall conform to all
regulations of the district in which it is located and it shall be treated as a new building. This
subsection shall not apply to single-unit detached, middle housingfamily dwellings units, and
apartments. (Ord. 5170 § 1, 1998; Ord. 4229 § 2, 1987.)
Page 126 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 7 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
18.54.080 Amortization and abatement of outdoor storage.
All outdoor storage yards that do not comply with the landscape and screening requirements of
Chapter 18.50 ACC which are located within an M-1 zone that are adjacent to a residential zone
or are visible from a public street shall, within three years of the adoption of this titleand make
any improvements included in ACC 18.54.060, shall screen and landscape the outdoor storage
pursuant to the requirements of Chapter 18.50 ACC, or the use shall be abated. (Ord. 6885 § 1
(Exh. A), 2022; Ord. 4229 § 2, 1987.)
Page 127 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 1 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
Chapter 18.54
NONCONFORMING STRUCTURES, LAND AND USES
Sections:
18.54.010 Intent.
18.54.020 Continuance of nonconforming structures and uses.
18.54.030 Use of nonconforming land.
18.54.040 Nonconforming signs.
18.54.050 Changes of use, tenancy, ownership or management.
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming structures,
and residential structures.
18.54.070 Abatement of nonconforming structures and uses.
18.54.080 Amortization and abatement of outdoor storage.
18.54.010 Intent.
Amendments over time to regulatory authority provided within this title may result in
structures, land and uses which no longer conform with the provisions set forth for the district
in which they are situated. Therefore it is the intent of this chapter to allow for the continuance
and maintenance of legally established nonconforming uses subject to standards and
provisions prescribed within this chapter. (Ord. 4229 § 2, 1987.)
18.54.020 Continuance of nonconforming structures and uses.
Any nonconforming structure or use lawfully existing on the effective date of this title, or any
subsequent amendments to this title, may be continued and maintained in conformance with
provisions of this chapter, provided no enlargement of area, space or volume occupied by the
nonconforming use occurs. Any nonconforming structure authorized by a valid building permit
prior to the effective date of the ordinance codified in this title, or any subsequent amendments
to this title, may be completed and used in accordance with the plans, specifications and
Page 128 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 2 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
regulations under which such permit was issued. Expiration of authorized permits will result in
a loss of vested right for construction and use of such structure. (Ord. 4229 § 2, 1987.)
18.54.030 Use of nonconforming land.
If any parcel of land with a minimum lot size or lot dimension which is less than that prescribed
for by the district in which such parcel is located, was subdivided into lots according to a plat of
record on or before the effective date of the ordinance codified in this title, or any subsequent
amendments to this title, then the fact that the parcel of land does not meet the minimum lot
size or lot dimension requirements as set forth in this title shall not prohibit the property from
being utilized; provided, that all other regulations prescribed for that district by this title are
complied with, except as provided for in Chapter 18.31 ACC. (Ord. 4229 § 2, 1987.)
18.54.040 Nonconforming signs.
Nonconforming signs shall be subject to provisions of Chapter 18.56 ACC. (Ord. 4229 § 2, 1987.)
18.54.050 Changes of use, tenancy, ownership or management.
Changes of use, tenancy, ownership or management may occur to any existing legally
established and continued nonconforming use under one or more of the following
circumstances:
A. Any part of a structure occupied by an existing legally established and continued
nonconforming use may be changed to a use which, in the opinion of the planning dDirector of
Community Development or designee, is of the same or of a more restrictive nature. When the
use of a nonconforming structure is hereafter changed to a more restrictive use, the structure
shall not thereafter be used for a less restrictive use.
B. There may be a change of tenancy, ownership or management of any existing legally
established and continued nonconforming use provided there is no change in the nature or
Page 129 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 3 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
character of such nonconforming use except as authorized within this chapter. (Ord. 4229 § 2,
1987.)
18.54.060 Maintenance, damage repairs and restorations, additions,
enlargements, moving or relocation of nonconforming
structures, and residential structures.
A. Ordinary maintenance of a nonconforming structure which includes minor interior and
exterior repairs and incidental alterations is permitted. Minor maintenance and repair may
include but is not limited to painting, roof repair and replacement, plumbing, wiring,
mechanical equipment replacement, and weatherization. Incidental alterations may include
construction of nonbearing walls or partitions.
B. No structural alterations, as defined by the Uniform International Building Codes, shall be
made except as required by law or ordinance; provided, that the cost of such work shall not
exceed 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll.
C. A nonconforming structure having been damaged or partially destroyed to an extent not
exceeding 50 percent of the assessed valuation of such structure as established by the most
current county assessor’s tax roll, may be restored to its original condition, as authorized by the
city’s building official, and its immediately preceding or existing use at the time of partial
destruction may be continued or resumed. Restoration shall begin within one year and be
completed within two years of the date of partial destruction. If restoration is not started within
one year, then the reuse and occupancy of the structure shall conform to all the regulations of
the district in which the use is located.
D. Structures or lands which are nonconforming as to use regulations shall not be enlarged or
intensified in any manner unless the enlargement within such structures or lands conforms to
all regulations of the district in which it is located, except for expansion permitted under ACC
18.54.060(H). A nonconforming use, within a nonconforming structure, shall not expand into
any portion of the nonconforming structure.
Page 130 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 4 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
E. Structures which are nonconforming as to percentage of site coverage, setbacks, building
height or density shall not be enlarged unless such enlargement conforms to the regulations of
the district in which it is located.
F. Nonconforming residential structures are allowed to provide maintenance, alterations and
additions which may exceed the requirements of this chapter; provided the total number of
dwelling units does not increase and all other development standards of the district are
complied with.
G. This chapter shall not prevent the following provided the total value of the improvements,
over the lifetime of the nonconforming usewithin five years of the date of permit issuance, does
not exceed 50 percent of the assessed value of the nonconforming use as established by the
most current county assessor’s tax roll, except for the following items: ; and, the
nonconforming use or structure is not expanded except as allowed by subsection H of this
section; provided further, that any replacement of a nonconforming structure, or parts thereof,
must comply with the appropriate development standards unless a special exception is granted
pursuant to ACC 18.70.020:
1. Strengthening or restoring to a safe condition any nonconforming structure or part
thereof which is declared to be unsafe or a hazard to the public by the order of the
Community Development Director or designeea city official charged with protecting the
public safety;
2. Lessening a hazardous situation, nuisance or other adverse environmental impact;
3. Bringing the structure or use into more conformance with this title;
4. Adapting the structure to new technologies or equipment; or
5. Improvements which do not increase the intensity of the nonconforming use.
H. Any replacement of a nonconforming structure, or parts thereof, must comply with the
appropriate development standards unless a special exception is granted pursuant to ACC
18.70.020.
IH. A nonresidential structure or use which becomes a legal nonconforming structure or use
after the effective date of the ordinance codified in this title may may expand the existing use
or structure subject to the requirements of this chapter. be permitted by means of a special
Page 131 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 5 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
exceptionA legal nonconforming structure or use may be expanded administratively up to 10%
by the director or designee. Expansions of a legal nonconforming structure or use by more than
10%, not to exceed 25%, may be permitted by means of a special exception issued by the
hearing examiner pursuant to ACC 18.70.020 to expand the existing use or structure up to 25
percent of the use or structure existing at the time of the adoption of the ordinance codified in
this title; provided further, that the addition otherwise meets the standards of this title and
other requirements of the city.
This section does not allow the expansion of a use or structure which would be inconsistent
with a previously authorized administrative use permit, conditional use permit, special property
use permit, contract rezone, or binding agreement between the city and the property owner.
This section also does not allow the expansion of any nonconforming hazardous material
storage.
JI. When a building or structure is moved to another location it must then be made to conform
to the requirements of the district to which it is moved, unless specifically allowed elsewhere by
this title.
KJ. Nonconforming single-unit detached, middle housing, and apartments single-family
residential homes and their accessory structures may be replaced and the new structure shall
either meet the development standards of the district in which the home isdwelling unit is or
are located or the new structure shall not be more nonconforming than the previous use. All
other applicable building and fire code requirements must be complied with. (Ord. 6269 § 21,
2009; Ord. 5170 § 1, 1998; Ord. 4705 § 2, 1994; Ord. 4304 § 1(43), 1988; Ord. 4229 § 2, 1987.)
18.54.070 Abatement of nonconforming structures and uses.
Nonconforming structures and uses shall be abated if one or more of the following
circumstances exist:
A. If a nonconforming use is discontinued and changed to a conforming use, any future use of
the structure or land shall be in conformity to the regulations of the district in which structure
or land is located.;
Page 132 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 6 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
B. If a nonconforming use or structure is discontinuedAny structure or portion of a
nonresidential structure, or parcel of land occupied by a nonconforming use which or becomes
vacant or unoccupied and remains unoccupied for a continuous period of 180 days more than
three years, it shall not thereafter be reestablished or occupied except by a use which conforms
to the use regulations of the district in which it is located, unless the director or designed
approves an extension pursuant to subsection C of this section. Failure to maintain compliance
with the criteria set forth in subsection (C)(2) of this section during the period of vacancy or
extension shall result in termination of the nonconforming status.Residential uses in
commercial or industrial zones which are unoccupied for more than 180 days may be allowed
to reoccupy if a special exception is issued pursuant to ACC 18.70.020;
C. The director or designee may administratively authorize the extension of a discontinued
nonconforming use or structure, up to one-year, through a Type I decision, allowing the
nonconforming use or structure to be re-established without requiring conforming with the use
regulations of the zoning district in which the property is located, subject to the following
criteria and conditions:
1. An applicant for an extension shall make a written request for the extension a minimum of
90 calendar days prior to expiration of the discontinued nonconforming use.
2. The director or designee shall in consideration of granting an extension find:
a. The property has no open code enforcement violations; and
b. The property, including structures, landscaping, and amenities, is maintained so as
to not appear degraded relative to the previous condition of the property nor detract
from the surrounding neighborhood.
c. The property owner has demonstrated a good faith effort to actively market the
property for sale or lease at a competitive market rate for occupancy and reuse.
CD. If a nonconforming structure sustains damage or destruction which exceeds 50 percent of
the current assessed valuation of the structure as established by the county assessor’s office.
Reconstruction of such damaged structure or reuse of occupancy shall conform to all
regulations of the district in which it is located and it shall be treated as a new building. This
subsection shall not apply to single-unit detached, middle housingfamily dwellings units, and
apartments. (Ord. 5170 § 1, 1998; Ord. 4229 § 2, 1987.)
Page 133 of 136
Chapter 18.54 ACC, Nonconforming Structures, Land and Uses Page 7 of 7
The Auburn City Code is current through Ordinance 7002, passed October 6, 2025.
18.54.080 Amortization and abatement of outdoor storage.
All outdoor storage yards that do not comply with the landscape and screening requirements of
Chapter 18.50 ACC which are located within an M-1 zone that are adjacent to a residential zone
or are visible from a public street shall, within three years of the adoption of this titleand make
any improvements included in ACC 18.54.060, shall screen and landscape the outdoor storage
pursuant to the requirements of Chapter 18.50 ACC, or the use shall be abated. (Ord. 6885 § 1
(Exh. A), 2022; Ord. 4229 § 2, 1987.)
Page 134 of 136
ACC 18.70.020, Special exceptions Page 1 of 2
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
18.70.020 Special exceptions.
A. Only the following special exceptions may be granted by the hearing examiner after a public
hearing is held pursuant to ACC 18.70.040:
1. Platted lots within the same block and same zone, but separated by a public alley, may
be used as a single building site for the purpose of calculating the number of dwelling units
permitted in a structure to be erected on one side of the alley, subject to the following
requirements:
a. Each portion of the property shall abut a minimum of 100 feet upon the alley.
b. The two portions of the property shall be directly opposite for a distance
representing at least 50 percent of the width of the portion of the property not to be
occupied by the proposed building.
c. The portion of the property not occupied by the building shall not be sold,
segregated or used for building purposes so long as the building remains on the
portion of property on the opposite side of the alley.
2. Whenever there is a change from a residential use to a nonresidential use in an existing
building a special exception may be issued to exclude the floor area within the building,
that cannot be effectively utilized by the proposed use, from the off-street parking
requirements.
3. A nonresidential structure or use which becomes a legal nonconforming structure or
use after may expand the existing use or structure subject to the requirements of this
chapter. the effective date of the ordinance codified in this title may be permitted, by
means of a special exception, Expansions of a legal nonconforming structure or use by
more than 10%, not to exceed 25%, may be permitted by means of a special exception to
expand the existing use or structure up to 25 percent of the use or structure existing at the
time of the adoption of this title; provided further, that the addition otherwise meets the
standards of this title and other requirements of the city.
This section does not allow the expansion of a use or structure which would be
inconsistent with a previously authorized administrative use permit, conditional use permit,
special property use permit, contract rezone, or binding agreement between the city and
Page 135 of 136
ACC 18.70.020, Special exceptions Page 2 of 2
The Auburn City Code is current through Ordinance 7008, passed November 17, 2025.
the property owner. This section also does not allow the expansion of any nonconforming
hazardous material storage.
4. Pursuant to ACC 18.54.060(G), a special exception may be issued for the replacement of
a nonconforming structure or part thereof which does not comply with the appropriate
development standards.
5. Pursuant to ACC 18.54.070(B), a special exception may be issued for residential uses, in
commercial or industrial zones, to reoccupy if unoccupied for longer than 180 days.
B. In considering applications for special exceptions, the hearing examiner shall consider the
nature and condition of all adjacent uses and structures, and no such special exception shall be
authorized by the hearing examiner unless the hearing examiner finds that the authorizing of
such special exception will not be materially detrimental to the public welfare or injurious to
property in the zone or vicinity in which the property is located, and that the authorization of
such special exception will be consistent with the spirit and purpose of this title. In authorizing a
special exception, the hearing examiner may impose such requirements and conditions with
respect to location, installation, construction, maintenance and operation and extent of open
spaces in addition to those expressly set forth in this title as may be deemed necessary for the
protection of other properties in the zone or vicinity and the public interest. (Ord. 6269 § 24, 2009;
Ord. 4840 § 1, 1996; Ord. 4229 § 2, 1987.)
Page 136 of 136