HomeMy WebLinkAbout5909RESOLUTION NO. 5909
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING AND ADOPTING
THE 2027-2032 TRANSPORTATION IMPROVEMENT
PROGRAM OF THE CITY OF AUBURN
WHEREAS, RCW 35.77.010 requires that the legislative body of each City prepare
and adopt a comprehensive Transportation Improvement Program for the ensuing six
years; and
WHEREAS, the Transportation Improvement Program is a short-range planning
document that is updated every year and shows the funding sources and amounts for
transportation improvement projects planned for the next six years; and
WHEREAS, pursuant to the requirements of State law, a Public Hearing to review
the 2027-2032 Transportation Improvement Program for the City of Auburn was held on
June 15, 2026, at 7:00 p.m. at the Auburn City Council meeting held both in the Auburn
City Hall Council Chambers and virtually, pursuant to notice published in the legal
newspaper of the City of Auburn on June 4, 2026.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, RESOLVES as follows:
Section 1. The 2027-2032 Transportation Improvement Program is adopted,
which will be in substantial conformity with the attached Exhibit "A."
Section 2. The City Engineer of the City of Auburn is authorized to file a certified
copy of this Resolution and the 2027-2032 Transportation Improvement Program with the
Washington State Department of Transportation.
Resolution No. 5909
May 5, 2026
Page 1 of 2
Rev. 04/24
Section 3. The Mayor is authorized to implement those administrative
procedures necessary to carry out the directives of this Resolution.
Section 4. The City Clerk is authorized to make necessary corrections to this
Resolution including, but not limited to, the correction of scrivener's/clerical errors,
references, Resolution numbering, section/subsection numbers, and any references
thereto.
Section 5. This Resolution will take effect and be in full force on passage and
signatures.
Dated and Signed: June 15, 2026
ATTEST:
4q"fW1-;WF6 K:
Shawn Campbell, MMC, City Clerk
Resolution No. 5909
May 5, 2026
Page 2 of 2
CITY OF AUBURN
APPROV AS TO FOR .
1 -
ason Whalen, City Attorney
Rev. 04/24
City of Auburn Transportation Improvement Program
CITY OF
WASHINGTON
Transportation Improvement
izlL�ibifTc;a
Proposed for Adoption by Auburn City Council
June 15, 2026
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)-931-3010
www.auburnwa.gov
City of Auburn Transportation Improvement Program
Placeholder for Resolution
City of Auburn Transportation Improvement Program
Table of Contents
Introduction..........................................................................................................................................1
Projects& Financing Plan Summary..................................................................................................3
SummaryCharts...................................................................................................................................4
Intersection, Signal, and ITS Projects................................................................................................ 5
Traffic Signal Replacement Program (TIP# 1-1).............................................................................. 5
Annual Traffic Signal Improvement Program (TIP# 1-2)................................................................. 6
Dynamic Message Sign Program (TIP# 1-3).................................................................................... 7
Street Lighting Improvement Program (TIP# 1-4)............................................................................ 8
Harvey Rd NE/8th St NE Intersection Improvements (TIP# 1-5).................................................. 9
AWS/17th St SE Intersection Improvements (TIP# 1-6)............................................................... 10
C St NW/3rd St NW Intersection Improvements (TIP# 1-8)......................................................... 11
Lea Hill Rd/104th Ave SE Roundabout (TIP# 1-12)...................................................................... 12
S 321 st St/46th PI S Intersection Improvements (TIP# 1-13)...................................................... 13
SE 304th SO 16th Ave Roundabout (TIP# 1-16)........................................................................... 14
Non -Motorized and Transit Projects.................................................................................................15
Active Mode Shift Program (TIP# N-1).......................................................................................... 15
Active Transportation — Safety, ADA, and Repair Program (TIP# N-2).................................... 16
R St SE Mobility Improvements (TIP# N-6)................................................................................... 17
Priority RRFB Enhanced Crossings (TIP# N-8)............................................................................ 18
PreservationProjects........................................................................................................................19
Arterial and Collector Preservation Program (TIP# P-1).............................................................. 19
Local Street Preservation Program (TIP# P-2).............................................................................. 20
2027 Local Street Preservation (TIP# P-5).................................................................................... 21
Lake Tapps Pkwy Preservation (Sumner Tapps to 182nd) (TIP# P-6)..................................... 22
A Street SE Preservation (17th St SE to 37th St SE) (TIP# P-8)............................................... 23
15th St SW Preservation and Safety (TIP# P-10)......................................................................... 24
15th St NW Bridge Deck Preservation (TIP# P-12)...................................................................... 25
RoadwayProjects.............................................................................................................................. 26
Neighborhood Traffic Safety Program (TIP# R-1)........................................................................ 26
M St Underpass (3rd St SE to 8th St SE) (TIP# R-3)................................................................... 27
MSt NE Widening (TIP# R-7).......................................................................................................... 28
East Valley Hwy Widening (TIP# R-26).......................................................................................... 29
Preliminary Engineering and Miscellaneous Projects.....................................................................30
S 277th St Improvements (TIP# S-2).............................................................................................. 30
Non -Capital Projects..........................................................................................................................31
Transit Partnership Routes Program (TIP# X-1)........................................................................... 31
Bridge Inspection Program (TIP# X-2)............................................................................................ 32
Pavement Ratings Program (TIP# X-3).......................................................................................... 33
Annual Channelization and Pavement Markings (TIP# X-4)....................................................... 34
Capital Program Indirect Costs (TIP# X-5).................................................................................... 35
iii
City of Auburn Transportation Improvement Program
Introduction
Purpose
The TIP is a 6-year planning tool for the development of transportation facilities within the City
and sets priorities for the allocation of funds. State law requires the City to prepare and adopt
the TIP and it is a prerequisite of most grant programs. The City also uses the TIP to
coordinate future transportation projects with needed City utility improvements.
Statutory Requirements
Six Year Transportation Improvement Program - RCW 35.77.010 requires that each City
prepare and adopt a comprehensive transportation improvement program for the ensuing six
calendar years consistent with its Comprehensive Transportation Plan (CTP). This six -year TIP
shall be filed with the Secretary of the Washington State Department of Transportation
(WSDOT) each year within 30 days of adoption.
Projects of Regional Significance - RCW 35.77.010 also requires each city to specifically
identify those projects and programs of regional significance for inclusion in the transportation
improvement program for that region. The 2027-2032 TIP includes two projects of regional
significance:
TIP Project Number Project Title
TIP# R-7 M St NE Widening (E Main St to 4th St NE)
TIP# R-26 E Valley Highway Widening
Transportation Benefit District (TBD) — RCW 36.73.160 requires that the City established a
material change policy to address major plan changes that affect project delivery or the ability
to finance the plan. The City established its plan with the adoption of Resolution 5680. The
plan requires that projects with TBD funding are:
1. Included in the TIP.
2. The TIP shall serve as the City's finance plan for TBD funded projects.
3. In the event the costs of a TBD funded project exceed the costs established in the TIP
by more than twenty percent, the City Council shall hold a public hearing to solicit
comments from the public regarding how the cost change should be resolved.
Introduction
City ofAuburn Transportation Improvement Program
Methodology
Transportation needs are identified by examining current levels of service, safety and crash
history, growth trends, traffic studies and the City's adopted CTP. The likelihood of receiving
federal or state grants for various improvements, community interests and values are also
considered. All these factors yield a prioritized list of transportation improvements.
Projects are grouped into the following categories based on the type of improvement:
• Intersection, Signal & Intelligent Transportation System Projects
• Non -Motorized and Transit Projects
• Preservation Projects
• Roadway Improvement Projects
• Preliminary Engineering and Miscellaneous Projects, and
• Non -Capital Projects.
The TIP is financially constrained for the entire six years covered by the TIP based on
anticipated revenue sources and estimated project and program costs. The revenue sources
include both secured and unsecured grant funding as shown on the project sheets and the
financial summary. Grant funding is competitive, and it is unlikely that all grant funding
identified in the TIP will be secured. Strategies to address shortfalls in funding include
postponing, re-scoping, canceling, and/or pursuing additional or alternative revenue sources
such as those available through the Transportation Benefit District. A summary table of all the
TIP project is included as Appendix A.
An interactive map of the projects included in the TIP is available on the City's website:
httr)s://tinvuri.com/TIP-Map
Introduction 2
City of Auburn Transportation Improvement Program
R
Gerweral; R�.vehUes ,For„ecast - ` :;: ':
_
Fund Balance
$5,642,189
1.0% Utility Tax
$12,591,000
1.5% City Utility Tax
$14,941,000
School Zone Photo Enforcement
$4,230,000
Utility Fund Transfer In
$900,000
Investment and Interest Income
$1,265,100
Motor Vehicle Fuel Tax (MVFT)
$3,858,000
Subtotal General Transportation Funds
$43,427,289
TIP Expenditures
$36,292,447
General Revenues (Revenues - Expenditures)
$7,134,842
Traffic All�ticjation
Traffic Mitigation Fees Collected $0
TIP Expenditures $0
Traffic Mitigation (Revenues - Expenditures) $0
-" Fund Balance $3,982,579
0.1% Sales Tax $13,393,500
$20 Car Tabs $0
Other Revenue Option 1 $0
Interest Earnings $772,900
Subtotal Transportation Benefit District Funds $18,148,979
TIP Expenditures $16,162,323
TBD (Revenues - Expenditures) $1,986,656
Othet:.Rdve ues . , - _
Development $1,807,500
Agency Partnerships $0
Sidewalk Repair Fees $600,000
Fee -In -Lieu $0
Public Works Trust Fund Loan $0
Subtotal Other Funds $2,407,500
TIP Expenditures $2,407,500
Other Revenues (Revenues . Expenditures) $0
Projects and Financing Plan Summary
x. .m ;:..._.. ..........._...._.......__._ .......
14EET2 Transfer In $4,945,000
TIP Expenditures $4,945,000
REET2 (Revenues - Expenditures) $0
Traff�,c lmQac�Fees � _ __]
Fund Balance $494,198
Collection 2027-20312 $3,846,000
Traffic Impact Fees Collected $4,340,198
TIP Expenditures $3,754,738
TIF (Revenues - Expenditures) $585,460
O Ciy,F�,nds ..E::.`M
Secured Non -City Funds $11,871,772
Unsecured Non -City Funds $19,364,159
Non -City Funds $31,235,931
Total Revenues $104,504,897
TIP Expenditures $94,797,939
TIP (Revenues - Expenditures) $9,706,958
City of Auburn Transportation Improvement Program
Summary Charts
Funding by Category
Preliminary
Engineering and
Miscellaneous
Projects, $40,000
Funding by Source
Non -Capital
P rniacts _
Secured Grant
Funds, 511,871,772
Intersection, Signal,
And ITS Prniartc
Other, $1,807,5001
Traffic Impact Fees,
$3,754,738
Projects and Financing Plan Summary
Capital
Improvements
Fund, $600,000
� REE FZ 54,945,000
il
City of Auburn Transportation Improvement Program
Traffic Signal Replacement Program TIP 1-1
Transportation Improvement Program, 2027 - 2032
Project Number: asbd47
Project Type: Non -Capacity
Description
This program funds the replacement of an existing traffic signal every 4 to 5 years either as stand alone project or with other projects. Funding for this project originates from the City's School Zone Photo
Enforcement Program.
Project Need
Replacing traffic signals as they approach or are at the end of their service life, is critical to maintaining the City's transportation systems.
Progress Summary
The 2029/2030 signal replacement is identified as a separate project: C St NW13rd St NW Signal Replacement (1-8)
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
- - - - 500,000 - 500,000 500,000
500,000 - 500,000 500,000
- - - - - - 500,000 - 500,000 500,000
500,000 - 500,000 500,000
Intersection, Signal, and ITS Projects 5
City of Auburn Transportation Improvement Program
Annual Traffic Signal Improvement Program TIP 1-2
Transportation Improvement Program, 2027 - 2032
Project Number. gcbd07
Project Type: Non -Capacity
Description
The program will replace end of life capital facilities replacement for traffic signal and Intelligent Transportation System equipment including cabinets, video detection cameras, field network devices, traffic
cameras, battery backup components, and other related equipment The program also includes minor safety improvements, operations improvements, and Accessible Pedestrian Signal Improvements based on
the requirements of the Americans with Disabilities Act (ADA)_ The project is needed to maintain and replace existing signal equipment.
Project Need
The project is needed to maintain and replace existing signal equipment
Progress Summary
Program is on -going
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 195,000
205,000
205,000
210,000
210,000
215,000 -
1,240,000
1,240,000
- 195,000
205,000
205,000
210,000
210,000
215,000 -
1,240,000
1,240,000
- 195,000
205,000
205,000
210,000
210,000
215,000 -
1,240,000
1,240,000
- 195,000
205,000
205,000
210,000
210,000
215,000 -
1,240,000
1,240,000
Intersection, Signal, and ITS Projects 6
City of Auburn Transportation Improvement Program
Dynamic Message Sign Program TIP I-a3
Transportation Improvement Program, 2027 - 2032
Project Number: asbdl6
Project Type: Non -Capacity
Description
This program funds the construction of one new dynamic message sign in 5 to 6 year intervals depending on funding availability and costs. Locations are as specified in the Comprehensive Transportation Plan -
Map 8, Intelligent Transportation Systems. Funding for this project originates from the City's School Zone Photo Enforcement Program.
Project Need
This program funds the placement of dynamic message signs at locations identified in the Comprehensive Transportation Plan to help provide a more resilient and efficient transportation system.
Progress Summary
New dynamic message sign is included with the East Valley Highway Widening Project (R-26)
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
- - - - 75,000 75,000 75,000
75,000 - 75,000 75,000
75,000 - 75,000 75,000
75,000 75,000 75,000
Intersection, Signal, and ITS Projects 7
City of Auburn Transportation Improvement Program
Street Lighting Improvement Program TIP 1-4
Transportation Improvement Program, 2027 - 2032
Project Number: gcbd09
Project Type: Non -Capacity
Description
This annual program provides for street lighting projects throughout the City, including converting existing lights to LED and installing additional new street lighting at strategic locations to address specific
transportation safety needs. Converting existing standard street lights to LED supports the reduction of greenhouse gas emissions and can provide more uniform lighting. Adding new street lights can help
support transportation safety.
Project Need
Converting existing standard street lights to LED supports the reduction of greenhouse gas emissions and can provide more uniform lighting. Adding new street lights can help support transportation safety.
Progress Summary
Program is on -going
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 50,000
55,000
55,000
60,000
60,000
65,000 -
345,000
345,000
- 50,000
55,000
55,000
60,000
60,000
65,000 -
345,000
345,000
50,000
55,000
55,000
60,000.
60,000
65,000 -
345,000
345,000
- 50,000
55,000
55,000
60,000
60,000
65,000 -
345,000
345,000
Intersection, Signal, and ITS Projects 8
City of Auburn Transportation Improvement Program
Harvey Rd NE/8th St NE Intersection Improvements TIP 1-5
Transportation Improvement Program, 2027 - 2032
Project Number: cp0611
Project Type: Capacity
Description
The project constructed one eastbound through/right lane on 8th St NE to the west of Harvey Rd and modified traffic signals and traffic channelization to accommodate the new lane. The project also re-
constructed M St NE from 4th St NE to 8th St NE with a four -lane cross section.
Project Need
This project addressed roadway capacity needs.
Progress Summary
Construction was complete in 2010. On -going budget is for Public Trust Fund Loan (PWTFL) payments through 2028.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other (Loan Repayment)
Total Project Capital Expenditures:
Budget
Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027
2027
2028 2029 2030 2031 2032 2032
Total
Total
3,172,527
81,187
80,785 - - - -
161,972
3,334,499
3,172,527:
81J87
80,785 - - -
161,972
3,334,499
3,172,527
81,187
80,785 - - - -
161,972
3,334,499
3,172,527
81,187
80,785, - - - - -
161,972
3,334,499
Intersection, Signal, and ITS Projects 9
City of Auburn Transportation Improvement Program
AWS/17th Street SE Intersection Improvements TIP 1-6
Transportation Improvement Program, 2027 - 2032
Project Number: TBD
Project Type: Capacity
Description
The project will complete a pre -design study to identify the scope of a future construction project to improve traffic operations and active transportation through the intersection. The pre -design study will include
coordination with WSDOT and public outreach_
Project Need
The project addresses an existing intersection delay level of service issue and provides capacity for future growth and development
Progress Summary
TIP funding is for preliminary design starting on 2029.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other (Loan Repayment)
Total Project Capital Expenditures:
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
100,000 - - - - 100,000 100,000
100,000 - - - - 100,000 100,000
- - - 100,000 - - - - 100,000 100,000
100,000 - - - - 100,000 100,000
Intersection, Signal, and ITS Projects 10
City of Auburn Transportation Improvement Program
C St NW13rd St NW Intersection Improvements
Transportation Improvement Program, 2027 - 2032
Project Number: cp2610
Project Type: Capacity, Non -Capacity
Description
This project will replace the traffic signal at the intersection as part of the Traffic Signal Replacement Program and will also improve the intersection to increase capacity and reduce delays.
Project Need
The project addresses an existing intersection delay level of service issue and provides capacity for future growth and development.
Progress Summary
Project design funds from 2026 will be carried forward to start design in 2028 or 2029.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget
Budget Forecast
Forecast Forecast Forecast Beyond
Prior to 2027 . 2027
2028 2029
2030 2031 2032 2032
270,000 -
- 150,000
1,900,000 - - -
- -
-
100,000 - - -
270,000 -
- 150,000
2,000,000 - - -
270,000. -
- 50,000
- - - -
- -
- 100,000
- - - -
- -
- -
2,000,000 - -
270,000 -
- 150,000
2,000,000 - - -
TIP 1-8
TIP
Project
Total
Total
2,050,000
2,320,000
100,000
100,000
2,150,000
2,420,000
50,000
320,000
100,000
100,000
2,000,000
2,000,000
2,150,000
2,420,000
Intersection, Signal, and ITS Projects 11
City of Auburn Transportation Improvement Program
Lea Hill Rd & 104th Ave SE Roundabout TIP 1-12
Transportation Improvement Program, 2027 -2032 STIP AUB-79
Project Number: cp2319
Project Type: Capacity, Non -Capacity, Preservation
Description
This project will replace the existing traffic signal with a single lane roundabout and also includes pedestrian and bike facilities, street lighting, utility replacements, and stormwater management
Project Need
Progress Summary
Design, environmental permitting, and ROW acquisition underway.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027
2027 2028 2029 2030 2031 2032 2032
Total
Total
89,537
- - - - - - -
-
89,537
995,654
500,000 - - - - - -
500,000
1,495,654
-
1,792,000 - - - - - -
1,792,000
1,792,000
476,000
2,138,000 - - - - - -
2,138,000
2,614,000
1,561,191
4,430,000 - - - - - -
4,430,000
5,991,191
1,370,060
- - - - - - -
-
1,370,060
191,131
- - - - - - -
-
191,131
-
4,430,000 - - - - -
4,430,000
4,430,000
1,561,191
4,430,000 - - - - - -
4,430,000
5,991,191
Intersection, Signal, and ITS Projects 12
City of Auburn Transportation Improvement Program
S 321st St/46th PI S Intersection Improvements TIP 1-13
Transportation Improvement Program, 2027 - 2032
Project Number: as9004
Project Type: Capacity
Description
This project will construct a single lane roundabout at the intersection and is anticipated to be designed and constructed by King County with funding provided by the City of Auburn under an Interlocal
Agreement.
Project Need
The project addresses an existing intersection delay level of service issue and provides capacity for future growth and development.
Progress Summary
Interlocal agreement negotiations underway in 2025 and 2026.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other (Developer Contribution)
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
50,000 - 50,000 50,000
- - - - - - 250,000 - 250,000 250,000
300,000 - 300,000 300,000
300,000 - 300,000 300,000
300,000 - 300,000 300,000
Intersection, Signal, and ITS Projects 0
City of Auburn Transportation Improvement Program
SE 304th Street/116th Avenue Roundabout
Transportation Improvement Program, 2027 - 2032
Project Number: cp2506
Project Type: Capacity, Non -Capacity
Description
The project will construct a single lane roundabout to replace the current two-way stop control.
Project Need
This project is needed to address an existing intersection delay level of service deficiency and will provide additional intersection capacity to support future growth and development.
Progress Summary
Design underway in 2025 and 2026.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other (Developer Contribution)
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
TIP 1-16
Budget Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027
2027 2028 2029 2030 2031 2032 2032
Total
Total
-
1,025,500 - - - - - -
1,025,500
1,025,500
1,525,000
412,000 - - - - - -
412,000
1,937,000
-
1,262,500 - - - - - -
1,262,500
1,262,500
1,525,000
2,700,000 - - - - - -
2,700,000
4,225,000
1,200,000
- - - - -
-
1,200,000
325,000
- - - - - -
-
325,000
-
2,700,000 - - - - -
2,700,000
2,700,000
1,525,000
2,700,000 - - - - - -
2,700,000
4,225,000
Intersection, Signal, and ITS Projects 14
City of Auburn Transportation Improvement Program
Active Mode Shift Program TIP N-1
Transportation Improvement Program, 2027 - 2032
Project Number: asbd08
Project Type: Capacity
Description
This program funds active transportation improvements that provide connections to transit and regional active transportation facilities as either stand alone projects and/or as improvements included with other
projects.
Project Need
This program supports multi -modal level of service policies in the 2024-2044 Comprehensive Transportation Plan. The improvements constructed with this program encourage and support people to walk, bike,
and ride transit to reduce overall transpiration system capacity needs (encourage a mode shift from vehicle travel modes to active transportation and transit).
Progress Summary
Program funds in 2027 and 2028 are allocated to other projects.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget Budget Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027 2028 2029
2030
2031
2032 2032
Total
Total
- - - 500,000
500,000
500,000
500,000 -
2,000,000
2,000,000
- - - 250,000
250,000
250,000
250,000. -
1,000,000
1,000,000
- - - 750,000
750,000
750,000
750,000 -
3,000,000
3,000,000
- - - 750,000
750,000
750,000
750,000 -
3,000,000
3,000,000
- - - 750,000
750,000
750,000
750,000 -
3,000,000
3,000,000
Non -Motorized and Transit Projects 15
City of Auburn Transportation Improvement Program
Active Transportation - Safety, ADA, & Repair Program TIP N-2
Transportation Improvement Program, 2027 - 2032
Project Number: gcbd01
Project Type: Non -Capacity
Description
This program constructs improvements and repairs throughout the City to address safety and accessibility concerns related to pedestrians and bicyclists. The program replaces damaged sidewalks throughout
the City, adds new curb ramps, replaces existing curb ramps that do not meet current American with Disabilities Act (ADA) requirements, and implements other improvements to support pedestrian and bicycle
safety. A portion of the program funding is provided by fees collected from property owners choosing to pay a fee to the City for replacement of damaged sidewalk sections that they are responsible for (caused
by their private trees)_ Additionally, HUD funds are often (not shown below) transferred into this program to complete accessibility improvements in qualifying neighborhoods. The program is needed to repair and
replace damaged sidewalk facilities, address ADA deficiencies to support the City's ADA Transition Plan, and improve active transportation safety.
Project Need
The program is needed to repair and replace damaged sidewalk facilities, address ADA deficiencies to support the City's ADA Transition Plan, and improve active transportation safety.
Progress Summary
Program is on -going.
Project Activity:
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027
2027
2028
2029
2030
2031
2032 2032
Total
Total
Funding Sources:
Fund Balance General Transportation (102) -
100,000
100,000
100,000
100,000
100,000
100,000 -
600,000
600,000
Fund Balance Capital Improvements (328) -
100,000
100,000
100,000
100,000
100,000
100,000 -
600,000
600,000
Transfer inREET2(331) -
230,000
235,000
240,000
245,000
250,000
255,000 -
1,455,000
1,455,000
Transfer In Impact Fees - Traffic -
-
-
-
-
-
- -
-
-
Transfer In Transportation Benefit District (105) -
-
-
-
-
-
- -
-
-
Grants (Secured) -
-
-
-
-
-
- -
-
-
Grants (Unsecured) -
-
-
-
-
-
- -
-
-
Other -
-
-
-
-
-
- -
-
-
Total Project Funding Sources: -
430,000
435,000
440,000
445,000
450,000
455,000 -
2,655,000
2,655,000
Capital Expenditures:
Pre Design - - - - - - - - - -
Design - 125,000 125,000 125,000 125,000 125,000 125,000 - 750,000 750,000
Right of Way - - - - - - - - - -
Construction - 305,000 310,000 315,000 320,000 325,000 330,000 - 1,905,000 1,905,000
Other - - - - - - - - - -
Total Project Capital Expenditures: - 430,000 435,000 440,000 445,000 450,000 455,000 - 2,655,000 2,655,000
Prior amounts not shown for on -going programs.
Non Motorized and Transit Projects 16
City of Auburn Transportation Improvement Program
R St SE Mobility Improvements TIP N-6
Transportation Improvement Program, 2027 - 2032
Project Number: cp2116
Project Type: Capacity, Non -Capacity, Preservation
Description
Project title was re -named from R St Widening to reflect updated project focus. This project will make improvements from 33rd St SE to 22nd St SE to improve multimodal mobility including a separated multi -use
trail, replacement of the pedestrian traffic signal at 31 st St SE with a full signal at the Game Farm Park driveway, an added southbound lane to the approach of the 29th St SE intersection, a center tum lane
between 29th St SE and 22nd St SE, replaced sidewalks, streetlighting, and replaced signal at the 29th St SE intersection. The project also includes city utility replacements and improvements.
Project Need
This project was identified in the R Street Corridor study completed in 2020. The improvements are needed to provide active transportation facilities that support access to transit and regional trail systems to
reduce the need for system vehicle capacity (mode shift), address existing intersection delay and queuing LOS deficiencies at 29th St SE, and preserve the existing roadway surface (preservation).
Progress Summary
Design and property acquisition underway in 2025 and 2026. Construction is anticipated to start in 2027. Construction funding/expenditures shown prior to 2027 will be carried forward into 2027/2028.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget
Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027
2027
2028 2029 2030 2031 2032 2032
Total
Total
119,000
-
- - - - -
-
119,000
2,684,000
-
197,000 - - - -
197,000
2,881,000
1,000,000
500,000
900,000 - - - - -
1,400,000
2,400,000
-
2,000,000
2,000,000 - - - - -
4,000,000
4,000,000
3,803,000
2,500,000
3,097,000 - - - - -
5,597,000
9,400,000
1,100,000
-
- - - - - -
-
1,100,000
900,000
-
- - - - - -
-
900,000
1,803,000
2,500,000
3,097,000 - - - -. -
5,597,000
7,400,000
3,803,000
2,500,000
3,097,000 - - - - -
5,597,000
9,400,000
Non Motorized and Transit Projects 17
City of Auburn Transportation Improvement Program
Priority RRFB Enhanced Crossings TIP N-8
Transportation Improvement Program, 2027 - 2032
Project Number: as9001
Project Type: Non -Capacity
Description
This project will construct up to 4 enhanced pedestrian crossings at 3 locations, depending on funding availability through the 2026 City Safety and/or other grant programs. The 3 locations are: a midblock
crossing at SE 312th St Approx. 600 feet east of 124th Ave SE, a midblock crossings at SE 312th St Approx 1,100 feet east of 124th Ave SE, and two crossings at the intersection of 132nd Ave SE and SE
308th Street.
Project Need
The project will improve non -motorized safety and access along these roadways.
Progress Summary
Applied for City Safety Grant in 2026. Design start in 2027. Construction 2028 pending grant funding award.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Beneflt District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget
Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027 2027
2028 2029 2030 2031 2032 2032
Total
Total
- 420,000
1,080,000 - - - - -
1,500,000
1,500,000
- 420,000
1,080,000 - - - - -
1,500,000
1,500,000
- 400,000
- - - - - -
400,000
400,000
- 20,000
- - - - - -
20,000
20,000
- -
1,080,000 - - - -
1,080,000
1,080,000
- 420,000
1,080,000 - - - - -
1,500,000
1,500,000
Non -Motorized and Transit Projects 18
City of Auburn Transportation Improvement Program
Arterial and Collector Street Preservation and Replacement Program TIP P-1
Transportation Improvement Program, 2027 - 2032
Project Number: spbd01
Project Type: Preservation
Description
This program funds the preservation and replacement of arterial and collector streets throughout the City as stand-alone projects and/or with other projects.
Project Need
This program supports asset management goals and policies in the Comprehensive Transportation Plan and is needed to efficiently and effectively replace, repair, and maintain the City's roadway pavement.
Progress Summary
The program is funding various projects.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
* Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
, Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 950,000
950,000
950,000
950,000
950,000
950,000 -
5,700,000
5,700,000
- 30,000
985,000
1,700,000
1,825,000
1,825,000
2,200,000 -
8,565,000
8,565,000
- -
850,000
1,850,000
-
-
1,850,000 -
4,550,000
4,550,000
- 980,000
2,785,000
4,500,000
2,775,000
2,775,000
5,000,000 -
18,815,000
18,815,000
- 200,000
750,000
1,250,000
750,000
750,000
1,250,000 -
4,950,000
4,950,000
- 780,000
2,035,000
3,250,000
2,025,000
2,025,000
3,750,000 -
13,865,000
13,865,000
- 980,000
2,785,000
4,500,000
2,775,000
2,775,000
5,000,000 -
18,815,000
18,815,000
Preservation Projects 19
City of Auburn Transportation Improvement Program
Local Street Preservation and Replacement Program TIP P-2
Transportation Improvement Program, 2027 - 2032
Project Number: sobd02
Project Type: Preservation, Non -Capacity
Description
This program funds the preservation and replacement of local streets throughout the City as stand-alone projects and/or with other projects.
Project Need
This program supports asset management goals and policies in the Comprehensive Transportation Plan and is needed to efficiently and effectively replace, repair, and maintain the City's roadway pavement.
Progress Summary
The program is funding various projects.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 350,000
1,950,000
1,950,000
1,950,000
1,950,000
1,950,000 -
10,100,000
10,100,000
- 350,000
1,950,000
1,950,000
1,950,000
1,950,000
1,950,000 -
10,100,000
10,100,000
- 350,000
350,000
350,000
350,000
350,000
350,000 -
2,100,000
2,100,000
- -
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000 -
8,000,000
8,000,000
- 350,000
1,950,000
1,950,000
1,950,000
1,950,000
1,950,000
10,100,000
10,100,000
Preservation Projects 20
City of Auburn Transportation Improvement Program
2027 Local Street Preservation TIP P-5
Transportation Improvement Program, 2027 - 2032
Project Number: cp2511
Project Type: Preservation, Non -Capacity
Description
This project is part of the Local Streets Preservation Program and will complete the following: Grind and overlay 10th St NE (from Auburn Way N to Harvey Rd), 42nd St NE (from C St NE to Auburn Way N), SE
299th St (from 132nd Ave SE to 130th Way SE), SE 307th PI (from 112th Ave SE to 124th'Ave SE), Oravetz PI SE (west of Oravetz Rd SE), S 297th PI/55th PI S (from 51st Ave S to S 300th PI). Full depth
pavement replacement SE 316th St (from 124th Ave SE to 126th Ave SE). Water, sewer, and storm upgrades and replacements.
Project Need
See Local Street Preservation program (P-2)
Progress Summary
Project design is underway in 2025 and 2026.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
450,000 3,000,000 - - - - - - 3,000,000 3,450,000
450,000 3,000,000 - - - - - - 3,000,000 3,450,000
450,000 - - - - - - - 450,000
3,000,000 - - - - - - 3,000,000 3,000,000
450,000 3,000,000 - - - - - - 3,000,000 3,450,000
Preservation Projects 21
City of Auburn Transportation Improvement Program
Lake Tapps Parkway Preservation (Sumner Tapps to 182nd)
Transportation Improvement Program, 2027 - 2032
Project Number: cp2607
Project Type: Preservation, Non -Capacity
Description
This project will grind and overlay the roadway from Sumner Tapps to 182nd and will re-channelize the roadway to include bike lanes.
Project Need
See Arterial Preservation Program.
Progress Summary
Project design underway in 2026.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
TIP P-6
STIP AUB-82
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
Prior to 2027 2027 2028 2029 2030 2031 2032 2032 Total Total
295,000 - - - - - - - - 295,000
- 530,000 - - - - - - 530,000 530,000
792,406 - - - - - - 792,406 792,406
295,000 1,322,406 - - - - - - 1,322,406 1,617,406
295,000 - - - - - - - 295,000
1,332,406 - - - - - - 1,332,406 1,332,406
295,000 1,332,406 - - - - - - 1,332,406 1,627,406
Preservation Projects 22
City of Auburn Transportation Improvement Program
A St SE Preservation (17th St SE to 37th St SE)
Transportation Improvement Program, 2027 - 2032
Project Number: cp2606
Project Type: Preservation, Non -Capacity
Description
This project will grind and overlay the roadway between 17th St SE and 37th St SE.
Project Need
See Arterial Preservation Program.
Progress Summary
Design underway in 2026.
Project Activity:
Budget
Prior to 2027
2027
Funding Sources:
Fund Balance General Transportation (102)
470,000
-
Fund Balance Capital Improvements (328)
-
-
Transfer in REST 2 (331)
-
Transfer In Impact Fees - Traffic
-
-
Transfer In Transportation Benefit District (105)
-
670,000
Grants (Secured)
-
965,000
Grants (Unsecured)
-
-
Other (Developer Contribution)
-
295,000
Total Project Funding Sources:
470,000
1,930,000
Capital Expenditures:
Pre Design
-
-
Design
470,000
-
Right of Way
-
-
Construction
-
1,930,000
Other
-
-
Total Project Capital Expenditures:
470,000
1,930,000
Budget
Forecast
Forecast
Forecast
Forecast
Beyond
2028
2029
2030
2031
2032
2032
Preservation Projects
TIP P-8
STIP AUB-81
TIP Project
Total Total
470,000
670,000
670,000
965,000
965,000
295,000
295,000
1,930,000
2,400,000
- - 470,000
- 1,930,000 1,930,000
1,930,000 2,400,000
23
City of Auburn Transportation Improvement Program
15th Street SW Preservation and Safety TIP P-10
Transportation Improvement Program, 2027 - 2032
Project Number: as9003
Project Type: Preservation
Description
The project will reconstruct the pavement along 15th Street SW between Industry Drive and C Street SW, approximately 2,300 feet. The project will also construct a 12-foot wide separated trail along the south
side of 15th Street SW between C Street SW and the Interurban Trail (located between Perimeter Road and Industry Drive). This completes a gap in the active transportation network between the Interurban
Trail and the C Street Trail. This will provide separation between vehicles and active transportation users, improving safety and comfort.
Project Need
See Arterial Preservation Program.
Progress Summary
Applied for FMSIB PE funds in 2026. Design start in 2028. Construction 2030 pending grant funding award.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget Budget
Forecast
Forecast
Forecast Forecast Beyond
TIP
Project
Prior to 2027 2027 2028
2029
2030
2031 2032 2032
Total
Total
- - 250,000
500,000
375,000
375,000 - -
1,500,000
1,500,000
- - 1,000,000
-
2,500,000
2,500,000 - -
6,000,000
6,000,000
- - 1,250,000
500,000
2,875,000
2,875,000 - -
7,500,000
7,500,000
- - 1,250,000
-
-
- - -
1,250,000
1,250,000
- - -
500,000
-
- - -
500,000
500,000
- - -
-
2,875,000
2,875,000 - -
5,750,000
5,750,000
- - 1,250,000
500,000
2,875,000
2,875,000 - -
7,500,000
7,500,0001
Preservation Projects 24
City of Auburn Transportation Improvement Program
15th St NW Bridge Deck Preservation
Transportation Improvement Program, 2027 - 2032
Project Number: cp2520
Project Type: Preservation
Description
This project will replace the surFace of two bridges on 15th Street NW: the bridge over the BNSF Railway/B Street and the bridge over the UP Railroad tracks.
Project Need
Progress Summary
Design is underway in 2026.
Project Activity:
Budget
Prior to 2027
2027
Funding Sources:
Fund Balance General Transportation (102)
10,000
391,947
Fund Balance Capital Improvements (328)
-
-
Transfer in BEET 2 (331)
-
-
Transfer In Impact Fees - Traffic
-
-
Transfer In Transportation Benefit District (105)
-
-
Grants(Secured)
791,687
2,511,366
Grants (Unsecured)
-
-
Other
-
-
Total Project Funding Sources:
801,687
_ 2,903,313
Capital Expenditures:
Pre Design
10,000
-
Design
791,687
Right ofWay
-
-
Construction
-
2,903,313
Other
-
-
Total Project Capital Expenditures:
801,687
2,903,313
Budget
Forecast
Forecast
Forecast
Forecast
Beyond
2028
2029
2030
2031
2032
2032
Preservation Projects
TIP P-12
TIP Project
Total Total
391,947 401,947
2,511,366 3,303,053
2,903,313 3,705,000
10,000
791,687
2,903,313 2,903,313
2,903,313 3,705,000
25
City of Auburn Transportation Improvement Program
Neighborhood Traffic Safety Program TIP R-1
Transportation Improvement Program, 2027 - 2032
Project Number: gcbd06
Project Type: Non -Capacity
Description
This program funds standalone projects and/or improvements included in other projects that improve safety on neighborhood streets with education, outreach, and physical improvements. The program takes an
areawide approach to traffic calming in residential neighborhoods, which includes community outreach and participation, to ensure the improvements are supported by engineering studies and the community.
Annual focus areas are selected based on a needs evaluation that considers request history, crash history, number of potential through streets between arterials or collectors, and destinations such as schools,
parks, transit stops, and convenience stores. This program supports safety goals and policies in the Comprehensive Transportation Plan and helps improve safety of transportation systems in neighborhoods.
Project Need
This program supports safety goals and policies in the Comprehensive Transportation Plan and helps improve safety of transportation systems in neighborhoods.
Progress Summary
Program is on -going
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in BEET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 305,000
310,000
315,000
320,000
325,000
330,000 -
1,905,000
1,905,000
- 305,000
310,000
315,000
320,000
325,000
330,000 -
1,905,000
1,905,000
- 61,000
62,000
63,000
64,000
65,000
66,000 -
381,000
381,000
- 244,000
248,000
252,000
256,000
260,000
264,000 -
1,524,000
1,524,000
- 305,000
310,000
315,000
320,000
325,000
330,000 -
1,905,000
1,905,000
Roadway Projects 26
City of Auburn Transportation Improvement Program
M Street Underpass (3rd St SE to 8th St SE)
Transportation Improvement Program, 2027 - 2032
Project Number: c201a0
Project Type: Capacity
Description
The project constructed a grade separated crossing of M Street SE and the BNSF Stampede Pass Railroad tracks.
Project Need
The project has improved traffic operations along the M Street SE corridor.
Progress Summary
Construction was complete in 2014. The project is now in Public Works Trust Fund Loan (PWTFL) debt repayment through 2041 _
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in BEET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other (Loan Repayment)
Total Project Capital Expenditures:
TIP R-3
Budget
Budget
Forecast
Forecast
Forecast
Forecast
Beyond
TIP
Project
Prior to 2027
2027
2028
2029
2030
2031
2032
2032
Total
Total
1,625,413
121,380
121,088
120,795
120,503
120,000
120,000
1,066,096
723,766
3,415,275
1,625,413
121,380
121,088
120,795
120,503
120,000
120,000
1,066,096
723,766
3,415,275
1,625,413
121,380
121,088
120,795
120,503
120,000
120,000
1,066,096
723,766
3,415,275
1,625,413
121,380
121,088
120,795
120,503
120,000
120,000
1,066,096
723,766
3,415,275
Roadway Projects 27
City of Auburn Transportation Improvement Program
M St NE Widening TIP R-7
Transportation Improvement Program, 2027 -2032
Project Number: cp2210
Project Type: Non -Capacity, Preservation, Capacity
Description
This project will add a second northbound lane, a center turn lane, wider sidewalks, and street lighting from E Main St to 4th St NE. The project will also replace roadway pavement, city utilities, the traffic signal
at E Main St, and the curb ramps at E Main St and 4th St NE.
Project Need
The project is needed to improve traffic operations along the M Street NE corridor, replace pavement that is in very poor condition, improve level of traffic stress for pedestrians, and replace the E Main St traffic
signal that is nearing end of life.
Progress Summary
Design is underway. A large portion of the funds/expenditures shown as "Prior to 2027" were carried forward into 2027. Planned construction shifted from 2025/26 to 2029130 to allow for non -city utility
relocations, property acquisition, and securing funding.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior to 2027
400,000
745,000
2,000,000
3,145,000
Budget Budget Forecast Forecast Forecast Forecast Beyond TIP Project
2027 2028 2029 2030 2031 2032 2032 Total Total
1,200,000 2,114,159 - - -
- 1,200,000 2,114,159 - - -
388,916 - - - - - -
693,177 - - - - - - -
2,062,907 - - 1,200,000 2,114,159 - - -
3,145,000 - - 1,200,000 2,114,159 - -
400,000
745,000
2,000,000
3,314,159 3,314,159
3,314,159 6,459,159
388,916
- 693,177
3,314,159 5,377,066
3,314,159 6,459,159
Roadway Projects 28
City of Auburn Transportation Improvement Program
East Valley Highway Widening TIP R-26
Transportation Improvement Program, 2027 -2032 STIP AUB-75
Project Number: cp2311
Project Type: Capacity, Preservation
Description
This project improves East Valley Highway from Oravetz PI. SE to the south city limits to provide 2 vehicle lanes in each direction, center turn lane where needed, a separated multi -use trail, utility relocations,
wetland and stream mitigation, storm improvements including replacement of a culvert to provide fish passage, street lighting, traffic signal replacementslimprovements, replaced pavement surface, and ITS
improvements including a dynamic message sign.
Project Need
The project will provide congestion relief along the corridor and provide access for non -motorized users. This project was identified as a recommended project in WSDOT's SR167 Master Plan Study,
Progress Summary
Design, environmental permitting, and preliminary right of way underway.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Budget
Budget
Forecast Forecast Forecast Forecast
Beyond TIP
Project
Prior to 2027
2027
2028
2029 2030 2031 2032
2032 Total
Total
-
-
2,000,000
1,200,000 - - -
- 3,200,000
3,200,000
1,535,677
-
-
470,000 - - -
- 470,000
2,005,677
-
240,323
965,000
500,000 - - -
- 1,705,323
1,705,323
1,939,000
-
5,465,000
- - - -
- 5,465,000
7,404,000
3,474,677
240,323
8,430,000
2,170,000 - - -
- 10,840,323
14,315,000
3,215,000
-
-
- - - -
- -
3,215,000
259,677
240,323
-
- - - -
- 240,323
500,000
-
-
8,430,000
2,170,000 - - -
- 10,600,000
10,600,000
3,474,677
240,323
8,430,000
2,170,000 - - -
- 10,840,323
14,315,000
Roadway Projects 29
City of Auburn Transportation Improvement Program
S 272nd/277th St Corridor Capacity & Non -Motorized Trail Improvements
Transportation Improvement Program, 2027 - 2032
Project Number: cp1821
Project Type: Capacity
Description
This project widened 277th from Auburn Way N to I St NE and added a non -motorized trail.
Project Need
Progress Summary
The project is complete except for the monitoring and occasional improvements to the stream/wetland mitigation site constructed with the project
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
TIP S-2
Budget
Budget Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027
2027
2028 2029 2030 2031 2032 2032
Total
Total
361,634
20,000
20,000 - - - - -
40,000
401,634
361,634
20,000
20,000 - - - - -
40,000
401,634
361,634
20,000
20,000 - - - - -
40,000
401,634
361,634
20,000
20,000 - - - - -
40,000
401,634
Preliminary Engineering and Miscellaneous Projects 30
City of Auburn Transportation Improvement Program
Transit Partnership Routes Program TIP X-1
Transportation Improvement Program, 2027 - 2032
Project Number: NIA
Project Type: Non -Capital
Description
The Lakeland Hills route, PT497, began in 2009. The route is operated in partnership with King County Metro and Pierce Transit. This program provides Auburn's share of operating costs associated with the
Commuter Shuttle (PT497) from the Lakeland Hills neighborhood to Auburn Station per the Interlocal Agreement with King County Metro and Pierce Transit.
Project Need
The City funds one third of the operating costs of Pierce Transit Route 497 to reduce congestion between Lakeland Hills and Downtown, and reduce parking needs around Auburn Station.
Progress Summary
Current interocal agreement extends through 2027.
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REST 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Non -Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 200,000
200,000
200,000
200,000
200,000
200,000 -
1,200,000
1,200,000
- 200,000
200,000
200,000
200,000
200,000
200,000 -
1,200,000
1,200,000
- 200,000
200,000
200,000
200,000
200,000
200,000 -
1,200,000
1,200,000
- 200,000
200,000
200,000
200,000
200,000
200,000 -
1,200,000
1,200,000
Non -Capital Projects 31
City of Auburn Transportation Improvement Program
Bridge Inspection Program TIP X-2
Transportation Improvement Program, 2027 - 2032
Project Number: TBD
Project Type: Non -Capital
Description
This program performs annual bridge inspections and load ratings as needed.
Project Need
This program supports asset management goals and policies in the Comprehensive Transportation Plan and is needed to efficiently and effectively replace, repair, and maintain the City's roadway bridges.
Bridge inspections are a regulatory requirement.
Progress Summary
Program is on -going.
Project Activity:
Budget
Prior to 2027
2027
Funding Sources:
Fund Balance General Transportation (102) -
50,000
Fund Balance Capital Improvements (328)
-
Transfer in REET 2 (331)
-
Transfer In Impact Fees - Traffic
-
Transfer In Transportation Benefit District (105)
-
Grants (Secured)
-
Grants (Unsecured) -
-
Other -
-
Total Project Funding Sources: -
50,000
Non -Capital Expenditures:
Pre Design -
-
Design -
-
Right of Way -
-
Construction -
-
Other -
50,000
Total Project Capital Expenditures: -
50,000
Prior amounts not shown for on -going programs.
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
2028
2029
2030
2031
2032 2032
Total
Total
50,000
50,000
50,000
50,000
50,000 -
300,000
300,000
50,000
50,000
50,000
50,000
50,000 -
300,000
300,000
50,000
50,000
50,000
50,000
50,000 -
300,000
300,000
50,000
50,000
50,000
50,000
50,000 -
300,000
300,000
Non -Capital Projects
32
City of Auburn Transportation Improvement Program
Pavement Ratings Program
Transportation Improvement Program, 2027 - 2032
Project Number: TBD
Project Type: Non -Capital
Description
This program funds the collection of pavement condition index (PCI) data for the City's street system.
TIP X-3
Project Need
This program supports asset management goals and policies in the Comprehensive Transportation Plan and is needed to efficiently and effectively replace, repair, and maintain the City's roadway pavement.
Progress Summary
Program is on -going.
Project Activity:
Budget Budget
Forecast Forecast Forecast Forecast Beyond
TIP
Project
Prior to 2027 2027 2028
2029 2030 2031 2032 2032
Total
Total
Funding Sources:
Fund Balance General Transportation (102)
- 50,000 -
- 50,000 - -
100,000
100,000
Fund Balance Capital Improvements (328)
- - -
- - - - -
-
-
Transfer in REST 2 (331)
- - -
- - - -
-
Transfer In Impact Fees - Traffic
- - -
- - - - -
-
-
Transfer In Transportation Benefit District (105)
- - -
- - - - -
-
-
Grants (Secured)
- - -
- - - - -
-
-
Grants (Unsecured)
- - -
- - - - -
-
-
Other
- -
- - - - -
-
-
Total Project Funding Sources:
- 50,000 -
- 50,000 - - -
100,000
100,000
Non -Capital Expenditures:
Pre Design
- - -
- - - - -
-
-
Design
- -
- - - - -
-
-
Right of Way
- - -
- - - - -
-
-
Construction
- - -
- - - - -
-
-
Other
- 50,000 -
- 50,000 - - -
100,000
100,000
Total Project Capital Expenditures:
- 50,000 -
- 50,000 - - -
100,000
100,000
* Prior amounts not shown for on -going programs.
Non -Capital Projects 33
City of Auburn Transportation Improvement Program
Annual Channelization and Pavement Markings TIP X-4
Transportation Improvement Program, 2027 - 2032
Project Number: TBD
Project Type: Non -Capital
Description
The program will refresh pavement markings, both painted and thermoplastic, and reflective pavement markers (RPMs). The program will also fund channelization revisions identified to increase safety, capacity,
or to accommodate active transportation modes. The program includes work by King County, private contractors, and City forces.
Project Need
Manual of Uniform Traffic Control Devices (MUTCD) requires the City to refresh pavement markings to achieve minimum reflectivity. Refreshing pavement markings supports City safety goals and policies. This
program is needed to supplement Maintenance and Operations - Streets pavement marking program to conform with the MUTCD requirements and due to the need to potentially hire private contractors to do
this work.
Progress Summary
Program is on -going. The TIP reflects the program improvement proposed in the 2027/28 budget
Project Activity:
Funding Sources:
Fund Balance General Transportation (102)
Fund Balance Capital Improvements (328)
Transfer in REET 2 (331)
Transfer In Impact Fees - Traffic
Transfer In Transportation Benefit District (105)
Grants (Secured)
Grants (Unsecured)
Other
Total Project Funding Sources:
Non -Capital Expenditures:
Pre Design
Design
Right of Way
Construction
Other
Total Project Capital Expenditures:
Prior amounts not shown for on -going programs.
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027 2027
2028
2029
2030
2031
2032 2032
Total
Total
- 800,000
750,000
750,000
750,000
750,000
750,000 -
4,550,000
4,550,000
- 800,000
750,000
750,000
750,000
750,000
750,000
4,550,000
4,550,000
750,000
750,000
750,000
750,000
750,000
750,000
4,500,000
4,500,000
- 750,000
750,000
750,000
750,000
750,000
750,000 -
4,500,000
4,500,000
Non -Capital Projects 34
City of Auburn Transportation Improvement Program
Capital Program Indirect Costs TIP X-5
Transportation Improvement Program, 2027 - 2032
Project Number: N/A
Project Type: Non -Capital
Description
The program will partially cover indirect costs associated with the design and construction of transportation projects.
Project Need
The program will support the ongoing design and construction of transportation infrastructure.
Progress Summary
Project Activity:
Budget
Budget
Forecast
Forecast
Forecast
Forecast Beyond
TIP
Project
Prior to 2027
2027
2028
2029
2030
2031
2032 2032
Total
Total
Funding Sources:
Fund Balance General Transportation (102) -
250,000
250,000
250,000
250,000
250,000
250,000 -
1,500,000
1,500,000
Fund Balance Capital Improvements (328) -
-
-
-
-
-
- -
-
Transfer in REET 2 (331) -
-
-
-
-
-
- -
-
-
Transfer In Impact Fees - Traffic -
-
-
-
-
-
- -
-
Transfer In Transportation Benefit District (105) -
-
-
-
-
-
- -
-
-
Grants (Secured) -
-
-
-
-
-
- -
-
-
Grants (Unsecured) -
-
-
-
-
-
- -
-
-
Other -
-
-
-
-
-
- -
-
-
Total Project Funding Sources: -
250,000
250,000
250,000
250,000
250,000
250,000 -
1,500,000
1,500,000
Non -Capital Expenditures:
Pre Design -
-
-
-
-
-
- -
-
-
Design -
-
-
-
-
-
- -
-
-
Right of Way -
-
-
-
-
- -
-
-
Construction -
-
-
-
-
-
- -
-
-
Other
250,000
250,000
250,000
250,000
250,000
250,000
1,500,000
1,500,000
Total Project Capital Expenditures: -
250,000
250,000
250,000
250,000
250,000
250,000 -
1,500,000
1,500,000
Prior amounts not shown for on -going programs.
Non -Capital Projects
35
lntar... den, Signal,
and US Projects
I_I
a.bd47
TratOc Signal Replacement Program
L
gcbdUT
Annual Traf k: Signal Improvement Program
143
e.bdl6
Oynemic Message Sign Program
td
gcbdOg
Street Lighting Improvement Program
L
cj,0611
Harvey Rd NE/Sth St NE Inter.ectlon Improvamenls
L.
TBO
AM11711, Sheet SE lnler.ecllon lmpree.....
IA
ep2610
C St 1,1031d St NW Inlaraeellon Improeamenla
L
cp2319
Lee Hill Rd & 104th Ave SE Roundabout
11-�3
as9004
S321.1 S1146th PIS lnt-elon lmproe....le
I_
cp25116
SE 3041h St-1/1161h Avenue Roundabout
City of Auburn
2027-2032
Transportation Improvement Program Summary
500.000-
- - 1,240,000 - -
75,000
345,000
- - 161.972 -
- - - 100,000
2.050.000 - - 100,000 -
500,000 1,000,000 2,138.000
50.000
1.025.500 - - 412.000 -
- s66,a6g
1.240,000
75,000
345,000
161.972
100,000
2,150,000
- 3,638,000
250,000 300,000
1,262.500 2.700.000
Subtelal Ont.m." on. Signal, and ITS Prol,cle) 3,650,500 - 1,585,000 1.323,972 1.000.000 2,138,000 1 1,512,500 J 11.209,972
AcUva Transportation Projects
-1-1 aA,108 A.Uva Mode Shift Program
N=2 g.bdOl Attlee Trana,.-Hon-S.fny,M)A,&R,palr Program
tL- ep2116 R St SE Mobility lmproeemenla
NA as9001 Priority RRFB Enhanced Crossings
Subtotal (Attlee Tranaporta0on Projects)
P--tion Projects
P_t
spbdOl
Ar.H.1 and Coped.,StrealPleaervatlon and Repla-oht Program
Fzo
cp2601
Lake Tapp. Parkway Preservation (Sumner Tapp, to 182nd)
PA
<p2606
ASt SE Pr ... reatlon(17lh St Sr to 371h St SE)
a.9003
15th Street SW Preservation and Safety
P_12
cp2520
15M St NW Bridge Deck PreservaUon
Armrlal P.... -1ion Fund.
Land In Olhar P,.Jetta
Ar ,W P-ervatioo Program suhlotaY•
P_2
sabd02
Local Sir aelPraservallo" and Replacement Program
PS
c1,2511
2027 Local Street Pre'-H.n
(local.-a-P........
Program Subtotal
2,000.000 I
- - 1.000,000
II 600;0w
600,000 1,455.000 - -
-
- -
2,655,000
-
- - 197,000 1,400,000
4,000,000 -
5.597.000
-
- - - -
-
1.500,000 -
1,500,000
2,600,000
600,000 1,455,000 1,197,000 1 d00,000
-
51500.000 -
12,752.000
5,700,000
- - 8,565,000
-
4,550.000 -
18,815.000
-
- - - 530,000
792,406
- -
1.322.406
-
- - - 670,000
965,000
- 295,000
1,930.000
-
- - - 1,500,000
-
6.000.000
7,500,000
391,947
- - - -
2,611,385
- -
2,903.313
-
- - - 2,257.000
-
- -
2,257,000
6,091,947
- - - 13,522,000
4,260,772
10,550,000 295,000
34,727,719
10.100,000
- - _ _
_
- _
10,100,000
3.000,000
_ _
-
- -
3,000,000.
13,100.000
_ _
_
_ _
13,100.000
Subtotal (Praser2Ron Projects)
19,191,947
13,522,000
4.268,772
10,550,000 295,000
47,827,719
Roadway Projects
P_I gcbd(1S N.Ighbarhood Traffic Safety Program
- -
1.905000 -
-
-
- -
1,906,000
t-3 c201,0 MStreet UWoM,,s lard St SE to 8lh St SE)
- -
- 723.766
-
-
- -
723,766
R c,Ull) MSt NE WIdening
- -
- -
-
-
3,314,159 -
3,314.159
'_, cp2311 East Valley Hlghwy Widening
3,200,000 -
- 470,000
240,323
5.465,000
- -
9.375,323
dubtd o (Road-y P,01-ta)
3.200.000 -
1.905,000 1,193,766
240,323
5,466,000
3,314.159 -
15,318,24.
Preliminary Engl.... Ing and Miscellaneous Projects
_ I pl S21 S M.,1 1111, Sl Corridor Capacity 8 Nan-Moforized Trail Improvo-te
1
40.000
-
-
- -
40,000
Sublotal(Pra6minxry Erglneering and Mle..IN.... a P,,Jacte)
_
_
40.000
Non -Capital P-jacts
X_t gcbd09 Transit Partnarahip Routes Program
1,200,(100 -
- -
-
-
-
1.200.000
" TBO Bridge I .... ction Program
300,000 -
- -
-
-
- -
300,000
X2 TBO Pavement Rating. Pragrem
100.000 _
_
_
-
-
100000
Xl TBo Annual Ch.-Heation and Pavamant Marking,
4,550,000 -
- -
-
-
- -
4,550,000
x_5 1 N/A Capital Program lndlmct Cost.
1.500,000 _
_ _
- -
1.500.000
Subiolel lNan P-1 Projects)
1 7.650.000
1 36,292.447 600.000
1 4.945.000 1 3.754739
1 16.162.323
1 11.971.772
1 19.364.159 1 1,807.500
1 94,797.939 1
P=Phab Enrmcement H,736,000
Funds
Appendix A