HomeMy WebLinkAbout06-03-2026 Agenda Airport Advisory Board
Special Meeting
June 3, 2026 - 8:00 AM
CITY OF Auburn Airport Office
A1JJ31JJI4 Conference Room 1
2143 E Street NE
WASHINGTON Auburn, WA 98002
AGENDA
CALL TO ORDER
PUBLIC PARTICIPATION
A. The Special Municipal Airport Advisory Board Meeting scheduled for Wednesday, June 3,
2026 at 8:00am will be held in person and virtually.
Virtual Participation Link:
To listen to the meeting by phone or Teams, please call the number below or follow the
link:
Telephone: 1-509-530-1507
Conference ID: 326 705 221#
Teams Link: Join the meeting now
Meeting ID: 224 647 651 771 10
Passcode: UB3qK6HQ
ROLL CALL
PUBLIC COMMENT
This is the place on the agenda where the public is invited to speak to the Board on any issue.
A. Participants can provide comments in person or submit written comments in advance of
the scheduled meeting. Participants can submit written comments via mail or email. All
written comments must be received prior to 5:00 p.m. on the day before the scheduled
meeting and must be 350 words or less.
Please mail comments to:
City of Auburn Attn: Angela Klein, Airport Administrative Specialist
2143 E St NE Suite 1
Auburn, WA 98002
Email comments to:
airport@auburnwa.gov
If an individual requires accommodation to allow for remote oral comment because of
difficulty attending a meeting of the governing body, notice of the need for accommodation
is needed by 5:00 p.m. on the day of the scheduled meeting. Participants can request
accommodation to be able to provide remote oral comment by contacting the Airport Office
in person, by phone (253) 333-6821, or email to airport@auburnwa.gov.
Page 1 of 29
APPROVAL OF MINUTES
A. MARCH 18, 2026 REGULAR MEETING MINUTES
DISCUSSION ITEMS
A. AIRPORT STRATEGIC PLAN (40 MIN)
B. CAPITAL PROJECT STATUS AND BOARD TRACKING MATRIX (5 MIN)
GUIDANCE AND INFORMATION ITEMS
A. AIRPORT MANAGER REPORT (10 MIN)
• Discuss Emergency Generator Project
• Discuss Airport Summer Intern Program
• Washington Airport Management Association (WAMA) Conference Update
• Discuss July 3rd Emerald Downs Fireworks Show Airport Logistics
• Discuss Airport Budget
• Derelict Airplanes Project Update
B. AIRPORT ADMINISTRATION REPORT (5 MIN)
• Fuel Sales Update
• Hanger and Tie Down Rent Numbers Update
• Discuss Past and Upcoming Airport Events
C. AIRPORT MAINTENANCE REPORT (5 MIN)
• Wildlife Mitigation
• Airport Maintenance Projects
SCHEDULE FOR UPCOMING MEETINGS
A. 2026 REGULAR MEETING SCHEDULE:
September 16, 2026
November 18, 2026
Unless otherwise noted and advertised, all meetings will start at 8 a.m. and will take place
at the Auburn Airport Office Conference Room 1 located at 2143 E St. NE, Auburn, WA
98002.
*Please note that subject to advanced public notice the Board may elect to schedule
additional special meetings beyond the meeting dates specified above.
ADJOURNMENT
Agendas and minutes are available to the public at the City Clerk's Office and on the City website
(http://www.auburnwa.clov).
Page 2 of 29
*
CITY OF * *
AUBURNAGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject: Meeting Date:
MARCH 18, 2026 REGULAR MEETING MINUTES June 3, 2026
Department: Attachments: Budget Impact:
Public Works March 18 2026 Minutes
Administrative Recommendation:
Approve the minutes for the meeting on March 18, 2026.
Background for Motion:
Background Summary:
See attached.
Councilmember: Staff: Tim Mensonides
Page 3 of 29
Airport Advisory Board
* * Regular Meeting
CITY OF March 18, 2026 - 8:00 AM
AUBI.JRN Airport Office
Conference Room 1
WASH I NGTON
MINUTES
CALL TO ORDER
Chairperson Prasse called the meeting to order and welcomed attendees.
PUBLIC PARTICIPATION
The meeting was held in person and virtually.
ROLL CALL
Present.-Andrea Prasse, Wayne Osborne, Jay Miner, Justin Heater, Deanna Clark
(virtually), Lee Potter
Absent: Greg Ramig
City Staff: Public Works Director Ingrid Gaub, Airport Manager Tim Mensonides, Airport
Administrative Specialist Angela Klein, Airport Operations Specialist Ethan Kimes,
Airport Staff Abbie Weir
AGENDA MODIFICATIONS
There were no modifications to the agenda.
PUBLIC COMMENT
None.
APPROVAL OF MINUTES
It was moved by Board Member Osborne, seconded by Board Member Heater that the
Board approve the Airport Advisory Board minutes for November 19, 2025. Motion
carried, 6-0.
ANNOUNCEMENTS, REPORTS, AND PRESENTATIONS
There were no announcements, reports or presentations.
ACTION ITEMS
None.
DISCUSSION ITEMS
A. 2026 AIRPORT MARKETING FOCUS (10 MIN)
Page 4 of 29
Manager Mensonides discussed the 2026 Airport Marketing Focus including the 2026
annual aviation trade show in Puyallup, south ramp development, and lease space
available at the airport.
Discussion followed.
B. AIRPORT BUDGET AND 2025 PERFORMANCE (5 MIN)
Manager Mensonides shared financial performance for 2025 and discussed fuel sales,
budgets and projects that impacted the budget.
C. CAPITAL PROJECT STATUS AND BOARD TRACKING MATRIX (10 MIN)
Manager Mensonides shared updates on projects at the airport including the E & F
hangar row enclosure project, installation of the AWOS and emergency generator,
pavement maintenance, and building repairs.
Questions and discussion followed.
GUIDANCE AND INFORMATION ITEMS
A. AIRPORT MANAGER REPORT (10 MIN)
Manager Mensonides reported on the status of derelict aircraft removal, a recently
stolen aircraft, new employee Mason Smith, Rainier Flight Services operations, fuel
operations, a plaque stolen from the airport entrance, operations numbers, and the
possibility of acquiring property adjacent to the airport.
Questions and discussion followed.
B. AIRPORT ADMINISTRATION REPORT (5 MIN)
Administrative Specialist Klein reported to the board on fuel and hangar/tie-down
numbers, the hangar wait list, the 2025 annual holiday open house, 2026 Aviation
Conference & Trade Show, and Young Eagles day scheduled for July 11, 2026. Airport
Staff Abbie Weir also reported on the new Auburn Airport coloring and activity book and
Food Truck Fridays that will start in June and run through August.
Questions and discussion followed.
C. AIRPORT MAINTENANCE REPORT (5 MIN)
Operations Specialist Kimes reported on mowing season, fad control, building leaks,
wildlife mitigation efforts and the recent snow.
Questions and discussion followed.
SCHEDULE FOR UPCOMING MEETINGS
A. 2026 REGULAR MEETING SCHEDULE:
Page 5 of 29
June 3, 2026
September 16, 2026
November 18, 2026
Unless otherwise noted and advertised, all meetings will start at 8 a.m. and will
take place at the Auburn Airport Office Conference Room 1 located at 2143 E
St. NE, Auburn, WA 98002.
*Please note that subject to advanced public notice the Board may elect to
schedule additional special meetings beyond the meeting dates specified
above.
ADJORNMENT
There being no further business to come before the Airport Advisory Board, the meeting
was adjourned at 9:04 a.m.
APPROVED this day of 2026.
Angela Klein, Board Secretary
Page 6 of 29
*
CITY OF * *
AUBURNAGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject: Meeting Date:
AIRPORT STRATEGIC PLAN (40 MIN) June 3, 2026
Department: Attachments: Budget Impact:
Public Works Strategic Plan Update Memo,
Exhibit A , SWOT
Administrative Recommendation:
For discussion only.
Background for Motion:
Background Summary:
See attached.
Councilmember: Staff: Tim Mensonides
Page 7 of 29
CITY OF * * Memorandum
WASHINGTON
To: Airport Advisory Board
From: Tim Mensonides, Airport Manager
Cc: Ingrid Gaub, Director of Public Works
Date: May 27, 2026
Re: Airport Strategic Plan Update
In preparation for the Airport Board's update to the Airport Strategic Plan, the existing plan and past
SWOT Analysis have been included in the meeting packet.
The past SWOT Analysis was conducted in 2019 and has been updated to reflect changed conditions
and completed projects. Additionally, Airport Staff added future recommendations (highlighted in yellow)
to the analysis.
At the June 3rd Board Meeting the SWOT Analysis will be updated and from that update a discussion on
the next steps for updating the Strategic Plan will take place.
Airport Staff is recommending the following updates take place in the Strategic Plan:
• Include future Airport Master Plan update
• Increase focus on Key Results Area 1
• Continue improving the Airport and addressing current and future needs with the help of Airport
Staff insights
Page 1 of 1
Page 8 of 29
EXHIBIT A
2021 -2024
STRATEGIC BUSINESS PLAN
, ,i.
. . ... r AUBURNAI 1
. -
LL
.s
_,P*' In honor of
[ommanderFrancis"pack"Scobee
_ 5paoe ca.,,,,,
1986 „'L'i'�:
J
-- _ - rr-1 -
' ".ti p" 4 ,. Fit
t.
_.. ,. + Yps
Auburn Municipal Airport
City of Auburn, Washington
Adopted via Resolution No. 5577(February 16, 2021)
Page 9 of 29
AUBURN
MUNICIPAL
AIRPORTp
�
AUBURN , Wq SryINGTON
ACKNOWLEDGMENTS
Mayor:
Nancy Backus
City Council:
Claude DaCorsi
Bob Baggett
Yolanda Trout-Manuel
Larry Brown
James Jeyaraj
Chris Stearns
Robyn Mulenga
Airport Advisory Board:
Deanna Clark
Danielle Butsick
Sean Marrow
Joe Nessel
Wayne Osborne
Andrea Prasse
Dennis Decoteau
City of Auburn Staff:
Ingrid Gaub, Public Works Director
Tim Mensonides, Airport Manager
Page 11 of 29
TABLE OF CONTENTS
EXECUTIVE SUMMARY 1
GUIDING PLAN PRINCIPLES 2
STRATEGIC PLAN ANALYSIS 4
KEY RESULT AREAS 7
APPENDIX A—BACKGROUND INFORMATION 11
Page 12 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
EXECUTIVE SUMMARY
In 2016, the Airport Advisory Board completed its first Strategic Business Plan and recommended
adoption to the City Council of Resolution 5264, which was adopted on December 19, 2016. The
original plan was for a 4-year period from 2017 to 2020. In 2019, the Board began working on an
update of the plan for the next 4-year period of 2021 to 2024. This included a Strength,
Weaknesses, Opportunities and Threats (SWOT)analysis to assess opportunities that the Airport
is positioned now or in the future to capitalize on and to manage and/or eliminate threats that
could limit current or future successes. From the SWOT analysis, the Board identified key result
areas (KRA's) on which to focus the updated plan and developed the specific goals and priorities
of that plan. The goals within each KRA are intended to be specific work projects or programs
that can be implemented within the time frame of the Strategic Plan. This helps guide the Board,
City Council and staff in strategic decision-making for current and future development and
operations of the Airport.
The Key Result Area's (KRA's) for this plan are as follows:
1. Facility and Infrastructure
The Facility and Infrastructure KRA is focused on maintaining and developing sustainable
facility and infrastructure improvements that maintain and enhance airport operations,
strengthen the airport's economic vitality and ensure fiscal stewardship. In addition, this
area provides for a balancing of new construction with the ability to effectively maintain
and operate current assets in a cost effective and safe manner. This includes goals such
as continued hangar development, identifying potential emerging technologies, and
development potential of the middle ramp.
2. Economic/Community Development
The Economic/Community Development KRA is focused on planning for ongoing and
enhanced sustainable economic development at the Auburn Municipal Airport through
understanding the market needs and opportunities and how to maximize development of
available space on the Airport. This includes goals such as completing the zoning
regulation update, updating the marketing plan as needed, pursuing partnerships and
preliminary work to expand the Airport and pursuing relationships with aviation
educational programs.
3. Operations Enhancement/Expansion
The Operations Enhancement/Expansion KRA is focused on planning for sustainable
airport business operations through optimal and cost-effective airport management and
development and implementation of airport marketing and branding plans. This includes
goals such as changing the night restrictions, identifying a viable instrument approach,
implementing on-Airport wayfinding, exploring broadband services, and continuing to
pursue the next phase of the runway extension.
P7 Page
Page 13 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
GUIDING PLAN PRINCIPLES
The development and implementation of the Auburn Municipal Airport Strategic Business Plan
is guided by the following City of Auburn principles pertaining to the governance and operation
of the City of Auburn:
CITY VISION STATEMENT
Your Premier Community with Vibrant Opportunities
CITY MISSION STATEMENT
To provide a service-oriented government that meets the needs of
our residents, citizens and business community.
CITY CORE VALUES
• Innovative
• Respectful
• Dedicated
• Hard-Working
• Ethical; Fair
' Environmentally Sensitive
• Trustworthy
• Financially Responsible
• Charitable
• Safe
• Transparent
• Engaged
' Responsive
• Supportive of the Arts
' Supportive of Life-Long Learning
• Embrace Diversity (Pluralistic)
P7 2 I Page
Page 14 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
AIRPORT VISION STATEMENT
Provide our community superior aviation facilities, custom solutions, and continued and
sustainable economic development as judged by our customers and community.
AIRPORT MISSION STATEMENT
Our Mission is to:
• Be a gateway to Auburn and the Puget Sound Region (1)
• Promote Aviation at the airport and within the community (2)
• Provide a high level of operational excellence (3)
• Be environmentally and economically responsible (4)
• Provide safe and secure aviation facilities (5)
*Note:the numbering provided above is not by order of priority but to provide a reference within the KRA goals to the Airport
mission.
A 3 I Page
Page 15 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
STRATEGIC PLAN ANALYSIS
This Strategic Business Plan is intended to be a "living document."While working within a four(4)-
year planning horizon, it is anticipated and expected that all parties will have the opportunity to
utilize, assess and modify the Plan as needed to ensure that it is providing valuable guidance on
policies, strategies, actions and expenditures relating to the growth and operation of the Airport.
The Plan covers a four(4)-year period from 2021 to 2024 that aligns with the City of Auburn's
biennial budget cycle. This alignment is purposeful and is intended to allow City Council, the
Airport Advisory Board and City staff to address needed actions and desired expenditures within
the framework of the adopted budget for the Airport Enterprise Fund. The Airport Enterprise Fund
within the City of Auburn's governmental financial model is a type of proprietary fund in which the
direct beneficiaries pay for all costs of the fund through fees and leases. The Public Works
Department, which is responsible for the management of the Airport, periodically reviews
revenues and expenses and adjusts priorities to ensure that the Airport remains sustainable.
The Airport Advisory Board completed a Strengths, Weaknesses, Opportunities and Threats
analysis which identified many elements both positive and negative for the Airport's future
sustainability. Following this analysis, the Board refined the goals of the plan to determine the
key areas that would provide the most potential benefit to the long-term success of the Airport
balanced with the ability of the airport to resource and fund the needs identified. The Key Results
Areas (KRAs) and goals identified in the next section are the result of this process. Each KRA
was identified for a specific purpose to provide the Airport with the revenues to meet the service
needs of the tenants and businesses located on the Airport while ensuring continued safe
operations of the Airport in a sustainable way. An additional element included how to leverage
the current market and changes in operations at other local airports that are affecting the general
aviation industry in the Puget Sound area so that Auburn is positioned to benefit.
The Auburn Municipal Airport is advantageously located within the Puget Sound Region on 110
acres in North Auburn. The Airport is located one mile north of the downtown Auburn urban
center, has easy access to Highway 167, U.S. Interstate 5, and Highway 18. It is bordered by
major arterial roadways on its south and north ends (15th Street N.E. and 30th Street N.E.) and
is surrounded by commercial and industrial developments. Some surrounding areas are currently
underutilized and have the opportunity to redevelop in the future. The City has some ability to
influence any redevelopment to enhance compatibility with the Airport.
The Auburn Municipal Airport has been directly operated by the City as an Enterprise Fund since
its inception in 1969. By the end of 2020, with the final payment of an interfund loan for a hangar
enclosure, the Airport is debt-free and fully financed from self-generated revenues and grants.
The Airport currently has several commercial tenants providing aircraft maintenance or other
services, and Airport Management staff provides on-site operations, facilities management and
aircraft fueling.
The Airport's annual revenue generated from fees for services and leases is approximately $1.4
million. Annual operating expenditures are approximately $1.0 million, though each year has
some variation depending on maintenance needs. The remaining revenues are used for capital
and major facility maintenance projects.
A4 I Page
Page 16 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
Capital projects are funded through a combination of Federal and/or State grants and Airport
revenues or solely by the Airport revenues. The Federal Aviation Administration and the
Washington State Department of Transportation Aviation Division provide grants typically for
projects which support airport infrastructure that do not directly produce revenue; examples
include runway/taxiways and airfield lighting. Grants through these programs are also very
competitive as there is not enough funding to complete all projects requested by qualifying
airports. Therefore, funding for facilities such as hangars, offices, security, parking and utilities
are not eligible for grant funding and must be paid for solely by Airport revenues. This means that
the Airport must have a financially sustainable plan for maintenance of its existing facilities and
for how it develops opportunity areas to ensure that revenues collected continue to pay for
operations and ongoing facility maintenance needs.
According to recent Airport Management records, the airport currently has 330 based aircraft with
140,000 total annual operations (takeoff or landing). The Airport's current fleet mix includes single-
engine piston aircraft, multi-engine piston aircraft and helicopters. The Airport does not anticipate
a significant change in the fleet mix in the near future and has seen an increased demand for
hangar space due to regional shifts away from serving smaller and nonbusiness aircraft at airports
such as Boeing Field and Renton. However, to maintain the Airport's sustainability, the Airport
needs a healthy mix of airport-based businesses and general aviation tenants. Currently, the
Airport's hangar spaces are fully occupied with a significant waitlist for new tenants that can take
up to two (2) years for them to achieve a space at the Airport. This high demand has been in
place for several years, and even during the 2020 pandemic the Airport has seen little reduction
in this demand. This is a driving force behind the need to develop more hangar spaces to meet
the growing demand. In addition, as the based aircraft numbers increase there will continue to
be an increased demand for more aviation services to be located at the Airport to meet these
needs.
The Airport has one runway that was extended to 3,841 feet in 2020. It was last slurry sealed in
2014 and has a current Pavement Condition Index of 68 and 71 out of 100. The PCI is a rating
that determines what type of preservation work may be needed to keep the runway functioning
sufficiently for safe aircraft operations. A rating of 68 and 71 indicates that the pavement is in
need of rehabilitation work in the next few years to maintain operations.
The Airport has one instrument approach that allows pilots to descend to 920 feet by flying solely
on reference to instruments inside their aircraft. The approach is currently not authorized at night
due to 33 obstructions in the vicinity of the Airport. Once the obstructions are mitigated, the night
restrictions will be removed. To increase access to the Airport in poor weather visibility conditions,
an approach with the ability to descend to a lower altitude is needed. The FAA has determined a
redesigned approach could allow aircraft to descend to 600 feet.
Auburn Municipal Airport does not have an automated weather observation system located on
the airport; one is planned to be installed in 2025. The airport does have an unofficial
"SayWeather" system which provides altimeter setting, wind data, temperature, dew point and
density altitude.
Auburn Municipal Airport accommodates a wide variety of aeronautical activity, including small
single and multi-engine aircraft, civilian helicopters, and occasional business class turbine aircraft.
Auburn Municipal Airport is classified as a Reliever airport in the National Plan of Integrated
A5 I Page
Page 17 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
Airport Systems (NPIAS) defined by the Federal Aviation Administration (FAA). Reliever airports
are intended to provide additional general aviation capacity to nearby commercial service airports.
The existing and future design aircraft identified in the Airport Master Plan is a multi-engine
aircraft. In addition to the typical range of general aviation activity, the potential exists for Auburn
Municipal Airport to accommodate small cargo aircraft. Several of these aircraft fall into the FAA
defined category of "small airplanes with 10 or more seats." The FAA runway length model
indicates that 4,060 feet is required to accommodate small airplanes with 10 or more seats at the
Auburn Municipal Airport. The Master Plan currently identifies a potential runway extension to
4,118 feet from the current 3,841 feet; however, 30th Street NE is located within what would be
the Runway Safety Area for the fully extended runway, and more coordination with the FAA on
how to accomplish this future extension is needed to determine its true viability.
Moving forward, a substantive planning effort to update the Strategic Business Plan should begin
in the third year of the Plan to allow for adequate opportunity to engage key external stakeholders,
complete needed investigations and analyses, coordinate with City Administration, City Council
and appropriate City Departments and prepare, review and finalize the Plan update. This
substantive effort should be completed by no later than the end of the fourth (4) year.
A6
Page 18 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
N
En
(KRA35 EIJI
16 Jis
Iw
v
KRA 2-3
Note: KRA's not depicted
here are considered
Airport wide goals and are
- -: ,
not specific to an
individual location on the
�� A
Airport.
M
L. i
3 I:.
'> North
d F Tie-Downs LL Self Sent
P4 KRA 1-3 Tie-Downs
■
TP
it portOffice
KRA 2-4 " Wash Rack
iiiim
rA
3
al
r~
aft
Sara
Tiebosv►rs) (4
KRA 1-1
______
P,1 7 I Page
Page 19 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
KEY RESULT AREAS
KRA 1: Facility and Infrastructure
With input from the Airport Advisory Board, City Council and community stakeholders, Auburn will
plan for sustainable facility and infrastructure improvements that maintain and enhance Airport
operations, strengthen the Airport's economic vitality and ensure fiscal stewardship of the Airport
Enterprise Fund balancing new construction with the ability to effectively maintain and operate current
assets in a cost-effective and safe manner.
Goal # Key Result Narrative Description Airport Anticipated Anticipated
Area/Goals Mission Start Date Completion
Date
1-1 Continued Hangar This program will continue to seek out 1, 2, 5 2022 On-going
Development and develop additional opportunities
for New Hangar Development beyond
the hangars already under design in
2020 in order to address the continued
high demand for hangar space and to
meet the needs of our individual and
business tenants.
1-2 Emerging As development of facilities occurs on 3, 4, 5 On-going On-going
Technologies the Airport, incorporate improvements
where feasible and affordable to allow
for potential new technologies being
developed in the aviation industry.
1-3 Middle Ramp This project would be the development 1, 2, 3, 5 2022 2026
Development or redevelopment of the middle ramp
area of the Airport to accommodate
Airport offices, improved access and
parking. There are additional
opportunities to seek partnerships with
those seeking to develop spaces for
business or restaurant uses.
P7 8 I Page
Page 20 of 29
KRA 2: Economic/Community Development
With input from the Airport Advisory Board, City Council and community stakeholders, Auburn will
plan for ongoing and enhanced sustainable economic development at the Auburn Municipal Airport
through: a) a comprehensive understanding of the Airport's market niche and growth opportunities;
b) implementing short-term and long-term strategic airport economic development actions; c)
positioning of existing development sites to maximize future return on investment potential; and d)
gaining understanding of opportunities and limitations for future on-Airport growth. These efforts
will maintain and enhance airport operations, strengthen the Airport's economic vitality and ensure
fiscal stewardship of the Airport Enterprise Fund.
Goal # Key Result Narrative Description Airport Anticipated Anticipated
Area/Goals Mission Start Date Completion
Date
2-1 Airport Zoning Coordinate with Community Dev. 1, 2, 4 2020 2021
Regulations Update to assess and potentially
implement new zoning regulations
amendments to current City zoning
standards for the Airport and
surrounding properties to address
operational needs or requirements
and support current and future
economic development efforts.
2-2 Airport Marketing Prepare an annual marketing plan 1, 2 On-going On-going
Plan that will act as a communication
and implementation tool to achieve
the goals established for the
Airport each year and be
responsive to changing market
conditions and needs with a focus
on marketing and leasing the two
on-airport development sites
approved in the approved Airport
Master Plan to prospective tenants
and developers. Other areas of
focus are emerging technologies,
alternative fuels, recruitment of on-
airport Businesses, and better
incorporation of the Airport into
other City events. Current focus for
on-airport business development
includes expanded flight training,
permanent maintenance facility,
expansion of avionics and
restaurant opportunities.
A9 I Page
Page 21 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
KRA 2 (Continued): Economic/Community Development
With input from the Airport Advisory Board, City Council and community stakeholders, Auburn will
plan for ongoing and enhanced sustainable economic development at the Auburn Municipal Airport
through: a) a comprehensive understanding of the Airport's market niche and growth opportunities;
b) implementing short-term and long-term strategic airport economic development actions; c)
positioning of existing development sites to maximize future return on investment potential; and d)
gaining understanding of opportunities and limitations for future on-airport growth. These efforts
will maintain and enhance airport operations, strengthen the Airport's economic vitality and ensure
fiscal stewardship of the Airport Enterprise Fund.
2-3 Airport Expansion Pursue opportunities for physical 1, 2, 5 On-going On-going
Areas growth of the Airport consistent
with the approved Airport Master
Plan including opportunities for
Partnerships for both on-airport
and adjacent property
development.
2-4 Airport West Side Conduct an environmental analysis 4, 5 2020 2020
Environmental of the west side development area
Analysis to confirm the location and extent
of wetlands/environmental
resources, potential mitigation
strategies and anticipated
mitigation costs
2-5 Build Relationships Strengthen and Develop 1, 2 On-going On-going
with Education Opportunities with aviation
Programs in the Puget programs at Green River College,
Sound Region Auburn School District and possibly
Federal Way or Kent School
Districts for use of Auburn Airport
in their programs.
2-6 Recommendations - Working with the Board and City 1, 2, 3 On-going On-going
City's 10-Year Administration, evaluate and
Economic implement recommendations of
Development the City's 10-Year Economic
Strategic Plan Development Strategic Plan
A 10 1 Page
Page 22 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
KRA 3: Operation Enhancement/Expansion
With input from the Airport Advisory Board, City Council and community stakeholders, Auburn
will plan for sustainable airport business operations through optimal and cost-effective airport
management, focused work efforts for the Board, and Airport management, development and
implementation of Airport marketing and branding plans.
Goal # Key Result Narrative Description Airport Anticipated Anticipated
Area/Goals Mission Start Date Completion
(Not in Priority Date
Order)
3-1 Night Work with adjacent properties and the 3, 5 2019 2020
Restrictions FAA to address obstructions and allow a
change to the night restrictions that
exist at the Airport.
3-2 Viable Work with FAA to determine the steps 3, 5 2020 2024
Instrument and work necessary to create a viable
Approach instrument approach for the airport.
3-3 On-Airport Continue improvements to on-airport 3, 5 2021 2021
Wayfinding signage to improve information for
Improvements airport users to find amenities and
businesses on the airport
3-4 Airport Extend City's Municipal Broadband 2, 3 2021 2021
Municipal service to the Airport. Currently,the
Broadband City's high-speed fiber optic network
Service has been extended to the Airport.
Building off of this network, wireless
broad band services will be installed at
the Airport for use by tenants, guests
and visitors to provide a valuable user
experience.
3-5 Airport Continue to pursue the necessary 1, 2, 3,4, 5 On-going On-going
Runway approvals from the FAA to extend the
Extension runway to the ultimate length as shown
in the 2015 Airport Master Plan.
PI 11 I Page
Page 23 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
APPENDIX A— BACKGROUND INFORMATION
City of Auburn Information:
The City of Auburn is an incorporated city of approximately 82,000 persons located in Southwest
King County and a small area of Northeastern Pierce County, approximately 26 miles south of
Seattle and 13 miles northeast of Tacoma. Auburn is bordered by the cities of Kent, Federal Way,
Pacific, Sumner and Algona, and unincorporated King and Pierce Counties. The Muckleshoot
Indian Reservation is located near the southeastern corner of the Auburn city limits. Within the
Puget Sound region, King County is bordered by Snohomish County (north) and Pierce County
(south). Kitsap, Kittitas, and Chelan counties also border King County to the west and east.
The City of Auburn was incorporated in 1891. The City is organized as a non-charter code city
retaining the council-mayor plan of government under which the city is presently operating, as
provided in RCW 35A.02.030 of the Optional Municipal Code for the State of Washington. The
Mayor is the Chief Administrative Officer for the City. There are currently seven (7) major
Departments of the City comprised of Administrative Services, Community Development and
Public Works, Finance, Innovation and Technology, Human Resources/Risk Management, Legal,
Parks, Arts and Recreation, and Police.
Auburn Municipal Airport Background:
The Auburn Municipal Airport (S50) is a municipal airport owned and operated by the City of
Auburn, Washington. Beginning in 1974 and continuing to the present, the Auburn Airport
Advisory Board has provided advisory support to the Auburn City Council and the Mayor or Chief
Administrative Officer for the City on Airport planning and operations.
All existing landside development (hangars, aircraft parking, etc.) is located on the east side of
the airport. An undeveloped area (approximately 23 acres) is located near the southwest corner
of the airport.
As described in the 2015 Airport Master Plan Update, the Airport's current mix of based aircraft
is projected to become more diverse reflecting growth in turbine aircraft (turboprop, very light jet,
business jet), helicopters, and light sport aircraft. It is recognized that runway length limits the
larger aircraft that can be accommodated at the Airport on a regular basis.
In Spring 2015, the City of Auburn completed an update of the Airport Master Plan that was
previously updated in 2002. The 2002 Airport Master Plan provided the primary airport planning
guidance for the Airport for over ten years. The recent Master Plan update was completed in
cooperation with the Federal Aviation Administration to address the Airport's needs over a
twenty(20)-year planning period and provide specific guidance in making the improvements
necessary to maintain a safe and efficient airport that is economically, environmentally, and
socially sustainable.
The purpose of the Airport Master Plan is to define the current, short-term and long-term needs
of the Airport through a comprehensive evaluation of facilities, conditions and FAA airport
planning and design standards. The study will also address elements of local planning (land use,
transportation, environmental, economic development, etc.) that have the potential of affecting
the planning, development and operation of the Airport.
Al2 I Page
Page 24 of 29
AUBURN MUNICIPAL AIRPORT: 2021-2024 STRATEGIC BUSINESS PLAN
Key Result Area Background:
Within the Plan there are several Key Result Areas (KRAs). The KRAs are broad-based goals
and are re-evaluated annually and incorporated within the four-year Strategic Business Plan.
Each KRA has a mission statement that describes the intent of each area. Additionally, each KRA
has various goals which describe in greater detail the elements of each KRA, including the priority,
a narrative description, and estimated start and completion dates. The KRAs are organized by
subject matter and are listed in the order of priority. It is expected that the Board and staff will
utilize the goals specified in each of the KRAs for the development and implementation of annual
work plans.
The development of the Key Result Areas has been based in part of the application of the SMART
model' for goal setting as described below:
Specific—simple, straightforward, compelling (without specificity, a goal can never truly be
reached).
Measurable—tangible, able to be tracked (an effective goal requires a statement of the tangible
evidence that the goal has been reached).
Attainable—possible, yet challenging enough to be motivating. If a goal requires an organization
to reach beyond its true self, the goal will become burdensome and ultimately detrimental to the
process. However, the goal should be challenging enough to cause the Airport's policymakers,
management, and staff to "rise up" to achieve it.
Relevant—important to stakeholders and connected to the organization's values. Goals that are
explicitly connected to values are motivational and, generally, easier to achieve as a result.
Time Bound—includes a beginning and ending point. Identifying start and end dates provides
the "race-track" needed to keep the organization on course with a clear finish line to pursue.
1 Source:Airport Cooperative Research Program (ACRP),ACRP Report 77, Guidebook for Developing General
Aviation Business Plan,2012
Pt 13 I Page
Page 25 of 29
AIRPORT ADVISORY BOARD SWOT ANALYSIS (October 18, 2019)
Facilities and Infrastructure, Economic/Community Development, Operations Enhancement/Expansion
STRENGTHS (+) WEAKNESSES (-)
• Great location for training (airspace) • Aging infrastructure
• Council Support • Not a viable inc&u;mentappr
• Central Setting (close to downtown) • No Fixed Base Operator
• High Regional demand for hangar space (no vacancy) • Visual Perception derelict aircraft, surrounding area appearance
• Runway length extended to 3800 feet in 2020 • Lack of available land for Airport Development
• Financially sound • Airport is not part of the identity of surrounding businesses
• Safety • Nc tc'aining facility/flight school
• Well Run Airport • Lack of hangar space
• Regional Asset: GA Reliever • Lack of amenities—airport restaurant etc...
• Tenant Base: Strong Supportive community • Lack of promotion
• Community Support: minimal noise complaints • City plmning airport plays a fao or in planning end surrounding
• Connectivity to transportation development
• New instrument approach, runway pavement, official weather • Lack of capital funding
• Communication • Lack of aircraft maintenance
• Young Eagle Day • Busy pattern with training aircraft
OPPORTUNITIES (+) THREATS (-)
• Runway Extension • Obstructions/encroachment
• Space Available on existing site to develop • Economic Downturn
• Partner with City events—include Airport • of 100LL
• FATPNW growing aviation community in the region • GA long term Decline
• Additional Hangars • Condition of facility
• Open to future opportunities for emerging technology Electric • Public Safety concerns in surrounding area
Aircraft • Limited land available: wetland/environmental issues
• Middle Ramp possibilities/future plans/airport partnership • Political Climate-local, state, national
• Interface with Green River College • Aviation mechanic shortage
• Business Aviation—alternate revenue source-projected to • Federal Regulations/FAA
increase • Noise Abatement
• Aviation business opportunities • Land acquisition process
• Fill GA niche in region • External Investment for new development
• Airport Loaner t'arrportation
• Urban Air Mobility
• SE Ramp Development
Page 26 of 29
*
CITY OF * *
AUBURNAGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject: Meeting Date:
CAPITAL PROJECT STATUS AND BOARD TRACKING MATRIX (5 MIN) June 3, 2026
Department: Attachments: Budget Impact:
Public Works Capital Project and Board
Tracking Matrix
Administrative Recommendation:
For discussion only.
Background for Motion:
Background Summary:
See attached.
Councilmember: Staff: Tim Mensonides
Page 27 of 29
Capital Projects
Capital Project Status
LEAD PROJECT DESCRIPTION CURRENT STATUS WHAT'S NEXT STAFF START DATE EST.COMPL. EST.COST
DATE
City/CW F Hangar Row Upgrades Bids Due June 4th Bid Award, Construction Moyer/Mensonides Nov-25 Feb-27 $ 2,400,000
City/CW AWOS, Beacon, Emergency Phase 2: installation of equipment: starting June 1st Installation emergency generator, FAA certificaiton of Wickstrom/ Nov-23 Sep-26 $ 1,111,110
Generator AWOS Mensonides
(95/5)
City Annual Pavement Maintenance Planning 2026 projects Mensonides May-26 Nov-26 $ 150,000
Annual Maintenance and Repair
City of Facilities Completed electrical upgrades of E14, 13, 12, 11 Complete remainder of E row before July Mensonides Jan-26 Dec-26 $ 100,000
City/CW Airport Master Plan Planning&Securing FAA funding Scoping Mensonides Jan-30 Jan-32 $ 5,000,000
(90/10)
Page 28 of 29
AIRPORT BOARD - TRACKING MATRIX
KRA Key Result Area/Goals Lead Narrative Description StartI
Completion Date
Reference [1] (Not in Priority Order) Date
Develop new hangars on the SE corner of the airport with multiple businesses
1-1 Continued Hangar Public Works Director/Airport placed in larger box style hangars. Seek opportunities for additional hangar 1Q 2020 On going
Development Manager development on the airport to address the high demand for hangar space within the
region.
Airport Manager/Public Works Redevelopment of the middle ramp area to accommodate the Airport Office,
1-3 Middle Ramp Development Director improve access and parking. Seek partnerships for development of space for 3Q 2022 On going
additional business use.
Annual review of the Airport Marketing Focus to be responsive to changing market
conditions and needs with a focus on marketing and leasing the two on airport
Public Works Director/Airport development sites approved in the approved Airport Master Plan to prospective
2-2 Airport Marketing Focus Manager/Airport Advisory tenants and developers. Other areas of focus are emerging technologies, alternative 1Q 2026 March 2026
Board/Economic Development fuels, recruitment of on airport Businesses, and better incorporation of the Airport
into other City events. Current focus for on airport business development includes
expanded flight training, permanent maintenance facility, expansion of avionics and
restaurant opportunities.
Airport Manager/Public Works Pursue opportunities for physical growth of the Airport consistent with the approved
2-3 Airport Expansion Areas Director Airport Master Plan including a runway extension and opportunities for partnerships 1Q 2023 On going
for both on-airport and adjacent property development.
N/A N/A Airport Manager/Public Works Review of current Airport strategic plan 2Q 2026 2Q 2026
Director
N/A N/A Airport Manager Development of Airport Emergency Plan and Exercise 1Q 2026 1Q 2027
N/A Annual Tasks Public Works Director/Airport
Staff/Airport Advisory Board 1. Annual Fee Update Antcipated: September
2. Capital Improvement Plan Update Antcipated:September
3. Board Composition Review Anticipated: November
4. Board Work Plan Update for 2027 Anticipated: November
[1] KRA 1 = Facility& Infrastructure; KRA 2 = Economic/Community Development; KRA 3 = Operation Enhancement/Expansion