HomeMy WebLinkAbout09-09-2026 Agenda Packet
Planning Commission
Special Meeting
September 9, 2026 - 6:00 PM
City Hall Council Chambers
AGENDA
CALL TO ORDER
PUBLIC PARTICIPATION
A. The Special Planning Commission Meeting scheduled for Wednesday, September 9, 2026,
at 6:00 p.m. will be held in person and virtually.
Virtual Participation Link:
Join from PC, Mac, iPad, or Android:
https://us06web.zoom.us/j/88477051814
Phone one-tap:
+12532050468,,88477051814# US
+12532158782,,88477051814# US (Tacoma)
Join via audio:
+1 253 205 0468 US
+1 253 215 8782 US (Tacoma)
877 853 5257 US Toll Free
888 475 4499 US Toll Free
Webinar ID: 884 7705 1814
PLEDGE OF ALLEGIANCE
ROLL CALL
PUBLIC COMMENT
A. The public can participate in-person or submit written comments in advance.
Participants can submit written comments via mail or email. All written comments must be
received prior to 5:00 p.m. on the day before the scheduled meeting and must be 350
words or less.
Please mail written comments to:
City of Auburn
Attn: Tammy Gallier, Administrative Specialist
25 W Main St
Auburn, WA 98001
Email written comments to: planning@auburnwa.gov
If an individual requires accommodation to allow for remote oral comment because of a
difficulty attending a meeting of the governing body, the City requests notice of the need for
Page 1 of 207
accommodation by 5:00 p.m. on the day before the scheduled meeting. Participants can
request accommodation to be able to provide a remote oral comment by contacting the
Community Development Department in person, by phone (253) 931-3090 or by email
(planning@auburnwa.gov.)
APPROVAL OF MINUTES
A. August 4, 2026 Draft Minutes from the Regular Planning Commission Meeting
BUSINESS ITEM #1
A. 2026 Map Amendments to the Comprehensive Plan
Staff Introduction/Presentation (Usman Adam)
Staff to provide a brief presentation on the City-Initiated Map Amendments; amending both
the Comprehensive Land Use Map and the Zoning Map.
BUSINESS ITEM #2
A. 2026 Text Amendments to the Comprehensive Plan
Staff Introduction/Presentation (Clark)
Staff to provide a brief presentation on the 2026 City-Initiated Text Amendments.
BUSINESS ITEM #3
A. Development Agreements Code
Staff Introduction/Presentation (Sturza)
Staff to provide a brief presentation to create a new Chapter 18.80 of the Auburn City Code
establishing a comprehensive framework for the use and administration of Development
Agreements within the City of Auburn.
ADJOURNMENT
The City of Auburn Planning Commission is a seven member advisory body that provides
recommendations to the Auburn City Council on the preparation of and amendments to land use
plans and related codes such as zoning. Planning Commissioners are appointed by the Mayor and
confirmed by the City Council.
Actions taken by the Planning Commission, other than approvals or amendments to the Planning
Commission Rules of Procedure, are not final decisions; they are in the form of recommendations to
the City Council which must ultimately make the final decision.
Page 2 of 207
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
August 4, 2026 Draft Minutes from the Regular Planning Commission
Meeting
September 9, 2026
Department: Attachments: Budget Impact:
Community Development 08.04.26 P.C. Draft Minutes
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Draft Minutes
Councilmember: Staff: Jason Krum
Page 3 of 207
Planning Commission
Regular Meeting
August 4, 2026 - 7:00 PM
City Hall Council Chambers
MINUTES
CALL TO ORDER
Chair Judi Roland called the meeting to order at 7:00 p.m. in the Council Chambers of
Auburn City Hall, 25 West Main Street.
PUBLIC PARTICIPATION
The City of Auburn Planning Commission Meeting was held in person and virtually.
PLEDGE OF ALLEGIANCE
Chair Roland led those in attendance in the Pledge of Allegiance.
ROLL CALL
Commissioners present: Chair Judi Roland, Vice Chair William Stewart, Julie Berry,
Aaron Vanderpol, Lynn Walters, and Kirk Hiller. Commissioner Adib Altallal was
excused.
Staff members present: Planning Services Manager Alexandria Teague, Senior Planner
Dinah Reed, Senior City Staff Attorney Chandra Hein, and Deputy City Clerk Rebecca
Wood-Pollock.
AGENDA MODIFICATIONS
There were no modifications to the agenda.
PUBLIC COMMENT
No one came forward to speak.
APPROVAL OF MINUTES
A. July 7, 2026 Draft Minutes from the Regular Planning Commission Meeting
Commissioner Walters moved and Commissioner Hiller seconded to approve
the July 7, 2026 Planning Commission Meeting minutes.
MOTION CARRIED UNANIMOUSLY. 6-0
BUSINESS ITEM #1
A. Daycare Code Update
Page 4 of 207
Staff Introduction/Presentation (Reed)
Text amendment to Daycare standards to comply with House Bill (HB) 5509,
intended to regulate the siting of child care centers as an outright permitted
use in all zones except industrial zones and open space zones.
Planner Reed shared a presentation with the Commission on the Daycare
Code Update, including its purpose, text amendment changes, and Staff's
request.
B. Public Hearing
Chair Roland opened the Public Hearing at 7:07 p.m.
No one came forward to speak.
Chair Roland closed the Public Hearing at 7:08 p.m.
C. Deliberation and Vote
The Commission discussed increases in childcare facilities for the City and
expressed support for compliance with Washington State guidelines.
Vice Chair Stewart moved and Commissioner Vanderpol seconded to
recommend to City Council the adoption of the the Daycare Code Update as
recommended by Staff.
MOTION CARRIED UNANIMOUSLY. 6-0
BUSINESS ITEM #2
A. Live/Work Code Update
Staff Introduction/Presentation (Reed)
Text amendment to update the Live/work use and supplemental development
standards associated with the use that would set clear and objective standards
for new Live/work units (buildings) and for re-purposing existing buildings into
Live/work units.
Planner Reed shared a presentation with the Commission on the Live/Work
Code Update, including its purpose, examples of Live/Work spaces,
supplemental standards, an overview of the steps in the application process,
text amendments, and Staff's request.
The Commission discussed retired business owners and vacant commercial
spaces, parking requirements, and existing Live/Work proposals.
B. Public Hearing
Chair Roland opened the Public Hearing at 7:21 p.m.
No one came forward to speak.
Page 5 of 207
Chair Roland closed the Public Hearing at 7:21 p.m.
C. Deliberation and Vote
The Commission expressed support for the Live/Work Code Update and
discussed potential builders, parking, and population density.
Commissioner Walters moved and Commissioner Vanderpol seconded to
recommend to City Council the adoption of the Live/Work Code Update as
recommended by Staff.
MOTION CARRIED UNANIMOUSLY. 6-0
COMMUNITY DEVELOPMENT REPORT
Manager Teague shared that the Auburn Magazine will have a feature on the Planning
Commission in the Fall 2026 edition, and that the next meeting will be scheduled for
September 9, 2026, at 6:00 p.m.
ADJOURNMENT
There being no further business to come before the Planning Commission, the meeting
was adjourned at 7:28 p.m.
APPROVED this 9th day of September, 2026.
_____________________________ _______________________________
JUDI ROLAND, CHAIR Rebecca Wood-Pollock, Deputy City Clerk
Page 6 of 207
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
2026 Map Amendments to the Comprehensive Plan
Staff Introduction/Presentation (Usman Adam)
Staff to provide a brief presentation on the City-Initiated Map Amendments;
amending both the Comprehensive Land Use Map and the Zoning Map.
September 9, 2026
Department: Attachments: Budget Impact:
Community Development Memorandum, Annual Map
Amendment PowerPoint
Presentation, CPA and ZOA Map
Amendments
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Memorandum
Councilmember: Staff: Jason Krum
Page 7 of 207
PLANNING COMMISSION MEMORANDUM
TO: Judi Roland, Chair, Planning Commission
Bill Stewart, Vice Chair Planning Commission
Planning Commission Members
FROM: Muwaffaq Usman Adam, AICP, PMP, Planner I
Dept. of Community Development
DATE: August 25, 2026
RE: 2026 Annual Map Amendments to the Comprehensive Plan (City-initiated)
I. BACKGROUND & PURPOSE
City of Auburn’s Comprehensive Land Use Map and Zoning Map are intended to be consistent
so that the land use designations and policy direction (see table 1 below) are implemented by
zoning districts (zones) and regulations. Over time, a set of mismatches has emerged where a
parcel’s zoning district does not correspond to its Comprehensive Plan land use designation (or
vice versa). Mismatches between a city’s land use map and zoning map often happen because
of routine updates made over many years. These issues can arise when annexations or
boundary changes are updated on one map but not the other, when map clean‑ups or GIS
updates accidentally shift designations, when new zoning districts or overlay areas are created
without updating every affected parcel, or when Council‑approved land use changes or rezones
are not fully carried through all mapping layers.
Correcting these inconsistencies is a legislative, city‑initiated housekeeping effort. It is grounded
in Washington’s Growth Management Act (GMA) codified as Chapter 36.70A of the Revised
Code Washington, which requires that comprehensive plans be implemented through
consistent development regulations and zoning. Auburn’s zoning regulations contained in Title
18 Auburn City Code (ACC) are the local framework that translates plan designations into
on‑the‑ground zoning. This memo discusses a consolidated set of map corrections to bring
zoning into alignment with adopted land use designations, or, where warranted by existing policy
and built context, to adjust the land use designation to reflect the implementing zoning.
The purpose of the map amendments is to restore the inconsistencies between the
Comprehensive Land Use Map and the Zoning Map that generally resulted from the 2024
Periodic Comprehensive Plan Update (“2024 periodic update”). In turn, this will improve permit
predictability, reduce nonconformities, and ensure that development regulations faithfully
implement adopted policies. Specifically, this action will:
• Align zoning with adopted land use designations where the Comprehensive Plan has
already established the intended use pattern (rezone to the implementing zoning
district).
• Rectify land use designations where long‑standing, Council‑approved zoning and
existing built character clearly indicate the implementing district and the adjustment is
consistent with overarching Comprehensive Plan policies.
• Correct mapping errors and legacy artifacts (e.g. mapping errors, some historical land
use and zoning mismatches) and clarify boundaries where multiple map layers intersect
(e.g. right-of-way lines, overlay edges, split zones).
Page 8 of 207
Staff Member: Usman Adam Date: August 25, 2026
2
• Support administrative efficiency and public transparency by reducing interpretive
conflicts, and by providing clear, predictable standards for applicants, neighbors, and
staff.
Table 1: Zoning Districts and Land Use Designation per COA Comprehensive Plan
Zoning District Land Use Designation
DUC Downtown Urban Center Downtown Urban Center
C-AG \ Auburn Gateway Mixed Use
C-1 Light Commercial Commercial
C-2 Heavy Commercial Commercial
I Institutional Public/Quasi-Public
M-1 Light Industrial Industrial
M-2 Heavy Industrial Industrial
LF Airport Landing Field Industrial
OS Open Space Open Space
P-1 Public Use Public/Quasi-Public
R-1 Residential 1 DU/Acre Neighborhood Residential One
R-2 Residential Low Neighborhood Residential Two
R-3 Residential Moderate Neighborhood Residential Two
R-4 Residential High Neighborhood Residential Three
Lakeland Hills PUD Neighborhood Residential Two
R-MHC Residential Manufactured/Mobile Home
Community
Neighborhood Residential Three
R-NM Neighborhood Mixed Use Mixed Use
RC Residential Conservancy Residential Conservancy
RF Residential Flex Mixed Use
II. SUMMARY OF PROPOSED MAP CHANGES
LAND USE MAP AMENDMENT (COMPREHENSIVE PLAN AMENDMENT - CPA)
Land use (designation) refers to the broad category of activity envisioned for a property. For
example, while “retail” is a specific use, it falls within the broader category of “Commercial.” In
this way, land use reflects a long-range policy direction or vision for an area. A Commercial land
use designation signals an intent for commercial activity; similarly, Mixed-Use or Residential
designations reflect broader goals for future development patterns.
The purpose of this section is to provide detailed information on the Land Use Map
Amendments. This section is represented in maps (CPA Map 1 through CPA Map 10)
contained in Attachment 2.
CPA Map 1 — C-AG Auburn Gateway (Copper Gate Properties)
The C-AG Auburn Gate Way zoning spans from 45th St NE to S 277th St along Auburn Way N. It
harbors the Copper Gate Apartment Community spanning the frontage between 49th Street NE
and 45th Street NE and 14 other Copper Gate North LLC-owned parcels. In 2017, the property’s
land use designation was Heavy Commercial; subsequent Comprehensive Plan updates
consolidated Heavy Commercial and Light Commercial into a single Commercial designation.
Today, the site is zoned C‑AG (Auburn Gateway) while the Land Use Map shows Commercial.
Because the C‑AG zoning district does not implement the Commercial designation, a land use
Page 9 of 207
Staff Member: Usman Adam Date: August 25, 2026
3
and zoning mismatch exists.
To restore consistency, staff recommends changing the land use designation from Commercial
to Mixed‑Use. As described in the Comprehensive Plan’s Land Use Element, the Mixed‑Use land
use designation is intended to accommodate a complementary blend of residential and
commercial uses within a single designation, encouraging vertical and horizontal mixed‑use,
allowing conversion where appropriate, supporting middle housing, and promoting pedestrian
and non‑motorized travel. This designation better reflects the implementing intent of the C‑AG
(Auburn Gateway) zone and the existing multifamily context at Copper Gate.
This action is a map alignment only. The zoning district will remain C‑AG, and no changes to the
property’s current use or entitlements are proposed or required. The amendment simply corrects
the Land Use Map to match the implementing zoning district.
CPA Map 2 — Vacant Parcel (Green River / John Reddington Rd NE)
This 5.51‑acre property is a privately owned vacant parcel with Auburn School District No. 408
future school site and the River Mobile Home Park to the west and with King County Parks
property along the Green River to the east. The site is currently zoned R‑2 Residential Low.
Historically, the parcel has carried residential zoning, most recently R‑7 (2009), which was
converted to R‑2 as part of the 2024 update. Surrounding properties reflect a residential and
public/open space context.
During the 2024 periodic update, the land use designation for this parcel was changed to
Public/Quasi‑Public, despite the parcel’s private ownership and residential zoning. This created
a land use and zoning mismatch: the R‑2 Residential Low zone does not implement the
Public/Quasi‑Public land use designation. By contrast, adjacent publicly owned properties
appropriately retain the Public/Quasi‑Public designation.
To restore consistency, staff recommends changing the land use designation from
Public/Quasi‑Public to Neighborhood Residential Two. Per the Comprehensive Plan’s Land Use
Element, Public/Quasi‑Public is intended for public uses (e.g., schools, developed parks) and
certain quasi‑public institutions (e.g., large churches, private schools), whereas Neighborhood
Residential Two accommodates a range of residential dwelling types—from single‑unit detached
homes to middle housing (two to six units)—and allows modest mixed‑use and apartment forms
scaled to traditional neighborhood character. The proposed amendment aligns the Land Use Map
with the implementing R‑2 Residential Low zone and the surrounding residential pattern.
This action is a map correction only. The zoning district will remain R‑2, and no changes to the
property’s current entitlements are proposed. The amendment simply corrects the Land Use Map
to match the implementing zoning district.
CPA Map 3 — PSE Power Station
This map depicts one 0.61‑acre parcel containing a Puget Sound Energy (PSE) utility substation
located off 312th Street SE between 121st Place SE and 124th Avenue SE. The parcel’s zoning
district was historically Light Commercial and, as part of the 2024 periodic update, was changed
to R‑NM (Neighborhood Mixed Use). The Land Use designation historically has been
commercial-oriented but changed to Public/Quasi‑Public in the 2024 periodic update, creating a
mismatch with the current R‑NM zoning.
The R‑NM zoning district allows a utility substation (see ACC 18.07.020 Use Table), whereas the
Public/Quasi‑Public land use designation is typically implemented by P‑1 (Public Use) or I
(Institutional) zones—districts in which a utility substation is prohibited per the ACC 18.35.030
Use Table. As a result, retaining the current Public/Quasi‑Public land use designation would invite
Page 10 of 207
Staff Member: Usman Adam Date: August 25, 2026
4
a future rezone to P‑1 or I and possibly result in the existing substation becoming a
nonconforming use. To maintain consistency between the Comprehensive Plan and the Zoning
Map without affecting the facility’s status, staff recommends changing the land use designation
from Public/Quasi‑Public to Mixed‑Use, which is the land use implemented by the R‑NM zone
and aligns with the area’s mixed context.
This amendment is a map correction only. The zoning district will remain R‑NM, and no changes
to the use, entitlements, or applicable development standards are proposed. The change
prevents unintended nonconformity and improves policy clarity by aligning the Land Use Map
with the implementing zoning district.
CPA Map 4 — Nine Parcels (Retirement/Nursing Homes and Middle Housing)
This map includes nine parcels, with the two largest developed as retirement/nursing home
facilities along I St NE and the smaller parcels developed with middle housing (duplexes and
fourplexes) along 28th St NE. Zoning in this area has historically supported multifamily
development: R‑4 Multiple Family Residential (2005), R‑20 Residential (20 du/ac) (2009), and,
since the 2024 periodic update, R‑4 Residential High (which succeeded R‑20). The land use
designation has similarly reflected higher‑density residential over time—High Density Residential
(2005) and Multi‑family (2017)—but is now shown as Mixed‑Use. The current uses on these
properties are not mixed‑use, and the area is bounded to the north and south by R‑4 zoning with
a Neighborhood Residential Three land use designation, reinforcing a predominantly residential
context.
At present, the parcels are zoned R‑4 Residential High while the Land Use Map depicts the land
use designation as Mixed‑Use, creating a mismatch because the R‑4 zoning district does not
implement the Mixed‑Use designation. To restore consistency, staff recommends changing the
land use designation from Mixed-Use to Neighborhood Residential Three. Per the
Comprehensive Plan’s Land Use Element, Neighborhood Residential Three accommodates a
range of higher‑density residential forms—including middle housing and apartment buildings—
and allows appropriately scaled mixed‑use where consistent with neighborhood character.
This action is a map alignment only. The zoning district will remain R‑4 Residential High, and no
changes to current uses or applicable development standards are proposed. The amendment
corrects the designation to match the implementing zoning and surrounding pattern.
CPA Map 5 — Six Parcels (310th St SE & 124th Ave SE)
This map covers six parcels along 310th Street SE and 124th Avenue SE—four vacant parcels
and two developed with single‑family residences. The six parcels sit within a larger R‑4
Residential High zoning block that is predominantly mapped with the Neighborhood Residential
Three land use designation.
Historically, these parcels carried the zoning district and land use designations that commonly
permitted single‑family residential use. As part of the 2024 periodic update, the parcels were
rezoned to R‑4 Residential High. Under the current R‑4 standards, the two single‑family homes
are now nonconforming; however, the proposed amendment does not seek to alter their status
or intensify nonconformities. Rather, it is a targeted map correction to align the Land Use Map
with the existing R‑4 zoning.
At present, the parcels are zoned R‑4 Residential High, while the Land Use Map depicts the land
use designation as Neighborhood Residential Two, creating a land use/zoning mismatch. To
restore consistency, staff recommends changing the land use designation from Neighborhood
Residential Two to Neighborhood Residential Three. Per the Comprehensive Plan’s Land Use
Element, Neighborhood Residential Three accommodates a broader range of residential forms—
Page 11 of 207
Staff Member: Usman Adam Date: August 25, 2026
5
including middle housing and apartment buildings—and allows appropriately scaled mixed‑use
in higher‑intensity residential areas. This designation aligns with the intent of the R‑4 Residential
High zone, which is designed to maximize residential density opportunities and is characterized
by middle housing and multi‑story apartment/mixed‑use development in locations near transit,
urban services, and commercial uses.
This action is a map alignment only. The zoning district will remain R‑4, and no changes to
existing uses or applicable development standards are proposed. The amendment corrects the
land use designation to match the implementing zoning and surrounding pattern.
CPA Map 6 — Family of Grace Lutheran Church (314th St SE & 124th Ave SE)
The map shows the Family of Grace Lutheran Church property located at the intersection of 314th
Street SE and 124th Avenue SE and has been zoned I Institutional since 2007. the land use
designation was Public/Quasi-Public as recently as 2022 but was mis-designated to
Neighborhood Residential Two during the 2024 periodic update, a designation that is not
implemented by the I Institutional zone.
At present, the property is zoned I Institutional while the Land Use Map depicts the land use
designation as Neighborhood Residential Two, creating a land use/zoning mismatch. To restore
consistency, staff recommends changing the land use designation from Neighborhood
Residential Two to Public/Quasi-Public. Per the Comprehensive Plan’s Land Use Element,
Public/Quasi-Public is intended for public uses such as schools and developed parks, as well as
quasi-public institutions including large churches and private schools—uses that align with the
existing institutional zoning and established church use on the site.
This action is a map correction only. The zoning district will remain I Institutional, and no changes
to the property’s current use or applicable development standards are proposed. The amendment
rectifies the 2024 mis-designation by aligning the land use designation with its implementing
zoning district.
CPA Map 7 — 675 sq. ft. Parcel Strip (companion to single-family parcel to the south)
This map identifies a 675-square-foot parcel strip under the same ownership as the abutting
parcel to the south, which is developed with a single-family residence. Functionally, the two
parcels operate as a single home site. The single-family parcel carries a Neighborhood
Residential Two Land Use designation, while the subject strip is designated Mixed-Use. The
subject parcel is zoned R-2 Residential Low, creating a land use/zoning mismatch because R-2
does not implement the Mixed-Use land use designation.
To restore consistency, staff recommends changing the land use designation for the 675-sq.-ft.
strip from Mixed-Use to Neighborhood Residential Two. Per the Comprehensive Plan’s Land Use
Element, Neighborhood Residential Two accommodates a variety of residential dwelling types—
ranging from single-unit detached homes to middle housing (two to six units)—and modestly
scaled mixed-use and apartment forms that fit traditional neighborhood character. Aligning the
strip’s designation with Neighborhood Residential Two ensures the land use designation is
consistent with the implementing R-2 Residential Low zoning district and avoids fragmented
policy treatment across contiguous, commonly owned residential property.
This action is a map correction only. The zoning district will remain R-2 Residential Low, and no
changes to the current use or applicable development standards are proposed. The amendment
aligns the land use designation with its implementing zoning district.
CPA Map 8 — City-Owned Storm Facility (D Pl SE, adjacent to Archdiocese of Seattle
church property)
Page 12 of 207
Staff Member: Usman Adam Date: August 25, 2026
6
This map is for city-owned parcel, located along D Place SE, adjacent to the Archdiocese of
Seattle church property, and functions as a stormwater facility dedicated to the City per the
Meade Plat Map. The parcel is zoned I Institutional, while the Land Use Map currently shows
Neighborhood Residential Two, creating a land use/zoning mismatch because the I Institutional
zone does not implement the Neighborhood Residential Two designation. To restore consistency,
staff recommends changing the land use designation to Public/Quasi-Public. Per the
Comprehensive Plan’s Land Use Element, Public/Quasi-Public is intended to accommodate
public uses such as schools and developed parks, as well as quasi-public institutions (e.g., large
churches and private schools). This designation appropriately reflects the parcel’s public
ownership and stormwater facility function.
This action is a map correction only. The zoning district will remain I Institutional and no changes
to the property’s current use or applicable development standards are proposed. The amendment
clarifies the policy framework by aligning the land use designation with its implementing zoning
district.
CPA Map 9 — Velvet Square (20th Ct SE & O Ct SE)
This map covers 15 parcels within the Velvet Square Plat at the intersection of 20th Court SE
and O Court SE. All lots are developed with single-family residences. Zoning in this area has
evolved over time—from R-4 Multifamily Residential (2005) to Residential 20 dwelling units per
acre (2009), and, as part of the 2024 periodic update, to R-4 Residential High to support additional
housing capacity. Historically, the Land Use Map has not consistently matched the zoning (e.g.,
Single Family Residential land use in 2005 while zoned R-4 Multifamily). Although both land use
and zoning were updated in 2024, the current land use designation does not match the adopted
zoning. Many of these properties have long been nonconforming under higher-density zoning;
this amendment does not seek to alter or intensify that status.
At present, the parcels are zoned R-4 Residential High, while the Land Use Map shows a land
use designation of Neighborhood Residential Two, creating a mismatch because R-4 does not
implement Neighborhood Residential Two. To restore consistency, staff recommends changing
the land use designation from Neighborhood Residential Three to Neighborhood Residential
Three. Per the Comprehensive Plan’s Land Use Element, the Neighborhood Residential Three
accommodates a broader range of higher-density residential forms—including middle housing
and apartment buildings—and may allow appropriately scaled mixed-use in higher-intensity
residential areas. The Neighborhood Residential Two land use designation, by contrast, supports
less intense housing types up to moderately sized apartments. The R-4 Residential High zone is
intended to maximize residential density opportunities and is characterized by middle housing
and multi-story apartment/mixed-use development in locations near transit, urban services, and
commercial uses. As such, R-4 is consistent with the Neighborhood Residential Three land use
designation.
This action is a map alignment only. The zoning district will remain R-4 Residential High, and no
changes to existing uses or applicable development standards are proposed. The amendment
simply corrects the Land Use Map designation to match the implementing zoning.
CPA Map 10 — Five Parcels (C St NW & 3rd St NW)
This map covers five parcels around the intersection of C Street NW and 3rd Street NW. Three
parcels are developed with single-family residences, one parcel is vacant, and one is developed
with a light-manufacturing building that is currently used as a professional office (Monty Warren
Painting Inc.). Historically, the area was zoned C-3 Heavy Commercial (2005), which was
succeeded by C-2 Heavy Commercial in the 2024 periodic update. During that update, the land
use designation for these parcels was changed to Industrial. The single-family homes have long
been nonconforming under the commercial zoning; the proposed amendment does not seek to
Page 13 of 207
Staff Member: Usman Adam Date: August 25, 2026
7
alter or intensify that status, but rather to correct the land use designation so it is consistent with
the adopted zoning.
At present, the parcels are zoned C-2 Heavy Commercial while the Land Use Map shows
Industrial, creating a mismatch because the C-2 district does not implement the Industrial land
use designation. To restore consistency, staff recommends changing the land use designation
from Industrial to Commercial. The C-2 Heavy Commercial zone is intended to allow medium- to
high-intensity uses across a wide range of retail, commercial, entertainment, office, services, and
professional activities. Per the Comprehensive Plan’s Land Use Element, the Commercial land
use designation is intended to accommodate a mix of local, regional, and national businesses.
Aligning the land use designation to Commercial accurately reflects the area’s zoning district and
existing development pattern.
This action is a map alignment only. The zoning district will remain C-2 Heavy Commercial, and
no changes to existing uses or applicable development standards are proposed. The amendment
corrects the mis-designation by aligning the Land Use Map with its implementing zoning district.
ZONING MAP AMENDMENT (ZOA)
Zoning is the regulatory tool used to implement the City’s land use designations. While land use
establishes the long-range policy vision for an area, zoning provides the specific regulatory
framework—permitted uses, development standards, and processes—necessary to achieve that
vision. This section is represented in maps (ZOA Map 1 through ZOA Map 8) contained in
Attachment 2.
ZOA Map 1 — E Main St (between G St SE and F St SE)
This map covers five parcels along E Main Street, between G Street SE and F Street SE. The
properties contain a mix of established uses: a medical/dental office, a restaurant/lounge, a
mixed-use apartment building with associated parking, and a single-family residence. These
parcels were mistakenly zoned DUC (Downtown Urban Center)—a carryover from their 2005 C-2
Central Business District (CBD) designation—despite being outside the adopted DUC boundary.
At present, the area is designated Mixed-Use, while zoning district is DUC. Because the DUC
zoning district does not implement the City’s Mixed-Use land use designation (and since the
parcels lie beyond the adopted DUC boundary), staff recommends a zoning map amendment to
R-F (Residential Flex). The R-F zoning district is the appropriate implementing zone for
Mixed-Use here and is better suited to the existing, small-scale pattern of professional offices
and services, medical/dental clinics, personal services, eating and drinking establishments,
banks and similar financial institutions, and residential uses.
This action is a zoning map correction that aligns zoning with the adopted Mixed-Use land use
designation and with the established built context. It does not require any change of use or
redevelopment of the properties. The amendment improves boundary accuracy, reduces
potential nonconformities, and enhances permitting by placing these parcels in a district designed
for their current scale and mix of uses.
ZOA Map 2 — 2nd St NW (between H St NW and D St NW)
This map covers 10 parcels along 2nd Street NW between H Street NW and D Street NW. The
properties are developed with predominantly industrial uses, including manufacturing and
warehousing—and have historically functioned within an industrial context. Although these
parcels were rezoned to C-2 Central Business District (CBD) in 2006 (and subsequently
converted to DUC Downtown Urban Center in the 2024 periodic update), they are outside the
Page 14 of 207
Staff Member: Usman Adam Date: August 25, 2026
8
adopted DUC boundary. Their current land use designation is Industrial (updated in 2024).
Over time, the land use and zoning district for these parcels has been out of sync. In 2005, the
zoning district was M-2 Heavy Industrial and land use was Heavy Industrial; in 2006, zoning
changed to C-2 CBD and the land use to Downtown, rendering many existing industrial
operations nonconforming. The land use designation shifted to Light Industrial in 2017 and to
Industrial in 2024, while zoning remained on a downtown trajectory (now DUC), leaving a
persistent mismatch since at least 2017.
To restore consistency and reflect the established industrial pattern, staff recommends changing
the zoning district from DUC (Downtown Urban Center) to M-1 (Light Industrial). The M-1 zoning
district implements the Industrial land use designation, is appropriate given the area’s proximity
to the DUC boundary, a nearby school site, and reduces the degree of nonconformity for existing
industrial uses compared to either retaining DUC or reverting to M-2. This correction will improve
permit predictability and align zoning with the Comprehensive Plan.
This action is a zoning map correction only; it does not require changes to existing uses or
redevelopment. The M-1 Light Industrial zone accommodates a variety of industrial and
manufacturing activities, related commercial uses, and limited residential in an industrial
environment, preserves land primarily for industrial/commercial purposes, advances the
Comprehensive Plan’s economic goals, and provides flexibility for non-nuisance operations (e.g.,
controlled noise, vibration, glare, odor, and emissions).
ZOA Map 3 — Boyd’s Addition (A St SE & 15th St SE)
This map contains a single parcel of approximately 4,800 square feet within the Boyd’s Addition
to Auburn Plat, developed with a single-family residence at the intersection of A Street SE and
15th Street SE. The Plat was established in 1913, and the lot was developed in 1920. Although
the parcel has never been assigned a zoning designation in the City’s GIS records, it has
consistently carried a Commercial-oriented land use designation. Consequently, the existing
residential use has been nonconforming within the broader commercial policy context.
To correct this omission on the City’s Zoning Map and to ensure consistency with the adopted
Land Use Map and surrounding zoning, staff recommends applying the C-2 Heavy Commercial
zoning district to this parcel. Adjacent properties to the north and south are zoned C-2 Heavy
Commercial; applying the same zoning district will restore zoning continuity, implement the
Commercial land use designation, and provide clearer permitting expectations. The C-2 Heavy
Commercial district supports medium- to high-intensity retail, commercial, entertainment, office,
service, and professional uses, consistent with the established Commercial land use
classification. This action is purely a zoning map correction and does not require any change to
the existing use or development of the property or intensify the nonconformity of the existing use.
ZOA Map 4 — M St SE Corridor
This map identifies four parcels along M Street SE, two developed with single‑family residences
and two with office buildings. In 2005, the properties were zoned RO Residential Office District
with an Office Residential land use designation. In 2017, the Land Use designation was changed
to Neighborhood Commercial, creating a mismatch between the land use and the zoning district.
Currently, the parcels are zoned R‑3 Residential Moderate, while the 2024 periodic update
assigned a Mixed‑Use land use designation. The R‑3 district does not implement the Mixed‑Use
designation. As a result, the existing single‑family residences are considered non‑conforming,
and office uses are not permitted outright and instead require an administrative use permit.
To correct the inconsistency created by previous map updates and to implement the Mixed‑Use
Page 15 of 207
Staff Member: Usman Adam Date: August 25, 2026
9
designation, staff recommends changing the zoning district to R‑F Residential Flex. The R‑F
Residential Flex zone accommodates small‑scale business and professional offices, medical and
dental clinics, salons and personal services, eating and drinking establishments, financial
institutions, and residential uses. The R‑F zoning district allows both residential and office uses
outright, resolving the zoning mismatch and eliminating the unintended non‑conformities affecting
both the residential and office properties. This zoning map correction will not require any change
to the existing uses or development of the properties.
ZOA Map 5 — Park 39 Apartments (12th St SE)
This map depicts four parcels comprising the Park 39 apartment community along 12th Street
SE. The properties have been zoned C-1 Light Commercial since 2005, paired at that time with
a Light Commercial land use designation. In 2017, the Land Use designation was changed to
Moderate Density Residential, creating a mismatch with the underlying C-1 zoning. The 2024
periodic update further updated the designation to Neighborhood Residential Two, which the C-1
district does not implement. As a result, the apartment use has been non-conforming under C-1
Light Commercial zoning since 2005.
Surrounding zoning includes R-NM Neighborhood Mixed Use to the west, Institutional zoning to
both the north and south, and R-3 Residential Moderate to the far east. Applying the R-3
Residential Moderate district will resolve both the zoning–land-use mismatch and the
long-standing non-conformity affecting the apartments. Therefore, staff recommends changing
the zoning from C-1 Light Commercial to R-3 Residential Moderate. The R-3 Residential
Moderate district accommodates middle housing (two to six units), apartment buildings, and
mixed-use developments of up to 20 units and three stories per lot. In contrast, the C-1 Light
Commercial zone supports small- to moderate-scale commercial uses. This zoning map
correction does not require any change to the existing use or development of the properties.
ZOA Map 6 — Auburn Assemblage (West Hill Overlay Area)
This map shows properties within the Auburn Assemblage community, located in the western
portion of the city and within the West Hill Overlay, annexed in 2009. The properties are
developed with single-family residences and were zoned R-1 Single Family Residential in 2007.
The land use was designated in 2005 as Single Family Residential. In 2009, the zoning was
changed to R-5 Residential (5 dwelling units per acre), while the land use designation remained
Single Family until updated again in 2017. These changes did not create any non-conformity.
During the 2024 periodic update, the land use designation was amended to Neighborhood
Residential Two. However, the zoning for these parcels was inadvertently not assigned. As a
result, the properties currently do not have an assigned zoning district, while the official land use
designation is Neighborhood Residential Two. Adjacent parcels within the Canyon Creek at
Peasley Divisions I and II subdivisions are zoned R-2 Residential Low.
To restore zoning continuity and implement the Neighborhood Residential Two designation, staff
recommends applying the R-2 Residential Low zoning district to the Auburn Assemblage
community. The Neighborhood Residential Two designation supports a variety of housing types,
ranging from single-unit detached homes to middle housing (two to six units), and moderately
scaled mixed-use or apartment buildings that fit the character of traditional single-family
neighborhoods. Neighborhood Residential Two is implemented by the R-2 Residential Low
zoning district, which allows lower-intensity residential development, including single-unit
detached houses, townhouses, duplexes, triplexes, fourplexes, two-story stacked flats, courtyard
apartments, and cottage housing on lot sizes typical of suburban and urban environments.
Page 16 of 207
Staff Member: Usman Adam Date: August 25, 2026
10
This correction does not create any non-conformity nor require any change to the existing use or
development of the properties.
ZOA Map 7 — J, 22nd, L, 24th, K, and M Streets NE
This map covers 82 parcels located along J Street NE, 22nd Street NE, L Street NE, 24th Street
NE, K Street NE, and M Street NE. Most properties are developed with single-family residences,
with several containing middle-housing types (primarily duplexes), one parcel developed with a
group residential facility (retirement home), and one with a church.
Historically, zoning for these parcels consisted of R-2 Single Family Residential for properties
along J Street NE, with a corresponding Single Family Residential land use designation, and R-3
Two-Family (Duplex) Residential for the remaining properties, aligned with a Moderate
Residential land use designation in 2005. In 2009, parcels along J Street NE were rezoned to
R-5 Residential (5 dwelling units per acre), while the remaining parcels were rezoned to R-10
Residential (10 dwelling units per acre). Until 2024 periodic update, zoning and land use
designations remained consistent. In 2024, these parcels were upzoned to R-4 Residential High
as part of the citywide housing capacity initiative, while the land use designation was updated to
Neighborhood Residential Two. The inconsistency arises because the R-4 Residential High
district does not implement the Neighborhood Residential Two land use designation.
To correct this mismatch, staff recommends applying the R-2 Residential Low zoning district. The
R-2 Residential Low Zone properly implements Neighborhood Residential Two and aligns with
existing development patterns. Neighborhood Residential Two accommodates a variety of
residential dwelling types, ranging from single-unit detached homes to middle housing (two to six
units), as well as moderately sized mixed-use or apartment buildings compatible with traditional
single-family neighborhoods. The R-2 Residential Low district allows lower-intensity residential
development, including single-unit detached houses, townhouses, duplexes, triplexes,
fourplexes, two-story stacked flats, courtyard apartments, and cottage housing. In contrast, the
R-4 Residential High zone is intended to maximize residential density and supports middle
housing and multi-story apartment and mixed-use development.
This correction does not create any non-conformity and does not require any change to the
existing use or development of the affected properties.
ZOA Map 8 — K, 18th, and M Streets NE
This map covers six parcels located along K Street NE, 18th Street NE, and M Street NE. Most
properties are developed with multifamily housing, including apartments, middle-housing types,
condominiums, and townhomes. One parcel, at the intersection of 18th Street NE and M Street
NE, is developed with a single-family residence.
Historically, these parcels were zoned R-3 Two-Family (Duplex) Residential with a Moderate
Residential land use designation in 2005. In 2009, the zoning was updated to R-10 Residential
(10 dwelling units per acre). Zoning and land use designations remained consistent until the 2024
periodic update, when the properties were upzoned to R-4 Residential High as part of the citywide
housing capacity initiative. At the same time, the land use designation was updated to
Neighborhood Residential Two. This produced a broader mismatch between the R-4 zone and
the Neighborhood Residential Two land use designation.
The R-4 Residential High district does not implement Neighborhood Residential Two. Reapplying
the R-3 Residential Moderate zone will correct the mismatch and align zoning with the adopted
land use designation. Additionally, the majority of existing uses—including apartments,
townhomes, and middle housing—are permitted outright in the R-3 district under the
Neighborhood Residential Two designation. An R-2 designation would create widespread
Page 17 of 207
Staff Member: Usman Adam Date: August 25, 2026
11
non-conformities and is therefore not appropriate. Accordingly, staff recommends changing the
zoning district from R-4 Residential High to R-3 Residential Moderate.
Neighborhood Residential Two accommodates a range of residential dwelling types, from
single-unit detached homes to middle housing (two to six units), as well as moderately scaled
mixed-use and apartment buildings compatible with traditional single-family neighborhoods.
The R-3 Residential Moderate zone allows townhouses, duplexes, triplexes, fourplexes,
two-story stacked flats, courtyard apartments, cottage housing, apartment buildings, and
mixed-use developments (up to 20 units and three stories per lot). In contrast, the R-4 Residential
High zoning district is intended to maximize residential density and primarily supports middle
housing and multi-story apartment or mixed-use development. This correction does not create
or intensify any non-conformity and does not require any change to the existing use or
development of the affected properties.
III. MAP AMENDMENT
The map amendment is illustrated on the parcels of interest, showing both existing and
proposed zoning or land use designations. The full amendment is provided in Attachment 2,
which contains 18 map pages. The first ten pages depict Comprehensive Plan Amendment
(CPA) land use map changes, and the remaining eight pages depict Zoning Map Amendment
(ZOA) changes. Each map page includes side‑by‑side “Existing” and “Proposed” map panels
that show the current and proposed designations for the parcels of interest.
IV. STAFF REQUEST
Planning Commission to review and provide feedback on the proposed map amendments to the
Comprehensive Land Use Map and the Zoning Map.
V. ATTACHMENTS
1) Annual Map Amendment PowerPoint Presentation
2) CPA and ZOA Map Amendments
Page 18 of 207
PLANNING COMMISSION
2026 ANNUAL
MAP AMENDMENTS
PRESENTED BY
MUWAFFAQ USMAN ADAM, PLANNER I
SEPTEMBER 9, 2026
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 19 of 207
BACKGROUND AND PURPOSE
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
•Land Use and Zoning Maps are intended to be
consistent
•Inconsistencies emerged overtime
•Made up of historical and recent mismatches
Page 20 of 207
OBJECTIVES
–Rectify the mismatches by:
•Aligning zoning district with land use designations
•Adjusting land use designations to match zoning districts
•Correcting mapping errors
– Improve clarity, reduce nonconformities, and enhance
permit predictability
Page 21 of 207
PUBLIC OUTREACH
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
–Notified all affected property-owners by mail
•Letters and proposed maps mailed
–Will discuss comments received, as applicable
Page 22 of 207
KEY TERMS
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
•Land Use
•Vision or long-term goal or plan
•Zoning
•Regulatory tool used to implement the land use
•Mismatch
•When the land use says one thing, but zoning encourages
something else
Page 23 of 207
SUMMARY OF MAP CHANGES
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
•Identification of mismatches
•Existing condition
•Current use and historical context
•Recommendation
Page 24 of 207
10 CPA MapsLAND USE MAP AMENDMENTS
(CPA)
Page 25 of 207
CPA MAP 1
Page 26 of 207
CPA MAP 2
Page 27 of 207
CPA MAP 3
Page 28 of 207
CPA MAP 4
Page 29 of 207
CPA MAP 5
Page 30 of 207
CPA MAP 6
Page 31 of 207
CPA MAP 7
Page 32 of 207
CPA MAP 8
Page 33 of 207
CPA MAP 9
Page 34 of 207
CPA MAP 10
Page 35 of 207
ZONING MAP AMENDMENTS
(ZOA)8 ZOA Maps
Page 36 of 207
ZOA MAP 1
Page 37 of 207
ZOA MAP 2
Page 38 of 207
ZOA MAP 3
Page 39 of 207
ZOA MAP 4
Page 40 of 207
ZOA MAP 5
Page 41 of 207
ZOA MAP 6
Page 42 of 207
ZOA MAP 7
Page 43 of 207
ZOA MAP 8
Page 44 of 207
WHAT’S NEXT?
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
•Receive Public Feedback
•Anticipate Planning Commission Meeting in October
•Anticipate Public Hearing in November
Page 45 of 207
ANY QUESTIONS PLEASE?
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 46 of 207
Page 47 of 207
Page 48 of 207
Page 49 of 207
Page 50 of 207
Page 51 of 207
Page 52 of 207
Page 53 of 207
Page 54 of 207
Page 55 of 207
Page 56 of 207
Page 57 of 207
Page 58 of 207
Page 59 of 207
Page 60 of 207
Page 61 of 207
Page 62 of 207
Page 63 of 207
Page 64 of 207
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
2026 Text Amendments to the Comprehensive Plan
Staff Introduction/Presentation (Clark)
Staff to provide a brief presentation on the 2026 City-Initiated Text
Amendments.
September 9, 2026
Department: Attachments: Budget Impact:
Community Development Memorandum, 1 - Annual Text
Amendment PowerPoint
Presentation, 2 - Auburn School
District CFP Text Amendment, 3
- Federal Way Public Schools
CFP Text Amendment, 4 - Kent
School District CFP Memo, 5 -
City of Auburn Capital Facilities
Element Text Amendment
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Memorandum
Councilmember: Staff: Jason Krum
Page 65 of 207
PLANNING COMMISSION MEMORANDUM
TO: Judi Roland, Chair, Planning Commission
Bill Stewart, Vice Chair Planning Commission
Planning Commission Members
FROM: Gabriel Clark, Planner II
Dept. of Community Development
DATE: August 25, 2026
RE: 2026 Annual Text Amendments to the Comprehensive Plan (City-Initiated)
I. BACKGROUND & PURPOSE
The City of Auburn adopted its first Comprehensive Plan in 1995 in accordance with the state’s Growth
Management Act (GMA) of 1990. This initial plan established the framework for Auburn’s long-term
objectives in land use, housing, transportation, and environmental stewardship. Since that time, Auburn’s
Comprehensive Plan has undergone successive updates—most notably in 2005, 2015, and most
recently, 2024—to address shifting demographic trends, evolving regional planning goals, and emerging
community priorities.
Pursuant to Revised Code Washington (RCW) 36.70A.130
“Comprehensive Plans” and Chapter 14.22 Auburn City Code
(ACC) “Comprehensive Plan,” the City of Auburn conducts a
single comprehensive docketing cycle each calendar year to
consider amendments to its Comprehensive Plan. This
annual cycle promotes transparency, consistency, and public
engagement by consolidating all proposed revisions into a
unified review process.
Those interested in submitting a comprehensive plan or land use map amendment application for
consideration during the annual amendment cycle are encouraged to discuss their ideas with the Staff.
Privately initiated comprehensive plan amendments were required to be submitted prior to July 2026. No
privately initiated applications were received for the 2026 Annual Amendment Cycle.
Anticipated Schedule
• Introduce the annual amendments at the September 9th special meeting
• Continue discussion of the annual amendments at the October 6th meeting
• Public hearing with Planning Commission deliberation and vote at the November 4th meeting
• Following a vote to recommend the annual amendments, Staff will present the 2026 Annual
Amendments to City Council at the November 23rd Study Session
II. SUMMARY OF PROPOSED TEXT AMENDMENTS
Staff will introduce several city-initiated annual amendments to the Comprehensive Plan. The text
updates are summarized below.
Page 66 of 207
Staff Member: Clark Date: August 24, 2026
2
Each of the school districts which serve the student population of the City may provide capital facilities
plans explaining the district’s current facility inventory, planned facility maintenance or improvements,
propose new facilities, and student generation rates. These documents typically have a planning horizon
of approximately six years and require annual adjustments to modify plans according to demographic and
economic trends.
P/T No. 1 Auburn School District 2026 Capital Facilities Plan
The Plan was prepared using data available in the spring of 2026, unless otherwise noted and remains
consistent with the CFP provided to the City at the 2025 Annual Amendment Cycle with minor changes
outlined below.
Projected enrollment based on a district-wide analysis shows the overall population of the enrolled
students is projected to decrease 1.8% over the next five years and 1.5% over the next ten years. The
District notes a declining birth rate leading to variability in the student enrollment numbers.
In 2023, the District completed a ten-year Facilities Master Plan which identifies the following facility
needs:
• Complete improvements to 22 facilities to address aging equipment, air conditioning, energy
conservation, major maintenance, and safety and security improvements within six years.
• Replace Alpac Elementary School within six years.
• Replace Cascade Middle School within six years.
• Build a new middle school within six years.
• Replace Evergreen Heights and Gildo Rey Elementary Schools within seven to 13 years.
• Replace the Administration Annex within seven to 13 years.
• Build a new high school in nine years if current enrollment projection remain accurate.
• Acquire new portable classrooms and relocate existing portable classrooms where needed to
accommodate localized student enrolment growth at individual schools.
P/T No. 2 Dieringer School District 2026-2032 Capital Facilities Plan
The Dieringer School District will provide an updated Capital Facilities Plan after legislative changes are
agreed upon with Pierce County. Staff will present any changes to Dieringer School District’s CFP at the
October 6th Planning Commission Meeting.
P/T No. 3 Federal Way Public Schools 2026 Capital Facilities Plan
In response to the requirements of the State of Washington Growth Management Act and other local
ordinances, Federal Way Public Schools (FWPS) has updated their CFP as of June 2026.
The District is nearing the end of Phase 2 Bond projects supporting school expansion and replacement as
voters authorized in 2017. As of today, the District has completed Thomas Jefferson High School,
Evergreen Middle School, Lake Grove Elementary School, Mirror Lake Elementary School, Star Lake
Elementary School, Wildwood Elementary School, Olympic View K-8, and Memorial Field. Illahee Middle
School is complete and occupied in its 1-year warranty period.
FWPS continues to monitor factors that may impact enrollment and capacity, such as new single-family
and multi-family developments and impacts due to the COVID-19 pandemic. Student enrollment in
physical buildings have decreased and increased online enrollment in the Internet Academy. FWPS notes
that enrollment during the 2022-2023 school year was higher than projected and is seeing similar growth
during the 2024-25 years, though pre-COVID enrollment has not yet been passed. The District is
anticipating continued enrollment growth, especially considering the City of Federal Way’s plans to
increase housing in the downtown core in conjunction with Sound Transit’s Link Light Rail project
completion.
Page 67 of 207
Staff Member: Clark Date: August 24, 2026
3
FWPS increased capacity at the elementary level over the past several years and shows no unhoused
scholars based on the six-year enrollment projections. The 2026 Capital Facilities Plan shows flat
enrollment in the near term but will adjust as appropriate based on new multi-family housing
developments proposed to open in 2027 and beyond with total enrollment hovering around 21,000
students.
P/T No. 4 Kent School District Capital Facilities Plan
At the request of the Kent School District (KSD), the prior year’s adopted Capital Facilities Plan will be
retained. KSD notes declining and leveling enrollment trends remain consistent with adopted standards.
P/T No. 5 City of Auburn Capital Facilities Element
Updates to policy no. CFE-18 address outdated timelines and incorporate new information received from
the four school districts serving Auburn students as part of the periodic update process. These include:
• Auburn School District – The Portable Relocation Project has been revised to reflect continuous
implementation.
• Other changes as necessary from the Dieringer School District’s CFP and the City of Auburn’s
CFP.
Updates to other portions of the Capital Facilities Element is dependent on the complete analysis of the
City’s Capital Facilities Plan, with drafts ready for review in October.
III. TEXT AMENDMENT
Attachments two, three, and four contain the CFP packages the school districts submitted. Attachment
five contains the text amendments to the Capital Facilities Element with changes reflected by strike-
out/underline.
IV. ATTACHMENTS
1) Annual Text Amendment PowerPoint Presentation
2) Auburn School District CFP Text Amendment
3) Federal Way Public Schools CFP Text Amendment
4) Kent School District CFP Memo
5) City of Auburn Capital Facilities Element Text Amendment
Page 68 of 207
PLANNING COMMISSION
2026
ANNUAL TEXT
AMENDMENTS
PRESENTED BY
GABRIEL CLARK, PLANNER II
SEPTEMBER 9, 2026
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 69 of 207
BACKGROUND & PURPOSE
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 70 of 207
PROPOSED TEXT AMENDMENTS
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 71 of 207
SEP.
9
•INTRODUCTION
OCT.
4
•PROPOSED UPDATES
NOV.
4
•PUBLIC HEARING
ANTICIPATED SCHEDULE
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Page 72 of 207
QUESTIONS?
Department of Community Development
Planning Building Development Engineering Permit Center
Economic Development Code Enforcement
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
Page 73 of 207
Auburn School District No. 408
Capital
Facilities Plan
2026 through 2032
Terminal Park Elementary School – 2023
Adopted by the Auburn School District Board of Directors on June 8, 2026.
Page 74 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 1
915 Fourth Street SE
Auburn, Washington 98002
(253) 931-4900
Board of Directors
Sheilia McLaughlin - President
Shelly Combs
Valerie Gonzales
Arlista Holman
Laura Theimer
Dr. Alan Spicciati, Superintendent
TABLE OF CONTENTS
SECTION 1 – Executive Summary Page 2
SECTION 2 – Facility Inventory Page 3
SECTION 3 – Enrollment Projections Page 7
SECTION 4 – Student Generation Rates Page 9
SECTION 5 – Standard of Service Page 11
SECTION 6 – Capacity and Facility Planning Page 14
SECTION 7 – Impact Fees Page 18
SECTION 8 – Conclusions Page 22
Page 75 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 2
SECTION 1 – EXECUTIVE SUMMARY
Auburn School District (District) prepared this six-year Capital Facilities Plan (Plan) in
compliance with the requirements of Washington’s Growth Management Act and the
ordinances adopted by the counties and cities served by the District. The District reviews
and amends the Plan annually. All changes are made pursuant to the Growth
Management Act and the local ordinances.
The Plan was prepared using data available in the spring of 2026 unless otherwise noted.
The Plan is consistent with prior long-term capital facilities plans adopted by the District.
This Plan is not intended to be the sole plan for all the District’s needs. The District may
prepare interim and periodic long-range Capital Facilities Plans.
The Plan will be submitted to jurisdictions located within the District’s service area along
with a request to include the plan as an element in the jurisdictions’ Comprehensive Plans.
King County, and the Cities of Algona, Auburn, Black Diamond, Kent, and Pacific must
adopt this Plan to enable the District to collect impact fees within their jurisdiction. In the
past, the Cities of Algona and Pacific did not adopt a school impact fee ordinance or the
District’s Capital Facilities Plans.
King County Code 21A allows school districts to assess impact fees on every dwelling unit
in the District for which a fee schedule has been established. This Plan provides the data
and calculations required by King County and the Cities to establish the District’s school
impact fees for 2026.
The District’s 2026 impact fee for Single-Family Residences is $8,003, $0 for Middle
Housing (Townhome/Duplex/Multiplex), and $8,966 for Apartments/Condos. The Single
Family and Apartment/Condo impact fees include a discretionary adjustment to the fee
generated from the King County formula. The adjustment by the District reduces the fee to
match the fees calculated by the District in the 2025 CFP. This reduction was made to
establish a more stable impact fee from year to year. Additionally, King County caps
apartment/condo school impact fees at $5,000.
The Plan establishes the District’s Standard of Service to determine the District’s current
and future capacity. While the State Superintendent of Public Instruction establishes
square footage guidelines for school capacity, those guidelines do not account for the local
program needs of the District. The Growth Management Act and the school impact fee
ordinance authorize the District to define its standard of service based on the District’s
specific needs.
Page 76 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 3
The District’s Standard of Service is based upon the District’s current student-teacher ratio
and service models tailored for specific program needs. The Standard of Service and
District’s school inventory has been used to calculate the capacity of schools in the District.
The District’s permanent capacity for the 2026-27 school year is 14,550 students. The
number of students enrolled in the District as of April 1, 2026, is 16,897 students.
The following table summarizes changes that are incorporated in the District’s 2026-2032
Capital Facilities Plan:
Table 1: 2026 Capital Facilities Plan Changes
ITEM 2025 CFP 2026 CFP SOURCE
Debt Service Tax Rate 1.78915 1.50213 Per King County
District Average Assessed Value - Apt/Condo 2+ Bd n/a $349,208 Per King County
District Average Assessed Value – Single Family 3+ Bd $602,881 $634,827 Per King County
District Average Assessed Value - Townhome/
Duplex/Triplex/Fourplex 3+ Bd n/a $656,062 Per King County
District Student Capacity - Permanent 14,550 14,451 Updated calculation
District Student Capacity - Permanent + Portables 17,496 17,409 Updated calculation
District Impact Fee – Single Family 3+Bedroom $8,003 $8,003 Updated calculation with discretionary
adjustment
District Impact Fee – Middle Housing (Townhouse,
Duplex, Triplex, Fourplex 3+Bedroom) N/A $0 New fee category
District Impact Fee – Apartment/Condo $8,966 $5,000 Updated calculation with discretionary
adjustment and King County cap
Facility Cost - Middle School $182,000,000 $189,000,000 Construction cost refinement and
escalation
Facility Cost - Portable Classroom $250,000 $250,000 Based on current portable classroom
cost
Genl. Obligation Bonds Interest Rate 4.15% 4.77% Per Bond Buyer Index
OSPI Match % - District 33.22% 34.14% Calculation
OSPI Match % - State 66.78% 65.83% Per OSPI
Site Cost per Acre $533,937 $560,634 District Data
Student Generation Rate - Elementary - SFR 0.331 0.434 Updated housing inventory
Student Generation Rate - Middle School - SFR 0.118 0.196 Updated housing inventory
Student Generation Rate - High School - SFR 0.161 0.143 Updated housing inventory
Student Generation Rate - Elementary - MFR 0.431 0.478 Updated housing inventory
Student Generation Rate - Middle School - MFR 0.154 0.186 Updated housing inventory
Student Generation Rate - High School - MFR 0.152 0.175 Updated housing inventory
Middle Housing Student Generation Rate n/a 0.130 Borrowed from Highline School District
SECTION 2 – FACILITY INVENTORY
Auburn School District encompasses 62 square miles in King and Pierce Counties and
serves the cities of Auburn, Algona, Pacific, as well as a portion of Unincorporated King
Page 77 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 4
County. The District owns 661 acres of property, operates 30 facilities, and utilizes 112
portable classrooms. The 30 facilities include 16 elementary schools, four middle schools,
four high schools, and six support facilities. 108 portable classrooms are located at schools
to accommodate growth and four are located at the District’s Administration Building and
used for conferences, training, and office space.
The following map shows the District’s boundaries, school locations, major roads, and the
Urban Growth Boundary.
Figure 1 – School District Map
Page 78 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 5
The following table identifies the District’s school facilities and facility data.
Table 2: School Facility Inventory
FACILTY ADDRESS YEAR BUILT MAJOR MOD. SITE SIZE (ACRES) GROSS SF OSPI SF
ELEMENTARY SCHOOLS
Alpac 310 Milwaukee Blvd N, Pacific 1972 1987 10.68 48,042 46,592
Arthur Jacobsen 29205 132nd Ave SE, Auburn 2007 NA 10.02 56,620 56,283
Bowman Creek 5701 Kersey Way SE, Auburn 2020 NA 21.85 75,862 74,413
Chinook 3502 Auburn Way S, Auburn 2022 NA 13.07 75,896 74,496
Dick Scobee 1031 14th St NE, Auburn 2020 NA 8.90 76,371 74,961
Evergreen Heights 5602 S 316th St, Auburn 1970 2014 / 2017 10.10 44,231 41,923
Gildo Rey 1005 37th St SE, Auburn 1969 1988 / 2012 10.05 49,123 47,697
Hazelwood 11815 SE 304th St, Auburn 1990 NA 13.08 54,906 53,482
Ilalko 301 Oravetz Place SE, Auburn 1992 NA 14.22 54,734 53,310
Lake View 16401 SE 318th St, Auburn 1980 NA 16.48 54,054 52,252
Lakeland Hills 1020 Evergreen Way SE, Auburn 2006 NA 12.00 54,876 53,454
Lea Hill 30908 124th Ave SE, Auburn 2022 NA 20.24 75,896 74,384
Pioneer 2301 M St SE, Auburn 2021 NA 11.13 76,758 75,358
Terminal Park 1101 D St SE, Auburn 2023 NA 6.09 77,443 75,793
Washington 20 E St NE, Auburn 1972 1988 5.33 46,378 46,377
Willow Crest 13002 SE 304th St, Auburn 2021 NA 10.43 75,849 74,405
TOTAL 193.67 997,039 975,180
MIDDLE SCHOOLS
Cascade 1015 24th St NE, Auburn 1967 1998 16.94 89,320 89,320
Mt Baker 620 37th St SE, Auburn 1994 NA 28.98 90,365 90,365
Olympic 839 21st St SE, Auburn 2019 NA 17.40 107,625 107,625
Rainier 30620 116th Ave SE, Auburn 1991 NA 25.54 91,321 91,321
TOTAL 88.86 378,631 378,631
HIGH SCHOOLS
Auburn High - Main Building 711 E Main St, Auburn 2015 NA 20.50 277,229 276,229
Auburn High - TAP Building 501 3rd St NE, Auburn 2009 NA 0.24 2,662 2,662
Auburn Mountainview 28900 124th Ave SE, Auburn 2005 NA 39.42 187,542 187,539
Auburn Riverside 501 Oravetz Rd, Auburn 1995 NA 35.32 180,248 180,248
West Auburn 401 W Main St, Auburn 1990 NA 5.26 30,295 30,295
TOTAL 100.74 677,976 676,973
GRAND TOTAL 383.27 2,053,646 2,030,784
The following table identifies the District’s support facilities and facility data.
Page 79 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 6
Table 3: Support Facility Inventory
FACILTY ADDRESS YEAR BUILT MAJOR MOD.
SITE SIZE (ACRES)
GROSS SF OSPI SF
SUPPORT FACILITIES
Administration Building 915 4th St NE, Auburn 1968 1987 / 2017 3.50 24,046 NA
Administration Annex 502 4th St NE, Auburn 1935 1989 0.34 6,557 NA
Auburn Memorial Stadium 405 4th St NE, Auburn 1978 1980 / 1997 6.60 17,055 NA
Auburn Pool 516 4th St NE, Auburn 1971 2011 0.74 14,390 NA
Support Services 1302 4th St SW, Auburn 1996 NA 5.50 41,184 NA
Transportation Center 615 15th St SW, Auburn 1997 NA 5.90 19,500 NA
TOTALS 22.58 122,732
The following table identifies the District’s portable classrooms that are located at schools.
Table 4: School Portable Classroom Inventory
FACILITY SINGLE PORTABLE CLASSROOMS DOUBLE PORTABLE CLASSROOMS TOTAL PORTABLE CLASSROOMS
ELEMENTARY SCHOOLS
Alpac 6 0 6
Arthur Jacobsen 0 0 0
Bowman Creek 0 0 0
Chinook 0 0 0
Dick Scobee 0 0 0
Evergreen Heights 4 0 4
Gildo Rey 1 0 1
Hazelwood 2 0 2
Ilalko 0 0 0
Lake View 0 0 0
Lakeland Hills 1 1 3
Lea Hill 0 0 0
Pioneer 0 0 0
Terminal Park 0 0 0
Washington 10 0 10
Willow Crest 0 0 0
TOTAL 24 1 26
MIDDLE SCHOOLS
Cascade 8 0 8
Mt. Baker 8 3 14
Olympic 8 0 8
Rainier 9 1 11
TOTAL 33 4 41
HIGH SCHOOLS
Auburn High - Main Building 10 0 10
Auburn High - TAP Building 0 0 0
Auburn Mountainview 10 1 12
Auburn Riverside 6 6 18
West Auburn 1 0 1
TOTAL 27 7 41
GRAND TOTAL 84 12 108
Page 80 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 7
The following table identifies the District’s inventory of undeveloped property.
Table 5: Undeveloped Property Inventory
SITE
NO. LOCATION YEAR
ACQUIRED
SITE SIZE
(ACRES)
BUILDING DEPT.
JURISDICTION
URBAN GROWTH
BOUNDARY
23A SE 318th St., Auburn 1948 62.44 King County Outside
25A SE Lake Holm Road / 190th Ave. SE, Auburn 1990 23.86 King County Outside
25B SE Lake Holm Road / 188th Ave. SE, Auburn 2008 5.00 King County Outside
33 SE Lake Holm Road /129th Way SE, Auburn 2005 40.00 King County Outside
34/39 I St. NE/40th St. NE, Auburn 2002 / 2022 72.28 City of Auburn Within
35 Sumner Tapps Hwy. E./ 62nd St. SE, Auburn 2009 53.00 City of Auburn Within
TOTAL 256.58
SECTION 3 – ENROLLMENT PROJECTIONS
The District has prepared a comprehensive and detailed demographic analysis of the
school district. This includes updating District mapping files, analyzing the District using
geocoded student data files, developing and researching pertinent demographic data,
identifying current and future residential development plans, and preparing a ten-year
student population forecast. The data collected and used in the ten-year forecast includes:
●an analysis of birth rates and their effect on incoming kindergarten classes,
●the effects of student mobility including cohort survival rates,
●student yield rates based upon historic housing data and trends, and
●a detailed review of future residential development within the district.
The methodology utilized is more extensive than traditional cohort survival projections and
has proven to be reasonable and effective in predicting the student population in the
District.
Historical Enrollment
The following table shows the District’s October 1 historical enrollment over the past 20-
years. The data reveals an average overall growth of 1.0% over the past 10 years. This
includes a 4.42% decrease in 2020 enrollment due to the COVID pandemic.
Page 81 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 8
Table 6: Historical Enrollment
GRADE 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 23-24 24-25 25-26
KDG 940 995 998 1,032 1,010 1,029 1,098 1,170 1,232 1,198 1,237 1,261 1,271 1,291 1,038 1,227 1,214 1,205 1,225 1,147
1 1,012 995 1,014 1,033 1,066 1,068 1,089 1,188 1,219 1,279 1,210 1,276 1,290 1,314 1,236 1,135 1,304 1,305 1,232 1,239
2 1,001 1,019 1,024 998 1,016 1,097 1,083 1,124 1,196 1,289 1,300 1,251 1,311 1,295 1,243 1,249 1,241 1,320 1,338 1,220
3 1,031 997 1,048 993 1,013 996 1,111 1,125 1,136 1,232 1,317 1,328 1,275 1,320 1,243 1,264 1,324 1,265 1,338 1,318
4 1,049 1,057 1,045 1,073 1,024 1,022 1,038 1,123 1,156 1,170 1,237 1,328 1,378 1,316 1,257 1,255 1,322 1,356 1,314 1,339
S 998 1,077 1,070 1,030 1,079 1,017 1,070 1,075 1,122 1,172 1,199 1,269 1,345 1,361 1,294 1,251 1,296 1,349 1,345 1,320
6 1,061 1,008 1,096 1,040 1,041 1,063 1,041 1,076 1,059 1,116 1,152 1,207 1,275 1,337 1,306 1,233 1,227 1,276 1,314 1,270
7 1,014 1,057 1,034 1,125 1,060 1,032 1,036 1,072 1,091 1,099 1,132 1,194 1,232 1,295 1,319 1,304 1,267 1,230 1,259 1,271
8 1,069 1,033 1,076 1,031 1,112 1,046 1,018 1,116 1,088 1,136 1,108 1,183 1,213 1,236 1,264 1,312 1,315 1,277 1,241 1,255
9 1,372 1,337 1,257 1,245 1,221 1,273 1,200 1,159 1,275 1,229 1,261 1,257 1,372 1,399 1,351 1,386 1,455 1,453 1,367 1,341
10 1,400 1,367 1,341 1,277 1,238 1,168 1,278 1,229 1,169 1,316 1,248 1,300 1,313 1,410 1,376 1,188 1,416 1,507 1,501 1,382
11 1,294 1,305 1,304 1,269 1,212 1,177 1,116 1,187 1,169 1,111 1,248 1,188 1,198 1,218 1,174 1,299 1,300 1,309 1,409 1,415
12 1,068 1,176 1,259 1,319 1,251 1,220 1,231 1,186 1,218 1,175 1,104 1,266 1,126 1,113 1,039 1,248 1,251 1,252 1,280 1,380
TOTALS 14,309 14,423 14,566 14,465 14,343 14,208 14,459 14,830 15,130 15,522 15,753 16,308 16,599 16,905 16,190 16,601 17,059 17,239 17,312 16,897
Student Gain/Loss 114 143 -101 -122 -135 251 371 300 392 231 555 291 306 -715 411 458 180 73 -266
Percent Gain/Loss 0.98% -0.70%-0.85%-0.95%1.74% 2.50% 1.98% 2.53% 1.47% 3.40% 1.75% 1.81% -4.42%2.48% 2.68% 1.04% 0.42% -1.57%
Projected Enrollment
Based upon a district-wide analysis:
●Birth rates continue to decline leading to variability in Kindergarten enrollment.
●Overall, the student population is projected to decrease by 1.8% over the next 5
years and 1.5% over the next 10 years.
●The elementary school grade group represents the largest portion of students and
shows consistent stability, with a slight decline of 1.7% in the short-term, peaking
growth in school year 2032, and then stabilizing for a ten-year average return to
current levels.
●The middle school grades group will maintain stability near the current level and
increase slightly in the first four years of the planning period. Thereafter, this
population is expected to slightly decline over 2025 actual enrollment and through
the second half of the forecast for a total of -0.5% over ten years.
●High school grades 9-12 show a gradual decline over the forecast. This grade group
is expected to decrease by -2.7% in the five-year forecast and -4.7% in the ten-year
forecast.
Page 82 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 9
The following table identifies October 1 student enrollment projections for the next six
years.
Table 7: Student Enrollment Projections
GRADE 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32
IN-DISTRICT STUDENTS
Pre-K 122 122 122 122 122 122
K 1,191 1,169 1,145 1,164 1,169 1,179
1 1,105 1,201 1,178 1,154 1,181 1,195
2 1,205 1,125 1,219 1,195 1,180 1,217
3 1,189 1,213 1,137 1,228 1,213 1,208
4 1,301 1,215 1,240 1,161 1,263 1,258
5 1,309 1,314 1,229 1,254 1,182 1,293
6 1,253 1,288 1,295 1,206 1,241 1,180
7 1,228 1,234 1,269 1,275 1,191 1,233
8 1,245 1,225 1,232 1,263 1,279 1,201
9 1,255 1,267 1,244 1,254 1,283 1,313
10 1,270 1,275 1,288 1,265 1,279 1,315
11 1,186 1,187 1,194 1,204 1,187 1,207
12 1,258 1,154 1,157 1,161 1,180 1,171
Subtotal 16,117 15,989 15,949 15,906 15,950 16,092
OUT-OF-DISTRICT STUDENTS
K-5 415 412 407 407 409 418
6-8 65 65 66 65 64 63
9-12 450 442 442 443 447 454
Subtotal 930 919 915 915 920 935
TOTAL STUDENTS
PreK-5 7,837 7,771 7,677 7,685 7,719 7,890
6-8 3,791 3,812 3,862 3,809 3,775 3,677
9-12 5,419 5,325 5,325 5,327 5,376 5,460
TOTAL 17,047 16,908 16,864 16,821 16,870 17,027
SECTION 4 – STUDENT GENERATION RATES
King County Code 21A establishes a formula to determine school impact fees. Developers
of residential properties must pay a school district the impact fee to help compensate the
District for the impact of new housing units on school facilities. This King County code was
substantially adopted by the Cities of Auburn, Black Diamond, and Kent.
This formula requires the District to establish a “Student Generation Rate.” This rate is the
average number of students generated by a residential housing unit and is used to
estimate the number of students that will be added to the District by each new housing
unit.
Two sets of data are used to calculate Student Generation Rates - current student
enrollment and students generated from recently constructed housing units. This
Page 83 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 10
information links each student with a housing unit. Three general housing categories are
analyzed - single-family detached units, “middle housing” consisting of
duplexes/multiplexes, and stacked apartments/condo units.
The District also uses the Student Generation Rates to estimate student enrollment in the
future. Development data is collected to determine the number of new residential units that
may be built in the future. The Student Generation Rates are applied to estimate the
number of new students that the planned residential developments may yield.
Planned residential development data has been provided by MGT with additional data
obtained by the District from city agencies, counties, and major developers within the
District boundaries. Student population by residence includes all approved and tentative
tract maps in addition to any planned or proposed development that may occur within the
project timeframe. The planned residential development information is a current snapshot
of the District. The information may change and is updated annually.
The following table provides information about recent single-family residential
developments in the District and associated Student Generation Rates.
Table 8: Single-Family Residential Development Summary
SINGLE-FAMILY DEVELOPMENTS
FULL OCCUPANCY DATE
OCCUPIED UNITS TO BE OCCUPIED
2025 STUDENTS STUDENT GENERATION RATES
UNITS K-5 6-8 9-12 Total K-5 6-8 9-12 Total
Bridges 2021 380 380 0 176 73 55 304 0.463 0.192 0.145 0.800
Forest Glen at Lakeland 2021 30 30 0 18 11 7 36 0.600 0.367 0.233 1.200
Greenvale (Hazel Hts) 2023 17 17 0 2 2 0 4 0.118 0.118 0.000 0.235
Greenview Estates 2023 17 17 0 3 3 2 8 0.176 0.176 0.118 0.471
Lozier Ranch Pending 18 7 11 2 2 1 5 0.286 0.286 0.143 0.714
Palisades-Omni Homes Pending 16 15 1 6 3 1 10 0.400 0.200 0.067 0.667
River Rock Pending 14 10 4 2 1 1 4 0.200 0.100 0.100 0.400
The Willows/Phase 1 Pending 25 10 15 5 3 3 11 0.500 0.300 0.300 1.100
Vasiliy 2021 8 8 0 1 1 0 2 0.125 0.125 0.000 0.250
Willow Place 2021 11 11 0 4 0 2 6 0.364 0.000 0.182 0.545
TOTALS 536 505 31 219 99 72 390 0.434 0.196 0.143 0.772
The following table provides information about recent apartment/condo residential
developments in the District and associated Student Generation Rates.
Table 9: Apartment/Condo Residential Development Summary
MULTI-FAMILY DEVELOPMENTS
FULL OCCUPANCY DATE
OCCUPIED UNITS TO BE OCCUPIED
2025 STUDENTS STUDENT GENERATION RATES
UNITS K-5 6-8 9-12 Total K-5 6-8 9-12 Total
Copper Gate Apts. 2021 500 500 0 384 150 139 673 0.768 0.300 0.278 1.346
Divine Court Apts. 2024 98 98 0 2 0 0 2 0.020 0.000 0.000 0.020
The Verge Auburn 2022 226 226 0 8 3 5 16 0.035 0.013 0.022 0.071
TOTALS 824 824 0 394 153 144 691 0.478 0.186 0.175 0.839
Page 84 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 11
The District does not have its own data to determine the Middle Housing Student
Generation Rate. Instead, as permitted by King County Code 21A.43.030(B), the District
is using the Highline School District’s Middle Housing Student Generation Rates, given
that HSD is a school district with demographics similar to the District.
Table 10 provides a summary of the 2026 Student Generation Rates.
Table 10: Student Generation Rates Summary
Housing Type K-5 6-8 9-12 Total
Single-Family 0.434 0.196 0.143 0.772
Apartments/Condos 0.478 0.186 0.175 0.839
Middle Housing* 0.078 0.031 0.021 0.130
TOTALS 0.99 0.413 0.339 1.741
*Student Generation Rate taken from Highline School District.
SECTION 5 – STANDARD OF SERVICE
The School Impact Fee Ordinances adopted by King County and the Cities of Auburn,
Black Diamond, and Kent require the District to establish a “Standard of Service” to be
eligible to impose school impact fees. The Standard of Service must identify the school
program year, class size by grade span, the types of facilities needed to serve its student
population, and other rates identified by the District including the requirements of students
with special needs.
CURRENT ENROLLMENT
The District operates 16 elementary schools with pre-school to grade 5, four middle
schools with grades 6 to 8, three comprehensive and one alternate education high school
with grades 9 to 12. Student enrollments at these schools as of March 2026 are:
●Elementary Schools: 8,435 students
●Middle Schools: 3,799 students
●High Schools: 5,375 students
●Total Enrollment: 17,609 students
CLASS SIZE
Standard class sizes in the District are subject to state regulations, collective bargaining
agreements, and student needs. Class sizes also vary based upon grade level and
classroom type.
The District’s blended class size standards are as follows:
●Elementary Schools: 20.29 students per classroom
Page 85 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 12
●Middle Schools: 28.02 students per classroom
●High Schools: 28.74 students per classroom
●Self-Contained Special Education: 12.00 students per classroom
PERMANENT CLASSROOMS
Permanent classrooms are located at schools owned and operated by the District. The
school district does not lease classroom space. The number of permanent classrooms at
the District’s 24 schools are:
●Elementary Schools: 507 classrooms
●Middle Schools: 151 classrooms
●High Schools: 221 classrooms
●Total: 879 classrooms
PORTABLE CLASSROOMS
Portable classrooms in the District are modular structures that can be relocated. The
District uses portable classrooms when permanent facilities do not have adequate space
to accommodate its students and staff. Portable classrooms are also used at the school
district’s Administration Building for training, conference, and office space. The number of
portable classrooms in use and their locations are:
●Elementary Schools: 26 portables
●Middle Schools: 41 portables
●High Schools: 41 portables
●Support Facilities: 4 portables
●Total: 112 portables
TYPES OF CLASSROOMS
The types of classrooms in the District vary based upon grade level, instructional program,
and student needs. Classroom types in the District are:
●General Classrooms: Spaces used for general instruction and do not have
specialized features or equipment. These classrooms are present in elementary,
middle, and high schools.
●Special Education Self-Contained Classrooms: Spaces used for self-contained
instruction for students with special needs. These classrooms are present in
elementary, middle, and high schools.
●Specialty Classrooms: Instructional spaces that have unique features or equipment.
These classrooms are present in middle and high schools and consist of teaching
Page 86 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 13
stations for art, automotive technology, band, business education, career center,
choral, construction manufacturing, computer science, culinary arts, drafting, drama,
fitness and conditioning, horticulture, kitchen science, marketing, metals, orchestra,
physical education, robotics, science, sports medicine, theater arts, and visual
communications.
●Pull-Out Classrooms: Spaces where students receive specialized instruction for a
portion of the school day and are comprised of elementary gymnasiums and music,
and elementary, middle, and high school multi-lingual, resource, and Title/LAP
classrooms. Pull-out classrooms do not contribute to a school’s capacity because
students visit these classrooms during the school day while excused from their
general classrooms.
The standard number of students in a classroom varies based upon grade level and
classroom type. Standard class sizes in the District are:
●Elementary General Classroom Pre-Kindergarten: 20 students per classroom.
●Elementary General Classrooms Kindergarten through Grade 3: 17 students per
classroom.
●Elementary General Classrooms Grades 4 and 5: 27 students per classroom.
●Middle School General and Specialty Classrooms Grade 6: 27 students per
classroom.
●Middle School General and Specialty Classrooms Grades 7 and 8: 28.53
students per classroom.
●High School General and Specialty Classrooms Grades 9 through 12: 28.74
students per classroom.
●Special Education Self-Contained Classrooms Pre-Kindergarten – Grade 12: 12
students per classroom.
●Pull-Out Classrooms Pre-Kindergarten through Grade 12: Class size varies
depending on the grade level and type of instruction being provided.
CLASSROOM UTILIZATION
As noted above, the District has established standard student class sizes based upon
grade level and classroom use. While the District works diligently to assign students to
achieve full classroom capacity, it is not possible to always do so. Consequently, the
District applies classroom utilization rates to address inefficiencies in assigning classes.
The utilization rates are:
●Elementary Schools: 100% utilization based on the ability to fully assign classes at
classroom size standards.
●Middle and High Schools: 76.67% utilization based upon 92% utilization due to
elective class sizes x 83% utilization due to classrooms used for planning periods.
Page 87 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 14
SCHOOL CAPACITY
School capacity is determined by the number of teaching stations present at each school,
type of teaching station, class size, teaching station capacity, and classroom utilization
rate.
The following table identifies the capacity of each school in the District including
permanent classrooms and portable classrooms.
Page 88 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 15
TABLE 11: SCHOOL CAPACITIES - MARCH 2026
SCHOOL NAME GEN. CLRMS.PRE-K CLRMS.
SPEC. ED. SELF- CONTAINED CLRMS.
PULL- OUT CLRMS.
SPECIALTY CLRMS.TOTL CLRMS.
GEN. & SPECIALTY CLRM. CAPACITY
SPEC. ED. SELF-
CONTAINED CLRM. CAPACITY
CLRM. UTILIZATION RATE
SCHOOL CAPACITY PERMANENT
SCHOOL CAPACITY PERMANENT + PORTABLES
ELEMENTARY SCHOOLS
Alpac 19 1 0 6 0 26 20.29 12.00 100.00% 406 531
Arthur Jacobsen 20 1 2 5 0 28 20.29 12.00 100.00% 450 450
Bowman Creek 32 1 1 5 0 39 20.29 12.00 100.00% 682 682
Chinook 25 4 2 8 0 39 20.29 12.00 100.00% 612 637
Dick Scobee 24 4 2 9 0 39 20.29 12.00 100.00% 592 592
Evergreen Heights 15 1 2 4 0 22 20.29 12.00 100.00% 349 449
Gildo Rey 19 1 1 4 0 25 20.29 12.00 100.00% 418 418
Hazelwood 21 1 1 5 0 28 20.29 12.00 100.00% 458 458
Ilalko 19 1 2 6 0 28 20.29 12.00 100.00% 430 430
Lake View 18 1 1 5 0 25 20.29 12.00 100.00% 398 398
Lakeland Hills 21 1 1 5 0 28 20.29 12.00 100.00% 458 508
Lea Hill 28 3 2 6 0 39 20.29 12.00 100.00% 653 653
Pioneer 26 4 2 7 0 39 20.29 12.00 100.00% 633 633
Terminal Park 26 4 2 7 0 39 20.29 12.00 100.00% 633 633
Washington 13 3 2 6 0 24 20.29 12.00 100.00% 349 599
Willow Crest 27 3 2 7 0 39 20.29 12.00 100.00% 633 633
TOTALS 353 34 25 95 0 507 8,152 8,702
MIDDLE SCHOOLS
Cascade 13 0 2 8 17 40 28.02 12.00 76.67% 663 943
Mt Baker 12 0 2 7 15 36 28.02 12.00 76.67% 598 990
Olympic 11 0 3 9 17 40 28.02 12.00 76.67% 629 853
Rainier 10 0 3 7 15 35 28.02 12.00 76.67% 565 873
TOTALS 46 0 10 31 64 151 2,455 3,659
HIGH SCHOOLS
Auburn High 24 0 3 14 40 81 28.74 12.00 76.67% 1,438 1,718
Auburn High - TAP -1 0 4 0 0 3 28.74 12.00 76.67% 15 15
Auburn Mountainview 19 0 3 10 30 62 28.74 12.00 76.67% 1,107 1,499
Auburn Riverside 20 0 3 10 28 61 28.74 12.00 76.67% 1,085 1,589
West Auburn 8 0 0 4 1 13 28.74 12.00 76.67% 198 226
TOTALS 70 0 13 38 99 220 3,843 5,047
GRAND TOTALS 469 34 48 164 163 878 14,451 17,409
Page 89 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 16
SECTION 6 - CAPACITY AND FACILITY PLANNING
Since 1975, the District has regularly performed in-depth reviews of its existing facilities
and long-term facility needs. The process includes the formation of community-wide
citizens’ committees to review facility needs and make recommendations for
improvements, modernizations, and new facilities.
In 2015, a citizens’ committee recommended the District build two new elementary
schools, replace one middle and five elementary schools, and acquire property for three
elementary schools. In November 2016, the voters approved a bond proposition to build
and replace these schools. The last project in this building program was completed in
October 2024.
In 2023, the District completed a 10-year Facilities Master Plan. This plan identified the
following facility needs:
●Complete improvements to 22 facilities to address aging equipment, air
conditioning, energy conservation, major maintenance, and safety and security
improvements within six years.
●Replace Alpac Elementary School within six years.
●Replace Cascade Middle School within six years.
●Build a new middle school within six years.
●Replace Evergreen Heights and Gildo Rey Elementary Schools within seven to 13
years.
●Replace the Administration Building and Administration Annex within seven to 13
years.
●Build a new high school in nine years if current enrollment projections remain
accurate.
●Acquire new portable classrooms and relocate existing portable classrooms where
needed to accommodate localized enrollment growth at individual schools.
A citizens’ committee was convened in the fall of 2023 and recommended construction of a
new middle school to increase capacity, replace an aging elementary and middle school,
and provide improvements at 22 existing schools and support facilities. Based upon these
recommendations, the District Board of Directors placed a bond proposition on the
November 2024 ballot for these projects which received a 55% approval, missing the
required 60% approval requirement. The Board put the bond proposition for the same
schools on the November 2025 ballot which received a 54% approval, again below the
60% approval requirement.
Here is a record of construction bonds submitted to the voters during the past 10 years.
This includes the funding measures identified above.
Page 90 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 17
Table 12 – Construction Bond and Capital Levy – 10 Year History
FUNDING MEASURE PROJECTS FUNDING AMOUNT ELECTION DATE ELECTION RESULT
Capital Levy Safety, Security, Facility Improvements and
Technology Replacement Levy $110,800,000 Nov. 2025 Passed
Construction Bond New Middle School #5, Cascade MS
Replacement, Alpac Elem. Replacement $490,000,000 Nov. 2025 Failed
Construction Bond
New Middle School #5, Cascade MS
Replacement, Alpac Elem. Replacement,
Facility Improvements
$532,100,000 Nov. 2024 Failed
Construction Bond 2 New Elementary Schools, Replace 5
Elementary Schools and 1 Middle School $456,056,000 Nov. 2016 Passed
The District Board of Directors has approved a resolution to propose a bond proposition to
the voters in November 2026 to build a new Middle School #5 and replace Alpac
Elementary and Cascade Middle School. The District is not eligible for state funding
assistance for the Middle School #5 project. The District is eligible for state funding
assistance for the replacement of Alpac Elementary and Cascade Middle School. The
District will front fund the Alpac Elementary and Cascade Middle School projects because
the state funding assistance is not guaranteed for these projects.
The new middle school and portable classrooms are part of the District’s capacity solution.
The new middle school will provide added capacity to serve growth and is the basis for the
District's impact fees. The District also plans to purchase or relocate portable classrooms
to continue to accommodate growth at the middle and high school levels.
The District’s six-year facility needs are summarized in the following table.
Table 13 : Six -Year Capital Construction Plan
PROJECT ADDED
CAPACITY
FUND
SOURCE
ESTIMATED
COMPLETION
ESTIMATED
COST
SIX-YEAR FINANCE PLAN (Estimated)
2026 2027 2028 2029 2030 2031 Total
New Middle School 800 Future
Bond Aug. 2028 $184,000,000 $7,360,000 $75,440,000 $92,000,000 $7,360,000 $1,840,000 $0 $184,000,000
Cascade MS Replacement 125 Future Bond Aug. 2028 $189,000,000 $7,560,000 $77,490,000 $94,500,000 $7,560,000 $1,890,000 $0 $189,000,000
Alpac Elem. Replacement 224 Future Bond Aug. 2029 $118,000,000 $0 $1,770,000 $2,950,000 $48,380,000 $59,000,000 $5,900,000 $118,000,000
Improvements at 22
Facilities 0 Future
Cap. Levy Aug. 2031 $53,400,000 $7,905,297 $8,512,435 $8,976,492 $9,189,356 $9,342,314 $9,474,106 $53,400,000
Portable Classrooms 0 Cap. Proj. Fund Aug. 2026 $1,075,000 $1,075,000 $0 $0 $0 $0 $0 $1,075,000
Property
Acquisitions 0 Cap. Proj.
Fund NA $0 $0 $0 $0 $0 $0 $0 $0
TOTALS $545,475,000 $23,900,297 $163,212,435 $198,426,492 $72,489,356 $72,072,314 $15,374,106 $545,475,000
Page 91 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 18
SECTION 7 - IMPACT FEES
King County Code 21A allows school districts to assess impact fees on every dwelling unit
in the District for which a fee schedule has been established. The fee schedule is based on
the school impact fee formula set out in King County Code Section 21A.43.030.
In 2025, the King County Council adopted Ordinance 19965 to implement Engrossed
Second Substitute Senate Bill 5258 (2023), requiring local jurisdictions to use bedroom
count, square footage, or traffic count to “produce a proportionally lower impact fee for
smaller housing units.” Under Ordinance 19965, school districts must calculate impact
fees for single family detached, middle housing (townhome/duplex/multi-plex), and
apartment/condo stacked units using bedroom count categories that distinguish between
small and large units.
Residential development in the District is expected to add students to elementary and
middle schools in the upcoming years. The 2026 student generation rates are set forth in
Table 10. The tables below show the calculations for single-family, middle housing, and
apartments/condos. Because the data on the number of bedrooms for each housing type
is not available, the student generation rates are based on all units in a housing category.
As a result, impact fees cannot be calculated for specific numbers of bedrooms in each of
the housing types identified in the updated ordinance. Therefore, the District assumes a $0
impact fees for single family units with 2 bedrooms or less, middle housing units with 2
bedrooms or less, and apartments/condo units with 1 bedroom or less.
The development data available for apartments/condo units is limited to three
developments including one development with an exceptionally high Student Generation
Rate. This limited data and high student generation rate at one apartment development
resulted in a high overall Student Generation Rate and high impact fee for 2026 for
apartment/condo dwellings. In recognition of this, the District has made a discretionary
adjustment to this fee and reduced it to match the multi-family fee collected in 2025. The
same applies to single-family residence with 3 or more bedrooms. In addition, King County
caps apartment/condo school impact fees at $5,000.
Page 92 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 19
The following table shows the impact fee calculation for single-family residences with 3
bedrooms or more.
Table 14: Impact Fee Calculation – Single-Family Residence 3+ Bedroom
SCHOOL SITE ACQUISITION COST
Grade Level Site Acreage Cost per Acre School Capacity Site Cost per Student Student Gen. Rate Cost per SFR
Elementary 12 $0 650 $0 0.434 $0
Middle 24 $0 800 $0 0.196 $0
High 36 $0 1,500 $0 0.143 $0
TOTAL $0
SCHOOL CONSTRUCTION COST
Grade Level Facility Cost Student Capacity
Percent Permanent SF
Facility Cost per Student Student Gen. Rate Cost per SFR
Elementary $0 650 0.9773 $0 0.434 $0
Middle $189,000,000 800 0.9128 $215,649 0.196 $42,267
High $0 1,500 0.9487 $0 0.143 $0
TOTAL $42,267
PORTABLE CLASSROOM COST
Grade Level Facility Cost Student Capacity Percent Portable SF Facility Cost per Student Student Gen. Cost per SFR
Elementary $250,000 20.29 0.0227 $280 0.434 $122
Middle $250,000 28.02 0.0872 $778 0.196 $152
High $0 28.74 0.0513 $0 0.143 $0
TOTAL $274
STATE MATCH CREDIT
Grade Level Construction Cost Allowance
OSPI SF Per Student
State Match % State Match per Student Student Gen. Rate Cost per SFR
Elementary $399.38 90 0.6583 $0 0.434 $0
Middle $399.38 108 0.6583 $0 0.196 $0
High $399.38 130 0.6583 $0 0.143 $0
TOTAL $0
TAX CREDIT
Category Residential Assessed Value
Debt Service Tax Rate
G.O. Bond Interest Rate Years Amortized Tax Credit
Single Family $634,827 1.50213 0.0477 10 $7,446
IMPACT FEE SUMMARY – SINGLE-FAMILY RESIDENCE
Site Cost per Acre Permanent Facility Cost Portable Clrm. Cost State Match Credit Tax Credit 50% Local Share Impact Fee SFR
$0 $42,267 $274 $0 ($7,446) 0.500 $17,548
Auburn School District adjustment ($9,545)
Single-Family Residence 3+ Bedroom Impact Fee $8,003
Page 93 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 20
The following table shows the impact fee calculation for multi-family residences.
Table 15: Impact Fee Calculation – Middle Housing Townhome/Duplex/Triplex/Fourplex 3+ Bedroom
SCHOOL SITE ACQUISITION COST
Grade Level Site Acreage Cost per Acre School Capacity Site Cost per Student Student Gen. Rate Cost per MH
Elementary 12 $0 650 $0 0.078 $0
Middle 24 $0 800 $0 0.031 $0
High 36 $0 1,500 $0 0.021 $0
TOTAL $0
SCHOOL CONSTRUCTION COST
Grade Level Facility Cost Student Capacity Percent Permanent SF Facility Cost per Student Student Gen. Rate Cost per MH
Elementary $0 650 0.9773 $0 0.078 $0
Middle $189,000,000 800 0.9128 $215,649 0.031 $6,685
High $0 1,500 0.9487 $0 0.021 $0
TOTAL $6,685
PORTABLE CLASSROOM COST
Grade Level Facility Cost Student Capacity Percent Portable SF Facility Cost per Student Student Gen. Rate Cost per MH
Elementary $250,000 20.29 0.0227 $280 0.078 $22
Middle $250,000 28.02 0.0872 $778 0.031 $24
High $0 28.74 0.0513 $0 0.021 $0
TOTAL $46
STATE MATCH CREDIT
Grade Level Construction Cost Allowance
OSPI SF Per Student State Match % State Match per Student Student Gen. Rate Cost per MH
Elementary $375.00 90 0.6678 $0 0.078 $0
Middle $375.00 108 0.6678 $0 0.031 $0
High $375.00 130 0.6678 $0 0.021 $0
TOTAL $0
TAX CREDIT
Category Residential Assessed Value
Debt Service Tax Rate
G.O. Bond Interest Rate Years Amortized Cost per MH
Multi-Family $656,062 1.50213 0.0477 10 $7,695
IMPACT FEE SUMMARY – MIDDLE HOUSING RESIDENCE
Site Cost per Acre Permanent Facility Cost Portable Clrm. Cost State Match Credit Tax Credit 50% Local Share Impact Fee MH
$0 $6,685 $46 $0 ($7,695) 0.500 $0
Page 94 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 21
Table 16: Impact Fee Calculation – Multi -Family Apartment/Condo 2+ Bedrooms
SCHOOL SITE ACQUISITION COST
Grade Level Site Acreage Cost per Acre School Capacity Site Cost per Student Student Gen. Rate Cost per MFR
Elementary 12 $0 650 $0 0.478 $0
Middle 24 $0 800 $0 0.186 $0
High 36 $0 1,500 $0 0.175 $0
TOTAL $0
SCHOOL CONSTRUCTION COST
Grade Level Facility Cost Student Capacity Percent Permanent SF Facility Cost per Student Student Gen. Rate Cost per MFR
Elementary $0 650 0.9773 $0 0.478 $0
Middle $189,000,000 800 0.9128 $215,649 0.186 $40,111
High $0 1,500 0.9487 $0 0.175 $0
TOTAL $40,111
PORTABLE CLASSROOM COST
Grade Level Facility Cost Student Capacity Percent Portable SF Facility Cost per Student Student Gen. Rate Cost per MFR
Elementary $250,000 20.29 0.0227 $280 0.478 $134
Middle $250,000 28.02 0.0872 $778 0.186 $145
High $0 28.74 0.0513 $0 0.175 $0
TOTAL $279
STATE MATCH CREDIT
Grade Level Construction Cost Allowance
OSPI SF Per Student State Match % State Match per Student Student Gen. Rate Cost per MFR
Elementary $375.00 90 0.6678 $0 0.478 $0
Middle $375.00 108 0.6678 $0 0.186 $0
High $375.00 130 0.6678 $0 0.175 $0
TOTAL $0
TAX CREDIT
Category Residential Assessed Value
Debt Service Tax Rate
G.O. Bond Interest Rate Years Amortized Cost per MFR
Multi-Family $349,208 1.50213 0.0477 10 $4,096
IMPACT FEE SUMMARY – MULTI-FAMILY RESIDENCE
Site Cost per Acre Permanent Facility Cost Portable Clrm. Cost State Match Credit Tax Credit 50% Local Share Impact Fee MFR
$0 $40,111 $279 $0 ($4,096) 0.500 $18,147
Auburn School District Adjustment ($9,181)
$8,966
King County cap applied $5,000
Page 95 of 207
2026 Capital Facilities Plan
Auburn School District No. 408 22
SECTION 8 – CONCLUSIONS
New housing units continue to be built in the District, and the student population begins to
stabilize.
The District built two new elementary schools and replaced five elementary schools with
larger facilities during the past five years. This increased elementary school capacity, and
it now fully accommodates current elementary students. However, the District continues to
lack permanent classroom space to accommodate middle and high school students,
including students from new growth. Consequently, 82 portable classrooms are being used
to accommodate middle and high school students and are part of the District’s short-term
capacity solution.
Because of a shortage of permanent classrooms in middle schools, the District has
decided to place a bond proposition on the ballot in November 2026. This includes funding
to build an additional middle school. The District is also monitoring annual enrollment
levels and bonding capacity to determine when an additional high school should be built.
During the past year, the District experienced an increase in the construction cost for a
new middle school and a notable increase in single-family and multi-family Student
Generation Rates. The increased Student Generation Rates contributes to an increase in
the impact fee for single-family residences with 3 bedrooms or more from $8,003 to
$17,548. It also contributed to an increase in the impact fee for apartment/condo
residences. Based on an application of King County Code 21A and its associated formula,
the District’s 2026 impact fee for multi-family residences with 2 bedrooms or more would
increase from $14,408 to $18,147. The District has adjusted this fee and reduced it to
match the single- and multi-family fee collected in 2025. This discretionary reduction was
made to establish a more stable impact fee for students generated from the respective
developments. Conversely, the low Middle Housing Student Generation Rate, borrowed
from the Highline School District, results in a fee of $0. Again, given the lack of available
permit data, the District assumes a fee of $0 for single family units with 2 bedrooms or
less, middle housing units with 2 bedrooms or less, and apartments/condo units with 1
bedroom or less.
The District’s 2026-2032 Capital Facilities Plan will be submitted for adoption by the
Auburn School District Board of Directors. After adoption, the Plan, including its 2026
impact fee rates, will be submitted to King County and the Cities of Algona, Auburn, Black
Diamond, Kent, and Pacific. The submission to these public agencies will include a request
that the jurisdictions adopt the plan and include the plan as an element in their
Comprehensive Plans.
Page 96 of 207
Page 97 of 207
DETERMINATION OF NONSIGNIFICANCE
Issued with a 14-day comment period
Description of Proposal:
This threshold determination analyzes the environmental impacts associated with the following
actions, which are so closely related to each other that they are in effect a single course of action:
1. The adoption of the Auburn School District's Capital Facilities Plan 2026-2032 by the
Auburn School District No. 408 for the purposes of planning for the facilities needs of the District;
2. The amendment of the Comprehensive Plans of King County and the cities of Auburn,
Black Diamond, and Kent to include the Auburn School District's Capital Facilities Plan 2026-2032 as
part of the Capital Facilities Element of each jurisdiction’s Comprehensive Plan; and
3. The amendment of the Comprehensive Plans of the cities of Algona and Pacific to
include the Auburn School District's Capital Facilities Plan 2026-2032 as part of the Capital Facilities
Element of each jurisdiction’s Comprehensive Plan.
Proponent: Auburn School District No. 408
Location of the Proposal:
The Auburn School District includes an area of approximately 62 square miles. Portions of
unincorporated King County and County and the cities of Algona, Auburn, Black Diamond, Kent, and
Pacific fall within the District's boundaries.
Lead Agency: Auburn School District No. 408
The lead agency for this proposal has determined that the proposal does not have a probable significant
adverse environmental impact on the environment. An environmental impact statement (EIS) is not
required under RCW 43.21C.030(2)(c). This decision was made after a review of the completed
environmental checklist and other information on file with the lead agency. This information is available
to the public upon request.
This Determination of Nonsignificance (DNS) is issued under WAC 197-11-340(2). The lead agency
will not act on this proposal for 14 days from the date of issue. Comments must be submitted by 4:30
p.m. on June 8, 2026. The responsible official will reconsider the DNS based on timely comments and
may retain, modify, or, if significant adverse impacts are likely, withdraw the DNS. If the DNS is
retained, it will be final after the expiration of the comment deadline.
Responsible Official: Dr. Alan Spicciati
Superintendent
Auburn School District No. 408
Address: Auburn School District
915 4th Street NE
Auburn, WA 98002
Page 98 of 207
DETERMINATION OF NONSIGNIFICANCE
Issued with a 14-day comment period
Questions may be directed and comments may be submitted by 4:30 p.m., June 6, 2026, to: Cindi
Blansfield, Associate Superintendent, Business & Operations, Auburn School District No. 408, 915 4th
Street NE, Auburn, WA 98002.
Date of Issue: May 22, 2026
Date Published: May 22, 2026
Page 99 of 207
Page 100 of 207
Page 101 of 207
Page 102 of 207
Page 103 of 207
Page 104 of 207
Page 105 of 207
Page 106 of 207
Page 107 of 207
Page 108 of 207
Page 109 of 207
Page 110 of 207
Page 111 of 207
Page 112 of 207
Page 113 of 207
Page 114 of 207
Page 115 of 207
Page 116 of 207
Page 117 of 207
Page 118 of 207
Page 119 of 207
Page 120 of 207
Page 121 of 207
Page 122 of 207
Page 123 of 207
Page 124 of 207
Page 125 of 207
CAPITAL FACILITIES
PLAN 2027
Lake Grove Elementary Mirror Lake Elementary Wildwood Elementary
Star Lake Elementary/
Evergreen Middle School
Olympic View K-8
Thomas Jefferson High School Memorial Field Renovation
Illahee Middle School
DRAFT
Page 126 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
2
FEDERAL WAY PUBLIC SCHOOLS
2027
CAPITAL FACILITIES PLAN
June 9, 2026
BOARD OF EDUCATION
Dr. Jennifer Jones, President
Trudy Davis, Vice President & WIAA Representative
Luckisha Phillips, Legislative Representative
Eric Gollings, Board Director
Joan Marie Murphy, Board Director
SUPERINTENDENT
Dr. Dani Pfeiffer
Prepared by: Rob Bryant, Chief Finance & Operations Officer
Jennifer Thomas, Student & Demographic Forecaster
Page 127 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
1
TABLE OF CONTENTS
TABLE OF CONTENTS 1
INTRODUCTION 2-3
SECTION 1 THE CAPITAL FACILITIES PLAN
Introduction 4
Inventory of Educational Facilities 5
Inventory of Non-Instructional Facilities 6
Needs Forecast - Existing Facilities 7
Needs Forecast - New Facilities 8
Six Year Finance Plan 9
Ten Year Bond/Capital Activity Summary 10
SECTION 2 MAPS
Introduction 11
Map – City and County Jurisdictions 12
SECTION 3 SUPPORT DOCUMENTATION
Introduction 13
Building Capacities 14-16
Portable Locations 16-17
Student Forecast 18-20
SECTION 4 KING COUNTY, CITY OF FEDERAL WAY, AND
CITY OF KENT IMPACT FEE CALCULATIONS
Introduction 21
Capacity Summaries 22-27
Impact Fee Calculation 28-29
Changes Summary from 2026 to 2027 30
Page 128 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
2
INTRODUCTION
In response to the requirements of the State of Washington Growth Management Act (SHB)
2929 (1990) and ESHB 1025 (1991)), and under the School Impact Fee Ordinances of King
County Code 21A, City of Federal Way Ordinance No. 95-249 effective December 21, 1995
as amended, City of Kent Ordinance No.4278 effective June 2018, revised December 2021,
and the City of Auburn Ordinance No. 5078 effective 1998, Federal Way Public Schools has
updated its Capital Facilities Plan as of June 2026.
This plan will be submitted for consideration to each of the jurisdictions located within the
Federal Way Public Schools’ service area: King County, the City of Kent, City of Federal Way,
and the City of Auburn and is incorporated in the Comprehensive Plans of each jurisdiction by
reference. This plan is requested to be included in the Facilities Plan element of the
Comprehensive Plans of each jurisdiction. To date, the City of Des Moines has not adopted a
school impact fee ordinance. The City of Des Moines collects school mitigation fees as part
of the SEPA process. Discussions with the City of Milton to adopt an ordinance for school
impact fees for parcels located within the Federal Way School District’s service area is in
process.
The Growth Management Act requires the County to designate Urban Growth areas within
which urban growth can be encouraged. The Growth Management Planning Council adopted
and recommended to the King County Council Urban Growth Area Line Maps with
designations for urban centers. A designation was made within the Federal Way planning area,
which encompasses Federal Way Public Schools boundaries. King County will encourage and
actively support the development of Urban Centers to meet the region’s need for housing, jobs,
services, culture, and recreation. This Plan’s estimated population growth is prepared with this
underlying assumption.
This Capital Facilities Plan will be used as documentation for any jurisdiction which requires
its use to meet the needs of the Growth Management Act. This plan is not intended to be the
sole planning tool for all of the District needs. The District may prepare interim plans
consistent with Board policies or management need.
Currently Federal Way Public Schools is nearing the end of Phase 2 Bond projects
supporting school expansion and replacement as authorized by the voters in 2017. Prior to
the passage of the Phase 2 Bond the District formed a 100-member Facilities Planning
Committee consisting of parents, community members and staff. This Committee was tasked
with developing a recommendation to the Superintendent regarding Phase 2 of the District’s
plan for school construction, remodeling, and/or modernization for voter consideration in
November 2017. The voters passed this $450M bond authorization with a 62% YES vote
reflecting a commitment to invest in the modernization of our infrastructure. As of today, the
District has completed Thomas Jefferson High School, Evergreen Middle School, Lake
Grove Elementary, Mirror Lake Elementary, Star Lake Elementary, Wildwood Elementary,
Olympic View K-8 and Memorial Field. Illahee Middle School is complete and occupied in
its 1 year warranty period.
Page 129 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
3
INTRODUCTION, continued
The rebuilding of the schools has and will continue to create additional capacity for students
at the elementary and high school levels.
The District continues to monitor factors that may have an impact on enrollment and capacity
at our schools, including new single-family and multi-family residential developments and
any impacts due to the COVID-19. In accordance with the McCleary decision, the State has
provided funding to reduce K-3 class size to 17 and 4-12 class size to 25. Beginning in
2019-20 the legislature expected compliance with this funding adding pressure to the need
for elementary capacity. In response to this need the district acquired a commercial building
to renovate into classrooms to provide permanent additional capacity.
The COVID-19 pandemic negatively affected brick and mortar enrollment in recent years, as
well as increased enrollment in the Internet Academy. However, the District’s 2022-23
enrollment was higher than projected. We have seen similar growth in the 2023-2024 and
2024-2025 school years, although we have not yet reached our Pre-Covid enrollment
numbers. We are anticipating continued enrollment growth, especially considering the City
of Federal Way’s plans to increase housing in the downtown core in conjunction with Sound
Transit’s Link Light Rail project completion.
The District has increased capacity at the elementary level over the past several years and
shows no unhoused scholars based on the six-year enrollment projections (even with
projected growth at that level). The 2026 Capital Facilities Plan shows fairly flat enrollment;
however, we will monitor and adjust accordingly our projections yearly based on new
housing developments currently being proposed to open in 2027 and beyond.
The District is not requesting school impact fees as a part of this Capital Facilities Plan
update as it anticipates having sufficient capacity to serve new students from growth over the
six year planning period. As such, the CFP does not include a school impact fee calculation,
and the District has not prepared updated the student generation rates that are used in that
calculation. However, the District intends to monitor development activity and student
enrollment closely in the event of any shift in expected student enrollment. In such case, the
District will incorporate updated information in the next CFP update or, if necessary, an
interim update.
Page 130 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
4
SECTION 1 - THE CAPITAL FACILITIES PLAN
The State Growth Management Act requires that several pieces of information be gathered to
determine the facilities available and needed to meet the needs of a growing community.
This section provides information about current facilities, existing facility needs, and
expected future facility requirements for Federal Way Public Schools. A Financial Plan that
shows expected funding for any new construction, portables and modernization listed follows
this.
Page 131 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
5
INVENTORY OF EDUCATIONAL FACILITIES
ELEMENTARY SCHOOLS (K-5)
Adelaide 1635 SW 304th St Federal Way 98023
Brigadoon 3601 SW 336th St Federal Way 98023
Camelot 4041 S 298th St Auburn 98001
Enterprise 35101 5th Ave SW Federal Way 98023
Green Gables 32607 47th Ave SW Federal Way 98023
Lake Dolloff 4200 S 308th St Auburn 98001
Lake Grove 303 SW 308th St Federal Way 98023
Lakeland 35827 32nd Ave S Auburn 98001
Mark Twain 2450 S Star Lake Rd Federal Way 98003
Meredith Hill 5830 S 300th St Auburn 98001
Mirror Lake 625 S 314th St Federal Way 98003
Nautilus (K-8) 1000 S 289th St Federal Way 98003
Olympic View (K-8) 2626 SW 327th St Federal Way 98023
Panther Lake 34424 1st Ave S Federal Way 98003
Rainier View 3015 S 368th St Federal Way 98003
Sherwood Forest 34600 12th Ave SW Federal Way 98023
Silver Lake 1310 SW 325th Pl Federal Way 98023
Star Lake 26812 40th Ave S, Bldg.B Kent 98032
Sunnycrest 24629 42nd Ave S Kent 98032
Twin Lakes 4400 SW 320th St Federal Way 98023
Valhalla 27847 42nd Ave S Auburn 98001
Wildwood 2405 S 300th St Federal Way 98003
Woodmont (K-8) 26454 16th Ave S Des Moines 98198
MIDDLE SCHOOLS (6-8)
Federal Way Public Academy (6-10) 34620 9th Ave S Federal Way 98003
Illahee 36001 1st Ave S Federal Way 98003
Kilo 4400 S 308th St Auburn 98001
Lakota 1415 SW 314th St Federal Way 98023
Sacajawea 1101 S Dash Point Rd Federal Way 98003
Sequoyah 3450 S 360th ST Auburn 98001
Evergreen 26812 40th Ave S, Bldg.A Kent 98032
TAF @ Saghalie (6-12) 33914 19th Ave SW Federal Way 98023
HIGH SCHOOLS (9-12)
Decatur 2800 SW 320th St Federal Way 98023
Federal Way 30611 16th Ave S Federal Way 98003
Thomas Jefferson 4248 S 288th St Auburn 98001
Todd Beamer 35999 16th Ave S Federal Way 98003
Career Academy at Truman 31455 28th Ave S Federal Way 98003
ADDITIONAL SCHOOLS
Internet Academy (K-12) 31455 28th Ave S Federal Way 98003
Employment Transition Program (12+) 33250 21st Ave SW Federal Way 98023
Federal Way Open Doors 31455 28th Ave S Federal Way 98003
ES24 (Former DeVry Property) (K-8) 3600 S 344th Way Federal Way 98001
ECEAP (Former Headstart Bldg) 31457 28th Ave S Federal Way 98003
Page 132 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
6
CURRENT INVENTORY NON-INSTRUCTIONAL FACILITIES
Developed Property
Central Kitchen 1214 S 332nd St Federal Way 98003
Federal Way Memorial Field 1300 S 308th St Federal Way 98003
Educational Services Center 33330 8th Ave S Federal Way 98003
Support Services Center 1211 S 332nd St Federal Way 98003
Leased Property
Early Learning Center at Uptown
Square
1066 S 320th St Federal Way 98003
Undeveloped Property
Site
#
Location
75 SW 360th Street & 3rd Avenue SW – 9.2 Acres
65 S 351st Street & 52nd Avenue S – 8.8 Acres
60 E of 10th Avenue SW - SW 334th & SW 335th Streets - 10.04 Acres
73 N of SW 320th and east of 45th PL SW – 23.45 Acres
71 S 344th Street & 46th Avenue S - 17.47 Acres
82 1st Way S and S 342nd St – Minimal acreage
96 S 308th St and 14th Ave S – .36 Acres
Notes:
Not all undeveloped properties are large enough to meet school construction requirements.
Properties may be traded or sold depending on what locations are needed to house students in
the District.
Page 133 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
7
NEEDS FORECAST - EXISTING FACILITIES
PHASE EXISTING FACILITY FUTURE NEEDS ANTICIPATED SOURCE OF
FUNDS
As
needed
Purchase and Relocate
Portables
Interim Capacity Anticipated source of funds is
Impact Fees.
II Thomas Jefferson High
School
Replaced Existing Building,
Increased Capacity
Voter Approved Capital bond
II Illahee Middle School Replace Existing Building Voter Approved Capital bond
II Evergreen Middle School Replaced Existing Building Voter Approved Capital bond
II Lake Grove Elementary Replaced Existing Building,
Increased Capacity
Voter Approved Capital bond
II Mirror Lake Elementary Replaced Existing Building,
Increased Capacity
Voter Approved Capital bond
II Olympic View K-8 School Replaced Existing Building,
Increased Capacity
Voter Approved Capital bond
II Star Lake Elementary Replaced Existing Building,
Increased Capacity
Voter Approved Capital bond
II Wildwood Elementary Replaced Existing Building,
Increase Capacity
Voter Approved Capital bond
II Memorial Stadium Replaced Existing Facility Voter Approved Capital bond
II ES24 (DeVry Property) Temp Swing School
Increase Capacity
SCAP and K-3 Class size
reduction funding
III Mark Twain Elementary Replace Existing Building,
Increase Capacity
TBD
III Decatur High School Replace Existing Building,
Increase Capacity
TBD
III Kilo Middle School Replace Existing Building TBD
III Sacajawea Middle School Replace Existing Building TBD
III Adelaide Elementary Replace Existing Building,
Increase Capacity
TBD
III Brigadoon Elementary Replace Existing Building,
Increase Capacity
TBD
III Camelot Elementary Replace Existing Building,
Increase Capacity
TBD
III Lake Dolloff Elementary Replace Existing Building,
Increase Capacity
TBD
III Nautilus K-8 School Replace Existing Building,
Increase Capacity
TBD
III Twin Lakes Elementary Replace Existing Building,
Increase Capacity
TBD
III Woodmont K-8 School Replace Existing Building,
Increase Capacity
TBD
Page 134 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
8
NEEDS FORECAST - ADDITIONAL FACILITIES
NEW FACILITY LOCATION ANTICIPATED SOURCE OF FUNDS
FWPS has leased a portion of the Truman Campus property to Region X and Puget Sound
Education Service District. Region X and PSESD built a Head Start building on this property
which has served Federal Way 3- and 4-year-olds for the last twenty years. In the recent re-
competition, the federal funding for a Head Start program at this location was lost.
Subsequently the District has been using this facility for a state-funded Early Childhood
Education (ECEAP) program and has secured the title to the building. The building will only
be available for preschool activities.
Page 135 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
9
SIX YEAR FINANCE PLAN
Secured Funding Sources
Impact Fees (1)$680
Land Sale Funds (2)$7,685,000
Bond or Levy Funds (3)$11,689,000
K3-Class Size Reduction (4)$4,269,000
School Construction Assistance Program (SCAP) (5)$17,171,440
TOTAL $40,815,120
Projected Revenue Sources
School Construction Assistance Program (SCAP) (6)$0
K-3 Class Size Reduction (7)$0
Bond Funds (8)$0
Land Fund Sales (9)$0
Impact Fees (10)$0
TOTAL $0
Actual and Planned Expenditures Total Secured Funding and Projected Revenue $40,815,120
Estimated and Budget 2027 2028 2029 2030 2031 2032 Total Total Cost
Prior Years 2026-2027 2027-2028 2028-2029 2029-2030 2030-2031 2031-2032 2032-2033 2025-2033
MODERNIZATION AND EXPANSION
Lake Grove Elementary (11)$39,624,000 $0 $39,624,000
Mirror Lake Elementary (11)$41,963,000 $0 $41,963,000
Star Lake Elementary (11)$38,901,000 $0 $38,901,000
Wildwood Elementary (11)$40,970,000 $0 $40,970,000
Olympic View K-8 School (11)$46,140,000 $0 $46,140,000
Thomas Jefferson High School (11)$124,054,000 $0 $124,054,000
Evergreen Middle School (11)$64,516,000 $0 $64,516,000
Illahee Middle School (11)$89,713,000 $0 $89,713,000
Memorial Stadium (11)$29,780,000 $0 $29,780,000
Central Building Updates (11)$400,000 $400,000 $400,000
Memorial Field Track Updates (11)$500,000 $500,000 $500,000
Todd Beamer High School Tack Updates (11)$360,000 $360,000 $360,000
Elementary School Field Updates (11)$1,000,000 $1,000,000 $1,000,000
Illahee Roof (11)$5,200,000 $5,200,000 $5,200,000
SITE ACQUISITION
Former DeVry/ES 24 (12)$31,736,000 $1,424,000 $1,422,000 $1,423,000 $4,269,000 $36,005,000
TEMPORARY FACILITIES
Portables (13)$3,850,000 $850,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $3,850,000 $7,700,000
TOTAL $551,247,000 $9,734,000 $1,922,000 $1,923,000 $500,000 $500,000 $500,000 $500,000 $15,579,000 $566,826,000
NOTES:`
1. These fees are currently being held in a King County, City of Federal Way, City of Auburn, and City of Kent impact fee account, and will be
available for use by the District for system improvements. This is year end balance on 12/31/25.
2. This is year end balance on 12/31/25.
3. This is the 12/31/25 balance of bond funds and capital levy funds. This figure includes interest earnings.
4. This represents the K3-CSR revnue received but not spent as of 12/31/2025.
5. This represents the balance of SCAP funding but no spent as of 12/31/2025.
6. This is anticipated SCAP for the future projects authorized by the voters in 2017.
7. This is the remaining K-3 Class size reduction grant revenue.
8. In November 2017, the District passed a $450M bond measure. All bonds authorized have been issued.
9. There are no projected sale of surplus properties.
10. In this current plan, there are no projected impact fees.
11. Project budgets are updated as of December 2025.
12. A former private university campus located in Federal Way was purchased in 2019 to provide up to 43 additional permanent elementary classrooms. Prior to creating new permanent capcity this
location will be used as a temporary housing. These costs are excluded from impact fee calculations.
13. These fees represent the cost of purchasing and installing new portables. The portable expenditure in future years may replace existing portables that are not functional.
These may not increase capacity and are not included in the capacity summary.
NEW SCHOOLS
Page 136 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
10
TEN-YEAR BOND/CAPTIAL ACTIVITY SUMMARY
Year Dollars Budgeted Items Budgeted
2025 $63,085,233.00 Illahee MS, Thomas Jefferson HS Fields, Wildwood ES Field, Federal
Way HS CTE
2024 $78,050,000.00 Illahee MS, Thomas Jefferson HS, Memorial Stadium, Former
DeVry/ES24, Portables
2023 $55,743,000.00 Illahee MS, Memorial Stadium, Former DeVry/ES24, Portables
2022 $87,237,500.00 Olympic View K-8, Thomas Jefferson HS, Illahee MS, Former DeVry/ES
24, Portables
2021 $69,823,750.00 Star Lake ES, Olympic View K-8, Thomas Jefferson HS, Evergreen MS,
Illahee MS, Former DeVry ES/ES24, Portables
2020 $132,038,500.00 Lake Grove ES, Mirror Lake ES, Star Lake ES, Wildwood ES, Thomas
Jefferson HS, Evergreen MS, Former DeVry/ES24
2019 $116,740,000.00
Lake Grove ES, Mirror Lake ES, Star Lake ES, Wildwood ES, Thomas
Jefferson HS, Evergreen MS, Former DeVry/ES24, Norman Center,
Portables
2018 $11,935,000.00 Lake Grove ES, Mirror Lake ES, Wildwood ES, Thomas Jefferson HS,
Norman Center, Portables
2017 $75,625,000.00 Federal Way HS, Lake Grove ES, Mirror Lake ES, Star Lake ES,
Wildwood ES, Norman Center, Portables
2016 $30,420,000.00 Federal Way HS, Norman Center, Portables
2015 $47,815,000.00 Federal Way HS, Norman Center, Portables
Page 137 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
11
SECTION 2 - MAPS
As of September 2024, Federal Way Public Schools has twenty elementary schools (grades K-
5), three schools with a K-8 grade configuration, six middle school schools (grades 6-8), four
high schools (grades 9-12) and four small secondary schools. The Federal Way Public
Academy serves students in grades 6-10. The programs at Open Doors and Career Academy
at Truman High School serve students in grades 9-12. In addition to these programs,
TAF@Saghalie serves students in grades 6-12 who reside within the service area and the
Employment and Transition Program (ETP) at the Norman Center serves 18–21-year-old
scholars.
The Growth Management Act requires that a jurisdiction evaluate if the public facility
infrastructure is in place to handle new housing developments. In the case of most public
facilities, new developments have major impacts on the facilities immediately adjacent to
that development. School districts are different. If the district does not have permanent
facilities available, interim measures must be taken until new facilities can be built or until
boundaries can be adjusted to match the population changes to the surrounding facilities.
It is important to realize that a single housing development does not require the construction
of a complete school facility. School districts are required to project growth throughout the
district and build or adjust boundaries based on growth throughout the district, not just around
a single development.
Adjusting boundaries requires careful consideration by the district and is not taken lightly. It
is recognized that there is a potential impact on students who are required to change schools.
Boundary adjustments impact the whole district, not just one school.
The final map included represents the city and county boundaries which overlap with the
district’s service areas.
• City of Algona
• City of Auburn
• City of Des Moines
• City of Federal Way
• City of Kent
• City of Milton
• Unincorporated King County
Page 138 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
12
MAP – CITY AND COUNTY JURISDICTIONS
FWPS boundaries is 100% Urban Growth Area
Page 139 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
13
SECTION 3 - SUPPORT DOCUMENTATION
Building Capacities - The Education Program
Portable Locations
Student Forecast – 2027 through 2033
Page 140 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
14
BUILDING CAPACITIES
This Capital Facilities Plan establishes the District’s “standard of service” in order to
ascertain the District’s current and future capacity. The Superintendent of Public Instruction
establishes square footage guidelines for capacity, but these guidelines do not take into
consideration the education program needs.
In general, the District’s current target class size provides that the average class size for a
standard classroom for grades K through 3 should be 17 students to comply with current
legislation. In grades 4-5 the target is 25 students. For grades 6 to 12 the target class size is 26
students. Classrooms for students with Individualized Education Program (Special Education)
needs are calculated at 12 seats per classroom.
Historically, the District has used the OSPI square footage calculation as a baseline for
capacity calculation and made adjustments for specific program needs. The District will
continue to use this calculation for determining capacity at our middle and high schools.
However, for elementary school capacity will be calculated based on the number of
classroom spaces and the number of students assigned to each classroom.
Class Size
Guidelines
FWPS Historical
“Standard of Service”
HB2661/SHB2776
Enacted Law
Square Footage
Guideline
Kindergarten 18.9 17 25-28
Grades 1-2 18.9 17 25-28
Grade 3 18.9 17 28
Grades 4-5 25 25 28
Grades 6-12 26 26 28
For the purposes of determining student capacity at individual schools, the following list
clarifies adjustments to classroom spaces and the OSPI calculation.
Special Education Resource Rooms:
Each middle school requires the use of a standard classroom(s) for special education students
requiring instruction to address specific disabilities.
English as a Second Language Programs:
Each middle school and high school require the use of a standard classroom for students
learning English as a second language.
Middle School Computer Labs:
Each middle school has computer labs, except Evergreen Middle School. Wireless access
has been installed at all secondary schools. If additional classroom space is needed, these
computer labs may be converted to mobile carts.
Page 141 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
15
BUILDING CAPACITIES, continued
High School Career Development and Learning Center (Resource) Room:
Each high school provides special education resource room and career
development classrooms for students requiring instruction to address specific
disabilities.
Preschool/ECEAP:
Our district currently offers preschool programs for both special needs &
typically developing students at 9 elementary schools. We also have the ECEAP
program at 10 sites (6 elementary schools, 3 high schools, and 1 commercial site).
These programs decrease capacity at those schools.
Alternative Learning Experience:
Federal Way offers students the opportunity to participate in an Alternative
Learning Experience through our Internet Academy. These students have never been
included in the capacity calculation of unhoused students.
1418 Youth Reengagement:
Federal Way offers students the opportunity to participate in 1418 Youth
Reengagement Open Doors program. These students are housed at the Truman
campus but are not currently included in the capacity calculation of unhoused
students.
Page 142 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
16
BUILDING CAPACITIES, continued
ELEMENTARY BUILDING MIDDLE SCHOOL BUILDING
PROGRAM CAPACITY PROGRAM CAPACITY
School Name Headcount 1Preschool School Name Headcount
Adelaide 392 30 Illahee 855
Brigadoon 408 30 Kilo 779
Camelot 378 30 Lakota 786
Enterprise 524 15 Sacajawea 694
Green Gables 439 Sequoyah 585
Lake Dolloff 535 Evergreen 795
Lake Grove 558 30 TAF @ Saghalie 598
Lakeland 455 Federal Way Public Academy 183
Mark Twain 515 TOTAL 5,275
Meredith Hill 606 15
Mirror Lake 514 30 *Middle School Average 727
Nautilus (K-8)512
Olympic View (K-8)429 HIGH SCHOOL BUILDING
Panther Lake 501 15 PROGRAM CAPACITY
Rainier View 607 30
Sherwood Forest 451 6 School Name Headcount
Silver Lake 476 Decatur 1243
Star Lake 544 30 Federal Way 1684
Sunnycrest 636 Thomas Jefferson 1600
Twin Lakes 413 30 Todd Beamer 1085
Valhalla 598 TAF @ Saghalie 155
Wildwood 597 30 Career Academy at Truman 159
Woodmont (K-8)474 Federal Way Public Academy 116
TOTAL 11,562 321 Employment Transition Program 48
TOTAL 6,090
Elementary Average 503 2High School Average 1,403
Notes:
1 Preschool enrollment reduces capacity for K-5 students. 15 preschool students in one classroom.
2 Federal Way Public Academy, Career Academy at Truman High School, and Employment Transition Program
and TAF @ Saghalie for the high school school grade span (9-12) are non-boundary schools. These schools are not used in the
calculated averages.
Page 143 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
17
PORTABLE LOCATIONS
The Washington State Constitution requires the State to provide each student a basic
education. It is not an efficient use of District resources to build a school with a capacity for
500 students due to lack of space for 25 students when enrollment fluctuates throughout the
year and from year to year.
Portables are used as interim measures to house students when increasing population impacts
a school attendance area. Portables may also be required to house students when new or
changing programs require additional capacity. They also provide housing for students until
permanent facilities can be financed and constructed. When permanent facilities become
available, the portable(s) is either used for other purposes such as storage or childcare
programs or moved to another school for an interim classroom. Some portables may not be
fit to move due to age or physical condition. In these cases, the District may choose to buy
new portables and surplus these unfit portables.
With the school expansion projects funded through the 2017 Bond, new capacity has been
created within the new schools and portables have been eliminated from these campuses.
The following page provides a list of the location of the portable facilities used for educational
facilities by Federal Way Public Schools.
Page 144 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
18
PORTABLE LOCATIONS, continued
PORTABLES LOCATED PORTABLES LOCATED
AT ELEMENTARY SCHOOLS AT HIGH SCHOOLS
NON NON
INSTRUCTIONAL INSTRUCTIONAL*INSTRUCTIONAL INSTRUCTIONAL
Adelaide 1 2 Decatur 8
Brigadoon 1 Federal Way
Camelot 1 Thomas Jefferson
Enterprise 3 Todd Beamer 8
Green Gables 1 TOTAL 16
Lake Dolloff 5 1
Lake Grove
Lakeland
Mark Twain 3
Meredith Hill 3 PORTABLES LOCATED
Mirror Lake AT SUPPORT FACILITIES
Nautilus 3
Olympic View MOT
Panther Lake 4 TDC 9
Rainier View 5 Former TAFA
Sherwood Forest 2 2 TOTAL 9
Silver Lake 1 3
Star Lake
Sunnycrest 6 DISTRICT PORTABLES IN USE FOR ECEAP
Twin Lakes 1 2 AND/OR HEADSTART
Valhalla 4 Sherwood Forest 2
Wildwood Evergreen
Woodmont 5 Total 2
TOTAL 49 10
PORTABLES LOCATED
AT MIDDLE SCHOOLS
NON
INSTRUCTIONAL INSTRUCTIONAL
Illahee
Kilo 1 6
Lakota
Sacajawea 5
Sequoyah 2
Evergreen
TAF@ Saghalie 4
TOTAL 10 8
Page 145 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
19
STUDENT FORECAST
Student enrollment projections are a basic component of budget development and facility
need. Enrollment projections influence many of the financial estimates that go into budget
preparation. The majority of staffing requirements are derived directly from the forecasted
number of students. Allocations for instructional supplies and materials are also made based
on projected enrollment. Other expenditures and certain revenue projections are directly
related to enrollment projections.
Enrollment projections are completed annually in the Business Services Department.
Projections must be detailed at various levels, district total, school-building totals, grade
level and program level to include vocational and special education students.
The basis of projections has been cohort survival analysis. Cohort survival is the analysis of
a group that has a common statistical value (grade level) as it progresses through time. In a
stable population the cohort would be 1.00 for all grades. This analysis uses historical
information to develop averages and project the averages forward. This method does not
trace individual students; it is concerned with aggregate numbers in each grade level. The
district has used this method with varying years of history and weighted factors to study
several projections. Because transfers in and out of the school system are common, student
migration is factored into the analysis as it increases or decreases survival rates. Entry
grades (kindergarten) are a unique problem in cohort analysis. The district collects
information on birth rates within the district’s census tracts and treats these statistics as a
cohort for kindergarten enrollment in the appropriate years.
The Federal Way School District is using various statistical methods for projecting student
enrollments. The resultant forecasted enrollments are evaluated below.
In February 2026, the District contracted a demographer to develop projections for the
Federal Way School District. The model used to forecast next year’s enrollment uses cohort
survival rates to measure grade to grade growth, assumes market share losses to private
schools (consistent with county-wide average), assumes growth from new housing or losses
due to net losses from migration. This forecast was provided as a range of three projections.
The long-range forecast provided with this report used a model with cohort survival rates
and growth rates based on projected changes in the 5-19 age group for King County.
The difference between projected enrollment and actual for Fall 2025 was less than 1% in
the positive with 20,970 projected and 21,006 actual.
Page 146 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
20
STUDENT FORECAST, CON’T
Percent
Calendar Yr School Year Elementary Middle School High School Total K -12 Change
2020 2020-21 9,192 5,153 6,385 20,730
2021 2021-22 9,062 4,850 6,390 20,302 -2.1%
2022 2022-23 9,317 4,716 6,532 20,565 1.3%
2023 2023-24 9,461 4,713 6,523 20,697 0.6%
2024 2024-25 9,612 4,893 6,643 21,148 2.2%
2025 2025-26 9,605 4,826 6,575 21,006 -0.7%
2026 B2026-27 9,447 4,816 6,355 20,618 -1.8%
2027 P2027-28 9,456 4,821 6,361 20,639 0.1%
2028 P2028-29 9,466 4,826 6,368 20,659 0.1%
2029 P2029-30 9,475 4,830 6,374 20,680 0.1%
2030 P2030-31 9,485 4,835 6,380 20,701 0.1%
2031 P2031-32 9,494 4,840 6,387 20,721 0.1%
2032 P2032-33 9,504 4,845 6,393 20,742 0.1%
Elementary K-5 Middle School 6-8 High School 9-12
Includes Open Doors and Internet Academy / Excludes Preschool and Full-time Running Start
October 1 Head Count Enrollment History and Projections
0
2,500
5,000
7,500
10,000
12,500
15,000
17,500
20,000
22,500
25,000
Scholar HeadcountSchool Year: Actual Budgeted Projected
Enrollment History and Six Year Forecast
Page 147 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
21
STUDENT FORECAST, continued
Most of the methods used for long range enrollment reporting assume that enrollment is a
constant percent of something else (e.g. population) or that enrollment will mirror some
projected trend for the school-age population over time. The report included 5 different
calculations to provide a range of possible projections for the District to the year 2034. This
model produces a projection that is between 20,933 to 23,730 when applied to the low,
medium, and high range modes. This provides a reasonable range for long-range planning
and is consistent with estimates from various models.
Long-range projections that establish the need for facilities are a modification of the cohort
survival method. The cohort method of analysis becomes less reliable the farther out the
projections are made. The Federal Way School District long-range projections are studied
annually. The study includes information from the jurisdictional demographers as they
project future housing and population in the region. The long-range projections used by
Federal Way Public Schools reflect a similar age trend in student populations as the
projections published by the Office of Financial Management for the State of Washington.
Near term projections assume some growth from new housing, which is offset by current
local economic conditions. The District tracks new development from five permitting
jurisdictions. Long range planning assumes a student yield from proposed new housing
consistent with historical growth patterns.
Growth Management requires jurisdictions to plan for a minimum of twenty years. The
Federal Way School District is a partner in this planning with the various jurisdictions
comprising the school district geography. These projections create a vision of the school
district community in the future.
The COVID-19 pandemic negatively affected brick and mortar enrollment in recent years,
as well as increased enrollment in the Internet Academy. As we move farther away from the
effects of COVID-19, we hope to see continued enrollment growth, especially considering
the City of Federal Way’s plans to increase housing in the down-town core in conjunction
with Sound Transit’s Link Light Rail development.
Page 148 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
22
SECTION 4 – KING COUNTY, CITY OF FEDERAL WAY, AND CITY OF KENT
IMPACT FEE CALCULATIONS
Capacity Summaries
Site & Construction Costs Allocations
Student Generation Rates
Impact Fee Calculations
Reference to Impact Fee Calculations
Page 149 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
23
CAPACITY SUMMARIES
All Grades, Elementary, Middle School, and High Schools
The Capacity Summaries combine Building Capacity information, Portable Capacity
information and the Student Forecast information. The result demonstrates the requirements
for new or remodeled facilities and why there is a need for the District to use temporary
facilities or interim measures.
The District has recently adjusted its capacity calculation method for Elementary schools to
better show capacity needed to comply with the K-3 Class Size Reduction. This adjustment
is also shown in the portable capacity calculation. In order to allow for flexibility in portable
usage the District will use an average class size calculation of 21 for each Elementary portable
and an average class size of 25 for each Middle and High School portable.
The information is organized with a page summarizing the entire District, and then evaluating
capacity vs. number of students at elementary, middle school, and high school levels
individually.
The notes at the bottom of each spreadsheet provide information about what facilities are in
place each year.
Page 150 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
24
CAPACITY SUMMARIES, Continued
Capacity Summary – All Grades
Actual Budget
Calendar Year 2026 2027 2028 2029 2030 2031 2032 2033
CAPACITY School Year 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33
BUILDING PROGRAM
HEADCOUNT CAPACITY 22,927 22,927 22,927 22,927 22,927 22,927 23,539 23,539
Add Capacity 0 0 0 0 0 612 0 0
Adjusted Program Headcount Capacity 22,927 22,927 22,927 22,927 22,927 23,539 23,539 23,539
ENROLLMENT
Basic Headcount Enrollment 21,148 20,840 20,722 20,743 20,763 20,752 20,773 20,789
Internet Academy Headcount Enrollment1 (255) (255) (255) (255) (255) (255) (255) (255)
Basic FTE Enrollment without Internet Academy 20,893 20,585 20,467 20,488 20,508 20,497 20,518 20,534
SURPLUS OR (UNHOUSED)
PROGRAM FTE CAPACITY 2,034 2,342 2,460 2,439 2,419 3,042 3,021 3,005
RELOCATABLE CAPACITY
Current Portable Capacity 1,685 1,727 1,727 1,779 1,831 1,883 1,935 1,987
Add/Subtract Portable Capacity 42 0 52 52 52 52 52 0
Adjusted Portable Capacity 1,727 1,727 1,779 1,831 1,883 1,935 1,987 1,987
SURPLUS OR (UNHOUSED)
PROGRAM AND RELOCATABLE
CAPACITY 3,761 4,069 4,239 4,270 4,302 4,977 5,008 4,992
NOTES:
1
- - Projected - -
Internet Academy students are included in projections but do not require full time use of school facilities. This
represents historic enrollment.
Page 151 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
25
CAPACITY SUMMARIES, Continued
Capacity Summary – Elementary Schools
Actual Budget
Calendar Year 2026 2027 2028 2029 2030 2031 2032 2033
CAPACITY School Year 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33
BUILDING PROGRAM
HEAD COUNT CAPACITY 11,562 11,562 11,562 11,562 11,562 11,562 12,174 12,174
Add/Subtract capacity total 0 0 0 0 0 612 0 0
Add capacity at1:
De Vry 612
Adjusted Program Headcount Capacity 11,562 11,562 11,562 11,562 11,562 12,174 12,174 12,174
ENROLLMENT
Basic Headcount Enrollment 9,612 9,605 9,447 9,456 9,466 9,443 9,453 9,462
Internet Academy Headcount2 (20) (20) (20) (20) (20) (20) (20) (20)
Basic Headcount Enrollment without Internet Academy 9,592 9,585 9,427 9,436 9,446 9,423 9,433 9,442
SURPLUS OR (UNHOUSED)
PROGRAM CAPACITY 1,970 1,977 2,135 2,126 2,116 2,751 2,741 2,732
RELOCATABLE CAPACITY3
Current Portable Capacity 931 973 973 973 973 973 973 973
Add/Subtract portable capacity 42 0 0 0 0 0 0 0
Add portable capacity at:
Subtract portable capacity at:
Woodmont K-8 42
Adjusted Portable Capacity 973 973 973 973 973 973 973 973
SURPLUS OR (UNHOUSED)
PROGRAM AND RELOCATABLE
CAPACITY 2,943 2,950 3,108 3,099 3,089 3,724 3,714 3,705
NOTES:
1
2
3
- - Projected - -
Capacity increases are projected based on a design to accommodate 525 students. Increased capacity is currently stated as the difference
between current calculated capacity and the projected design. In order to reduce elementary class size, Devry capacity is calculated at 17
scholars per classroom.
Internet Academy students are included in projections but do not require full time use of school facilities. This represents historic enrollment.
Relocatable Capacity is based on the number of portables available and other administrative techniques which can be used to temporarily house
students until permanent facilities are available. This is a calculated number only based on class size capacity of 21. The actual number of portables
that will be used will be based on actual student population needs.
Page 152 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
26
CAPACITY SUMMARIES, Continued
Capacity Summary – Middle Schools
Actual Budget
Calendar Year 2026 2027 2028 2029 2030 2031 2032 2033
CAPACITY School Year 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33
BUILDING PROGRAM
HEADCOUNT CAPACITY 5,275 5,275 5,275 5,275 5,275 5,275 5,275 5,275
Add/Subtract capacity 0 0 0 0 0 0 0 0
Add capacity at:
Illahee 1
Adjusted Program Headcount Capacity 5,275 5,275 5,275 5,275 5,275 5,275 5,275 5,275
ENROLLMENT
Basic Headcount Enrollment 4,893 4,714 4,749 4,754 4,759 4,763 4,768 4,768
Internet Academy2 (55) (55) (55) (55) (55) (55) (55) (55)
Basic Enrollment without Internet Academy 4,838 4,659 4,694 4,699 4,704 4,708 4,713 4,713
SURPLUS OR (UNHOUSED)
PROGRAM CAPACITY 437 616 581 576 571 567 562 562
RELOCATABLE CAPACITY3
Current Portable Capacity 338 338 338 338 338 338 338 338
Add/Subtract portable capacity 0 0 0 0 0 0 0 0
Illahee Middle School
Adjusted Portable Capacity 338 338 338 338 338 338 338 338
SURPLUS OR (UNHOUSED)
PROGRAM AND RELOCATABLE
CAPACITY 775 954 919 914 909 905 900 900
NOTES:
1
2
3
- - Projected - -
Illahee Middle Schools currently have capacity for 850 students, so no new capacity is anticipated with the rebuild of
these older buildings.
Internet Academy students are included in projections but do not require full time use of school facilities. This represents
historic enrollment.
Relocatable Capacity is based on the number of portables available and other administrative techniques which can be used to
temporarily house students until permanent facilities are available. This is a calculated number only based on class size capacity of
25. The actual number of portables that will be used will be based on actual student population needs.
Page 153 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
27
CAPACITY SUMMARIES, Continued
Capacity Summary – High Schools
Actual Budget
Calendar Year 2025 2026 2027 2028 2029 2030 2031 2032
CAPACITY School Year 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32
BUILDING PROGRAM
HEADCOUNT CAPACITY 6,090 6,090 6,090 6,090 6,090 6,090 6,090 6,090
Add/Subtract capacity 0 0 0 0 0 0 0 0
Thomas Jefferson High School
Adjusted Program Headcount Capacity 6,090 6,090 6,090 6,090 6,090 6,090 6,090 6,090
ENROLLMENT
Basic Headcount Enrollment 6,643 6,521 6,526 6,533 6,539 6,546 6,552 6,559
Internet Academy1 (180) (180) (180) (180) (180) (180) (180) (180)
Basic Ed without Internet Academy 6,463 6,341 6,346 6,353 6,359 6,366 6,372 6,379
SURPLUS OR (UNHOUSED)
PROGRAM CAPACITY (373) (251) (256) (263) (269) (276) (282) (289)
RELOCATABLE CAPACITY2
Current Portable Capacity 416 416 416 520 624 728 832 936
Add/Subtract portable capacity 0 0 52 52 52 52 52 0
As Needed on High School Campuses 52 52 52 52 52
Adjusted Portable Capacity 416 416 520 624 728 832 936 936
SURPLUS OR (UNHOUSED)
PROGRAM AND RELOCATABLE
CAPACITY3 43 165 264 361 459 556 654 647
NOTES:
1
2
3
- - Projected - -
Internet Academy students are included in projections but do not require full time use of school facilities. This represents
historic enrollment.
Relocatable Capacity is based on the number of portables available and other administrative techniques which can be used to
temporarily house students until permanent facilities are available. This is a calculated number only based on class size capacity of
25. The actual number of portables that will be used will be based on actual student population needs.
Capacity for unhoused students will be accommodated with traveling teachers and no planning time in some classrooms.
Page 154 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
28
IMPACT FEE CALCULATIONS
Single and Multi-Family Residences
Each jurisdiction that imposes school impact fees requires that developers pay these fees to
help cover a share of the impact of new housing developments on school facilities.
To determine a proportionate share of the costs of growth-related facilities, the District uses
a formula first adopted by King County. The formula uses growth related facilities costs, and
provides credits for any anticipated State School Construction Assistance Program funds
related to the project, and a credit for the anticipated property taxes that would be assessed
against the unit for the costs of the same improvement. The final unfunded need is then
discounted by 50% based on the code requirement. This formula can be found in King County
Code 21A and was substantially adopted by the City of Auburn, Federal Way, and Kent. The
formula requires the District to establish a "Student Generation Factor" which estimates how
many students will be added to a school district by each new single or multi-family unit and
to gather some standard construction costs, which are unique to that district.
Impact Fee Calculation
When applicable, the CFP includes variables for the calculation of the Impact Fee for single
family and multi-family units based on King County Code 21A and the Growth Management
Act.
Plan Year 2026 Plan Year 2027
Single Family Units $0 $0
Multi-Family Units $0 $0
Page 155 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
29
IMPACT FEE CALCULATION, CON’T
SCHOOL CONSTRUCTION COST
FACILITIES CAPACITY
Permanent Facility Capacity:
Changes to the Building Program Capacities calculation are found on page 15.
Capacity Summaries:
The changes in the Capacity Summary reflect the changes in the capacities and
student forecast. New schools and increased capacity at current buildings are
shown as increases to capacity. Capacity Summaries are found on pages 22-26.
Student Generation Factor Analysis:
Federal Way Public Schools student generation factor was determined separately
for single-family units and multi-family units. The factors used in the 2026
Capital Facilities Plan were derived using actual generation factors from single-
family units and multi-family units that were constructed in the District in the
last five (5) years and can be found on the next page.
Temporary Facility Cost:
The list of portables reflects the movement of portables between facilities or new
portables purchased. Portable Locations can be found on pages 16 and 17.
Page 156 of 207
FEDERAL WAY PUBLIC SCHOOLS 2027 CAPITAL FACILITIES PLAN
30
IMPACT FEE CALCULATION CHANGES FROM 2026 to 2027
Item From/To Comment
Percent of Permanent Facilities 97.68% to 97.62%Report #3 OSPI
Percent Temporary Facilities 2.32% to 2.38%Updated portable inventory
Average Cost of Portable $400,000 to $572,362 Cost of last portable purchased.
Classrooms
Construction Cost Allocation $375.00 to $399.38 Change effective July 2026
State Match 63.86% to 67.34%Change effective February 2024
Average Assessed Value Per King County Assessor's Office
$207,985.89 Apt/Condo Units with 1 bedroom or less
$312,924.51 Apt/Condo Units with 2 bedrooms or more
$543,325.70 Single Family Units with 2 bedrooms or less
$621,005.54 Single Family Units with 3 bedrooms or more
$443,868.42 Townhome/Duplex/Triplex/Fourplex with 2 bedrooms or less
$528,609.65 Townhome/Duplex/Triplex/Fourplex with 3 bedrooms or more
Capital Bond Interest Rate 4.15% to 4.77%Market Rate
Property Tax Levy Rate $1.53 to $1.06 King County Treasury Division
Student Generation Factors Updated Housing Inventory
Single-Family
Elementary 0.9649 to 0.9304
Middle School 0.4035 to 0.3130
High School 0.4211 to 0.3652
Multi-Family
Elementary 0.3855 to 0.4299
Middle School 0.1740 to 0.1616
High School 0.2070 to 0.1875
Impact Fee1
SFR- $0 to $0 Single-Family Residential based on the updated calculation
MFR -$0 to $0 Multi-Family Residential based on the updated calculation
1 Each jurisdiction (King County, Cities of Federal Way, Auburn, Kent) through local ordinances may adopt lesser fees.
Note: Student generation factors for our
single family units are based on new
developments constructed within the District
over the last five (5) years prior to the date of
the fee calculation.
Student generation factors for are multi-
family units are based on new developments
constructed within the District over the last
five (5) years prior to the date of the fee
calculation.
Page 157 of 207
Page 158 of 207
SEPA Environmental checklist September 2023 Page 1
(WAC 197-11-960)
SEPA 1 Environmental Checklist
Purpose of checklist
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization, or
compensatory mitigation measures will address the probable significant impacts or if an environmental impact
statement will be prepared to further analyze the proposal.
Instructions for applicants
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully, to the best of your knowledge. You may need to consult with an
agency specialist or private consultant for some questions. You may use “not applicable” or “does not apply”
only when you can explain why it does not apply and not when the answer is unknown. You may also attach
or incorporate by reference additional studies reports. Complete and accurate answers to these questions
often avoid delays with the SEPA process as well as later in the decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time
or on different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for lead agencies
Please adjust the format of this template as needed. Additional information may be necessary to evaluate the
existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist
is considered the first but not necessarily the only source of information needed to make an adequate
threshold determination. Once a threshold determination is made, the lead agency is responsible for the
completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts
of sections A and B, plus the Supplemental Sheet for Nonproject Actions (Part D). Please completely answer all
questions that apply and note that the words "project," "applicant," and "property or site" should be read as
"proposal," "proponent," and "affected geographic area," respectively. The lead agency may exclude (for non-
projects) questions in “Part B: Environmental Elements” that do not contribute meaningfully to the analysis of
the proposal.
1 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/Checklist-guidance
Page 159 of 207
SEPA Environmental checklist September 2023 Page 2
(WAC 197-11-960)
A. Background
Find help answering background questions2
1. Name of proposed project, if applicable:
The adoption of a Federal Way Public Schools’ 2027 Capital Facilities Plan by the Federal
Way Public Schools No. 210 for the purposes of planning for the District's facilities needs.
The King County, City of Federal Way, City of Kent and the City of Auburn’s Comprehensive
Plan will be requested to include the District's 2027 Capital Facilities Plan in the Capital
Facilities Plan Element. This project may also request the City of Des Moines to incorporate
the District’s 2027 Capital Facilities Plan into their Comprehensive Plans.
2. Name of applicant:
Federal Way School District No. 210.
3. Address and phone number of applicant and contact person:
Federal Way School District No. 210
33330 8th Avenue South
Federal Way WA 98003
(253) 945-2000
Contact Person: Ms. Jennifer Thomas
Student and Demographic Forecaster, Business Services
Telephone: (253) 945-2071
Email: jthomas@fwps.org
4. Date checklist prepared:
May 12, 2026
5. Agency requesting checklist:
Federal Way School District No. 210.
6. Proposed timing of schedule (including phasing, if applicable):
The Federal Way Public Schools’ 2027 Capital Facilities Plan is scheduled to be adopted by
the District in June 2026. The Capital Facilities Plan will be forwarded to King County, the
City of Federal Way, City of Kent, and the City of Auburn for inclusion in the City's
Comprehensive Plan. It will also be forwarded to the City of Des Moines and Muckleshoot
Indian Tribe for consideration. The District will continue to update the Capital Facilities Plan
annually. The projects included in the Capital Facilities Plan have been or will be subject to
project-specific environmental review.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
The Capital Facilities Plan sets forth the capital improvement projects that the District is
currently implementing. This includes finishing construction on Federal Way High School
2 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-A-Background
Page 160 of 207
SEPA Environmental checklist September 2023 Page 3
(WAC 197-11-960)
and planning for several new voter-approved, Bond-funded projects. Additionally, the plan
covers the purchase and siting of temporary facilities at various locations.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
The projects included in the Capital Facilities Plan will undergo additional environmental
review, when appropriate, as they are developed.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
This is a non-project action. See Supplemental Sheet for Non-project Actions.
10. List any government approvals or permits that will be needed for your proposal, if known.
• King County,
• City of Federal Way,
• City of Kent,
• City of Auburn,
• City of Des Moines,
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site. There are several questions later in this checklist that ask you
to describe certain aspects of your proposal. You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional specific information
on project description.)
This is a non-project action. This proposal involves the adoption of the Federal Way Public
Schools’ 2026 Capital Facilities Plan for the purpose of planning the District’s facilities
needs. The projects included in the Capital Facilities Plan have been or will be subject to
project-specific environmental reviews.
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by
the agency, you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
The Capital Facilities Plan will affect the Federal Way School District. The District includes
an area of approximately 35 square miles. The City of Federal Way, parts of the cities of
Kent, Des Moines and Auburn, parts of unincorporated King County, fall within the District's
boundaries. A detailed map of the District's boundaries may be viewed at the District's
main office.
Page 161 of 207
SEPA Environmental checklist September 2023 Page 4
(WAC 197-11-960)
B. Environmental Elements
1. Earth
Find help answering earth questions3
a. General description of the site:
Circle or highlight one: Flat, rolling, hilly, steep slopes, mountainous, other:
The Federal Way School District is comprised of a variety of topographic landforms and
gradients. Specific topographic characteristics of the sites at which the projects
included in the Capital Facilities Plan are located have been or will be identified during
project-level environmental review when appropriate.
b. What is the steepest slope on the site (approximate percent slope)?
Specific slope characteristics at the sites of the projects included in the Capital Facilities
Plan have been or will be identified during project-level environmental review.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them, and note any
agricultural land of long-term commercial significance and whether the proposal
results in removing any of these soils.
Specific soil types found at the sites of the projects included in the Capital Facilities Plan
have been or will be identified during project-level environmental review when
appropriate. Project-level environmental review for any projects identified in the
Capital Facilities Plan will include identification of any agricultural soils and associated
impacts.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If
so, describe.
Unstable soils may exist within the Federal Way School District. Specific soil limitations
on individual project sites have been or will be identified at the time of project-level
environmental review when appropriate.
e. Describe the purpose, type, total area, and approximate quantities and total affected
area of any filling, excavation, and grading proposed. Indicate source of fill.
Individual projects included in the Capital Facilities Plan have been or will be subject,
when appropriate, to project-specific environmental review and local approval at the
time of proposal. Proposed grading projects, as well as the purpose, type, quantity, and
source of any fill materials to be used have been or will be identified at that time.
f. Could erosion occur because of clearing, construction, or use? If so, generally describe.
3 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-earth
Page 162 of 207
SEPA Environmental checklist September 2023 Page 5
(WAC 197-11-960)
It is possible that erosion could occur as a result of the construction projects currently
proposed in the Capital Facilities Plan. The erosion impacts of the individual projects
have been or will be evaluated on a site-specific basis at the time of project-specific
environmental review when appropriate. Individual projects have been or will be
subject to local approval processes.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
The proposed renovation projects will require the construction of impervious surfaces.
The extent of any impervious cover constructed will vary with each capital facilities
project included in the Capital Facilities Plan. This issue has been or will be addressed
during project-specific environmental review when appropriate.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any.
The erosion potential of the projects included in the Capital Facilities Plan and
appropriate control measures have been or will be addressed during project-specific
environmental review when appropriate. Relevant erosion reduction and control
requirements will be met.
2. Air
Find help answering air questions4
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe
and give approximate quantities if known.
Various emissions, many construction-related, may result from the individual projects
included in the Capital Facilities Plan. The air-quality impacts of each project have been
or will be evaluated during project-specific environmental review when appropriate.
Please see the Supplemental Sheet for Non-project Actions.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If
so, generally describe.
Any off-site sources of emissions or odor that may affect the individual projects included
in the Capital Facilities Plan have been or will be addressed during project-specific
environmental review when appropriate.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
The individual projects included in the Capital Facilities Plan have been or will be subject
to project-specific environmental review when appropriate and relevant local approval
processes. The District will be required to comply with all applicable air regulations and
air permit requirements. Proposed measures specific to the individual projects included
4 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-Air
Page 163 of 207
SEPA Environmental checklist September 2023 Page 6
(WAC 197-11-960)
in the Capital Facilities Plan have been or will be addressed during project-specific
environmental review when appropriate. Please see the Supplemental Sheet for Non-
project Actions.
3. Water
Find help answering water questions5
a. Surface:
Find help answering surface water questions6
1. Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If
yes, describe type and provide names. If appropriate, state what stream or river it
flows into.
There is a network of surface water bodies within the Federal Way School District.
The surface water bodies that are in the immediate vicinity of the projects included
in the Capital Facilities Plan have been or will be identified during project-specific
environmental review when appropriate. When necessary, the surface water
regimes and flow patterns have been or will be researched and incorporated into
the designs of the individual projects.
2. Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
The projects included in the Capital Facilities Plan may require work near the surface
waters located within the Federal Way School District. Applicable local approval
requirements have been or will be satisfied.
3. Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
Information with respect to the placement or removal of fill and dredge material as
a component of the projects included in the Capital Facilities Plan has been or will be
provided during project-specific environmental review when appropriate.
Applicable local regulations have been or will be satisfied.
4. Will the proposal require surface water withdrawals or diversions? Give a general
description, purpose, and approximate quantities if known.
Any surface water withdrawals or diversions required in connection with the
projects included in the Capital Facilities Plan have been or will be addressed during
project-specific environmental review when appropriate.
5 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water
6 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Surface-water
Page 164 of 207
SEPA Environmental checklist September 2023 Page 7
(WAC 197-11-960)
5. Does the proposal lie within a 100-year floodplain? If so, note location on the site
plan.
Each project included in the Capital Facilities Plan, if located in a floodplain area, will
be required to meet applicable local regulations for flood areas.
6. Does the proposal involve any discharges of waste materials to surface waters? If
so, describe the type of waste and anticipated volume of discharge.
Specific information regarding the discharge of waste materials that may be
required as a result of the projects included in the Capital Facilities Plan has been or
will be provided during project-specific environmental review when appropriate.
Please see the Supplemental Sheet for Nonproject Actions
b. Ground:
Find help answering ground water questions7
1. Will groundwater be withdrawn from a well for drinking water or other purposes?
If so, give a general description of the well, proposed uses and approximate
quantities withdrawn from the well. Will water be discharged to groundwater?
Give a general description, purpose, and approximate quantities if known.
Individual projects included in the Capital Facilities Plan may impact groundwater
resources. The impact of the individual projects included in the Capital Facilities
Plan on groundwater resources has been or will be addressed during project-specific
environmental review when appropriate. Each project is or will be subject to
applicable local regulations. Please see the Supplemental Sheet for Non-project
Actions.
2. Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (domestic sewage; industrial, containing the following
chemicals…; agricultural; etc.). Describe the general size of the system, the number
of such systems, the number of houses to be served (if applicable), or the number
of animals or humans the system(s) are expected to serve.
The discharges of waste material that may take place in connection with the projects
included in the Plan have been or will be addressed during project-specific
environmental review.
c. Water Runoff (including stormwater):
1. Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow? Will
this water flow into other waters? If so, describe.
Individual projects included in the Capital Facilities Plan may have storm water
runoff consequences. Specific information regarding the storm water impacts of
each project has been or will be provided during project-specific environmental
7 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-3-Water/Environmental-
elements-Groundwater
Page 165 of 207
SEPA Environmental checklist September 2023 Page 8
(WAC 197-11-960)
review when appropriate. Each project is or will be subject to applicable local storm
water regulations.
2. Could waste materials enter ground or surface waters? If so, generally describe.
The projects included in the Capital Facilities Plan may result in the discharge of
waste materials into ground or surface waters. The specific impacts of each project
on ground and surface waters have been or will be identified during project-specific
environmental review when appropriate. Each project is or will be subject to all
applicable regulations regarding the discharge of waste materials into ground and
surface waters. Please see the Supplemental Sheet for Non-project Actions.
3. Does the proposal alter or otherwise affect drainage patterns in the vicinity of the
site? If so, describe.
Individual projects included in the Capital Facilities Plan may alter or otherwise
affect drainage patterns in the vicinity of the site. Specific information regarding the
drainage pattern impacts of each project has been or will be provided during
project-specific environmental review when appropriate. Each project is or will be
subject to applicable local drainage pattern regulations. Please see the
Supplemental Sheet for Non-project Actions.
d. Proposed measures to reduce or control surface, ground, and runoff water, and
drainage pattern impacts, if any:
Specific measures to reduce or control runoff impacts associated with the projects
included in the Capital Facilities Plan have been or will be addressed during project-
specific environmental review when appropriate.
4. Plants
Find help answering plants questions
a. Check the types of vegetation found on the site:
☐ deciduous tree: alder, maple, aspen, other
☐ evergreen tree: fir, cedar, pine, other
☐ shrubs
☐ grass
☐ pasture
☐ crop or grain
☐ orchards, vineyards, or other permanent crops.
☐ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
☐ water plants: water lily, eelgrass, milfoil, other
☐ other types of vegetation
Page 166 of 207
SEPA Environmental checklist September 2023 Page 9
(WAC 197-11-960)
A variety of vegetative zones are located within the Federal Way School District.
Inventories of the vegetation located on the sites of the projects proposed in the Capital
Facilities Plan have been or will be developed during project-specific environmental
review when appropriate.
b. What kind and amount of vegetation will be removed or altered?
Some of the projects included in the Capital Facilities Plan may require the removal or
alteration of vegetation. The specific impacts on vegetation of the projects included in
the Capital Facilities Plan have been or will be identified during project-specific
environmental review when appropriate.
c. List threatened and endangered species known to be on or near the site.
The specific impacts to these species from the individual projects included in the Capital
Facilities Plan have been or will be determined during project-specific environmental
review when appropriate.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any.
Measures to preserve or enhance vegetation at the sites of the projects included in the
Capital Facilities Plan have been or will be identified during project-specific
environmental review when appropriate. Each project is or will be subject to applicable
local landscaping requirements.
e. List all noxious weeds and invasive species known to be on or near the site.
A variety of vegetative zones are located within the Federal Way School District.
Inventories of the noxious weeds and invasive species known to be on or near the sites
of the projects proposed in the Capital Facilities Plan have been or will be developed
during project-specific environmental review when appropriate.
5. Animals
Find help answering animal questions8
a. List any birds and other animals that have been observed on or near the site or are
known to be on or near the site.
Examples include:
• Birds: hawk, heron, eagle, songbirds, other:
• Mammals: deer, bear, elk, beaver, other:
• Fish: bass, salmon, trout, herring, shellfish, other:
An inventory of species that have been observed on or near the sites of the projects
proposed in the Capital Facilities Plan has been or will be developed during project-
specific environmental review when appropriate.
8 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-5-Animals
Page 167 of 207
SEPA Environmental checklist September 2023 Page 10
(WAC 197-11-960)
b. List any threatened and endangered species known to be on or near the site.
Inventories of threatened or endangered species known to be on or near the sites of the
projects included in the Capital Facilities Plan have been or will be developed during
project-specific environmental review when appropriate.
c. Is the site part of a migration route? If so, explain.
The impacts of the projects included in the Capital Facilities Plan on migration routes
have been or will be addressed during project-specific environmental review when
appropriate.
d. Proposed measures to preserve or enhance wildlife, if any.
Appropriate measures to preserve or enhance wildlife have been or will be determined
during project-specific environmental review when appropriate.
e. List any invasive animal species known to be on or near the site.
Inventories of any invasive animal species known to be on or near the sites of the
projects included in the Capital Facilities Plan have been or will be developed during
project-specific environmental review when appropriate.
6. Energy and natural resources
Find help answering energy and natural resource questions9
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
The State Board of Education requires the completion of a life cycle cost analysis of all
heating, lighting, and insulation systems before it will permit specific school projects to
proceed. The energy needs of the projects included in the Capital Facilities Plan have
been or will be determined at the time of specific engineering and site design planning
when appropriate. Please see the Supplemental Sheet for Non-project Actions.
b. Would your project affect the potential use of solar energy by adjacent properties? If
so, generally describe.
The impacts of the projects included in the Capital Facilities Plan on the solar potential
of adjacent projects have been or will be addressed during project-specific
environmental review when appropriate.
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any.
Energy conservation measures proposed in connection with the projects included in the
Capital Facilities Plan have been or will be considered during project-specific
environmental review when appropriate.
9 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-6-Energy-natural-resou
Page 168 of 207
SEPA Environmental checklist September 2023 Page 11
(WAC 197-11-960)
7. Environmental health
Health Find help with answering environmental health questions10
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur because of this
proposal? If so, describe.
Please see the Supplemental Sheet for Non-project Actions.
1. Describe any known or possible contamination at the site from present or past
uses.
The projects included in the Capital Facilities Plan that may have any known or
possible contamination at the site from present or past uses have been or will be
identified during project-specific environmental review when appropriate. Please
see the Supplemental Sheet for Non-project Actions.
2. Describe existing hazardous chemicals/conditions that might affect project
development and design. This includes underground hazardous liquid and gas
transmission pipelines located within the project area and in the vicinity.
The projects included in the Capital Facilities Plan that may contain existing
hazardous chemicals/conditions that might affect project development and design
have been or will be identified during project-specific environmental review when
appropriate. Please see the Supplemental Sheet for Non-project Actions.
3. Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
Toxic or hazardous chemicals that might be stored, used or produced during the
project’s development or construction, or at any time during the operating life of
the project have been or will be identified during project-specific environmental
review when appropriate. Please see the Supplemental Sheet for Non-project
Actions.
4. Describe special emergency services that might be required.
Please see the Supplemental Sheet for Non-project Actions.
5. Proposed measures to reduce or control environmental health hazards, if any.
The projects included in the Capital Facilities Plan will comply with all current codes,
standards, rules, and regulations. Individual projects have been or will be subject to
project-specific environmental review and local approval at the time they are
developed when appropriate.
b. Noise
10 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-7-Environmental-health
Page 169 of 207
SEPA Environmental checklist September 2023 Page 12
(WAC 197-11-960)
1. What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
A variety of noises from traffic, construction, residential, commercial and industrial
areas exists within the Federal Way School District. The specific noise sources that
may affect the projects included in the Capital Facilities Plan have been or will be
identified during project-specific environmental review when appropriate.
2. What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, construction, operation,
other)? Indicate what hours noise would come from the site)?
The projects included in the Capital Facilities Plan may create normal construction
noises that will exist on a short-term basis only. The construction projects could
increase traffic around the construction sites on a short-term basis. Please see the
Supplemental Sheet for Non-project Actions.
3. Proposed measures to reduce or control noise impacts, if any:
The projected noise impacts of the projects included in the Capital Facilities Plan
have been or will be evaluated and mitigated during project-specific environmental
review when appropriate. Each project is or will be subject to applicable local
regulations.
8. Land and shoreline use
Find help answering land and shoreline use questions11
a. What is the current use of the site and adjacent properties? Will the proposal affect
current land uses on nearby or adjacent properties? If so, describe.
There are a variety of land uses within the Federal Way School District, including
residential, commercial, industrial, institutional, utility, open space, recreational, etc.
Impacts on projects included in the Capital Facilities Plan on land uses on nearby or
adjacent properties have been or will be identified and described during project-level
environmental review when appropriate.
b. Has the project site been used as working farmlands or working forest lands? If so,
describe. How much agricultural or forest land of long-term commercial significance
will be converted to other uses because of the proposal, if any? If resource lands have
not been designated, how many acres in farmland or forest land tax status will be
converted to nonfarm or nonforest use?
The project sites covered under the Capital Facilities Plan have not been used recently
as working farmlands or working forest lands.
1. Will the proposal affect or be affected by surrounding working farm or forest
land normal business operations, such as oversize equipment access, the
application of pesticides, tilling, and harvesting? If so, how?
11 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-8-Land-shoreline-use
Page 170 of 207
SEPA Environmental checklist September 2023 Page 13
(WAC 197-11-960)
Any areas located on the sites of the projects included in the Plan that may affect
or be affected by surrounding working farm or forest land normal business
operations have been or will be identified and described during project-specific
environmental review when appropriate.
c. Describe any structures on the site.
The structures located on the proposed sites for the projects included in the Capital
Facilities Plan have been or will be identified and described during project-specific
environmental review when appropriate.
d. Will any structures be demolished? If so, what?
The remodeling and renovation projects in the Capital Facilities Plan will require the
demolishment of school structures. The structures that will be demolished as a result of
the projects included in the Capital Facilities Plan have been or will be identified during
project-specific environmental review when appropriate.
e. What is the current zoning classification of the site?
The sites that are covered under the Capital Facilities Plan have a variety of zoning
classifications under the applicable zoning codes. Site-specific zoning information has
been or will be identified during project-specific environmental review when
appropriate.
f. What is the current comprehensive plan designation of the site?
Inventories of the comprehensive plan designations for the sites of the projects included
in the Capital Facilities Plan have been or will be completed during project-specific
environmental review when appropriate.
g. If applicable, what is the current shoreline master program designation of the site?
Shoreline master program designations of the sites of the projects included in the
Capital Facilities Plan have been or will be identified during project-specific
environmental review when appropriate.
h. Has any part of the site been classified as a critical area by the city or county? If so,
specify.
Any areas located on the sites of the projects included in the Plan that have been
classified as a critical area by the city or county have been or will be identified during
project-specific environmental review.
i. Approximately how many people would reside or work in the completed project?
The Federal Way School District currently serves approximately 21,500 students. The
student population is expected to increase to 22,000 by the year 2029. This projection
has been adjusted to reflect the current economic conditions. The District employs
approximately 3,200 people.
j. Approximately how many people would the completed project displace?
Page 171 of 207
SEPA Environmental checklist September 2023 Page 14
(WAC 197-11-960)
Any displacement of people caused by the projects included in the Capital Facilities Plan
has been or will be evaluated during project-specific environmental review when
appropriate. However, it is not anticipated that the Capital Facilities Plan, or any of the
projects contained therein, will displace any people.
k. Proposed measures to avoid or reduce displacement impacts, if any.
Individual projects included in the Capital Facilities Plan will be subject to project-
specific environmental review and local approval when appropriate. Proposed
mitigating measures will be proposed at that time, if necessary.
l. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any.
The compatibility of the specific projects included in the Capital Facilities Plan with
existing uses and plans has been or will be assessed as part of the comprehensive
planning process and during project-specific environmental review when appropriate.
m. Proposed measures to reduce or control impacts to agricultural and forest lands of
long-term commercial significance, if any:
The compatibility of the specific projects included in the Capital Facilities Plan with
nearby agricultural and forest lands of long-term commercial significance have been or
will be assessed as part of the comprehensive planning process and during project-
specific environmental review when appropriate.
9. Housing
Find help answering housing questions12
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
No housing units would be provided in connection with the completion of the projects
included in the Capital Facilities Plan.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
It is not anticipated that the projects included in the Capital Facilities Plan will eliminate
any housing units. The impacts of the projects included in the Capital Facilities Plan on
existing housing have been or will be evaluated during project-specific environmental
review when appropriate.
c. Proposed measures to reduce or control housing impacts, if any:
Measures to reduce or control any housing impacts caused by the projects included in
the Capital Facilities Plan have been or will be addressed during project-specific
environmental review when appropriate.
12 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-9-Housing
Page 172 of 207
SEPA Environmental checklist September 2023 Page 15
(WAC 197-11-960)
10. Aesthetics
Find help answering aesthetics questions13
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?
The aesthetic impacts of the projects included in the Capital Facilities Plan have been or
will be addressed during project-specific environmental review when appropriate.
b. What views in the immediate vicinity would be altered or obstructed?
The aesthetic impacts of the projects included in the Capital Facilities Plan have been or
will be addressed during project-specific environmental review when appropriate.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Appropriate measures to reduce or control the aesthetic impacts of the projects
included in the Capital Facilities Plan have been or will be determined on a project-
specific basis when appropriate.
11. Light and glare
Find help answering light and glare questions14
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
The light or glare impacts of the projects included in the Capital Facilities Plan have been
or will be addressed during project-specific environmental review.
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
The light or glare impacts of the projects included in the Capital Facilities Plan have been
or will be addressed during project-specific environmental review when appropriate.
c. What existing off-site sources of light or glare may affect your proposal?
Off-site sources of light or glare that may affect the projects included in the Capital
Facilities Plan have been or will be evaluated during project-specific environmental
review when appropriate.
d. Proposed measures to reduce or control light and glare impacts, if any:
Proposed measures to mitigate light and glare impacts have been or will be addressed
during project-specific environmental review when appropriate.
13 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-10-Aesthetics
14 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-11-Light-glare
Page 173 of 207
SEPA Environmental checklist September 2023 Page 16
(WAC 197-11-960)
12. Recreation
Find help answering recreation questions
a. What designated and informal recreational opportunities are in the immediate
vicinity?
There are a variety of formal and informal recreational facilities within the Federal Way
School District.
b. Would the proposed project displace any existing recreational uses? If so, describe.
The recreational impacts of the projects included in the Capital Facilities Plan have been
or will be addressed during project-specific environmental review when appropriate.
The projects included in the Capital Facilities Plan, including proposed renovated school
and support facilities, may enhance recreational opportunities and uses.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Adverse recreational effects of the projects included in the Capital Facilities Plan have
been or will be subject to mitigation during project-specific environmental review when
appropriate. A school site usually provides recreational facilities to the community in
the form of play fields and gymnasiums.
13. Historic and cultural preservation
Find help answering historic and cultural preservation questions15
a. Are there any buildings, structures, or sites, located on or near the site that are over
45 years old listed in or eligible for listing in national, state, or local preservation
registers? If so, specifically describe.
There are no known places or objects listed on, or proposed for such registers on the
sites of the projects included in the Capital Facilities Plan. The existence of historic and
cultural resources on or next to the sites has been or will be addressed in more detail
during project-specific environmental review when appropriate.
b. Are there any landmarks, features, or other evidence of Indian or historic use or
occupation? This may include human burials or old cemeteries. Are there any material
evidence, artifacts, or areas of cultural importance on or near the site? Please list any
professional studies conducted at the site to identify such resources.
An inventory of historical sites at or near the sites of the projects included in the Capital
Facilities Plan has been or will be developed during project-specific environmental
review when appropriate.
c. Describe the methods used to assess the potential impacts to cultural and historic
resources on or near the project site. Examples include consultation with tribes and
the department of archeology and historic preservation, archaeological surveys,
historic maps, GIS data, etc.
15 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-13-Historic-cultural-p
Page 174 of 207
SEPA Environmental checklist September 2023 Page 17
(WAC 197-11-960)
Methods used to assess the potential impacts to cultural and historic resources on or
near the sites of the projects included in the Capital Facilities Plan have been or will be
developed during project-specific environmental review when appropriate.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and
disturbance to resources. Please include plans for the above and any permits that may
be required.
Appropriate measures have been or will be proposed on a project-specific basis.
14. Transportation
Find help with answering transportation questions16
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
The impact on public streets and highways of the individual projects included in the
Capital Facilities Plan has been or will be addressed during project-specific
environmental review when appropriate.
b. Is the site or affected geographic area currently served by public transit? If so,
generally describe. If not, what is the approximate distance to the nearest transit
stop?
The relationship between the specific projects included in the Capital Facilities Plan and
public transit has been or will be addressed during project-specific environmental
review when appropriate.
c. Will the proposal require any new or improvements to existing roads, streets,
pedestrian, bicycle, or state transportation facilities, not including driveways? If so,
generally describe (indicate whether public or private).
The need for new streets or roads, or improvements to existing streets and roads has
been or will be addressed during project-specific environmental review when
appropriate.
d. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe.
Use of water, rail, or air transportation has been or will be addressed during project-
specific environmental review when appropriate.
e. How many vehicular trips per day would be generated by the completed project or
proposal? If known, indicate when peak volumes would occur and what percentage of
the volume would be trucks (such as commercial and nonpassenger vehicles). What
data or transportation models were used to make these estimates?
The traffic impacts of the projects included in the Capital Facilities Plan have been or will
be addressed during project-specific environmental review when appropriate.
16 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-B-Environmental-elements/Environmental-elements-14-Transportation
Page 175 of 207
SEPA Environmental checklist September 2023 Page 18
(WAC 197-11-960)
f. Will the proposal interfere with, affect, or be affected by the movement of agricultural
and forest products on roads or streets in the area? If so, generally describe.
Projects included in the Capital Facilities Plan that may interfere with, affect or be
affected by the movement of agricultural and forest products on roads or streets in the
area has been or will be addressed during project-specific environmental review when
appropriate.
g. Proposed measures to reduce or control transportation impacts, if any:
The mitigation of traffic impacts associated with the projects included in the Capital
Facilities Plan has been or will be addressed during project-specific environmental
review when appropriate.
15. Public services
Find help answering public service questions17
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, public transit, health care, schools, other)? If so,
generally describe.
The District does not anticipate that the projects identified in the Capital Facilities Plan
will substantially increase the need for other public services.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Remodeled/renovated school or facilities will be built with automatic security systems,
fire alarms, smoke alarms, heat sensors, and sprinkler systems.
16. Utilities
Find help answering utilities questions18
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse
service, telephone, sanitary sewer, septic system, other:
Electricity, natural gas, water, refuse service, telephone, and sanitary sewer utilities are
available at the sites of the projects proposed in the Capital Facilities Plan. The types of
utilities available at specific project sites have been or will be addressed in more detail
during project-specific environmental review when appropriate.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate vicinity
which might be needed.
Utility revisions and construction needs have been or will be identified during project-
specific environmental review when appropriate.
17 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-15-public-services
18 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-b-environmental-elements/environmental-elements-16-utilities
Page 176 of 207
SEPA Environmental checklist September 2023 Page 19
(WAC 197-11-960)
C. Signature
Find help about who should sign19
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Recoverable Signature
X Jennifer Thomas
Signed by: 046d9bb9-9b8b-4cdf-9a19-b67dd0ab7dc0
Type name of signee: Jennifer Thomas
Position and agency/organization: Student and Demographic Forecaster, Federal Way Public
Schools
Date submitted: May 12, 2026
D. Supplemental sheet for nonproject actions
Find help for the nonproject actions worksheet20
Do not use this section for project actions.
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of activities
likely to result from the proposal, would affect the item at a greater intensity or at a faster rate
than if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances; or production of
noise?
To the extent the Capital Facilities Plan makes it more likely that school facilities will be
constructed and/or renovated and remodeled, some of these environmental impacts will be
more likely. Additional impermeable surfaces, such as roofs, parking lots, sidewalks, access
roads, and playgrounds could increase storm water runoff, which could enter surface or
ground waters. Heating systems, emergency generators, and other school equipment that
is installed pursuant to the Capital Facilities Plan could result in air emissions. The projects
included in the Capital Facilities Plan should not require the production, storage, or release
of toxic or hazardous substances, with the possible exception of the storage of diesel fuel or
gasoline for emergency generating equipment. The District does not anticipate a significant
19 https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-guidance/SEPA-checklist-
guidance/SEPA-Checklist-Section-C-Signature
20 https://ecology.wa.gov/regulations-permits/sepa/environmental-review/sepa-guidance/sepa-checklist-
guidance/sepa-checklist-section-d-non-project-actions
Page 177 of 207
SEPA Environmental checklist September 2023 Page 20
(WAC 197-11-960)
increase in the production of noise from its facilities, although the projects included in the
Capital Facilities Plan will increase the District's student capacities.
• Proposed measures to avoid or reduce such increases are:
Proposed measures to mitigate any such increases described above have been or
will be addressed during project-specific environmental review when appropriate.
Storm water detention and runoff will meet applicable County and/or City
requirements and may be subject to National Pollutant Discharge Elimination
System ("NPDES") permitting requirements. Discharges to air will meet applicable
air pollution control requirements. Fuel oil will be stored in accordance with local
and state requirements.
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
The Capital Facilities Plan itself will have no impact on these elements of the environment.
These impacts have been or will be addressed in more detail during project-specific
environmental review when appropriate. The projects included in the Plan are not likely to
generate severe impacts on fish or marine life.
• Proposed measures to protect or conserve plants, animals, fish, or marine life are:
Specific measures to protect and conserve plants, animals, and fish cannot be
identified at this time. Specific mitigation proposals have been or will be identified,
however, during project-specific environmental review when appropriate.
3. How would the proposal be likely to deplete energy or natural resources?
The construction of the projects included in the Capital Facilities Plan will require the
consumption of energy.
• Proposed measures to protect or conserve energy and natural resources are:
The projects included in the Capital Facilities Plan will be constructed in accordance
with applicable energy efficiency standards.
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for governmental protection, such as
parks, wilderness, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetlands, floodplains, or prime farmlands?
The Capital Facilities Plan and individual projects contained therein should have no impact
on these resources.
• Proposed measures to protect such resources or to avoid or reduce impacts are:
Appropriate measures have been or will be proposed during project-specific
environmental review when appropriate. Updates of this Plan will be coordinated
with King County and the cities of Federal Way, Kent, Des Moines, and Auburn as
part of the Growth Management Act process, one of the purposes of which is to
protect environmentally sensitive areas. To the extent the District's facilities
planning process is part of the overall growth management planning process, these
resources are more likely to be protected.
Page 178 of 207
SEPA Environmental checklist September 2023 Page 21
(WAC 197-11-960)
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
The Capital Facilities Plan will not have any impact on land or shoreline use that is
incompatible with existing comprehensive plans, land use codes, or shoreline management
plans. The District does not anticipate that the Capital Facilities Plan or the projects
contained therein will directly affect land and shoreline uses in the area served by the
District.
• Proposed measures to avoid or reduce shoreline and land use impacts are:
No measures to avoid or reduce land use impacts resulting from the Capital Facilities
Plan or the projects contained therein are proposed at this time.
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
The projects included in the Capital Facilities Plan may create temporary increases in the
District's need for public services and utilities. Upon the completion of the projects
included in the Capital Facilities Plan, however, the District does not anticipate that its need
for public services and utilities will increase substantially beyond existing levels.
• Proposed measures to reduce or respond to such demand(s) are:
No measures to reduce or respond to such demands are proposed at this time.
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws
or requirements for the protection of the environment.
The Capital Facilities Plan will not conflict with any laws or requirements for the protection
of the environment.
Page 179 of 207
Israel Vela
Superintendent
MISSION
Successfully Preparing All
Students For Their Futures
Capital Projects
12033 SE 256th St. – A-300
Kent, WA 98030
Phone: (253) 373-7526
Fax: (253) 373-7410
www.kent.k12.wa.us
August 20, 2026
Kent School District #415
12033 SE 256th Street
Kent, WA 98030
Re: Capital Facilities Plan Memo
To whom it may concern,
Please accept this letter as confirmation that the Kent School District is not
updating the Capital Facilities Plan for the 2026-2027 school year. This decision
came about from the Finance team after seeing a trend of enrollment and
birthrates declining and leveling, with forecasted future trends to remain
consistent.
The Kent School District may reinstate the Capital Facilities Plan in future years
but is currently on hold until further notice.
If you have any questions, please feel free to contact me.
Sincerely,
Brett Scribner, Director
Capital Projects
Page 180 of 207
Imagine Auburn | Comprehensive Plan Capital Facilities Element | CFE-18
Public Education Facilities
Auburn’s residential areas are served by a combination of Auburn School District, Dieringer School District, Federal
Way Public Schools, and Kent School District. Detailed inventories of school district capital facilities and levels-of-
service are contained in the Capital Facilities Plan (CFP) of each school district. The CFPs of the four school districts
serving Auburn residential areas are adopted annually as part of the Annual Comprehensive Plan amendment
process. Locations of schools and school districts within the City of Auburn which are illustrated in the map below.
Future Plans
To accommodate projected growth, the school districts have noted the following projects in their 2025 2026
Capital Facilities Plans:
Auburn School District
• Portable Relocation – Opens 2024-2025Continuous
• Middle School #5 – Opens 2027-2028Continuous
• Replacement of Alpac Elementary and Cascade Middle School
• District-Wide improvements identified in the 10-year Facilities Plaster Plan - Continuous
Dieringer School District
• Comprehensive Building Condition Assessment Study – Summer 2025
• Elementary School #3 – Opens 2027
• North Tapps Middle School Classroom Addition – Opens 2027
Federal Way Public Schools
• Former DeVry/ES 24 Site Acquisition – Opens 2028
• Portables Expansion – Through 2030
Page 181 of 207
AGENDA BILL APPROVAL FORM
Agenda Subject: Meeting Date:
Development Agreements Code
Staff Introduction/Presentation (Sturza)
Staff to provide a brief presentation to create a new Chapter 18.80 of the
Auburn City Code establishing a comprehensive framework for the use and
administration of Development Agreements within the City of Auburn.
September 9, 2026
Department: Attachments: Budget Impact:
Community Development Memorandum , Attachment 1 -
DA PowerPoint Presentation,
Attachment 2 - Chapter 18.80
ACC Text Amendment
Administrative Recommendation:
Background for Motion:
Background Summary:
See attached Memorandum
Councilmember: Staff: Jason Krum
Page 182 of 207
PLANNING COMMISSION MEMORANDUM
TO: Judi Roland, Chair, Planning Commission
Bill Stewart, Vice Chair Planning Commission
Planning Commission Members
FROM: Steven Sturza, Assistant Director
Department of Community Development
DATE: August 19, 2026
RE: Development Agreements Code – Chapter 18.80 Auburn City Code
I. BACKGROUND & PURPOSE
The purpose of this text amendment (code update) is to create a new Chapter 18.80 of the
Auburn City Code establishing a comprehensive framework for the use and administration of
Development Agreements within the City of Auburn. While Washington law has long authorized
local governments to enter into Development Agreements pursuant to Revised Code of
Washington (RCW) 36.70B.170 through 36.70B.210, Auburn has historically relied primarily on
individually negotiated agreements without a dedicated chapter of the zoning code establishing
consistent procedures and expectations.
As Auburn continues to experience redevelopment, mixed-use projects, master planned
developments, and complex public-private partnerships, Development Agreements have
become an increasingly important tool to implement the City's Comprehensive Plan while
providing certainty for both the City and development community.
Development Agreements allow the City and property owners to establish mutually agreed-upon
development standards, project phasing, public improvements, infrastructure commitments,
mitigation measures, affordable housing provisions, and other project-specific obligations that
remain vested for the duration of the agreement. They also provide a mechanism for addressing
unique development circumstances where strict application of existing code standards may not
achieve the best overall public outcome.
The proposed code establishes consistent procedures for processing Development
Agreements, identifies required contents, establishes responsibilities, defines amendment
procedures, and clarifies the relationship between Development Agreements and other permit
approvals. The proposal also establishes standards for evaluating requests to depart from
existing development regulations while ensuring that any flexibility provided through a
Development Agreement results in an equivalent or greater public benefit.
This Planning Commission meeting is intended to introduce the proposed code, discuss the
overall policy framework, and receive preliminary feedback from Planning Commission prior to
scheduling a future public hearing.
II. SUMMARY OF PROPOSED CODE
Page 183 of 207
Staff Member: Sturza Date: July 30, 2026
2
NEW CHAPTER 18.80 – DEVELOPMENT AGREEMENTS
The proposal creates an entirely new chapter within Title 18 “Zoning” establishing a
standardized process for Development Agreements in Auburn.
Major components of the chapter include:
AUTHORITY
The chapter formally recognizes the City's authority under Chapter 36.70B RCW to enter into
Development Agreements and establishes that Development Agreements are discretionary
legislative actions approved by City Council. The code also clarifies that approved development
regulations contained within an agreement remain vested for the term of the agreement.
GENERAL PROVISIONS
The proposed code establishes the basic framework for Development Agreements, including:
1) Definition of "departure" from development regulations.
2) Requirement that departures remain consistent with the Comprehensive Plan.
3) Requirement that any departure be offset by an equivalent or greater public benefit.
4) Clarification that Development Agreements generally supplement rather than replace
required project permits and environmental review.
5) Identification of items that may be included within a Development Agreement, including:
a) land uses
b) density
c) building standards
d) affordable housing
e) parks and open space
f) impact fees
g) infrastructure
h) mitigation
i) project phasing
j) vesting periods.
DEVELOPMENT REGULATION FLEXIBILITY
One of the primary purposes of Development Agreements is to provide flexibility where
appropriate. The proposed code allows alternative development standards when they provide
meaningful public benefits or better accomplish the purposes of the City's development
regulations.
However, the proposal also establishes clear limitations by prohibiting departures from:
1) Building Code;
2) Environmental regulations;
3) Stormwater requirements; and
4) Federal and State regulatory requirements, including NPDES permit obligations.
PROCESSING PROCEDURES
The proposal establishes a consistent review process including:
1) application requirements;
2) Director review and recommendation;
3) other City departments review based on details and conditions;
4) City Council public hearing and approval;
5) public noticing requirements; and
6) concurrent review with associated land use applications where appropriate.
DEVELOPMENT AGREEMENT DURATION
The proposed code establishes:
Page 184 of 207
Staff Member: Sturza Date: July 30, 2026
3
1) maximum initial term of ten (10) years;
2) up to two five-year extensions;
3) extension criteria based upon project completion; and
4) recording requirements to ensure agreements run with the property.
AMENDMENTS
The proposal distinguishes between:
Minor Amendments
Administrative changes that do not materially alter the approved project and may be approved
by the Community Development Director.
Examples include:
1) correcting scrivener's errors;
2) updating ownership information;
3) revising exhibits;
4) administrative schedule adjustments; and
5) assignment of the agreement.
Major Amendments
Substantive changes requiring City Council approval following a public hearing.
Examples include:
1) increased density;
2) changes in land use;
3) increased building height;
4) reduced public benefits;
5) significant phasing changes; or
6) major infrastructure modifications.
III. TEXT AMENDMENT
The proposed code is attached to this memo as Attachment 2.
IV. STAFF REQUEST
Planning Commission to review the items listed in the memo and corresponding attachments.
V. ATTACHMENTS
1) DA PowerPoint Presentation
2) Chapter 18.80 ACC Text Amendment
Page 185 of 207
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLANNING BUILDING DEVELOPMENT ENGINEERING PERMITCENTER ECONOMIC DEVELOPMENT CODE ENFORCEMENT
CHAPTER 18.80 ACC
DEVELOPMENT
AGREEMENTS
PRESENTED BY
STEVE STURZA, ASSISTANT DIRECTOR
SEPTEMBER 9, 2026
PLANNING COMMISSION
Page 186 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
What is a Development Agreement?
Development Agreements are authorized under
RCW 36.70B
Negotiated agreement between City & Property
owner/Developer
Page 187 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
What is a Development Agreement?
Establish:
Development standards
Public improvements
Mitigation
Project phasing
Public benefits
Vesting of approved regulations
Page 188 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Why Use Development Agreements?
Useful for:
Large mixed-used projects
Master planned developments
Redevelopment projects
Public/private partnerships
Projects requiring significant infrastructure
Complex phasing
Page 189 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Why Adopt a Development
Agreement Chapter?
State law authorizes Development Agreements
Auburn has used them previously
Auburn does not currently have a dedicated code chapter
Predictability
Transparency
Consistency
Standard Procedures
Clear Approval Criteria
Page 190 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
•Land uses
•Density
•Building heights
•Design standards
•Affordable housing
•Public infrastructure
•Impact fees
•Parks and open space
•Project phasing
•Vesting periods
What Can Be Included?
Page 191 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Public Benefit Requirement
Page 192 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
What Cannot Change?
Certain regulations cannot be modified through a
Development Agreement.
Page 193 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Duration
Page 194 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Approval Process
Page 195 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Minor Amendments
Director Approval
Examples:
Clerical corrections
Ownership changes
Administrative schedule updates
Page 196 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Major Amendments
City Council Approval
Examples:
Density changes
Height increases
Reduced public benefits
New land uses
Page 197 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Relationship to Other Permits
A Development Agreement does NOT replace:
SEPA
Site Plan Review
Conditional Use Permits
Shoreline permits
Subdivisions
Building permits
Page 198 of 207
SERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATIONSERVICE ENVIRONMENT ECONOMY CHARACTER SUSTAINABILITY WELLNESS CELEBRATION
Policy Questions for Planning Commission
Staff is interested in feedback on:
Overall framework
Public benefit requirement
Flexibility provided
Amendment process
Duration of agreements
Any additional policy considerations
Page 199 of 207
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLANNING BUILDING DEVELOPMENT ENGINEERING PERMITCENTER ECONOMIC DEVELOPMENT CODE ENFORCEMENT
AUBURN
VALUES
S E R V I C E
ENVIRONMENT
E C O N O M Y
C H A R A C T E R
SUSTAINABILITY
W E L L N E S S
C E L E B R AT I O N
QUESTIONS?
Page 200 of 207
Page 1/7
Title 18 ZONING
18.80 Development Agreements
Chapter 18.80
DEVELOPMENT AGREEMENTS
18.80.010 Authority.
The City may consider and enter into a development agreement with the owners of real property within
the City, or with persons having control of real property within the City if the owners of such real property
execute an authorization for such real property to be subject to and bound by the development
agreement. In this Chapter, the term “owner” shall include both the owner of such real property and such
person having control of such property. Per RCW 36.70B.170, the execution of a development agreement
is a proper exercise of City police power and contract authority. A development agreement shall establish
the development regulations and other applicable provisions governing the development, use, and
mitigation of the property, which shall remain vested for the term specified in the development agreement.
The City Council’s decision to approve, approve with conditions, or deny a development agreement is a
discretionary legislative action undertaken pursuant to the City’s police power and contract authority.
18.80.020 General provisions.
A. In this Chapter, the term “development regulations” shall have the meaning set forth in ACC 14.02.040.
B. For purposes of this Chapter, "departure" means a modification, adjustment, exception, or alternative
development standard approved through a development agreement that differs from an otherwise
applicable provision of the Auburn City Code while remaining consistent with the Comprehensive Plan,
applicable state law, and the overall purpose and intent of the affected development regulation. A
departure may include a change to permitted land uses, residential density, floor area ratio, or maximum
building height only if expressly approved by the City Council as part of the development agreement.
C. Any departure requested by the owner from the development regulations of the Auburn City Code
through a development agreement shall be offset by the owner’s provision of a benefit to the City of equal
or greater value relative to the departure requested, as determined by the City.
1. Equivalent value need not be measured monetarily and the proposed benefit need not be of the
same type as the existing development standard requirement.
2. A departure from the development regulations shall not be granted unless an equivalent benefit to
the City is provided.
D. Unless otherwise specified within the terms of a development agreement, the development agreement
does not supplant any required project permit decision process per Chapter 14.03 ACC, including, but not
limited to, a rezone, a shoreline permit, administrative use permit, conditional use pe
Page 201 of 207
Page 2/7
rmit, architectural site design review, environmental review under Title 16 ACC, or land divisions under
Title 17 ACC. Such land use decisions shall be reviewed in conjunction with the development agreement.
E. The development agreement must specify the following, as applicable:
1. Project components which define and detail the permitted uses, residential densities,
nonresidential densities, and intensities or building sizes;
2. Design standards such as architectural treatment, maximum heights, setbacks, landscaping,
drainage and water quality requirements, and other development features;
3. Parking;
4. Provisions for affordable housing;
5. Parks and common open space preservation;
6. Amount and payment of impact fees imposed or agreed to in accordance with any applicable
provisions of state law, any reimbursement provisions, other financial contributions by the property
owner, or dedications;
7. Mitigation measures, development conditions, and other requirements of Chapter 43.21C RCW;
8. Phasing;
9. Build-out or vesting periods for applicable standards; and
10. Other appropriate development requirements or procedures which are based upon a City policy,
rule, regulation, or standard.
F. A development agreement may obligate a party to dedicate land or easements or fund or provide
services, infrastructure, or other facilities.
G. Subsequently adopted development regulations, which differ from those of an approved development
agreement, shall apply to the property subject to the development agreement only where necessary to
address a serious threat to public health and safety. Subsequently adopted development regulations
which differ from those of an approved development agreement also shall apply following expiration of
any phase or time period specified in the development agreement during which identified standards
cannot be modified.
18.80.030 Development regulations – Flexibility.
A. A development agreement shall be consistent with applicable development regulations to the fullest
extent possible. However, a development agreement may allow for development regulations that are
different from those standards otherwise imposed under Auburn City Code in order to provide flexibility to
achieve public benefits, respond to changing community needs, or authorize departures that provide the
functional equivalent or adequately achieve the purposes of otherwise applicable development
regulations.
Page 202 of 207
Page 3/7
B. A development agreement cannot authorize departures from the following development regulations
herein and hereafter amended:
1. ACC Title 15, Buildings and Construction;
2. ACC Title 16, Environment;
3. Chapter 13.48 ACC, Storm Drainage Utility; and
4. Any requirements adopted to implement federal or state law, including the City's National Pollutant
Discharge Elimination System (NPDES) Municipal Stormwater Permit and the City of Auburn Surface
Water Management Manual.
C. Development regulations approved through a development agreement shall govern the property in lieu
of conflicting provisions of Auburn City Code. Nothing in this subsection authorizes departures prohibited
by ACC 18.80.030(B) nor eliminates permits or approvals otherwise required by state law or this title.
18.80.040 Enforceability.
The development agreement shall be binding on the parties and their successors or assigns. Unless
amended or terminated by agreement of both parties, the development agreement is enforceable during
its term by a party to the development agreement. Except as provided in ACC 18.80.020(G), a
development agreement and the development regulations in the development agreement govern during
the term of the development agreement or for all or that part of the build-out period specified in the
development agreement. The development agreement shall not be subject to an amendment to a
development regulation or a new development regulation adopted after the effective date of the
development agreement, except as provided in ACC 18.80.020(G). Applications for building permits and
other permits subject to ACC Title 15, Buildings and Construction, shall be considered under the
provisions of ACC Title 15 that are in effect at the time of submittal of a valid and fully complete
application. Any land use decision issued by the City pertaining to the property subject to the
development agreement, after the execution of the development agreement, must be consistent with the
development agreement.
18.80.050 Processing procedure.
A. An application for a development agreement shall be filed by the owner of real property within the City
on forms provided by the Department. An application shall be accompanied by an application fee
pursuant to the City’s current fee schedule and a signed development agreement on forms provided by
the Department. The development agreement may provide for assignment of a portion of the application
fee to other permit fees if a development agreement is ultimately approved by the City Council.
B. Before voting on a proposed development agreement, the City Council shall hold a public hearing
about the development agreement. The City Council shall approve, disapprove, or modify a development
agreement.
C. The Director of Community Development (“Director”) or Designee, shall prepare a recommendation to
the City Council on a proposed development agreement. The recommendation shall be prepared in
consultation with the other City departments as appropriate based on the details and conditions of the
agreement. The recommendation shall be provided to the City Council
Page 203 of 207
Page 4/7
and made available to the public at least 10 calendar days prior to the public hearing on the proposed
development agreement.
D. If a development agreement is associated with a legislative action, including, but not limited to, a
comprehensive plan amendment or area-wide rezone, the development agreement may be processed
concurrently with that legislative action. Any required Planning Commission recommendation shall be
transmitted to the City Council.
E. If the owner files an application for a Type II, III, or IV land use decision or a Type I project permit, the
City shall review and process the application concurrently with the development agreement, and the
owner shall sign a written waiver of the deadline for issuance of the final decision. A final decision of the
Director or hearing examiner on such types of project permit decisions shall become effective on the date
that the City Council approves the development agreement. The period for appealing such final decision
shall commence on the date that the City Council approves the development agreement. A
recommendation of the Director or hearing examiner to the City Council on such types of land use
decisions shall be issued at least 10 calendar days prior to the public hearing on the proposed
development agreement.
F. The City shall give notice of the public meeting or public hearing at which the City Council considers a
proposed development agreement or any amendment thereto as follows:
1. Not less than 10 calendar days prior to the public hearing date, a notice of the public hearing shall
be sent to property owners within 300 feet of the property subject to the development agreement and
to others who have submitted comments and/or requested notice.
2. Not less than 10 calendar days prior to the public hearing date, a notice of the public hearing shall
be posted on the property subject to the development agreement in the manner required by Chapter
1.27 ACC.
3. Notice shall be published in the City’s official newspaper not less than 10 calendar days prior to
the meeting or hearing date.
4. All costs associated with the public notice shall be borne by the applicant.
G. Any subsequent land use decisions shall be reviewed for compliance with the terms of the
development agreement and any associated land use decisions.
18.80.060 Status, recording, and amendment of development agreement.
A. Development agreements are not “project permit applications” as defined in RCW 36.70B.020(4).
Therefore, there is no deadline for processing a development agreement.
B. The owner shall sign the development agreement before the public hearing on the development
agreement. If a person or corporation has a “substantial beneficial interest in the property,” as specifically
described below, the owner shall submit a written consent executed and acknowledged by each person
or corporation having a substantial beneficial interest in the property to the Director, with the request for
development agreement, a document stating that such person or corporation concurs in the request and
will not object to, contest, or appeal any terms and conditions of the approved development agreement. A
person or corporation having a “substantial beneficial interest in the property” shall include easement
holders, lessees with a lease of one year or more, and persons or corporations with a recorded deed of
trust or mortgage on the real property subject to
Page 204 of 207
Page 5/7
the development agreement. The Director shall have the authority to determine whether other persons or
corporations with an interest in the real property subject to the development agreement have a
“substantial beneficial interest in the property.” Within 20 calendar days after receiving written notice from
the Director that another person or corporation has a substantial beneficial interest in the property, the
owner shall submit a written consent executed and acknowledged by each such person or corporation in
accordance with this subsection.
C. The term of a development agreement and any extensions thereof shall be as follows:
1. A development agreement may be approved for a maximum period of 10 years with the possibility
for two 5-year extensions.
2. In determining the appropriate term for a development agreement, the City Council should
consider the type, size, and location of development and phasing if proposed. The City Council may
consider a shorter term with extensions.
3. If extensions are authorized in a development agreement, the owner must request the extension at
least 90 calendar days prior to expiration of the term or any extension. For development agreements
associated with land use decisions, the Director may grant an extension for up to five years if the
owner can satisfactorily show that, for a residential project, at least 50 percent of the residential units
are constructed or, for nonresidential and mixed-use projects, at least 50 percent of the gross floor
area is constructed. All other requests for extensions shall be reviewed by the City Council unless
another process is expressly provided for in the development agreement.
D. The City shall record an approved development agreement with the King or Pierce County recorder’s
office, at the cost of the owner.
E. Amendments to an approved development agreement shall be classified as either minor or major
amendments.
1. Minor Amendments.
a. The Director may approve a minor amendment upon determining that the proposed
amendment:
i. Does not increase residential density or nonresidential intensity;
ii. Does not change or expand permitted land uses;
iii. Does not increase maximum building height, floor area ratio, or other development
intensity approved by the City Council;
iv. Does not substantially modify project phasing or sequencing in a manner that affects
public facilities, infrastructure, or mitigation;
v. Does not reduce required public improvements, mitigation measures, affordable housing
commitments, or other public benefits required by the development agreement;
Page 205 of 207
Page 6/7
vi. Does not materially alter the findings or basis upon which the development agreement
was approved.
b. Minor amendments may include, but are not limited to:
i. Correction of clerical, typographical, or scrivener's errors;
ii. Correction of legal descriptions;
iii. Updating ownership or contact information;
iv. Assignment or transfer of the development agreement to a successor in interest;
v. Revision of exhibits that do not materially alter the approved development;
vi. Administrative adjustments to implementation schedules or deadlines expressly
authorized by the development agreement;
vii. Updating references to statutes, regulations, department names, or City code
provisions;
viii Other administrative revisions determined by the Director to have no material effect on
the approved development.
2. The City Council may approve major amendments.
a. Any amendment that does not qualify as a minor amendment shall be considered a
major amendment. Major amendments shall require a public hearing before the City
Council and approval by the City Council. Major amendments include, but are not limited
to:
i. Changes to permitted land uses;
i. Changes to residential density or nonresidential development intensity;
ii. Changes to maximum building height or floor area ratio;
iv. Substantial modifications to project phasing;
v. Changes to required public improvements, infrastructure, mitigation measures,
or affordable housing obligations;
vi. Reductions in required public benefits;
vii. Extensions of the term of the development agreement not otherwise
authorized by subsection (C) of this section;
viii. Any amendment determined by the Director to materially alter the approved
development agreement or the findings supporting its approval.
b. The City Council shall not approve a major amendment unless it finds the amendment
remains consistent with the Comprehensive Plan, any associated land
Page 206 of 207
Page 7/7
use approvals, and the purposes of this Chapter. The Mayor is authorized to execute
approved major amendments following City Council approval, unless the approving
resolution provides otherwise.
Page 207 of 207