HomeMy WebLinkAbout08/13/2026 - RFP CP2520 e$eattle Times
AFFIDAVIT OF PUBLICATION
Lydia Fink
City of Auburn, Finance Dept
25 W Main St
Auburn WA 98001
STATE OF WASHINGTON,COUNTIES OF KING AND SNOHOMISH
The undersigned,on oath states that he/she is an authorized
representative of The Seattle Times Company,publisher of The
Seattle Times of general circulation published daily in King and
Snohomish Counties,State of Washington. The Seattle Times has
been approved as a legal newspaper by orders of the Superior Court
of King and Snohomish Counties.
The notice,in the exact form annexed,was published in the regular
and entire issue of said paper or papers and distributed to its
subscribers during all of the said period.
08/06/2026,08/13/2026
Agent FranKie Flight Signature Pr c6-
Subscribed and sworn to before me on b S ft 3 /2.624
ire.444.:d
� .� Debbie Collantes
(Notary Signature)Notary Public in and for the State of Washington,residing at Seattle
Publication Cost: $1514.36 -'�r-::.�' _�: •,= � _:;� • •- ~
Order No: 118070 DEBBIE COLLAN i ES
Customer No: 184 Notary Public
State of Washington
PO#: Commission# 197558
My Comm. Expires Feb 15, 2030
Page 1
CITY OF AUBURN
t o.c 5CP2S20 P13th St NW Barge)
Deck Preservation
Federal Ald f:BMH4130(004)
Pr Is Due:August 2$,2026
The City of Auburn Is soliciting Propos- Publication Cost: $1514.36
als from qualified consulting teams to
provide professional services,and exe-
cute a negotiated hourly rote agree-
ment, for the design. and potentially
construction support for the 15th St NW Order No: 118070
Bridge Deck Preservation,CP2520.
)• •..
rrzTr1i77w rrr1irrTY1T77t• Customer No: 184
Mirl:T7717 rTT7rT7W7rrs T7 r•rs
•, I777777.7 .TTLTYTTN7.TYTT•7Ili'I1-
.TT77117•T'>r/777 77:111r•T7TWf 777T1.
T 0/77•T1TSTT.,ITTTST?T77/W77T777771.
7
One electronic copy(PDF)of the Pro- POD
P etal Package shall be smelled to miar•
son0auburnwa.gov on or before 4:00
pvm{{Friday,August 20,2926 wilb a sub-
tact line"Proposal—10tb St NW Bridge
Deck Preservation,CP2520".Questions
regarding this solicitation should be
directed to Molt Larson.Senior Protect
Engineer, by small only at mlar•
sonOouburnwa.gov.
For Guidance on proposal content and
the criteria used for consultant selec•
lion and evaluation,refer to the section
below titled Selection Process and
Evaluation Criteria.Although the use
of subconsultonts Is recognized as
being necessary for a multidiscipline
protect,the City's preference Is for the
lead consultant to hove the majority of
the work performed in-house.
PROJECT DESCRIPTION
City of Auburn's 15th Street Northwest
is a Principal Arterial that is located
between B Street Northwest and West
Valley Highway North. The protect's
main ablective is to scarify the existing
concrete deck and Install a polyester or
modified overlay over two bridge
decks. The bridge decks included in
this protect are located on 15th Street
Northwest over B Street NW and BNSF
Railway (Auburn05 per King County
Bridge Database.14,110 SF)and over
UPRR Railway (Auburne4 per King
County Bridge Database, 10,1107 SF).
The preliminary engineering will be
funded by federal grant funds and City
of Auburn monies.Design Is anticipated
to start In November 2026 and be com-
pleted in March 2027.
The protect is located within the City
easement provided by BNSF and UPRR,
and construction activities will be
above the railways. Funding Is pro-
vided by the federal WSDOT local
bridge program grant program and City
of Auburn monies.The total estimated
cost of the protect Is S3.704,000.
The City of Auburn reserves the right to
retain the services of the successful
firm for any subsequent Phases (ex.
Construction Support) associated with
this Protect. Future phases may need
to be evaluated for new SEE goals.
SCOPE OF WORT(
The design contract will include protect
management, bridge deck and expan-
sion taint condition assessment and
repair/or eservalien recommendations.
preparation of contract plans,specifi-
cations,and estimates at the 30%.90%
and final review levels: ..over-the-
shoulder"reviews between the 30%and
90% review levels, and bidding/con-
struction assistance.
The protect deliverables Include:
•A Protect Schedule:
• Recommendation for bridge repairs
following a detailed review of !nspec•
Lion report of the bridge decks:and
• Contract documents. Including Sae-
dal Provisions, on Engineer's Con-
struction Cost Estimate,and Contract
Plans for the 30%,90%,99%check set,
and final bid documents.
ri.kffillthriMOCESS AND EVALUA.
Each proposal Is limited to a maximum
of 10 numbered letter sized pages of
content(excluding only the cover and
any dividers) (minimum font size 10
Arial)and should address each criteria
element listed below. A committee of
City personnel will evaluate and rote
the proposals on the following criteria,
weighted as indicated:
1.identifyprotect
the at Protect Teama qs(thoseUna
who
will be actively working on this pro-
fact). Include an organizational Chart
and Identify any sub-consultants.Dis-
cuss the Proposed Protect Team's
expertise and experience with 3 similar
protects within the last 10 years.At a
minimum,information for the following
learn rotes must be provided: Protect
Manager, Quality Control (QC) Man-
ager, and Bridge Engineer. Please
include the following information for
each protect:
a.Protect name and location
b.A brief description of the protect
c.Provide the total protect costs
d. Protect Team Member roles in the
protect
Page 2
e. A Protect reference and contact
phone number
2.st a d bri fasugs tribe
List and r e y escr s o minimum of
three of the most important Issues or
considerations for this protect and iden-
tify the attributes and/or experiences
that may set your team apart or make
it particularly well.suited to address
the issues.
3.1•s Dns t eactnyrd 20%)
Describe specific lessons learned by
Your firm/team regarding similar pro-
tects and what those lessons learned
taught the team.
1.Qropl�t gslnrnnre!Qf,allty Centre,
!an tl%)
Describe your firm's process/Proce-
dures for providing quality assur-
ance/quality control throughout the life
of the project.
5,prefer,Sr edule Me eonment IO%1
Discuss bow the Protect Team will meet
the Proposed schedule shown in the Pro-
tect Description section above.
Describe your team's general approach
towards schedule management and
ovallablllty of the team members.
6.scr be rl )y DO's nowStpn-
ter t 1 Li1�IlfL_I!h_a L.I1_Oix_1
eser De a ro ec cam's now edge
and experience with WSDOT/FHWA
standards tar design and Construction.
7./1Doreoch to meet the SBE cool(10%)
Describe your firm's approach to meet
the SBE goal.
Following the evaluation of the Propos-
als, the City will conduct In person
Interview of up to 3 of the prospective
consultants. Those firms selected for
interview will have the opportunity to
present their past experience with simi-
lar Protects and overall protect
approach.
LECTION SCHEDULE
The CIW's proposed schedule for Con.
sultant selection,subject to change,Is
as follows:
issue Request for Proposals August 6,
2026
Deadline for Submittal of Proposals
August 25,2026 0 4:00 pm
Preliminary Selection of Firms Septem-
ber 2.2026
Notify Firms Chosen for Interviews
September 0.2026
Consultant interviews Week of Sepiom-
Der 11,2026
Final Selection of Design Firm Septem•
her 2e,2026
Execution of Consultant Agreement
October 30,2026
TERMS AND C HDlTlO[Q,=
The CC�iity off Auburn reserves the right to
reflect any and all Proposals and to
waive irregularities and informalities
in the submittal and evaluation
process. This solicitation for Consul-
tant Services does not obligate the City
of Auburn to pay any casts Incurred by
respondents In the preparation and sub-
mission at a Proposal.This solicitation
does not obligate the City of Auburn to
accept or Contract for any expressed or
implied services. Furthermore, the
City of Auburn reserves the right to
award the contract to the next most
Qualified Consultant it the selected Con-
sultant does not execute a contract
within thirty 30 days after the award of
the proposal.
The City of Auburn in accordance with
Section 504 of the Rehabilitation Act
(Section SO1) and the Americans with
Disabilities Act (ADA), commits to
nondiscrimination on the basis of dis-
ability.In all of its programs and activ-
ities.This materiel can be made avail-
able in on alternate format by coiling
253.931-3010.
The City of Auburn,in accordance with
the provisions of Title VI of the Civil
Rights Act of 1964 (1$ Stat. 252, 12
U.S.C.if 2000d to 2000d-1)and the Reg-
ulations, hereby notifies all bidders
that it will affirmatively ensure that
any contract entered tato pursuant to
this advertisement, disadvantaged
business enterprises will be afforded
full and fair opportunity to submit bids
in response to this Invitation and will
not be discriminated against on the
grounds of race, color, or national
origin in consideration for an award.
Dales of Publication in the Seattle
Doily Journal of Commerce.August 6,
and August 19.2026
Dotes of publication in the Seattle
Times,August 6,and August 13,2026.
Page 3