Loading...
HomeMy WebLinkAbout71W1513kll;%. DETAIL .---No --SCALE-'--'-. _31 - 2 -REMOVE _ 26'-0r` EXISTINCi So' PIPE - REMOVE 30'-0__EXISTIN(. I8"_5TEEL-CASINCz z2=I - - EXI5TIN4.. SOVTH Nt% DRAINAGE - DITCH • I. _.SMITH-BLAIR 437 CUT --IN REPAIR COUPLINCi. I I - SMITH-BLAIR 437 CUT -IN EXISTING._ 18"�STEEL CASINGC REPAIR. COUPLING Sir- 45Q M• J.. ELL_. - -... _ EXISTiNCs PIPE �' CASINIc TO BE.. REMOVED - - EXISTINGr -8'_`C.I: WATER. MAIN EXISTING: IE�'STEEL CASING;._ -'/gr x .3 " (TYPICAL) . _ _ _ — — — — — — _-.._� STEEL COLLAR (TYP.� EXI5TINQz 5"C.I. WATER MAIN. - - - - - - - -' � _ S_EE DETAIL:-•A1—- - . - - _ _EXISTING B.02 ATE VALVE APPROX. 60• t--- - EX I STINCz 8"� SATE VALVE A PPROX. 60r • �� — � — -- __ — — — — -- — _ v • ."tq_.--.----BACKFILL WITH CLA55 A PIT RUN GRAVEL ;AND ..GRADE 'p TO MATCH EXI STING • DITCH LINES Q�Q v o� o O r • 9 .A `�}. 9. I SHACKLE ROD ANCHORS, (TYPICAL) a' ' G e v 9 r Q -(SEE OF -TAIL, "A�� t 0'e „CONCRETE PAD-28'x 4�x. 1%Z� DEEP 9"DUCTILE IRON PIPE ,�a n A? REINF.-" STEEL-.12".O.C. EA -CH: WAY ' .._ -. y PLACE6 AT.CENTER DEPTH OF PAD: Q, o ` V c d D c c t c i Q r r r r c aq t Y f r ! G f O d r n rc7 •. r c,< < o . r._ G, 12'o L� L R� Qf l 1..N�N U�• aC R U5i-I�Ev �Oc IZ -i- c► • r i. , • 13-3_ 14! - C) LUND ROAD & SR 18 LOOKIN4 WEST NOTES I. ALL MATERIALS, EXCEPT 2%z*MINUS CRUSHED ROCK, PIT RUN GaRAVEL•, CONCRETE, CONCRETE FORMS, REINFORCING; STEEL, STEEL COLLARS AND SHACKLE. RODS S To BEc TIME 51JED PRIOR BY TOHE CITY. Z. CONCRETE PAD SHALL "BE P0VRED _ IN PLACE AND 6.IVEN TEN REMOVAL OF EXISTINrz PIPE AND CA51NCr. 3. MAXIMUM SHUT DOWN TIME FOR WATER w1AINS,IIAtLN4T:Ta=:EXCEEt 14.HOURS. 4. ALL NEW PIPE AND FITTIN6--5-5HALL-BE_ASSEMBLED AND 114STALLED AS A UNIT AND INSERTED - INTO EXISTING LINE IN ONE VNIT TO REDUCE DOWN TIME TO A M-INIMUM. - 5. EXCAVATIO-N7SHALL BE$ACKFILLED TO EX15TING GRADE WITH CLASS-"K PIT RUN GRAVEL. - 6. ALL. PIPE AND FITTINrzS TO BE FLUSHED WITH A CHLORINE SOLUTION, FURNISHED BY THE --CITY, PRIOR TO INSTALLATION. 7. CONTRRACTOR SHALL CLEAN TO BRIGHT METAL,:AL.L CLAMPS AND EXP05_ED PO_RTI.ONS_ OF -17'_SN- ACKLE RODS -AND PAINT WITH TWO COATS .OF �BITUMASTIC N2_ 50.. - S, PUMPIN4 , IF REQUI-RED;514ALL SE-ACCOMPLI5HED BY CONTRACTOR. 9. w0 K 5HALL BE_CDMPL.ETEO NOT LATER THAN AVC&. P-7., 1971. 10. SALVAGED MATERIAL SHALL BE DELIVERED TO M- 4 O BLDG. By CONTRACTOR. I1. CITY WILL FURNI514 PIPE IN EXCESS LEN&TI•IS. CONTRACTOR SHALL CUT TQ FIT. _4; { �sS�Oi�Al.t'r►'� VLV 0 DATE I N0, REVISION BY .CITY OF AUBURN AUBURN WASHINGTON WATER IMPR. N2 80 LOWERING OF 8" C.I. WATER LINE LUND ROAD a SR 18 M14 DESIGNED V, APPROVEDSHEET DRAWN G. A.O. SCALE 1" - 2'-0" CHECKED ` I` �I DATE JULY 28, 1971 71-W-+?& SH L j .