HomeMy WebLinkAbout05-19-2003 Item V-D-2CITY OF 'v" ASIIINGTON AGENDA BILL APPROVAL FORM Agenda Subject Date: Award Contract 02-29 May 14, 2003 Department: Attachments: Budget Status Sheet, Budget Impact: Public Works Bid Tab Summary & Map $ 0 Administrative Recommendation: City Council award Small Works Contract 02-29, Project Number C217A, D Street Storm System Improvement, to RW Scott on their low bid of $25,710.00 plus WA state sales tax of $2,262.48 for a total contract price of $27,972.48. Background Summary: The D Street SE. Storm Improvement includes installation of a new storm under -drain infiltration system of approximately 60 ft in length in unimproved right-of-way at the west end of 25th Street SE to eliminate the existing sanitary sewer cross -connection. This is a reduced scope to repair the immediate cross connection and flooding problem. The original scope was to provide capacity improvements, which are not necessary at this time. A project budget contingency of $877,629 remains in the 2003 432 Storm Utility fund. W0519-10 04.8.1 C217A Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board ®Public Works ❑ Human Resources ❑ Police ❑ Planning Comm. ❑ Other ❑ Legal ® Public Works Action: Committee Approval: ❑Yes ❑No Council Approval: ❑Yes ❑No Call for Public Hearing Referred to Until Tabled Until Councilmember: Wagner Staff: Dowd Meetinq Date: Mav 19, 2003 Item Number: V.D.2 AU MORE THAN YOU IMAGINED BUDGET STATUS SHEET 0 PS&E @100% 0 Pre-bid Date: 5/6/03 * Award 0 Const. @ xx% The "Future Years" column indicates the projected amount to be requested in future annual budget requests. Funds Budgeted (Funds Available) Funding Prior Years 2002 2003 Future Total 432 Storm drainage Fund 0 100,000 921,000 0 1,021,000 Construction Engineering 0 15,147 6,000 0 0 Construction Bid (w/Tax) 0 1 (84,853)1 27,972 0 0 Authorized Contingency (5%) 0 1 0 1 1,399 0 0 Total 0 100,000 921,000 0 1,021,000 Estimated Cost (Funds Needed) Activity Prior Years 2002 Actual 2003 Future years Total Design Engineering 0 15,147 8,000 0 23,147 Construction Engineering 0 15,147 6,000 0 6,000 Construction Bid (w/Tax) 0 1 (84,853)1 27,972 0 27,972 Authorized Contingency (5%) 0 1 0 1 1,399 0 0 1 1 1 1 1 1 1 Total 1 0 1 15,147 1 43,371 1 0 157,119 102 Budget Status Prior Years' 2002 2003 Future Years Total 102 Funds Budgeted 0 (100,000) (921,000)0 1 (1,021,000) 102 Funds Needed 0 15,147 43,371 0 57,119 (102 Fund Project Contingency) 0 1 (84,853)1 (877,629)1 0 1 (963,881) 102 Funds Required 0 1 0 1 0 1 0 1 0