Loading...
HomeMy WebLinkAbout05-19-2003 Item V-D-4CITY OF„ - a AGENDA BILL APPROVAL FORM WASHINGTON Agenda Subject Date: Consultant Agreement No. AG -C-199 May 14, 2003 Department: Attachments: Budget Impact: Public Works Budget Status Sheet and Ma $0 Administrative Recommendation: City Council approve Consultant Agreement No. AG -C-199 in the amount of $58,000 with PB Power, Inc., Downtown Lighting Study. Background Summary: Consultant Agreement No. AG -C-199 in the amount of $58,000 is being requested to perform a scoping analysis of the Downtown Lighting as the first step in a potential Downtown Lighting LID. The scope of work includes: Analyze the low light level conditions along City streets, in City parking lots, alleyways, and sidewalks. (See the attached map) These low light conditions are a security concern to the City. The primary objectives of the lighting study are as follows: 1) Measure and document existing light levels along roadways, parking lots, alleyways, sidewalks, and pedestrian crossings 2) Compare measured light levels against standard practice for both traffic and pedestrians 3) Document and define areas of insufficient lighting (low light levels) 4) Provide recommendations and cost estimates for lighting system improvements including upgrades required to the existing system to increase light levels. W0519-2 A3.16.9, 04.9.1 Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board EPublicWorks ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other E Public Works ❑ Human Resources Action: Committee Approval: ❑Yes ❑No Council Approval: ❑Yes (--]No Call for Public Hearing Referred to Until _!_/ Tabled Until Councilmember: Wagner Staff: Dowdy Meeting Date: May 19, 2003 1 Item Number: V.D.4 AUBURN* MOR1 THAN YOU IMAGINED BUDGET STATUS SHEET Project No: Project Title: Downtown Lighting Study Q PS&E @ 0% O Pre-bid t:>ate:5-7-2003 O Award Const. @ xx % The "Future Years" column indicates the projected amount to be requested in future annual budget requests. Funds Budgeted (Funds Available) Funding Prior Years 2002 2003 Future Years Total 102 Streets 0 0 150,000 0 150,000 Total 0 0 150,000 0 150,000 Estimated Cost (Funds Needed) Activity Prior Years 2002 2003 Future Years Total Pre -Design 0 0 58,000 0 58,000 Design Engineering 0 0 58,000 0 0 Property Acquisition 0 0 92,000 0 0 Construction Estimate or Bid 0 0 0 1 0 0 Line Item Changes 0 Change Order #1 0 Construction Contingency Other Construction Engineering 0 Total 0 01 58,000 1 01 58,000 Bud et Status HAStaffFiles\BrianC\Lighting Study\BudgetStatusSheet Prior Years 2002 2003 Future Years Total Funds Budgeted 0 0 (150,000) 0 (150,000) Funds Needed 0 0 58,000 0 58,000 ( Fund Project Contingency) 0 0 92,000 0 91000 Funds Required 0 0 0 1 0 0 HAStaffFiles\BrianC\Lighting Study\BudgetStatusSheet O Auburn Downtown 0 POAERTucm MAIN AND ALLEYS INCLUDED IN STUDY 0 POWER ��' MAIN SrST NOT INCLUDED IN STUDY '� MON-U MY OL PNP rots SCALE: 1" =350' Lighting Study Areas rARffiNC LOTS G NRAPPIC SIGNAL Pols °H P03f HUILOINCS • TRIIr)S CAMN ■ ssHnca c�elNsr / u°ar