HomeMy WebLinkAbout06-02-2003 Item V-D-3CITY OF,.
AGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject
Date:
Final Pay Estimate #9 to Contract 01-09
5/28/2003
Department:
Attachments: Budget Status Sheet,
I
Budget Impact:
Public Works
Final Pay Estimate #9, Ma
$25,240 — 432 Storm Fund
Administrative Recommendation:
City Council approve Final Pay Estimate #9 to Contract 01-09 with Rodarte Construction Co. Inc., and
accept construction of Project No. C1005, 2002 Sewer Replacement Program.
Background Summary:
This project replaced old clay sewer pipes at various locations around Auburn. Most of the locations were
in alleys east of downtown.
This project also included emergency Sewer repairs at the Dinner Theater and sewer improvements that
were outside of the scope of the South 277th street project. A new sewer line was also installed in the
Sound Transit alley that was needed prior to completion of their improvements.
The Masonic Temple sewer and storm improvements completed within this project will require a mid -year
budget adjustment in the 432 Storm Fund to complete this work.
A project budget contingency of $637,459 remains in the 431 Sewer Fund.
W0602-4
04.6.3 C1005
Reviewed by Council & Committees:
Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITTEES:
❑ Building ❑ M&O
❑ Airport ❑ Finance
❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv.
❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD
❑ Fire ❑ Planning
❑ Park Board NPublic Works
❑ Human Resources ❑ Police
❑ Planning Comm. ❑ Other
❑ Legal ® Public Works
Action:
Committee Approval: ❑Yes [:]No
Council Approval: ❑Yes ❑No Call for Public Hearing
Referred to Until
Tabled Until
Councilmember: Wagner Staff: Dowd
Meeting Date: June 2, 2003 Item Number: V.D.3
AUBURN M0P E THAN YOU IMAGINED
BUDGET STATUS SHEET
Project No: c1005 Project Title: 2002 Sanitary Sewer Replacements
Date: May 27, 2003
0 PS&E @ 0%
0 Pre-bid
0 Award
Const. @ 100%
2002 Sewer replacement around downtown mostly within public alleys along with the repair at the
Auburn Dinnner Theatre and the raising of two manholes along A St SE. Change Orders were added
to job to resolve wastewater problems around town.
Funds Budaeted (Funds Available)
Funding
2001 (actual)
2002(actual)
2003
Total
431 Sewer Fund (C1005)
34,228
518,460
1,242,836
1,795,524
432 Storm Funds(C216A)
-
100,000
-
100,000
120 Street Funds (PR 562)
-
-
11,043
11,043
Total,
34,228
618,460
1,253,879
1,906,567
Estimated Cost (Funds Needed)
Activity
2001 (actual)
2002(actual)
2003
Total
Design Engineering
34,228
29,993
-
64,221
Construction
-
433,078
547,615
980,693
Construction Contingency
-
1,158,065
-
-
Construction Engineering
-
29,153
20,000
49,153
Dinner Theater Replacement
-
20,383
-
20,383
C0019 MH's A St SE
-
5,852
-
5,852
CO#1 - Masonic Temple (Storm)
-
-
25,240
25,240
CO#1 - Masonic Temple (Sewer)
-
18,425
18,425
CO#2 - Sound Transit Alley
-
-
19,337
19,337
CO#3 - D st. @ 277th ( PR562),'
-
8,704
-
8,704
CO#4 - Time Extn.
-
-
-
-
CO#5 - 277th @ AWN (PR562).;..
-
-
2,339
2,339
Total
34,228
527,164
632,956
1,194,348
M:Active Projects\C1005\BudgetStatusSheet3.xls
2001 (actual)
431 Sewer Fund C1005
2003 1
Total
2001 (actual)
2002(actual) 1 2003
Total
431 Funds
Budgeted
34,228
518,460 1 1,242,836
1,795,524
431 Funds
Needed
34,228
518,460 605,377
1,158,065
431 Fund Contingency
0
1 (0) (637,459)
(637,459)
431 Funds Required
0
1 0 1 0 1
0
100,000
25,240
120 Street Funds (PR 562)
432 Fund Contingency
M:Active Projects\C1005\BudgetStatusSheet3.xls
2001 (actual)
1 2002 1
2003 1
Total
430 Funds Budgeted
430 Funds Needed
-
8,704
-
2,339
0
11,043
430 Fund Contingency
0
0
0
0
430 Funds Required
0
8,704
2,339
11,043
2001 (actual)
432 Storm Funds C216A
2002 2003
Total
432 Funds Budgeted
432 Funds Needed
100,000
25,240
100,000
25,240
432 Fund Contingency
0
100,000
0
74,761
432 Funds Required
0
1 0 1
25,240 1
0
M:Active Projects\C1005\BudgetStatusSheet3.xls
CITY OF AUBURN CO. NO. 01-09
C1005 2002 Sanitary Sewer Improvements
PAY ESTIMATE #9 & FINAL SCHEDULE A: Sanitary Sewer Utility Improvements
ITEM
ESTIMATE
TOTAL
PERIOD
UNIT
PERCENT EST.
NO.
ITEM DESCRIPTION
QUANTITY
QUANTITY
QUANTITY
TYPE
UNIT COST TOTAL COST
PERIOD COST
QTY.687.
1
Minor anges
1
0.683
0 Eq. Adj.
15,000.00 $
10,245.00
$
2
Temporary Water Poll ution rosion ontro
1
0.8625
0 Eq. Adj.
8,000.00 $
6,900.00
$
86%
3
1 emporary construction Site Sign
2
2
0
EA
450.00 $
900.00
$
100%
4
Mobilization
1
1
0
LS
52,500.00 $
52,500.00
$
100%
5
Traffic Control Labor - Flagging
6001
512
01
HRI
25.001$
12,800.00
$
85%,
6
emove manhole
221
21
0
EA
350.00 $
7,350.00
$
95%
7
Remove Raised Pavement Parkings
1
1
0
LS
300.00 $
300.00
$
1000/
100%
8
RemoveAsphalt Concrete avement
2,300
8577
0
SY
4.00 $
34,308.00
$
9
Remove Cement oncrete at or
280
323
0
SY
13.00 $
4,199.00
$
10
Remove Cement oncrete u
260
158
0LF
5.00 $
790.00
$
115%
11
roadway xcavation nc u mg au
200
200
0
CY
30.00 $
6,000.00
$
61
12
13
water
Shoring an Extra Excavation ass
15
3.067
0
MGAL
120.00 $
368.04
$
100%
20%
14
Crushed suFa-cing Top Course
63,800
2,400
63800
3225.93
0
0
SF
TON
0.10 $
6,380.00
$
100%
15
ruse Surfacing ase Course
300
300
0
TON
19.00 $
17.00 $
61,292.67
$
13q%
16
MFER o Patch Ix
100
156.38
0
TON
65.00 $
5,100.00
10,164.70
$
$
100%
17
sp a t oncrete Pavement class B
1,180
1374.18
0
TON
58.00 $
79,702.44
156%
18
orrugate tee Slottedram Pipe - 1
64
60
0
LF
100.00 $
6,000.00
$
116%
19
21
manhole Type 1, Diameter
23
23
0
EA
2,500.00 $
57,500.00
$
194%
94%
21
Cleanout T
atc basin Type
9
13
0
EA
300.00 $
3,900.00
$
144%
22
rashac
1
1
0
EA
800.00 $
800.00
$
100%
23
fustManhole
1
1
0
0
EA
200.00 $
$
0%
24
ConnectManholei
2
2
26
0
EA
25000 $
.8
500.00
$
200%
25
Pipe anon atena
oun
4,000
61.7
0
0
EA
TON
650.00 $
9.50 $
16,900.00
$
93%
26
Imported Pipe BeddGg
6,300
2293.32
0
TON
9.50 $
586.15
21,786.54
$
$
2%
36%
27
ImportedPipe TrenchBackfill
18,200
2696.77
0
TON
7.50
20,225.78
$
15%
28
or Filling Ipe
10
13.5
0
CY
100.00 $
1,350.00
$
135%
29
Solid Wallewer Pipe, iam.
260
253
0
LF
62.00 $
15,686.00
$
g7°/,
30
Solid a ewer i lam.
330
337
0
LF
47.00 $
15,839.00
$
102%
31
Solid Wallewer Pipe, iam.
5,430
6309
0
LF
34.00 $
214,506.00
$
116%
32
Solid Wallewer Pipe, SM35,15 Diam.
1,110
2275
17
LF
20.00 $
45,500.00
$ 340.00
205%
33
ewer Pipe, iam.
500
55
0
LFI
40.00 $
2,200.00
$ -
11%
34
rVnewer 151pe, ZR -M, iam.
250
113.5
O
LF
22.00 $
2,497.00
$
45%
35
Ductile iron Pipe 12 Diem.
174
330
0
LF
58.00 $
19,140.00
$
190%
36
ewer Television Inspection
6,840
7110
0
LF
0.50 $
3,555.00
$
37Potholing
or nvate tl hies
1
0.89
0 Ea. Ad'.
10,000.00 $
8,931.00
$
104%
38
39
Concrete arner u Gutter
xtru Cement oncrete ur ype
230
166
0
LF
12.00 $
1,992.00
$
84%
72%
40
monument Type i I
1
0.35
0 Eq. Adj.
1,600.00 $
560.00
$
35
2
1
01
EAI
4WO-07F-400.
00
$
50%
SCHEDULE SUBTOTAL $ 340.00
Period bates
Begin: April 21, 2003
End: May 20, 2003
h:\proj\pe\01005 PE 1 of 4
05/23/2003 at 11:59 AM
CITY OF AUBURN CO. NO. 01-09
C1005 2002 Sanitary Sewer Improvements
PAY ESTIMATE #9 & FINAL SCHEDULE A: Sanitary Sewer Utility Improvements
ITEM
ESTIMATE
TOTAL
PERIOD
UNIT
PERCENT EST.
NO.
I ITEM DESCRIPTION
QUANTITY
QUANTITY
QUANTITY
TYPE
UNIT COST
TOTAL COST
PERIOD COST
QTY.
41
mmercia /Industrial dveway
265
406.73
0
SY
38.00 $
15,455.74
$
153%
42
ement Concrete Sidewalk40
68.56
0
SY
24.00 $
1,645.44
$
171%
43
Plastic Crosswalktripe Wide)
150
19
0
LF
7.00 $
133.00
$
13%
44Asphalt
pe ump
2
3
0
EA
950.00 $
2,850.00
$
150%
CO -1
asornc empe
1
1
0
LS
40,133.00 $
40,133.00
$
100%
C -2
treat
1
0.93
0
LS
17,773.00 $
16,522.21
$
93%
C -3
tree
1
1
0
LS
8,000.001$
8,000.001$
100%
CO -5
Hernoval o pug
11
11
01
LS
2,150.001 $
2,150.00
1 $
100%
SCHEDULE TOTAL $
Period Dates
Begin: April 21, 2003
End: May 20, 2003
340.00
h:\proj\pe\C1005 PE 2 of 4 05/23/2003 at 11:59 AM
CITY OF AUBURN
PROJECT SUMMARY
PAY ESTIMATE #9 & FINAL
C1005, 2002 Sanitary Sewer Improvements
CO. NO. 01-09
Original Contract Contract Change
Amount Orders Total Pavment Thic Pa -rind
SCHEDULE A: Sanitary Sewer Utility Improvements
Contract
$
881,362.00 $
68,056.00 $
846,543.71
$
340.00
Sales Tax (+8.8%)
$
77,559.86 $
5,988.93 $
74,495.85
$
29.92
Retainage (-5%)
$
- $
- $
42,327.19
$
17.00
(escrow)
SCHEDULE TOTAL
$
958,921.86 $
74,044.93 $
878,712.37
$
352.92
TOTAL PAYMENT TO CONTRACTOR
PAYMENT DUE CONTRACTOR:
Period Dates
Begin: April 21, 2003
End: May 20, 2003
$ 878,712.37 $
352.92
352.92
Percent/Contract
89%
h:\proj\pe\C1005 PE 3 of 4 05/23/2003 at 11:59 AM
CITY OF AUBURN
C1005
PAY ESTIMATE #9 & FINAL
CONTRACTOR:
Rodarte Construction
PO Box 1875
Auburn, WA 98071-1875
Phone: 253.939.0532 fax 253.939.0557
CO. NO. 01-09
2002 Sanitary Sewer Improvements
The undersigned has reviewed and approved this final pay estimate. I agree that it is a true and correct statement
showing all monies due me from the City of Auburn under this contract; that I have carefully examined the final pay estimate
estimate and understand it and that I hereby release the City of Auburn from any and all claims of whatsoever
nature which I may have, arising out of this contract, which are not set forth in this estimate.
PAY AMOUNT DUE CONTRACT =
Signatures:
Contractor
Inspector
Project Manage
City Engineer _
352.92
Date
Date �— Z. 3—n3,
Manager Date . = Z 7 O�
Date