HomeMy WebLinkAbout10-06-2003 Item V-D-1CITY OF '*
AGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject
Date:
Final Pay Estimate #4 to Contract 03-02
10/2/2003
Department:
Attachments: Budget Status Sheet,
Budget Impact:
Public Works
Final Pay Estimate #4 and Ma
$ 0
Administrative Recommendation:
City Council approve Final Pay Estimate #4 to Small Works Contract 03-02 with Holt Drilling, Inc. and
accept construction of Project No. MS755, Well #2 & 4 Investigation & Rehabilitation.
Background Summary:
This project consisted of the following: (1) the repair and rehabilitation of Well No.2; (2) rehabilitation of
Well No. 4; and (3) the abandonment of test Well 6A.
A project budget contingency of $41,431 remains in the 430 fund.
W1006-3
04.11.1 MS 755
Reviewed by Council & Committees:
Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITTEES:
❑ Building
❑ M&O
❑ Airport ❑ Finance
❑ Cemetery
❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv.
❑ Finance
❑ Parks
❑ Human Services ❑ Planning & CD
❑ Fire
❑ Planning
❑ Park Board ®Public Works
❑ Human Resources
❑ Police
❑ Planning Comm. ❑ Other
❑ Legal
® Public Works
Action:
Committee Approval: ❑Yes []No
Council Approval: ❑Yes ❑No Call for Public Hearing
Referred to Until _
Tabled Until
Councilmember: Wagner Staff: Dowd
Meeting Date: October 6, 2003 Item Number: V.D.1
AUBURN* MORE THAN YOU IMAGINED
BUDGET STATUS SHEET
Project No: MS755 Project Title: Well No.2&4 Investigation & Rehabilitation
PS&E @ 100%
Pre-bid Date: 7/28/03
Award
Const. @ 100 %
The "Future Years" column indicates the projected amount to be requested in future annual budget requests.
Mimic Rrnrlrmforl /Funria Ovailahlp►
Funding
Prior Years
2002
2003
Future Years
Total
430 Fund
0 41,431
0
150,000
430 Funds Required
150,000
Total
0
1 0
0
0
OMJ
Fcfimatprl Cnst /Funds Needed)
Activity
Prior Years
2002
2003
Future Years'
Total
Design Engineering
0 41,431
0
14,733
430 Funds Required
8,000
Property Acquisition
0
0
0
0
Construction
91,836
91,836
Line Item Changes
0
0
Change Order #1
0
0
Change Order #2
0
0
Change Order #3
0
0
Construction Contingency (5%)'
0
0
Other
1,000
1,000
Construction Engineering
1,000
1,000
Total
0
0
108,569
0
108,569
430 Budget Status
430 Funds Budgeted
430 Funds Needed
0
0
0 150,000
0 108,569
0
0
150,000
108,569
(430 Fund Project Contingency)
0
0 41,431
0
41,431
430 Funds Required
0
0 1 0 1
0
0
W1006 -3A
CITY OF AUBURN
MS755
PAY ESTIMATE #4 & FINAL
`02 -Mar
Well #2 & 4 Investigation & Rehabilitation
SCHEDULE A: Driller Work
ITEM
NO.
ITEM DESCRIPTION
ESTIMATE
QUANTITY
I TOTAL
DUANTITY
PERIOD I
QUANTITY
UNIT
TYPE
UNIT COST
TOTAL COST
PERIOD COST
PERCENT EST.
1Mobilization
Minor
1
1
0
LS
750,00
750.00
OTY.
1003%
3
anges
ut
1
0.52
0 Eq. Ad.
1,500.00 $
780.00
52%
4
z ig o
ns era emove es Pum
100
1
1 .75
-34
HR
140.00 $
14,665.0 0
$ 4,760.00
105%
5
n ime r ump I est
16
1
0
LS
1,000.00 $
1,000.00
100%
onmen o e
1
1.25
0
HR
90.00 $
112.50
6%
7
7
-1-1
installation on Tubes
`�
1
400
0
LS
4,000.00
4,000.00
-
100%
UO
iboundingat
a worka e
1
0
LF
2.00
800 00
100%
C01-2
e u s e electric motor
1
1
0.25
LS
2,437.12
2,437.12
609,28
100yo
um s new pump or e
1
1
0
LS
2,.262.70
2,262.70
100/
CO2 -1
t-umlSn Well #2 cas ng, screen gravel
1
1
0.74
0
0.00181134
LS
LS
2883.53
20,275.00
28,830.53
100%
2-2
Mobilize prepare ner screen
1
1
0
LS
14,911.65
32.87
74%
003-1
ns liner casing a screen
32
28.75
28.75
HR
2.000.00
165.00
2,000.00
100%
CO3-2
003-3
IT4 -F-p—
one
1
1 1.357621
1.35762
Adi.
4,000.00
4,743.75
5,430.48
4,743.75
5,430.48
90%
C
az g me
ns sou ng
40
38.5
38.5
HR
140.00
5,390.00
5,390.00
136%
96%
180
leol
180
IF: 1
2.00
360.00
360.00
100%
SCHEDULE TOTAL $ 11,806.18
Period Dates
Begin: July 20, 2003
End: September 16, 2003
h:\pr0rVe\MS755 PE 1 of 3 09/16/2003 at 2:09 PM
Period Dates
Begin: July 20, 2003
End: September 16, 2003
h:\proApeWS755 PE 2 of 3 09/16/2003 at 2:09 PM
CITY OF AUBURN
MS755, Well #2 & 4 Investigation & Rehabilitatl6n
PROJECT SUMMARY
###
PAY ESTIMATE #4 & FINAL
Original Contract
Contract Change
Amount
Orders
Total Payment
This Period Percent/Contract
SCHEDULE A: Driller Work
Contract
$ 23,490.00
$ 60,112.35
$
88,473.73
$
11,806.18 106%
Sales Tax (+8.8%)
$ 2,067.12
$ 5,289.89
$
7,785.69
$
1,038.94
Retainage (-50k)
$ -
$ -
$
4,423.69
$
590.31
(city held retainage)
SCHEDULE TOTAL
$ 25,557.12
$ 65,402.24
$
91,835.73
$
12,254.81 -
TOTAL PAYMENT TO CONTRACTOR
$
91,835.73
$
12,254.81
PAYMENT DUE CONTRACTOR:
$
12,254.81
Period Dates
Begin: July 20, 2003
End: September 16, 2003
h:\proApeWS755 PE 2 of 3 09/16/2003 at 2:09 PM
CITY OF AUBURN
MS755
PAY ESTIMATE #4 & FINAL
CONTRACTOR:
Holt Drilling Inc
PO Box 1890
Milton WA 98354
Phone: 253.845.7448 fax 253.770.1420
Well #2 & 4 Investigation & Rehabilitation
The undersigned has reviewed and approved this final pay estimate. I agree that it is a true and correct statement
showing all monies due me from the City of Auburn under this contract; that I have carefully examined the final pay estimate
estimate and understand it and that I hereby release the City of Auburn from any and all claims of whatsoever
nature which I may have, arising out of this contract, which are not set forth in this estimate.
PAY AMOUNT DUE CONTRACT = $ 12,254.81
Signatures:
Contractor
Inspector
Project Manager
Date C
Date
T'
Dated G 3
City Engineer �J v .�t�- P Date 24/0 3
hAproNe\MS755 PE 3 of 3 09/16/2003 at 2:09 PM
� J tr71Ctn � q
1'r 19 SE
=a SO AWCKLESXOor
a•
rs 22nd ST SE CASINO S
R um or
a a
23rd 3T SE 23rd of ST SC
SE a s
25th Sr SB 25W
A r� awws
27th ST PARK t =" w = • w
CffY 29th
AUBURN ; � s%• •
� CAVA' .�• ;= .
FARM ,
w Vicinity MapC&
SCALE: 1" = 1500'
1
u
A
f �
710.
0th ST WE
Sim n
w» r
+
NE
Bth NE
8th
_
B"PY a�
h ST
z
z
`�,
•
NW
Bt
NE
�.
V
w w K
8th
��R
EJIORUL
m
z
5th
yW .
5
NE PARK �
PARK x pyo
4th '� '• +� ..
j
-•
.
s 4th
ST
3rd
�, �• ..
..
B 3rd
AUBURN o"
2n
t
,
HIGH k z o
1at
i
mw
e
SCHOOL tot
z
C a' " j 1
4= 300
a
ST
# !
t
Sw
d3r
.a
00 ST
SE
e
4th
7th
7
8th ST SE
ath
w 9th SB LES
�
cow
l
10th ST v
* PARA'
L
11 SE ~
A
YMCA
12th
G.S
P
13TH
14th
S
611. 1 ke4
'
1 S4l1 CT Q!
� J tr71Ctn � q
1'r 19 SE
=a SO AWCKLESXOor
a•
rs 22nd ST SE CASINO S
R um or
a a
23rd 3T SE 23rd of ST SC
SE a s
25th Sr SB 25W
A r� awws
27th ST PARK t =" w = • w
CffY 29th
AUBURN ; � s%• •
� CAVA' .�• ;= .
FARM ,
w Vicinity MapC&
SCALE: 1" = 1500'