Loading...
HomeMy WebLinkAboutItem V-D-1WASHINGTON AGENDA BILL APPROVAL FORM Agenda Subiect Date: December 9, 2003 Award Contract 03-04 Department: Attachments: Budget Status Sheet, Budget Impact: Public Works Bid Tab Summary, Map $ 0 Administrative Recommendation: City Council award Small Works Contract 03-04, Project Number C306A, Coal Creek Springs Security Hatches, to Gary Harper Construction Inc. on their Iow bid of $71,100.00 plus WA state sales tax of $6,256.80 for a total contract price of $77,356.80. Background Summary: This project will provide for the removal of seven manhole frames and covers and replace them with seven access hatches; removal of flow control vault top cover and replacement with a new top cover complete with two access hatches and one valve box; and removal of the four knife gate valves and replacement with four butterfly valves. The estimated project start and completion dates are, respectively, January 2004 to March 2004. A project budget contingency of $85,900 remains in the 430 Water Fund. As noted on the Bid Tab Summary, the apparent Iow bidder, RW Scott Construction, claimed an error per WSDOT Standard Specifications 1-03.1. Upon review of the documentation provided by RW Scott, staff concurs and recommends that they be relieved of their responsibility. W1215-5 O4.11.1 PR C306A Reviewed by Council & Committees: Reviewed by Departments & Divisions: [] Arts Commission COUNCIL COMMITTEES: [] Building [] M&O [] Airport [] Finance [] Cemetery [] Mayor [] Hearing Examiner [] Municipal Serv. [] Finance [] Parks [] Human Services [] Planning & CD [] Fire [] Planning [] Park Board []Public Works [] Human Resources [] Police [] Planning Comm. [] Other [] Legal [] Public Works Action: Committee Approval: []Yes []No Council Approval: []Yes []No Call for Public Hearing / /__ Referred to Until / / Tabled Until / / Councilmember: Wagner Staff: Dowdy Meeting Date: December 15, 2003 Item Number: V.D.1 AUBURN * THAN YOU IMAGINED IProJect No: C306A BUDGET STATUS SHEET Project Title: Coal Creek Springs Hatches PS&E @ 100% Prs-bid Award X Const. @ 0 % Date: 12/02/03 The "Future Years" column indicates the projected amount to be requested in future annual budget requests. Funds Budgeted (Funds Available) Funding Prior Years 2003 2004' Future Years Total 430 Fund 100,000 75,000 175,000 Total 0 100,000 75,000 0 175,000 Estimated Cost (Funds Needed) Activity Prior Years 2003 2004' Future Years Total Design Engineering 3,300 3,300 Properb/Acquisition 0 Construction Estimate or Bid 77,400 77,400 Line item Changes 0 Change Order #1 0 Construction Contingency (5%) 3,900 3,900 Other 0 0 Construction En~lineering 5,000 5,000 Totar 0 3,300 86,300 0 89,600 430 Funds Budgeted 430 Funds Needed (430 Fund ProJect Contingency) 430 Funds Required 430 Bud~let Status Prior Years ~ 2003 100,000 3,300 0 (96,700) 0 2004 I Future Yearn ~ Total 75,000 175,000 86,300 89,100 tl,3000 00 (85,900)0 W1215-5A Project Name: Prepared by : Pdnt Date : BID TABULATION BID TOTALS SUMMARY C306A, Coal Creek Springs Security Hatches City of Auburn 12/2/2003 ENGINEER'S ESTIMATE : $ 63,820.00 AVERAGE BASIC BID AMOUNT : $ 75,728.00 BASIC BID SPREAD AMOUNT : $ 35,820.00 Basic BID Amount Spread $ Spread % LOW BIDDER : Gary Harper Construction Inc $ 71,100.00 $17,280.00 32.t 1% Second Bidder : Pivetta Brothers Construction $ 78,860.00 $25,040.00 46.53% Basic BID (Tax not Included) Total BID (Tax Included) RW Scott Construction $ 54,180.00 $ 58,947.84 Gary Harper Construction Inc $ 71,100.00 $ 77,356.80 Pivetta Brothers Construction $ 78,860.00 $ 85,799.68 Rodarte Construction $ 84,500.00 $ 91,936.00 Scotty's General Construction NON-RESPONSIVE NON-RESPONSIVE Nordic Construction $ 90,000.00 $ 97,920.00 Contractor claimed error per VVSDOT Std. Specs 1-03.1. Contractor failed to include all matedal costs in initial bid. 12/3/2003 (2:01 PM) h:\proj \bidtabs\C306A BT-Revised.xls 4 Ill