Loading...
HomeMy WebLinkAbout03-06-2006 ITEM V-C-1CITY OF WASHINGTON AGENDA BILL APPROVAL FORM Agenda Subject: Permission to Advertise Contract 06-01 Date: February 22, 2006 Department: Attachments: Budget Status Sheet Budget Impact: Public Works and Vicinity Map $ 0 Administrative Recommendation: along Elm Street from flowing south onto private property to being collected into the public conveyance City Council grant permission to advertise for bids, for Project No. C516A, Auburn Way South Sewer — Phase II. The construction costs for Phase II are estimated to be $5,185,000. A project increase of $2,240,000 in Background Summary: The purpose of this project is to replace undersized, deteriorating, 10" to 12" diameter, concrete sanitary sewer main along the Auburn Way South (AWS) corridor with larger 24" to 26" diameter, PVC sewer pipe, together with water pressure zone and storm drainage improvements. Phase two of the Auburn Way South Sanitary Sewer Replacement project will be replacing the sanitary sewer main on AWS from the Forrest Villa mobile home park to Riverwalk Drive then along Riverwalk Drive to Howard Road then along Howard Road to R Street SE. The water improvements included will remove 8 Pressure Reducing Valves (PRV's) and install 2 new PRV's along this same corridor to reconfigure the pressure zones. The storm improvements included will reconfigure the street drainage along Elm Street from flowing south onto private property to being collected into the public conveyance system to the west. The project is estimated to begin construction in May 2006. The construction costs for Phase II are estimated to be $5,185,000. A project increase of $2,240,000 in the 431 Sewer Fund will be required to support all 3 phases of the project in 2006; however, a budget carry forward of 2,279,849 will be included in Budget Amendment #1 for 2006. W0306-5 04.6.3 PR C516A Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire Planning ❑ Park Board ®Public Works ❑ Legal Police ❑ Planning Comm. ❑ Other ® Public Works ❑ Human Resources Action: Committee Approval: ❑Yes ❑No Council Approval: ❑Yes ❑No Call for Public Hearing Referred to Until _/_/_ Tabled Until —/—/ Councilmember: Wagner Staff: Dowdy Meeting Date: March 6, 2006 Item Number: V.C.1 AUBURN *MOPE THAN YOU IMAGINED BUDGET STATUS SHEET Project No: C516A & C9056A Title: AWS Sanitary Sewer Replacement - I O PS&E Pre-bid Date: Feb. 22, 2006 O Award Const. @ XX % Funds Bud eted Funds Available Funding Prior Years 2005 2006 Future Years Total Sanitary Sewer Fund (431) 263,537 998,120 650,000 2,279,849 1,911,657 Public Works Trust Fund Loan (431) 39,849 2,156,880 3,500,000 0 5,656,880 Muckleshoot Indian Tribe' 0 2,000,000 2,050,000 0 4,050,000 Water Funds (430) improvements 10,000 175,000 185,000 Storm Funds (432) improvements 8,000 100,000 108,000 Total 263,537 5,173,000 1 6,475,000 Ol 11,911,537 Construction funds shall be on account prior to the award of the construction contract and transferred to the sewer account as expenditures take place. Estimated Cost (Funds Neededl Activity Prior Years 2005 2006 Future Years Total Design 263,537 397,617 30,000 2,279,849 691,154 Construction C9056A (Phase 1) 39,849 2,447,534 1,500,000 0 3,947,534 Construction C604A (R St. Imp.) 0 - 2,000,000 0 2,000,000 Construction C516A (Phase II) _ Sewer (431) - 4,650,000 4,650,000 Water (430) 10,000 175,000 185,000 Storm (432) 8,000 100,000 108,000 Construction Engineering (Phase II) 30,000 150,000 180,000 Authorized Contingency 2.5% (Phase II) 110,000 110,000 Total 263,537 2,893,151 8,715,000 0 5,233,000 431 Budget Status - (Sanitary Sewer) Prior Years 2005 2006 Future Years Total 431 Funds Budgeted 431 Funds Needed 263,537 263,537 5,155,000 2,875,151 6,200,000 8,440,000 0 11,618,537 11,578,688 (431 Fund Project Contingency) 0 2,279,849 0 0 39,849 431 Funds Required 0 0 2,240,000 0 0 430 Budget Status - (Water) Prior Years 2005 2006 Future Years Total 430 Funds Budgeted 430 Funds Needed 0 0 10,000 10,000 175,000 175,000 0 185,000 185,000 (430 Fund Project Contingency) 0 0 0 0 0 431 Funds Required 0 0 0 0 0 432 Budciet Status - i Storm W0306 -5A Prior Years 2005 2006 Future Years Total 432 Funds Budgeted 0 0 8,000 8,000 100,000 100,000 0 108,000 108,000 432 Funds Needed (432 Fund Project Contingency) 0 0 0 0 0- 431 Funds Required 0 0 0 0 0 W0306 -5A