HomeMy WebLinkAbout03-06-2006 ITEM V-C-2CITY OF s WASH[NGTON AGENDA BILL APPROVAL FORM Agenda Subject: Change Order #1 to Contract 05-27 Date: February 117, 2006 Department: Attachments: Budget Impact: Public Works Budget Status Sheet & Ma $ 0 Administrative Recommendation: City Council approve Change Order #1 in the amount of $17,571.20 to Contract 05-27 with Hokkaido Drilling, Inc. for work on project C519A, Well 2 Repacking. Background Summary: The purpose of the project is to repack the gravel filter pack in Well 2 and decommission two monitoring wells. The gravel filter pack reserve has become depleted and it is necessary to replenish the pack in the annular space between the riser and well casing. During the start up process the well began pumping turbid water and eventually broke suction, at that point the well was shutdown to prevent damage to the pump. A preliminary inspection revealed that the gravel filter pack had dropped over 100 feet. Change Order #1 is necessary to have the Contractor remove the pump and well column and a camera lowered into the well to investigate why the gravel pack has suddenly dropped. Anticipated finish date: March 10`h, 2006 The project will not require a budget adjustment since it is anticipated that the budgeted expenditures in the 430.00.534.100.65 fund will not be exceeded this year. W0306-4 04.11.1 PR C519A Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board SPublic Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other S Public Works ❑ Human Resources Action: Committee Approval: ❑Yes []No Council Approval: ❑Yes ❑No Call for Public Hearing Referred to Until Tabled Until Councilmember: Wagner Staff: Dowd Meeting Date: March 6, 2006 1 Item Number: V.C.2 AUBURN * MORE THAN YOU IMAGINED BUDGET STATUS SHEET Project No: C519A Title: Well 2 Repacking Repair O PS & E @ 100% O Pre-bid Date: February 17, 2006 O Award • Const. @ 50% Funds Rudnatad (Funds Available) Funding Prior Years 2006 Future Years Total • 430 Fund 55,000 55,000 Total 01 55,000 1 0 1 55,000 Fctimatpd Cnst (Funds Nandad) Activity Prior Years 2006 Future Years Total Design Engineering 5,000 Construction Estimate or Bid 15,800 Change Order #1 17,600 Construction Contingency 15,000 Construction Engineering 1,600 Total 01 55,000 1 0 10 430 Budg let Status Prior Years 2006 Future Years Total 430 Funds Budgeted 55,000 55,000 430 Funds Needed 55,000 55,000 (430 Fund Project Contingency) 430 Funds Required 0 0 0 0 * The water budget has $1,000,000 budgeted in 2006 for the Pipeline Replacement Program of which $55,000 has been allocated towards this project. W03064A