HomeMy WebLinkAbout03-06-2006 ITEM VIII-A-5CITY OF
x WASHINGTON
AGENDA BILL APPROVAL FORM
Agenda Subject: Traffic Impact Fees
Date: March 2, 2006
Department:
Attachments: Ordinance No. 6005
1
Budget Impact:
Public Works
$0
Administrative Recommendation:
City Council introduce and adopt Ordinance No. 6005.
Background Summary:
A significant portion of the vehicle trips generated by industrial uses within the City of Auburn are made
by trucks of three or more axles. Those trucks have a disproportionately high impact on the traffic
capacity of the City's streets. The City Council finds that it is fair and equitable that the traffic impact fees
for those industrial uses should offset the impact of such truck trips.
The director shall apply a heavy truck adjustment factor to the transportation impact fees charged for
industrial land uses, addressing the percentage of vehicle trips for such uses made by trucks of three or
more axles and the street capacity used by such trucks in comparison to other vehicles.
W0306-6
F4.3
Reviewed by Council & Committees:
Reviewed by Departments & Divisions:
ElArts Commission COUNCIL COMMITTEES:
❑ Building ❑ M&O
❑ Airport ❑ Finance
❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv.
❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD
❑ Fire ❑ Planning
❑ Park Board ®Public Works
❑ Legal ❑ Police
❑ Planning Comm. ❑ Other
® Public Works ❑ Human Resources
Action:
Committee Approval: ❑Yes []No
Council Approval: ❑Yes []No Call for Public Hearing
Referred to Until
Tabled Until
Councilmember: Wagner Staff: Dowd
Meetin Date: March 6, 2006 Item Number: VIII.A.5
AUBURN * MORE THAN YOU IMAGINED
ORDINANCE NO. 6005
AN ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF AUBURN, WASHINGTON, AMENDING
SECTION 19.04.040 OF THE AUBURN CITY CODE
RELATING TO ADOPTION OF A HEAVY TRUCK
ADJUSTMENT FACTOR FOR TRANSPORTATION
IMPACT FEES
WHEREAS, a significant portion of the vehicle trips generated by industrial
uses within the City of Auburn are made by trucks of three or more axles; and
WHEREAS, trips by such trucks have a disproportionately high impact on
the traffic capacity of the City's streets; and
WHEREAS, the City Council finds that it is fair and equitable that the
traffic impact fees for those industrial uses should offset the impact of such truck
trips,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, DO ORDAIN as follows:
Section 1. Amendment to City Code. That section 19.04.040 of
the Auburn City Code be and the same hereby is amended to read as follows:
19.04.040Assessment of impact fees.
A. Effective July 1, 2001, the city shall collect impact fees, based
on the fee schedule of the city of Auburn, from any applicant seeking a
building permit from the city for any development activity within the city.
B. Effective May 19, 2003, where a change in use increases the
trip generation by more than one whole PM peak hour trips, the director
----------------------------
Ordinance No. 6005
March 2, 2006
Page 1
shall calculate a transportation impact fee based on the increases in the
trip generation rate.
C. The director shall apply a heavy truck adiustment factor to the
transportation impact fees for industrial land uses addressing the
percentage of vehicle trips for such uses made by trucks of three or more
axles and the street capacity used by such trucks in comparison to other
vehicles.
DG. The amount of impact fees shall be determined at the
time an applicant submits a complete application for a building permit,
using the impact fee schedules then in effect, or. pursuant to an
independent fee calculation accepted by the director pursuant to ACC
19.04.050, and adjusted for any credits pursuant to ACC 19.04.060.
EB. Payment of impact fees shall be made by the feepayer at
the time the building permit is issued. The amount to be paid shall not be
increased for any applicant that submitted a complete application for the
building permit before the city established the impact fee rates.
F€. Applicants that have been awarded credits prior to the
submittal of the complete building permit application pursuant to ACC
19.04.060 shall submit, along with the complete building permit
application, a copy of the letter or certificate prepared by the director
pursuant to ACC 19.04.060 setting forth the dollar amount of the credit
awarded. Impact fees, as determined after the application of appropriate
credits, shall be collected from the feepayer at the time the building permit
is issued.
G. The department shall not issue a building permit unless
and until the impact fees have been paid or credit(s) awarded. (Ord. 5763
§ 1, 2003; Ord. 5506 § 1, 2001.)
Section 2. Fee Schedule Amended. That the Fee Schedule for the
City of Auburn, Washington, attached hereto and incorporated by reference, be
and the same hereby is amended to read as set forth therein.
Section 3. Implementation. The Mayor is hereby authorized to
implement such administrative procedures as may be necessary to carry out the
directives of this legislation.
----------------------------
Ordinance No. 6005
March 2, 2006
Page 2
Section 4. Severability. The provisions of this ordinance are
declared to be separate and severable. The invalidity of any clause, sentence,
paragraph, subdivision, section or portion of this ordinance, or the invalidity of the
application thereof to any person or circumstance shall not affect the validity of
the remainder of this ordinance, or the validity of its application to other persons
or circumstances.
Section 5. Effective date. This Ordinance shall take effect and be
in force five days from and after its passage, approval and publication as
provided by law.
DATED and SIGNED this day of 2006.
INTRODUCED:
PASSED:
APPROVED:
CITY OF AUBURN
PETER B. LEWIS
MAYOR
----------------------------
Ordinance No. 6005
March 2, 2006
Page 3
ATTEST:
Danielle E. Daskam,
City Clerk
APPROVED AS TO FORM:
Daniel B. Heid,
City Attorney
Published:
----------------------------
Ordinance No. 6005
March 2, 2006
Page 4
CITY OF AUBURN FEE SCHEDULE
FEES FOR CITY PERMITS AND ACTIONS
Last Updated January 1, 2006
A. Planning & Land Use Fees, Application Fees (Per Ordinance No. 5707, amended by
Ordinance No. 5715, Ordinance No. 5819, Resolution No. 3797 and Resolution No.
3953)
Applications for any action identified below shall not be accepted for filing until the fees
per the below schedule have been paid.to the City.
Tvpe Fee Shoreline substantial development
$1,070.00
Street and alley vacations
$252.00
Short subdivisions
$1,070.00
Short plat modification
$215.00
Rezoning
$1,600.00
Conditional use permits
$800.00
residential
Conditional use permits — major adjustment
$1,070.00
$400.00
commercial
residential
Mining permits
$535.00
$3,205.00
commercial
Preliminary plats
Final plats
$1,070.00
and $55.00 per lot
Hearing Examiner variances
$1,070.00
$215.00
and $33.00 per lot
single family residential
Hearing Examiner cases (non -variance)
$545.00
other (non-residential)
temporary uses, special exceptions,
administrative appeals, off-site
parking lots
$215.00
Administrative Temporary use permits
50.00
Planned Unit Developments (PUD)
PUD Site Plan Approval
$2,135.00
and $55.00 per acre
residential $1,070.00
nonresidential $1 A-
PUD — major adjustment
Lot line adjustments
other Administrative use permits
Special home occupation permits
Environmental checklists $750.00 plus
statements including labor materials, mailing
circulating of the E.I.S.Critical Areas
$215.00
Critical Areas Variance
0.00
ft. gfa
$2,135.00
$215.00
$535.00
$430.00
$110.00
and $55.00 per unit
and $55.00 per 10,000 sq.
and $55.00
single family residential lots
actual cost for preparation of draft & final
& other actual costs relating to the drafting &
Reasonable Use Determination
$100.00 Administrative
----------------------------------
Page 1 --------------•
12/14/2005
Development Agreement
Water/Sewer Certificate
Fee for Posting Public Notices
(per Ch. 1.27 ACC)
Type of
Mounting Board
Type I
Type If
Type III
$215.00 Hearing Examiner
$2,135.00 and $55.00 per acre
$265.00
Fee Replacement
Per Board Cost, Per Board
$25.00 $55.00
$35.00 $80.00
$55.00 $105.55
Sign Permits (per Ch. 18.56 ACC)
Unless exempt by Ch. 18.56 ACC, the fee shall accompany each application for a sign
permit. The amount of the fee shall be based upon the value of the sign pursuant to
Table 1-A, Ch. 1, 1997, International Building Code.
Additional Sign Fees
Appeals and variance applications $215.00
Temporary sign permits (issued by hearing examiner) $105.00
Comprehensive Plan Text Amendments* $520.00
Comprehensive Plan Map Amendments* $1,560.00
*Fees for amendments to text or maps of the Comprehensive Plan apply only where an
applicant seeks an amendment affecting specific properties, rather than the City generally or
property within the City generally.
Zoning Certification letter (commercial) $50.00
Books, Maps, Materials
Comprehensive Plan
$20.00
Critical Areas Ordinance
Downtown Plan
.$3.00
$24 00
Downtown Plan Appendices
$24.00
Land Division Ordinance
$3.00
SEPA Ordinance
$3 00
Wetlands Map
$5 00
Zonma Map
$5.00
Zoning Ordinance
$10 00
Prices for printed materials
do not include tax
--
Page ----------------
12/14/2005
B. Auburn Municipal Airport Lease Fees (Per Ordinance No. 5707, amended by
Ordinance No. 5715 and Ordinance No. 5819, and amended by Resolution No. 3784,
Resolution No. 3841 and Resolution No. 3953)
Type
Open hangar (buildings 3, 4, 5, 6, 7)
Lease Rate
$160.93
Open twin hangar (building 8)
$206.15
Closed hangar (building 2)
$226.98
Closed hangar (buildings 9, 10)
$350.45
Tiedown
$44.21
Storage units (buildings 2, 3, 4, 5, 6, 7, 8)
$66.04
Storage units (185 sq. ft. — buildings 9, 10)
$87.34
Storage units (380 sq. ft. — buildings 9, 10)
$131.01
Storage units (430 sq. ft. — buildings 9, 10)
$152.84
Hangar rows 9 and 10 west end hangars have an additional 298 square feet each. There shall
be an additional $100.00 per month surcharge for the additional space.
A security surcharge of $3.00 per month is charged, in addition to the base monthly rental
fees provided in this section, for each tie -down, each hangar door and each storage rental area,
which security surcharge fees are to be used for the provision of increased security at the
Auburn Municipal Airport (approved by Ordinance No. 5500 on January 16, 2001). For the
purposes hereof, each tie -down consists of the structures/facilities necessary to accommodate
one (1) regular sized light aircraft. Furthermore, the hangar doors to which the security
surcharge applies includes all hangars located at the Auburn Municipal Airport, including those
hangars built on land owned by the City but leased to private parties, and those hangars owned
in a condominium type ownership.
The above lease and security surcharge amounts are subject to applicable leasehold taxes,
which shall be paid by the tenant. The total charges, including the above lease rates plus lease
hold tax and surcharge shall be reflected in monthly billing rates. Tenants shall be given notice
as required by Ordinance or lease agreements. The Airport Lease rates shall be effective
January 1, 2006.
Payments.
Payments are due on the first of each month, past due as of the 5th and late as of the 15th.
Payments not received by the 15th incur a $10.00 late fee. Payments not received after 30 days
from the due date incur an additional $25.00 delinquency fee.
Automatic gate electronic cards.
One automatic gate electronic card will be issued to each tenant free of charge. Any additional
electronic cards requested by a tenant are subject to a $25.00 refundable deposit charge. A
$25.00 replacement fee will be assessed against the tenant for all lost or damaged electronic
cards. All electronic cards must be returned to the airport at the time of lease expiration.
-
Page 3 --------------•--
12/14/2005
Each lease shall include an initial payment of first and last months' rent plus a damage
deposit in the amount of two times the monthly base rate. Each lease agreement shall
also include terms that authorize the city to apply the damage deposit to outstanding
charges on termination.
Page 4 12/14/2005
C. Permit Fees (Resolution No. 3773, amended by Resolution No. 3797,
Resolution No. 3818, and Resolution No. 3953)
Building Permit Fees
The fee for each International Building Code, International Residential Code,
Washington State Energy Code or Washington State Indoor Air Quality Code building
permit shall be as set forth in Table 1-A, below.
Table 1-A BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to $500.00 $30.00
$501.00 to $2,000.00 $30.00for the first $500.00 plus $6.00 for each additional $100.00, or fraction thereof, to and
including$2,000.00
$2,001.00 to $25,000.00 $107.00 for the first $2,000.00 plus $18.00 for each additional $1,000.00, or fraction thereof, to and
—including $25,000.00
$25,001.00 to $50,000.00 $510.00 for the first $25,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and
including $50,000.00
$50,001.00 to $100,000.00 $845.00 for the first $50,000.00 plus $10.00 for each additional $1,000.00, or fraction thereof, to and
including $100,000.00
$100,001.00 to $500,000.00 $1,308.00 for the first $100,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof, to
and including $500,000.00
$500,001.00 to $1,000,000.00 $4,604.00 for the first $500,000.00 plus $8.00 for each additional $1,000.00, or fraction thereof, to
and including $1,000,000.00
$1,000,000.00 and up $8,209.00 for the first $1,000,000.00 plus $6.00 for each additional $1,000.00 or fraction
thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours.............................................................................................................. :559.00 per hour]
(minimum charge — two hours) ""
2. Reinspection fees assessed under provisions of Section109.4.13...................................................................................... $59.00 per hour[
3. Inspections for which no fee is specifically indicated........................................................................................................ $59.00 per hour]
(minimum charge — one half hour)
4. Additional plan review required by changes, additions or revisions to plans..................................................................... $59.00 per hour]
(minimum charge — one half hour)
5. For use of outside consultants for plan checking and inspections, or both .............................................................................. Actual costs2
]Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly
wages and fringe benefits of the employees involved.
2Actual costs include administrative and overhead costs.
Mechanical Permit Fees
The fee for each permit issued under provisions of the International Mechanical Code,
International Fuel Gas Code, NFPA 54 (National Fuel Gas Code), NFPA 58 (Liquefied
Petroleum Gas Code), or the mechanical device provisions of the International
Residential Code shall be as set forth in Table 2-A, below. For new single-family
dwellings a flat rate permit fee of $173.00 may be charged in lieu of fees as prescribed
in Table 2-A.
Page 5 --------
12/14/2005
Tahle 2_A MRruANire1 1DrDx4im vrurV o
Permit Issuance and Heaters
1. For the issuance of each mechanical permit ........................
2. For issuing each supplemental permit for which the original ermit has not ex
g P pired, been canceled or finaled.................................
$25.00
$9.00
Unit Fee Schedule
(Note: The following do not include permit -issuing fee)
1. Furnaces
$20.00
For the installation or relocation of forced -air or gravity -type furnace or burner, including ducts and vents
attached to such appliance up to and including 1000,000 Btu/h(29.3kW)......................................................................................
$16.00
For the installation or relocation of forced -air or gravity -type furnace or burner, including ducts and vents
attached to such appliance over 100,000 Btu/h (29.3kW)................................................................................................ ...............
$20.00
For the installation or relocation of each floor furnace, including vent...........................................................................................
$16.00
For the installation or relocation of each suspended heater, recessed wall heater or floor -mounted unit heater ...............................
$16.00
2. Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit
$9.00
.................
3. Repairs or Additions
For the repair of, the alteration of, or addition to each heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation
of controls regulated by the Mechanical Code.................................................................................................................................
$15.00
4. Boilers, Compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 k W) or each absorption
system to and including 100,000 Btu/h (29.3 kW)..........................................................................................................................
$16.00
For the installation or relocation of each boiler or compressor over 3 horsepower (I0.6kW) to and
including 15 horsepower (52.7 kW),or each absorption system over 100,000 Btu/h (29.3 kW) to and
including500,000 Btu/h (146.6 kW).............................................................................................................................................. $29.00
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) to and including
30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including
1,000,000 Btu/h (293.1kW) .............................................................................................................................. ..... $39.00
.........................
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) to and
including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to
andincluding 1,750,000 Btu/h (512.9 kW)........................................................................................................................ ...... $58.00
For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or
each absorption system over 1.750.000 Btu/h (512.9 kW).............................................................................................................. $96.00
5. Air Handlers"
For each air handling unit to and including 10,000 cubic feet per minute (cfm) (4719 Us), including ducts
attachedthereto...............................................................................................................................................................................
$12.00
Note: This fee does not apply to an air -handling unit which is a portion of a factory -assembled appliance, cooling system,
evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code.
For each air -handling unit over 10,000 cfm (4719 Us)............................................................................................. ......................
$20.00
6. Evaporative Coolers
For each evaporative cooler other than a portable type...................................................................................................................
$12.00
7. Ventilation and Exhaust
For each ventilation fan connected to a single duct............................................................................................................................
$9.00
For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit ...................
$12.00
For the installation of each hood which is served by a mechanical exhaust, including the ducts for each hood ..............................
$12.00
Page 6 12/14/2005
8. Incinerators
For the installation or relocation of each domestic -type incinerator................................................................................ ..... $20.00
For the installation or relocation of each commercial or industrial -type incinerator .................................. ............... $16.00
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other
appliance categories or for which no other fee is listed in the table................................................................................................ $12.00
Other Inspections and Fees:
1. Inspections outside of normal business hours, per hour (minimum charge -- two hours).................................................................. $59.00
2. Reinspection fees assessed under provisions of Section 109.4.13..................................................................................................... $59.00
3. Inspections for which no fee is specifically indicated, per hour (minimum charge -- one-half hour) ................................................ $59.00
4. Additional plan review required by changes, additions or revisions to plans or to plans for which
an initial review has been completed (minimum charge — one-half hour) ................ $59.00
*Or the total cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment,
hourly wages and fringe benefits of the employees involved.
Plumbing Code Permit Fees
The fee for each permit issued under the provisions of the International Plumbing Code
shall be as set forth in Table 3-A, below, and adjusted for inflationary factors using the
Seattle Consumer Price Index retroactively from year 1997. For new single-family
dwellings a flat rate permit fee of $173.00 may be charged in lieu of fees as prescribed
in Table 3-A.
Page 7 12/14/2005
Table 3-A PLUMBING PERMIT FEES
Permit Issuance
1. For issuing each permit................................................................................................................................................ $22.00
2. For issuing each supplemental permit........................................................................................................................... $12.00
Unit Fee Schedule (in addition to items 1 and 2 above)
1. For each additional plumbing fixture on one trap or a set of fixtures on one trap
(including water, drainage piping and backflow protection therefore)............................................................................. $9.00
2. For each building sewer and each trailer park sewer...................................................................................................... $17.00
3. Rainwater systems - per drain (inside building).............................................................................................................. $9.00
4. For each water heater and/or vent................................................................................................................................... $9.00
5. For each industrial waste pretreatment interceptor including its trap and vent,
except kitchen -type grease interceptors functioning as fixture traps............................................................................... $9.00
6. For each installation, alteration or repair or water piping and/or water treatment, each ................................................... $9.00
7. For each repair or alteration of a drainage or vent piping, each fixture............................................................................ $9.00
8. For each lawn sprinkler system on any one meter including backflow protection devices therefore ................................$9.00
9. For atmospheric -type vacuum breakers not included in item 12:
1 to 5.............................................................................................................................................. $6.00 over 5, each
............................................................................................................................................................................................ $2.00
10. For each backflow protective device other than atmospheric type vacuum breakers:
2 inch (51 mm) diameter and smaller........................................................................................................................... $9.00
over 2 inch (51 mm) diameter ......................... $17.0011. For initial installation and testing for a reclaimed water system
............................................................................................................................................................................................... $33.00
12. For each annual cross -connection testing of a reclaimed waster system (excluding initial test) .................................... $33.00
13. For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas .......................................... $53.00
14. For each additional medical gas inlet(s)/outlet(s).............................................................................................................$6.00
Other Inspections and Fees
1. Inspections outside of normal business hours...............................................................................................................
$59.00
2. Reinspection fee...........................................................................................................................................................
$59.00
3. Inspections for which no fee is specifically indicated..................................................................................................
$59.00
4. Additional plan review required by changes, additions or
revisions to approved plans (minimum charge - one-half hour)..................................................................................
$59.000
*Per hour for each hour worked or the total hourly cost to the jurisdiction, whichever is greater. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of all the employees involved.
Fire Code Permit Fees
The fee for each activity requiring a permit issued under the provisions the International
Fire Code Section 105.6 shall be as set at $59.00 per hour with a minimum charge of
$59.00. There shall be no charge imposed for routine annual fire prevention inspections.
Fees
Permit fees shall be assessed in accordance with this section. Fees specified shall be
adjusted for inflation each year based upon the Seattle Consumer Price Index. Fees
shall be rounded down to nearest whole dollar.
Page 8 12/14/2005
Appeal Fees
The fee for appeals of codes adopted pursuant to ACC chapter 15 shall be $103.00.
Plan Review Fees
When submitted documents are required by section 106.3 of the Construction
Administrative Code, a plan review fee shall be paid at the time of submitting the
submittal documents for plan review. Said plan review fee shall be 65 percent of the
building permit fee as shown in Table 1-A. The plan review fees specified in this section
are separate fees from the permit fees and in addition to permit fees.
Temporary Certificate of Occupancy Fees.
There shall be a fee equal to ten percent of the building permit fee for issuance of a
temporary certificate of occupancy.
Fee schedule for administrative procedures and miscellaneous inspections.
In addition to any other fees specified in this chapter, there shall be a fee schedule for
certain administrative procedures not otherwise included as set forth in the following
schedule of fees:
Demolition, permit and inspections
Relocation (pre -inspection)
Housing inspection
Change of use
Fire sprinklers, first 10 heads
Fire sprinklers, additional heads
Fire alarm systems, first 10 devices
Fire alarm systems, additional devices
Per Table 1-A
Per Table 1-A
Actual city cost, minimum $21.00
Per Table 1-A
$155.00
$0.75 each
$155.00
$5.00 each
Page 9 12/14/2005
D. Police Department Fees (Per Ordinance No. 5715 amended by Ordinance No. 5819,
Resolution No. 3797 and Resolution No. 3953.)
Type
Police Report/Collision Report
(fee not charged where requested
by victim or party involved)
Fingerprinting Fees
(fee not charged where taking of
fingerprints is required by the city)
Health Services
(to be collected from persons confined in the
Auburn City Jail who request health services)
Jail Inmate Booking Fee (per booking)
Electronic Home Monitoring (per inmate, per day)
Alarm Registration and Service charges.
Service charges will be assessed by the city
during the registration year as follows:
Fees
$11.00
$11.00
$6.00
$42.00
$15.00
for excessive false alarms
Type of Fee Amount
Registration fee (one time fee)
$17.00
Late registration fee penalty
$52.00
Appeal hearing cancellation fee
$11.00
Page 10 12/14/2005
E.
City Clerk Fees (Per Ordinance No. 5715 and amended by Ordinance No. 5819
and Resolution No. 3797.)
Type
Fees for public records - Collection.
Noncertified copies of public records
where no special search or documentation is required)
Certified copies of public records
Noncertified copies of public records
where a search or documentation is required)
Fees for Auburn City Code book and supplements.
Copy of Auburn City Code book
(with latest supplement)
Supplements to the Auburn City Code book
Fees
$0.15 per page
$4.00 per page
$4.00 for 1 st page
and $2.00 each add'I page
$100.00 per code book
$11.00 per copy.
Page 11 12/14/2005
F. City Cemetery Fees (Amended by Resolution No. 3797 and Resolution No. 3953)
Type
Fees
Property
Graves — Standard
1250
Sections 1 — 6
SOLD OUT
Sections 1- 7 and Memory Meadow
1,189.00
Section 9
1595.00
Section 9 Double Depth
(includes 2 Lawn Crypts)
3295.00
Section 9, Upright Section
3195.00
Children's Place
295.00
Section 9 — Upright Section Urn
Plots (up to 6 urns)
3195.00
Centennial Urn Garden
495.00
Centennial Urn Garden Companion
990.00
Columbarium Wall Single
SOLD OUT
Columbarium Wall Double
SOLD OUT
Centennial Columbarium Wall
Single
SOLD OUT
Double
SOLD OUT
Companion
SOLD OUT
Phase II — Centennial Columbarium Wall
1. Top Row
SOLD OUT
2. Middle Row
SOLD OUT
3. Middle Row
1695.00
4. Bottom Row
1545.00
Phase II — Centennial Columbarium Companion
1. Top Row
SOLD OUT
2. Middle Row
SOLD OUT
3. Middle Row
1695.00
4. Bottom Row
1545.00
Phase II — Centennial Columbarium Companion
1. Top Row
SOLD OUT
2. Middle Row
SOLD OUT
3. Middle Row
SOLD OUT
4. Bottom Row
SOLD OUT
Mausoleum Niches — Single
480.00
Mausoleum Niches — Double
735.00
Extended Land Use (2nd interment)* 495*(increased
cremation demand)
Memorial Plaque
295.00
Opening and Closing
Vault/Liner
885.00
Page 12 12/14/2005
Children's Place
230.00
Cremation Plot
*375.00
Niche
*360.00
*(Includes minimum set-up and staff assistance)
790.00 + tax
Entombment
615.00
Set up charge
165.00
Marker Services
Setting Flat Marker
195.00 + tax
Setting Flat Marker if Concrete Required
287.00
Setting Upright Monument
385.00 + tax
Resetting Fee — Flat
130.00 + tax
Resetting Fee — Upright
325.00 + tax
Recording Fee
25.00
Overtime Per Person,
Per Hour
125.00
Saturday Service Fee
Full Burial
395.00
Cremation
200.00
Flower Vases
Standard Stainless Steel
55.00 + tax
Deluxe Cast Zinc
110.00 + tax
Deluxe Niche Vase
110.00 + tax
Liners
Mountain View Vault
*485.00 + tax
*(Additional Supplier Cost)
Concrete Liner
395.00 + tax
Double Depth Liner
790.00 + tax
Infant
215.00 + tax
Urn Encasement
185.00 + tax
Vaults (Other than Mtn. View Vault) 1.4 x cost
Markers 1.67 x cost
Urns
Basic
21.00
Deluxe Urns 1.67 x cost
Discounts
Marker setting by private parties.
$11.00
(Setting must meet the cemetery
specifications - border size, cleanup,
work signed off by cemetery coordinator.)
Page 13 12/14/2005
G.
Fire Department Fees (Per Ordinance No. 5715 and amended by Ordinance No. 5819,
Resolution No. 3797 and Resolution No. 3953.)
Type
Fire Code Appeals (ACC 15.36.020)
Permit Fees (per IFC § 105)**
Initial permit
Annual renewal
Inspection Fees (per IFC § 103, Ch 15.38 ACC)**
Initial inspection
1st re -inspection
2nd re -inspection
Any subsequent (after 2nd) re -inspection
After Hours Fee
(for fire inspections or permit work
required to occur outside of normal
business hours)
Fire Ambulance transport fee:
Fire Ambulance transport mileage fee:
** For permits and inspections not covered by the
International Building Code or building code fee
schedule/table.
Fees
$520.00
$63.00
$63.00
No Charge
No Charge
$47.00
$104.00
$57.00 per hour (2 hour min.)
$658.00 base rate
$13.50 per mile
Page 14 12/14/2005
H. Public Works Department Fees
Transportation Impact Fee Rate Schedule (Per Ordinance No. 5763 as amended by
Resolution No. 3953.)
Unit of Basic Impact
Land Use Measure Trip Rate Fee Rate
Residential
SF residential
dwelling
1.01
$699.40
MF residential
dwelling
0.62
$455.02
Mobile home in MH park
dwelling
0.49
$269.72
Retirement community
dwelling
0.27
$148.62
Hotel
room
0.61
$483.78
Motel
room
0.47
$372.75
Commercial - Services
Drive-in bank
lane
63.33
$11,244.60
Walk-in bank
sf/GFA
33.15
$7.86
Day care center
sf/GFA
13.20
$2.801
Library
sf/GFA
7.09
$1.80
Post office
sf/GFA
10.79
$2.74
Service station
VFP2
14.56
$1,964.77
Service station w/minimart
sf/GFA
96.37
$9.76
Auto care center
sf/GLA
3.38
$1.03
Movie theater
sf/GFA
3.80
$1.48
Health club
sf/GFA
4.30
$1.98
Commercial - Institutional
Elementary school
sf/GFA
1.20
$0.72
Middle school/jr. high
sf/GFA
1.20
$0.70
High school
sf/GFA
1.02
$.0.69
Church
sf/GFA
0.66
$0.49
Hospital
sf/GFA
0.92
$0.74
Commercial - Restaurant
Restaurant
sf/GFA
7.49
$4.02
High turnover restaurant
sf/GFA
10.86
$3.97
Fast food restaurant
sf/GFA
33.48
$6.64
Commercial - Retail Shopping
Shopping center
Up to 9,999 sq. ft.
sf/GLA
13.70
$1.75
10,000 to 49,999 sq. ft.
sf/GLA
9.46
$1.54
-----------------------------------------------------------------------------------------------------------------------
Page 15
12/14/2005
50,000 to 99,999 sq. ft.
sf/GLA
6.92
$1.13
100,000 to 199,999 sq. ft.
sf/GLA
5.47
$1.12
200,000 to 299,999 sq. ft.
sf/GLA
4.60
$1.02
300,000 to 399,999 sq. ft.
sf/GLA
4.10
$1.19
Over 400,000 sq. ft.
sf/GLA
3.77
$1.35
Supermarket
sf/GFA
11.51
$3.59
Convenience market
sf/GFA
53.73
$6.17
Freestanding discount store
sf/GFA
4.24
$1.01
Hardware/paint store
sf/GFA
4.42
$0.60
Specialty retail center
sf/GFA
2.59
$0.45
Furniture store
sf/GFA
0.45
$0.10
Car sales - New
sf/GFA
2.80
$2.05
Car sales - Used
space3
0.28
$204.17
Commercial - Office
Up to 49,999 sq. ft.
sf/GFA
3.76
$2.32
50,000 to 99,999 sq. ft.
sf/GFA
2.18
$1.99
100,000 to 199,999 sq. ft.
sf/GFA
1.65
$1.50
200,000 to 299,999 sq. ft.
sf/GFA
1.44
$1.31
Over 300,000 sq. ft.
sf/GFA
1.35
$1.23
Medical office
sf/GFA
3.66
$2.60
Industrial
Light industry/ manufacturing
sf/GFA
0.98
$1.23 9.W
Heavy industry
sf/GFA
0.68
$0.96 89
Industrial park
sf/GFA
0.92
$1.169-93
Mini-warehouse/storage
sf/GFA
0.26
$0.30 9-.N
Notes:
A. Basic trip rates are based on the ITE Trip Generation Manual, 6th Edition.
B. Impact fee rate calculation is based upon the following methodology:
- Basic Trip Rate = PM Peak Hour Trip Generation (per unit of measure)
- Basic Trip Rate x Percent of New Trips x Trip Length Adjustment x Per Trip Fee/(divide by)
1,000 for rate per square foot (where applicable) = Impact Fee Rate (per unit of measure)
C. For land uses not specifically identified here, trip generation rates could be derived from ITE or a
special study by the applicant. The City fee for review of any special study shall be a non-reimbursible
fee of $250.00 per study submittal payable prior to City review of any independent fee study.
D. Per trip fee is $573.50.
E. sf = square foot = sq. ft.
Footnotes:
1 Impact fee rate was $3.80/sf. For the economic welfare of the citizens of Auburn, rate has been
reduced to $2.50/sf.
2 VFP = vehicle fueling position.
3 Space is individual vehicle sales space: 70 vehicles for sale = 70 vehicle spaces.
----------------------------------------------------------------------------------------------------------------------------------------
Page 16 12/14/2005
Impact Fees By Land Use - Revenue Credit = 20% (Per Ordinance No. 5977)
Page 17 12/14/2005
Total
Adjustment
Fire and EMS
Fire and EMS Cost
(Revenue
Impact Fee
Per Unit Of
Credit) At
Per
Land Use
Development
20%
Unit of Development
Residential
Single Family, Duplex, Mobile Home
$ 362.66
$ 72.53
$ 290.13
per dwelling unit
Multi -family
383.09
76.62
306.47
per dwelling unit
Non -Residential
Hotel/Motel
0.53
0.11
0.42
per sq ft
Hospital/Clinic
1.05
0.21
0.84
per sq ft
Group Living
2.63
0.53
2.10
per sq ft
Office
0.29
0.06
0.23
per sq ft
Retail
0.62
0.12
0.50
per sq ft
Restaurant/Bar/Lounge
1.62
0.32
1.30
per sq ft
Industrial/Manufacturing
0.11
0.02
0.09
per sq ft
Leisure/Outdoors
2.01
0.40
1.61
per sq ft
Agriculture
0.71
0.14
0.57
per sq ft
Church
0.38
0.08
0.30
per sq ft
Schools/Colleges
1.07
0.21
0.86
per sq ft
Government/Public Buildings
3.24
0.65
2.59
per sq ft
Page 17 12/14/2005
FACILITY EXTENSION FEES (Per Ordinance No. 5791 and amended by Ordinance No.
5819 and Resolution No. 3953.)
The Facility Extension Application Fee is $516.00, plus $155.00 for each Facility (Water,
Sanitary Sewer, Storm Drainage, Street, private street and private storm systems within private
streets).
Facility Extension Fees are the summation of the following categories (a+b+c+d), or
$1,550.00, whichever is greater.
a. For the combined linear footage of water, sewer, storm drainage and private storm
drainage within private streets:
The first 0 lineal feet (LF) to 1000 LF is charged at $5.15 per LF plus,
The next 1001 LF to 2500 LF is charged at $2.60 per LF plus,
Any additional over 2500 LF is charged at $1.55 per LF.
b. For the linear footage of streets and private streets:
The first 0 LF to 500 LF will be charged at $6.45 per LF plus,
The next 501 LF to 1000 LF will be charged at $3.85 per LF plus,
Any additional over 1000 LF will be charged at $1.03 per LF.
c. For non-linear extensions such as pump stations or traffic signals, the extension fee
will be determined by the City Engineer based on an estimate of the City's labor Cost
associated with the plan review, inspection, and administration of the application
Ck
. For that portion of the water or sewer facility located outside City Limits, but within
existing County (King or Pierce) right-of-way, an additional fee of $413.00 plus $4.65
per LF of the combined water and sewer extension located in the existing County
right-of-way applies.
Facility Extension Fees will be paid as follows:
1. Forty percent (40%) at the time of execution of the facility extension agreement
2. Sixty percent (60%) upon the City's approval of the construction drawings and prior
to the start of construction.
Page 18 12/14/2005
Right -of -Way Permit: (Per Ordinance No. 5819)
30 -Day permit
31 -Day to 5 -Year permit
Flood Control Zone Permit: (Per Ordinance No. 5819)
Base permit fee
$25.00
$75.00
$50.00
Utility System Development Fees: (Per Ordinance No. 5819 and amended by
Resolution No. 3797 and Resolution No. 3953.)
For all Utilities, a charge in lieu of assessment or payback charges may be applicable
for the proportional share of the utility line being connected to.
Water Utility
Connection fees are comprised of a Water Service Installation Permit Fee and the
System Development Charge as follows:
Meter
Water Service Installation Permit Fee
System
Size
In Inches
Existing Water Service
& Meter Box*
Water Service & Meter Box Installed by Cit *"
Paved Street Unpaved Street
Development
Charge SDC
% or less
$205.00
$2,100.00
$1,130.00
$2,424.00
1
$270.00
$2,300.00
$1,425.00
$4,048.00
1-1/2
$435.00
$3,100.00
$2,225.00
$8,072.00
2
$540.00
$3,370.00
$2,500.00
$12,920.00
3
Actual Cost
Actual Cost
Actual Cost
$24,240.00
4
Actual Cost
Actual Cost
Actual Cost
$40,408.00
6
Actual Cost
Actual Cost
Actual Cost
$80,792.00
8
Actual Cost
Actual Cost
Actual Cost
$129,280.00
10
Actual Cost
Actual Cost
Actual Cost
$135,971.00
*Installation of a water meter done by the City and the service either already exists or has been installed
by the developer.
**Installation of the entire water service is done by the City.
Sanitary Sewer Utility
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Type I Permit Fee I System Development
Page 19 12/14/2005
* RCE, Residential Customer Equivalent - an RCE shall be as defined by the King County
Department of Natural Resources.
**Except that for multifamily residential units with separate water meters for each family
unit, the sewer utility systems development charge will be calculated as one RCE per
family unit.
In addition to City sanitary sewer connection fees, there shall be a sanitary sewer
connection fee imposed to pay Capital Improvement fees to King County per the King
County Rate Schedule.
Storm Drainage Utility
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Type
Existing
Sewer Stub
New Service Line
Reg uired
Charge (SDC)**
Single Family Parcel
$85.00
$150.00
$850.00 Per Parcel
Other Parcels
$85.00
$150.00
$850.00 Per RCE*
Side sewer repair on
private property
$60.00
Side sewer repair in
right-of-way
$100.00
* RCE, Residential Customer Equivalent - an RCE shall be as defined by the King County
Department of Natural Resources.
**Except that for multifamily residential units with separate water meters for each family
unit, the sewer utility systems development charge will be calculated as one RCE per
family unit.
In addition to City sanitary sewer connection fees, there shall be a sanitary sewer
connection fee imposed to pay Capital Improvement fees to King County per the King
County Rate Schedule.
Storm Drainage Utility
Connection fees are comprised of a Permit Fee and the System Development Charge
as follows:
Type
Permit Fee
System Development Charge (SDC)
Single Family Residence & Duplexes (on
Individual Parcels)
$15.00 Per
Parcel*
$1,162.00 per Parcel
Other Parcels
$105.00
$1,162.00 per ESU**
*More than one single-family residence or one duplexes per parcel will be charged at
the Other Parcel rate.
**ESU, Equivalent Service Unit — A configuration of development of impervious surfaces
estimated to contribute an amount of runoff to the City's storm drainage system which is
approximately equal to that created by the average single family residential parcel. One
ESU is considered equal to 2,600 square feet of parcel coverage by impervious surfaces.
When calculating the total SDC, a credit will be applied for the existing impervious area.
Other Utility Fees: (Per Ordinance No. 5819 and 5944 and amended by Resolution No. 3953)
Page 20 12/14/2005
Fire service line permit
Fire Hydrant Permits:
Fire Hydrant Permit and Inspection Fee
Hydrant Meter Monthly Rate
Hydrant Meter Weekly Rate
Hydrant Meter Wrench — Refundable Deposit
Deposit — Hydrant Meter with RPGA Wrench and Valve
Water Main extension purity test fee
Water Meter test fee, 2" or less
Water Meter test fee greater than 2" At Actual Cost
Storm Drainage Repair Permit
Private Storm System located on Private Property
Storm System located in Public Right-of-Way/Easement
$1130.00
$230.00
$30.00
$25.00
$30.00
$1,400.00
$175.00
$210.00
$30.00
$55.00
Payback Administrative Fees: (Per Ordinance No. 5954)
Application Fee $ 500.00
Processing Fee $1,000.00
Area or Special Benefit Analysis $ 500.00
Transaction/Collection Fee $ 300.00
Outside Professional Services Time and Materials
Construction Permits (Per Ordinance No. 5817)
The fees for Construction Permits are as follows:
Basic Fee (BF) _ $142.00
Hourly Inspection Rate (HIR)
Normal Business Hours = $48.00
After Hours = $62.00
After hours work includes weeknights, weekends, and Holidays and will be at the After
Hours HIR x the duration of the work.
For Excavation Type Work:
Length of Excavation (feet) Additional Fee (AF)
31-100 $48.00
101-250 $143.00
251-500 $238.00
501-750 $332.00
Page 21 12/14/2005
751-1000
$427.00
Permit Fee = BF + AF(for the appropriate length of excavation)
If the excavation exceeds 1000 linear feet the following will be used:
Permit Fee = BF + $414.00 + (HIR x (Length of Excavation —1000)/100)
For Non -Excavation Type Work:
This work includes any work in the public right-of-way that is not covered by any other
permits and includes such things as overhead utility work, geotechnical borings,
horizontal directional drilling and vault installation.
Permit Fee = BF + (HIR x Permit Duration in days)
In Lieu of Fee:
In lieu of the above standard rates, the city engineer or his/her designee may calculate
the fee based upon current labor rates for administrative and inspection staff after
developing an estimate of staff effort involved. For projects that are expected to involve
significantly more than 1,000 feet of street excavation or when the scope or duration
cannot be accurately estimated, the city engineer may establish a deposit account to
manage permitee deposits in advance of permit issuance for reimbursing actual labor
costs of administering the permit. Such deposit accounts will not be interest bearing and
will be closed at the end of the permitted work when a final accounting of the permit
administration cost shall be calculated and a final bill or credit issued to the permitee.
Special Permits (Per Ordinance No. 5817 and amended by Resolution No. 3953)
Permit Type Base Additional Per Linear Foot Fee
Fee
Sidewalk $52.00 $1.03 per foot for each foot over 25 Linear Feet
Residential Driveway $52.00 $1.55 per foot for each foot over 20 Linear Feet*
Commercial $103.00 $2.05 per foot for each foot over 48 Linear Feet*
Driveway
*Driveway widths are based on the width of the driveway apron in the right-of-way.
Page 22 12/14/2005
I. PARKS AND RECREATION (Per Resolution No. 3797 and amended by
Resolution No. 3953.)
(These fees and charges have been previously established but not heretofore
included in the fee schedule.)
BUILDINGS FEES
Resident Non -Resident
Senior Activity Center
Full Facility $80 per hour $100 per hour
4 hours Friday and up to 12 hours on Saturday $1200 $1500
Rental Package Full Day Saturday or Full Day Sunday
Up to 12 hours on either day $1000 $1300
Millennium Room
Damage & Cleaning Deposit
Without Alcohol
With Alcohol
Optional cleaning fee
Weese & Rotary Rooms
Catering & Kitchen
Commercial kitchen Wor
use dishes, tableware, pots, etc.
Kitchen with Millennium Room 3
Kitchen with Full Facility
Parks & Recreation Admin. Bldg.
Basic Kitchen
Les Gove Bldg.
Veterans Memorial Bldg.
White River Valley Museum
Full Facility
Muckleshoot Room
$20 per hour $25 per hour
$300 $300
$500 $500
$125 - groups of 124 or less
$150 - groups of 125 or more
$10 per hour $13 per hour
$50
$25
No charge
$4`0 per hour
$25
$10 per hour
$5 per hour
$50
$25
No charge
$25 per hour
$25
$13 per hour
$7 per hour
$125 per hour $125 per hour
$40 per hour $40 per hour
Page 23 12/14/2005
Picnic Shelter, Amphitheater, and Camping Rentals
Resident Non -Resident
Game Farm Park Half Day Full Day Half Day Full Day
Mon -Fri (Single Quadrant) $15 $30 $20 $40
Sat -Sun (Single Quadrant) NA NA NA NA
Mon -Sun (Full Shelter)
1-99 People
$60
$120
$80
$160
100-199 People
$90
$180
$120
$240
200 + People
NA
$250
NA
$300
Amphitheater
$35
$70
$45
$90
Sunset Park
Mon -Sun (Single Quadrant)
$15
$30
$20
$40
Mon -Sun (Full Shelter)
1-99 People
$60
$120
$80
$160
100-199 People
$90
$180
$120
$240
200 + People
NA
$250
NA
$300
Roegner
$30
$60
$40
$80
Isaac Evans
$30
$60
$40
$80
Game Farm Wilderness
$30
$60
$40
$80
Game Farm Wilderness Camping
Game Farm Camping $20 Per Night
Day Camp Area $50 Per Day
$25 Per Night
$70 Per Day
Page 24 12/14/2005
J. BUSINESS LICENSE FEES
Rental Housing Business License Fee (effective July 1, 2005) (Per
Ordinance No. 5882)
(1) The fee for a license to operate rental housing businesses in the City, as
defined in Chapter 5.22 of the City Code shall be based on the total number of units as
follows:
(a) One to four dwelling units: $50.00 per year;
(b) Five to 24 dwelling units: $100.00 per year;
(c) Twenty-five or more dwelling units: $200.00 per year.
(2) The fee for a license to operate rental housing businesses in the city shall be
for the license year from July 1 through June 30, and each applicant must pay the full
fee for the current license year or any portion thereof during which the applicant has
engaged in the operation of rental housing businesses.
(3) The rental housing business license fee required by this chapter is in lieu of,
and not in addition to, the general business license fee required by Chapters 5.05 and
5.10 of the City Code; provided, however, that any person required to obtain a rental
housing business license must also obtain a general business license, at no cost,
pursuant to Chapters 5.05 and 5.10 of the City Code.
(4) Notwithstanding the provisions of sub -section (1) of this section, the fee for
operating rental housing facilities for any single individual, partnership, corporation or
entity shall not exceed $400.00 per year
Page 25 12/14/2005
K. MULTIMEDIA DUPLICATION (Per Resolution No. 3953)
VHS copy DVD copy CD copy
$8.00 per tape $10.00 per disc $5.00 per disk
Page 26 12/14/2005