HomeMy WebLinkAbout06-05-2006 ITEM V-C-2CITY OF y x
WASHINGTON
AGENDA BILL APPROVAL FORM
Agenda Subject:
Date:
Final Pay Estimate No. 4 to Contract 05-09
May 22, 2006
Department:
Attachments:
Budget Impact:
Public Works
Budget Status Sheet, Final Pay
$ 0
Estimate No. 4, and Ma
Administrative Recommendation:
City Council approve Final Pay Estimate No. 4 to Contract 05-09 with Gary Merlino Construction, Inc.,
and accept construction of Project No. C505A, 2005 Pavement Preservation Auburn -Black Diamond
Road.
Background Summary:
This project completed pavement preservation of 2,400 feet of Auburn -Black Diamond Rd., from just east
of the Burlington Northern Santa Fe railroad crossing to the city limits. The failing road segment had the
existing overlay planed off, a leveling layer of asphalt pavement installed, and a structural overlay of
cement concrete pavement constructed within its current alignment and road width. Also constructed in
conjunction with this project were guardrail safety improvements at two identified locations.
A project increase of $168,883 within the 102 fund is necessary to complete the project in 2006. Of this
amount, $163,774 was previously approved as follows:
• The first budget amendment for 2006 did not account for an additional $79,223 that should have
been carried forward from the approved 2005 budget.
• At the time of construction contract award in December 2005, a budget adjustment of $84,500
was requested. Due to the timing of the award and fiscal year-end activities, this amount was
never accounted for in the 2005 carryover or the 2006 budget.
With these previously identified amounts, a project budget increase of only $5,109 is necessary in 2006 to
complete the project. A 102 fund budget adjustment is not required because the funds are identified
within the overall 102 fund budget, and it is anticipated that the budgeted expenditures will not be
exceeded this year.
W0605-9
04.9.1 PR C505A
Reviewed by Council & Committees:
Reviewed by Departments & Divisions:
❑ Arts Commission COUNCIL COMMITTEES:
❑ Building ❑ M&O
❑ Airport ❑ Finance
❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Serv.
❑ Finance ❑ Parks
❑ Human Services ❑ Planning & CD
❑ Fire ❑ Planning
❑ Park Board ®Public Works
❑ Legal ❑ Police
❑ Planning Comm. ❑ Other
® Public Works ❑ Human Resources
Action:
Committee Approval: ❑Yes ❑No
Council Approval: ❑Yes ❑No Call for Public Hearing
Referred to Until _/_/
Tabled Until
Councilmember: Wagner Staff: Dowd
Meeting Date: June 5, 2006 Item Number: V.C.2
MBURN *MORE THAN YOU IMAGINED
BUDGET STATUS SHEET
Project No: C505A Title: Auburn -Black Diamond Rd. Reconstruction:]
O PS & E @ 100%
Date: May 16, 2006 O Pre-bid
O Award
• Const. @ 100 %
Funds Budgeted (Funds Available)
Funding
2005
2006
Total
102 Arterial Street Fund
44,577
1,023
45,600
Pavement Preservation
123,800
456,000
579,800
Traffic Safety Improvements
0
16,900
16,900
Total
123,800
472,900
596,700
Fstimatad Cnst IFundc Noorlodl
Activity
2005
2006
Total
Design Engineering
44,577
1,023
45,600
Construction Contract
0
570,053
570,053
Change Order #1
0
23,966
23,966
Change Order #2
0
16,890
16,890
Construction Engineering
0
29,800
29,800
Total
44,5771
641,732
686,309
102 Budaet Status (Arterial Streetl
W0605 -9A
2005
2006 Total
102 Funds Budgeted
123,800
44,577
472,900 596,700
641,732 686,309
102 Funds Needed
102 Fund Project Contingency)
79,223
102 Funds Required
168,833 89,609
W0605 -9A
CITY OF AUBURN CO. NO. 05-09
C505A - -. 2005 Pavement Preservation Aub Black Diamond Road
PAY ESTIMATE #4 SCHEDULE A: Street Improvements
ITEM
NO. ITEM DESCRIPTION
ESTIMATE TOTAL
QUANTITY QUANTITY
PERIOD UNIT
QUANTITY TYPE 'UNIT COST !
TOTAL COST PERIOD COST !
PERCENT EST.
QTY
1 Minor Changes
-- -
1
1.035245
0
Eq. Adj.
10,000.00
$ 10,352.45j $104%
Temporary Wat
2 Tempora Water Pollution/Erosion Control
1
0.799756
- - -- -
0
-- - - --
$ 1,999.39 1 $
- - ---_ --
80%3
80
-- -
Eq. Adj.
Mobilization _-
1
1-
- 0
-- LS
_2,500.00
32,650.00
$ 32,650.00 $ - -
- -- 100%
4 Construction Site Sign(s) -
----
-- - 2�
- 0 - -
EA_
500.00
$ 1,000.00 $ - - -
100%
5 Traffic Control Labor - Flagging
_2
5'
0 - -
--- 35.00
$ 22,732.50 i $ - -
- -217%
- ---
6 Construction Signs Class A (Detour)-
-300 -
_ -649
366.5'
-
0
40.00
$ 14,660-001-$--
105%
- -HR -
SF
7 Remove Asphalt Concrete Pavement
_350
5,400
5400
_
4.50
$ 24,300.00 r $ -
- ---
100°k
SY
8 Roadway Excavation Including Haul --- -
- --100 -
- 220 _
_0
-- 0 - -
CY
- 20.00 -
$ -- 4,400.00 j $ - -
- - - -- 220%
9 Unsuitable Foundation Excavation Including Haul
0
0
0
20.00
$ - $ -
0%
CY
10 Ditch Excavation Including Haul --
- 165
- 88-
-- 0 -- -
- CY
- 20.00-
$- 1,760.00 $ --
-- 53%
11 Construction Geotextile - -- - -
- - 160 -- --
- 0 -
U -- --
- 2.5_0 --
_
$ -- - - $--
- - 0%
-SY
12 Crushed Surfacing Base Course ---
--150 -
- 859.4`
_-- 0 -
TON
- 35.00
$ 30,079.00 $ _
- ___ _-_- 573°k
13 Crushed Surfacing Top Course - --- -
-770-- -
-- 287.02
0 -
35.00
$ 10,045.70 $ - - -
37%
TON
14 Paving Fabric
----Asphalt
0
0--
- -
-- SY
_
15.00
$ - - - $ -
-- 0%
----
15 Concrete Pavement Class B, Modfied
nt
1_,000_
- - - -
0'
---- -
0
- -
- -
55.00
- --- - -0.0
$ (0.0.0) $ 0.00
0%
-- - - --- - _
16 Asphalt Concrete Pavement Class E
-
_ _
0
_
0
_
60.00
$ - $ -
0%
0
_TON
TON
17 Planing Bituminous Pavement - -- --- -- -
-- 1,755
0 -
-- -
-SY
4.50 - -
$ - -_ $ - -- _ -,
-- -- - -
- 00/6_
- - -
18 Retrofit Dowel Bars
_
- --- 0'
_ -- -
0
EA
85.00_
$
0 -
_. _ __
19 Replace Cement Concrete Panel --- -
- -
- - 20 --
20.67'
----0
- 0 -
SY
- 95.00
$---- 1,963.65 $ - - -
- - 103%
20 Partial Depth Spall Repair -
- -
-- -0 -
-- - - -_ 0--
-- 0
FA -
-1.0,000.00
$
0%
21
21 Sealing Existing Concrete Random Crack
0
0
0
5.25
$ - - $
---- -
LF
-22- Sealing Transverse and Longitudinal Joints
0
0
0
LF
3.00_
$ - $ -
0%
23 Seeding, Fertilizers, and Mulching
-38_0 -
- 760
- 0
SY
-- 2.00
$ 1,520.00 $ -
- 200°k
-
24 Raised Pavement Marker Type 2 -
- -12-0--
110
- -- 0 - --
--EA
----10-0
$ --330.00 $ -
.-_-92%
25 Monument Type B (Modified) -7
--
.__
0 -
-- 500.00
$ 3,500.00 $ - -
- - - 100°/6
-EA
26 Relocate Type 111 Mailbox Supprt w/ boxes - -
- 1
0
1,000.00 -
$ -- 1,000.00 $ - - -
-- - 100%
1
EA
27 Relocate Permanent Traffic Sign -& --Post
-._ .
7
- fi
- 0
EA
- 300.00
$ 1,800.00 $ - -
86%
28 Paint Line 4 inch wide - -- -
- 6,600 -
6935
- 0 --- -
LF
- - 0.10
$ 693.50 $ _ _
- _. _- -105%
29 Plastic Stop Bar (24 inch wide) -- - -
- - - -15 -- -
- 11 -
- - 0
LF
11.00 -
$ -- 121.00 $._.... _ __
- _ _ -73%
30 Plastic Railroad Crossing Symbol
1
1
0
285.00------t---
285.00 $ -
10056
EA_
31 Temporary Pavement Markings
veteke re � �r-w-naece
�rar-Parreis,ue�eze snr�crar-ar
6,600
- - _
0
-
0
-
LF
_ _---
-
0.25
- -
$ - $ -
----- - -- _ -
0%
---
CO -1 asphalt, concrete overlay;construct 10" cement
CO-1
1
0
0
LS
0.00
$ - $ -
0%
CO -1-1 10" Cement Concrete Pavement -includes dowels
2,037
1895
0
CY
183.55
$ 347,827.25 $
93%
-CO-1-2-Deleted Items Restocking Costs
1
1.012055833
0
Eq Adj
12,000.00
$ 12,144.67 $ -
101°k
Class B Modified Asphalt Concrete Pavment(see
-11 d Big a' _ -)
-2- i maven comments
1,000
1118.66
0
TON
58.80
$ 65,777.21 $
CO -2-2 Beam Guardrail Type I-11' posts -
50
50'
0
LF
37.63
$ 1,881.50 $
100%
CO -2-3 Beam Guardrail Tupe 1 -8' -posts
119
112.5
_
0
LF
35.78
$ 4,025.25 $ -
95%
CO -2-4 Beam Guardrail Type I fi' posts
50
43.75
0
LF
34.55
$ 1,511.56 $ -
88%
CO -2-5 Non Flared Terminal TL -2 -
-- 2
2
- - 0 -
EA
1,954.40
$ 3,908.80 $ -
100%
CO -2-6 Type I Anchor
2
2
0 1
EA
660.80
$ 1,321.60 $ -
100%
SCHEDULE TOTAL $ 0.00
h:lprojlpe\C505A PE (version 1)MERLINO.xls 1 of 1 5/16/2006 at 3:08 PM
vv MV. vawV CITY OF AUBURN
2005 Pavement Preservation Aub Black Diamond Road PROJECT SUMMARY
SCHEDULE A: Street Improvements
Contract $
NO TAX
Retainage (-5%)
SCHEDULE TOTAL $
TOTAL CONTRACT AMOUNT TO DATE
TOTAL PAYMENT TO CONTRACTOR
PAYMENT DUE CONTRACTOR:
PAY ESTIMATE #4
Original Contract Contract Change
Amount Orders Total Payment
570,052.50 $ 40,856.41 $ 611,780.03 $
$ (30,589.00) $
570,052.50 $ 40,856.41 $ 581,191.03 $
Period Dates
Begin: April 21, 2006
End: May 20, 2006
$ 611,780.03
$ 581.191.03 $
This Period
0.00
0 10
h:\Proj\pe\C505A PE (version 1)MERLINO.xls 1 of 1 5/16/2006 at 3:08 PM
C505A
CONTRACTOR:
Gary Merlino Construction Co Inc
9125 10th Ave South
Seattle, WA 98108
Phone: 206-762-9125
CITY OF AUBURN
ASA 19KIREik]
2005 Pavement Preservation Aub Black Diamond Road
PAY ESTIMATE # 4 & FINAL
The undersigned has reviewed and approved this final pay estimate. I agree that it is a true and correct statement
showing all monies due me from the City of Auburn under this contract; that I have carefully examined the final pay estimate
estimate and understand it and that I hereby release the City of Auburn from any and all claims of whatsoever
nature which I may have, arising out of this contract, which are not set forth in this estimate.
PAYMENT DUE TO CONTRACTOR = $ 0.00
Signatures:
Contractor
Date
Inspector
Date
Project Manager
Date
_
City Engineer
Date
hAprojlpe1C505A PE (version 1)MERLINO.xis 1 of 1 5/16/2006 at 3:08 PM
R PL
U PL `
COMM
MAIN
ST
r SE 327th S7
COL
W
1st ST SE
Ei
U2
W
W
�
E
SE
0.;
WGo
CA SE 330th
E-,
4t
ST SE
C42 V p SE
�'.---BET
°x UR_ NGT
pN
OCL Rn - -
PROJ
--
SITE
-
H
K
��
--
18
SCENIC
DR
14TH
2005 PAVEMENT
PRESERVATION
AUBURN -BLACK
DIAMOND ROAD