HomeMy WebLinkAbout06-05-2006 ITEM V-C-3CITYOFT WASHINGTON AGENDA BILL APPROVAL FORM Agenda Subject: Date: Award Contract 05-24 May 22, 2006 Department: Attachments: Budget Impact: Public Works Budget Status Sheet, Bid Tab $ 138,126 Summary, and Ma Administrative Recommendation: City Council award Contract 05-24, Project Number C513A, Terminal Park Neighborhood Improvements Phase 1 to Interwest Construction & Development, Inc., and waive the bid irregularities on their low bid of $390,499.63 plus WA state sales tax of $10,716.96 for a total contract price of $401,216.59. Background Summary: The purpose of this project is to improve the Terminal Park neighborhood by completing sidewalks along roadways that currently do not have sidewalks. This project will construct sidewalks with wheelchair ramps, a storm drainage system, water main upgrades, and pavement overlay along the western border of Terminal Park (C St SE from 12th St SE to 14' St SE) and the northern border of Terminal Park Elementary (10th St SE from B St SE to C St SE). There were several minor irregularities in the bid proposal, however, these irregularities did not substantively modify the documents nor did they provide an advantage in the bid. A total project increase of $165,317 will be required in 2006 to complete this project; of this amount a budget amendment of $138,126 of General Fund money is required as a budget amendment. This general fund money is required to match the Community Development Block Grant funds received for this project for 2006 and to carry forward the grant funds received in 2005. It is also anticipated that budget expenditures in the 430 Water and 432 Storm Drainage Funds will not be exceeded this year due to the deferral of construction of the R St Improvement Project. W0605-10 04.12.1 PR C513A Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board ®Public Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other ® Public Works ❑ Human Resources Action: Committee Approval: ❑Yes []No Council Approval: ❑Yes ❑No Call for Public Hearing _I_I Referred to Until _/_/_ Tabled Until —/—/ Councilmember: Wagner Staff: Dowd Meeting Date: June 5, 2006 1 Item Number: V.C.3 A, BURN * MORE THAN YOU IMAGINED BUDGET STATUS SHEET Project No: C513A Title: Terminal Park Neighborhood Improvements Phase 1 O PS & E @ 100% Q Pre-bid Date: May 18, 2006 O Award Const. @ 100% Funds Budaeted (Funds Available) Funding 2005 2006 2007 Total 001.32 General Engineering Fund 57,000 26,000 (001 Fund Project Contingency) 57,000 001 Community Development Block Grant 100,000 100,000 0 200,000 430 Water Utility Fund* 10,000 159,000 Total 169,000 432 Storm Drainage Fund 50,000 50,000 (432 Fund Project Contingency) 100,000 Total 1 217,0001 309,0001 0 526,000 Estimated Cost (Funds Needed) Activity 2005 2006 2007 Total Design Engineering 18,874 26,000 (001 Fund Project Contingency) 44,874 Construction Estimate 63,177 538,949 0 538,949 Construction Engineering 27,000 Total 27,000 Project Contingency 159,000 200,000 43,000 (432 Fund Project Contingency) 43,000 Total 18,874 634,949 0 653,824 432 Storm Drainaae Fund Status 2005 2005 001 General Fund Status 2006 2007 Total 001 Funds Budgeted 001 Funds Needed 157,000 18,874 100,000 174,949 257,000 193,823 (001 Fund Project Contingency) 138,126 74,949 63,177 001 Funds Required 0 0 0 430 Water Utility Fund Status 2005 2006 2007 Total 430 Funds Budgeted 430 Funds Needed 10,000 0 159,000 200,000 169,000 200,000 (432 Fund Project Contingency) 10,000 0 0 432 Funds Required 0 41,000 31,000 432 Storm Drainaae Fund Status 2005 2006 2007 Total 432 Funds Budgeted 50,000 432 Funds Needed 0 50,000 260,000 100,000 260,000 (432 Fund Project Contingency) 50,000 0 0 432 Funds Required 0 210,000 160,000 *The water budget has $1,000,000 budgeted in 2006 for the Pipeline Replacement program of which $159,000 has been allocated towards this project. W0605 -10A BID TABULATION BID TOTALS SUMMARY Project Name: C513A, Terminal Park Neighborhood Improvement Project Prepared by: City of Auburn Bid Date: 5/16/06 ENGINEER'S ESTIMATE. $ 526,412.60 AVERAGE BASIC BID AMOUNT: $ 468,930.77 BASIC BID SPREAD AMOUNT: $ 133,851.57 Basic BID Amount Spread $ Spread % LOW BIDDER: Interwest Construction & Development $ 390,499.63 -$135,912.97 -25.82% Second Bidder: NOVA Contracting, Inc $ 461,690.00 -$64,722.60 -12.30% Basic BID (Tax not Included) Total BID (Includes Tax on Schedule B) Interwest Construction & Dew $ 390,499.63 $ 401,216.59 NOVA Contracting, Inc $ 461,690.00 $ 470,252.84 DPK, Inc $ 499,182.25 $ 510,727.85 Construct Co. $ 524,351.20 $ 539,129.97 5/22/2006 (9:22 Alva h:\prof\bidtabs\C513A BT .xls 9 STH ST, S.E. FT � �d Fer 9 y 4�tm �i a .t .� :t wx r+ i i �Pr u•= P TERMINAL PARK NEIGHBORHOOD $ IMPROVEMENTS, PHASE 1 wnrn o ro VICINITY MAP 0�� Scale: 1" = 200' No1No a F1 -b- % WN