HomeMy WebLinkAbout09-18-2006 ITEM V-C-4C ITY OF_ WASHINGTON AGENDA BILL APPROVAL FORM Agenda Subject: Date: Change Orders land 2 to Contract 05-24 September 6, 2006 Department: Attachments: I Budget Impact: Public Works Budget Status Sheet & Ma $ 50,000.00 Administrative Recommendation: City Council approve Change Order 1 and 2 in the amounts of $46,971.00 and $408,248.00, respectively, to Contract 05-24 with Interwest Construction & Development, Inc. for work on project C513A, Terminal Park Neighborhood Improvements – Ph. 1 Background Summary: The purpose of this project is to improve the Terminal Park neighborhood by completing sidewalks along roadways that currently do not have sidewalks. This project will construct sidewalks with wheelchair ramps, a storm drainage system, water main upgrades, and pavement overlay along the western border Terminal Park from of (C St SE 12th St SE to 14t St SE) and the northern border of Terminal Park Elementary (10th St SE from B St SE to C St SE). The purpose of Change Order No. 1 is to complete 335 linear feet of additional sidewalks and sidewalk ramps identified in the Terminal Park Pedestrian Facilities Report that were not included in the original contract but are in close proximity of Terminal Park Elementary and the current project. This, work will utilize a portion of the $100,000 of the Community Development Block Grant (CDBG) funds the City received in 2005. The purpose of Change Order #2 is to install 1,187 linear feet of sanitary sewer mains and side service connections identified as failing structures in the Terminal Park Neighborhood prior to the streets being overlayed by this year's SOS Overlay Program. A budget adjustment of $50,000.00 of Community Development Block Grant funds unspent in 2005 from the 001 fund/account will be required this year to fund the project. A project increase of $60,162 within the 432 fund/account will be necessary this year to fund the project; however, it will not require a budget adjustment due to funds in the Storm Utility repair/replacement program. W0918-6 04.12.1 PR C513A Reviewed by Council & Committees: Reviewed by Departments & Divisions: ❑ Arts Commission COUNCIL COMMITTEES: ❑ Building ❑ M&O ❑ Airport ❑ Finance ❑ Cemetery ❑ Mayor ❑ Hearing Examiner ❑ Municipal Serv. ❑ Finance ❑ Parks ❑ Human Services ❑ Planning & CD ❑ Fire ❑ Planning ❑ Park Board ®Public Works ❑ Legal ❑ Police ❑ Planning Comm. ❑ Other ® Public Works ❑ Human Resources Action: Committee Approval: []Yes ❑No Council Approval: ❑Yes [--]No Call for Public Hearing Referred to Until —/—/ Tabled Until —/—/ Councilmember: Wagner Staff: Dowd Meeting Date: September 18, 2006 Item Number: V.C.4 AUBURN* MORE THAN YOU IMAGINED BUDGET STATUS SHEET Project No: C513A Title: Terminal Park Neighborhood Improvements Phase 1 O PS & E @100% O Pre-bid Date: September 6, 2006 O Award • Const. @ 70% Fnnele Ruelnafaei IM -1. A-11�kl-% Funding 2005 2006 2007 Total 001.32 General Engineering Fund 18,874 38,126 431 Funds Needed 57,000 001 Community Development Block Grant 100,000 100,000 431 Funds Required 200,000 430 Water Utility Fund' 0 180,000 180,000 431 Sewer Utility Fund" 0 428,660 428,660 432 Storm Drainage Fund 1 01 100,000 100,000 Total 1 118,8741 846,786 1 965,660 Estimated Cost !Funds Needed► Activity 2005 2006 2007 Total Design Engineering 18,874 26,000 431 Funds Needed 44,874 Construction Bid 0 401,217 431 Funds Required 401,217 Construction Engineering 0 27,000 27,000 Authorized Contingency 40,512 40,512 Change Order No. 1 46,971 46,971 Change Order No. 2 408,248 408,248 Total 18,874 949,948 968,822 001 Funds Budgetec 001 Funds Needed (001 Fund Projec 001 Funds 001 General Fund Status 2005 2006 2007 Total 118,874 138,126 257,000 18,874 188,126 207,000 D0,000) 0 50,000 0 50,000 0 430 Water Utility Fund Status 2005 2006 2007 Total 430 Funds Budgeted 0 173,000 173,000 430 Funds Needed 0 173,000 173,000 (430 Fund Project Contingency) 0 0 0 430 Funds Required 0 0 0 `The water budget has $1,000,000 budgeted in 2006 for the Pipeline Replacement program of which $180,000 has been allocated towards this project. 431 Sewer Fund Status "The sewer budget has $750,000 budgeted in 2006 for the Sewer Repair/Replacement program of which $428,660 has been allocated towards this project. 2005 2006 2007 Total 431 Funds Budgeted 0 0 428,660 428,660 428,660 428,660 431 Funds Needed (431 Fund Project Contingency) 0 0 0 431 Funds Required 0 0 0 "The sewer budget has $750,000 budgeted in 2006 for the Sewer Repair/Replacement program of which $428,660 has been allocated towards this project. W0918 -6A 432 2005 Storm Drainage 2006 Fund Status 2007 Total 432 Funds Budgeted 432 Funds Needed 0 0 100,000 160,162 100,000 160,162 (432 Fund Project Contingency) 0 0 0 432 Funds Required 0 60,162 60,162 W0918 -6A STORM DRAINAGE, WATER MAIN - 1 AND SIDEWALK IMPROVJEMENTS i! TERMINAL PARK(I ELEMENTARY e � mv j . �4p 0 lk ■ into OL — ADDITIONAL SIDEWALK IMPROVEMENTS one -z =T _sa fe ®® I�® m 0 gap%. !.tones I Lz' t1 1 v x � Q W `- ' ® ■ W > Y o SEW AI MS1 DE SEWER ®(.� • ff=f ` I a CONNECTION IMPROVEMENTS • w � ---- �---- --__.------.--L9x',..': 1 (q a '■ I = eggs......_._ ...............................,.-' MENT SEWER MAIN AND SIDE SEADDITIONAL SIDEWALK oWER ■ CONNECTION IMPROVES il ELM� �r �— e� IMPROVEMENTS ■ • ( ■ •al i -------- *Apollo .ol Ed I' �HOLY FAMILY CHURCH 0 r mp. ,crry OF .:..../ r TERMINAL PARK NEIGHBORHOOD IMPROVEMENTS, PHASE I N WASHINGTON PUBLIC WORKS DEPARTMENT VICINITY MAP NOT To SCALE SEPTEMBER, 2006