Loading...
HomeMy WebLinkAboutITEM V-C-1* " ALTB~JR:N WASHINGTON AGENDA BILL APPROVAL FORM Agenda Subject: Permission to Advertise Game Farm Park Soccer Date: April 2, 2007 Field Renovation, Pro~ect CP0608 Department: Parks, Arts and Attachments: SLA Landscape Budget Impact: Recreation Construction Cost Estimate Administrative Recommendation: City Council grant permission to advertise and solicit bids for Project No. CP0608, Game Farm Park Soccer Field Renovation. Background Summary: The purpose of Project CP0608 is to renovate two new synthetic soccer fields at Game Farm Park. The existing soccer fields will be demolished and replaced with two new synthetic soccer fields on the existing Game Farm Park soccer fields site. All work is within the existing Game Farm Park property. Design is 99% complete and construction is anticipated to occur between May and September, 2007. The total project construction cost is estimated to be $1,300,000. Funding will be through grants and city funding in the following amounts: Municipal Park Construction Funds: $ 500,000 State of Washington IAC Grant: $ 300,000 King County Youth Services Grant: $ 75,000 Local Grant AYSA/Rep. Hurst $ 125,000 REET Funds: $ 300,000 Total $1,300,000 R0402-2 05.2 CP0608 Reviewed by Council 8~ Committees: Reviewed by Departments & Divisions: ^ Arts Commission COUNCIL COMMITTEES: ^ Building ^ M&O ^ Airport ^ Finance ^ Cemetery ^ Mayor ^ Hearing Examiner ®Municipal Serv. ^ Finance ^ Parks ^ Human Services ®Planning & CD ^ Fire ^ Planning ^ Park Board ^Public Works ^ Legal ^ Police ^ Planning Comm. ^ Other ^Public Works ^ Human Resources ^ Information Services Action: Committee Approval: ^Yes ^No Council Approval: ^Yes ^No Call for Public Hearing _/ /_ Referred to Until _/_/_ Tabled Until _/_/_ Councilmember: Norman Staff: Faber Meetin Date: A ril 2, 2007 Item Number: V.C.1 riU$j,j.~~ItiT * MORE THAN YOU IMAGINED SLA Landscape Architecture, LLC Erik J. Sweet, ASLA, RLA 18825 SE 164th St . Renton, WA 98058 Phone (425) 766-9535 Fax (425) 793-4276 CONSTRUCTION COST ESTIMATE Project: Game Farm Park Soccer Field Renovations Subject: Cost Model Numbers Date: February 13, 2007 ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE HIGH END FIELD WITH OPTIONS A. Demo/Base Construction 1. Construction fencing 1,850 If $ 3.00 $ 5,550 2. Field rou h rade 162,700 s ft $ 0.06 $ 9,762 3. Excavate Infiltration Trenches 500 ds $ 15.00 $ 7,500 4. Demo Existin CB's 6 ea $ 150.00 $ 900 5. Fine rade sub rade 162,700 s ft $ 0.06 $ 9,762 6. Concrete curbin 2,400 If $ 20.00 $ 48,000 7. Permeable a re ate -Field area 5,000 tons $ 37.00 $ 185,000 8. Permeable a re ate -infiltration are 1,375 tons $ 37.00 $ 50,875 9. Collector drains 1,850 If $ 4.00 $ 7,400 10. Lateral Drains 9,000 If $ 7.00 $ 63,000 11. Construction Entrance 1 ea $ 5,000.00 $ 5,000 12. As halt Pavin walkwa s 21,700 sgft $ 2.65 $ 57,505 13. As halt Pavin base rock 4" depth 375 tons $ 25.00 $ 9,375 14. Fine rade field finish rade rock 162,800 sgft. $ 0.04 $ 6,512 15. Chainlink Fencin 2,400 If $ 16.00 $ 38,400 16. Chainlink Gates 6 ea $ 2,500.00 $ 15,000 17. H droseed 20,000 s ft $ 0.07 $ 1,400 Subtotal Demo/Base Work $ 515,391 B. New Fields 1. S nthetic Turf Carpet 162,800 s ft $ 4.75 $ 773,300 $ - Subtotal Synthetic Field $ 773,300 ITEM NO. SUMMARY OF COSTS A. DemolBase Construction $ 515,391 B. New Field Renovation $ 773,300 TOTAL $ 1,288,691 p:\i\itgr0005\docs\R0402-2a GFP Soccer Field Cost Estimate.xls