AGENDA BILL APPROVAL FORM
Agenda Subject: Change Order #5 to Contract No. CP0608A Date: December 6, 2007
Department: Parks, Arts and Attachments: Change Order No. 5 Budget Impact:
Recreation and Architect Letter of Ex lanation
Administrative Recommendation:
City Council approve Change Order No. 5 to Contract with CP0608A Earthwork - T. J. Sahli Construction
for the Game Farm Park Soccer Field Renovation and accept construction of Project No. CP0608A.
Background Summary:
This project provided for all of the earthwork (grading, paths, etc.) preparation for the Game Farm Park
Soccer Field Renovation. Construction was completed in early September and play has been vigorous
since that time.
The original contract amount was 435,000.00. Five change orders were attached to this contract:
Change Order No. 1 (5,000.00) Change Asphalt walkways to concrete
Change Order No. 2 11,920.00 Add excavating and top rock to fields
Change Order No. 3 9,400.00 Additional concrete walk and bleacher pad
Change Order No. 4 4,140.00 Add 5 days for getting layout info/field approval
Change Order No. 5 11,200.00 Remove walkways to access irrigation lines and
reduce berm areas on west side of field. Added
fill materials.
Additional fill materials were required to achieve sub-grade and became Change Order 5 (per attached
letter from SLA Architect). The contractor imported fill materials in the areas, where designed asphalt
pathways were eliminated from the project and replaced with concrete, and to bring the site up to grade.
No additional time was added to this project. The cost of this Change Order No. 5 is $11,636.80 with tax
less retainage. With the acceptance of this change order, the contractor has fulfilled his responsibilities
for this project and we request acceptance of the project.
R1217-1
05.2 CP0608A
Reviewed by Council & Committees: Reviewed by Departments & Divisions:
^ Arts Commission COUNCIL COMMITTEES: ^ Building ^ M&O
^ Airport ®Finance ^ Cemetery ^ Mayor
^ Hearing Examiner ®Municipal Serv. ^Finance ^ Parks
^ Human Services ^ Planning & CD ^ Fire ^ Planning
® Park Board ^Public Works ^ Legal ^ Police
^ Planning Comm. ^ Other Museum Board ^Public Works ^ Human Resources
^ Information Services
Action:
Committee Approval: ^Yes ^No
Council Approval: ^Yes ^No Call for Public Hearing _/_/_
Referred to Until _/_/_
Tabled Until _/_/_
Councilmember: Backus Staff: Faber
Meetin Date: December 17, 2007 Item Number: V.C.1
AU$U~~N ~ MORE THAN YOU IMAGjNED
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. _5_
Contract No., Project No. and Project Title: 0704,CP0-608A GAME FARM PARK
SOCCER FIELD RENOVATION
Contractor Name and Address:
T. J. SAHLI CONSTRUCTION
PO BOX 332
S EAH U RST, WA 98062
The Contractor is hereby directed to make the changes to the Contract as described herein. This document and all attachments
are a supplement to the contract. All work, materials and measurements for the type of construction involved shall be in
accordance with the contract documents of the above named project unless stated otherwise in this change order.
Summary of Proposed Changes:
1. Remove walkways to allow access to irrigation mainlines and reduce cut of berm areas.
2. Fill material to make this change
3.
The Contract time is extended by
days.
Item
Sch.
Sec. No.
Item. Description
Quantity
Units
Unit Price
Total Price Sales
Tax
Remove Walkways N
Add Fill Material $11,200 y
N
N
N
N
Subtotal $ 11,200.00
Washington State Sales Tax (8.9%) on applicable items $ 996.80
TOTAL $ 12,196.80
Less Retainage $560.00
Total Due $ 11,636.80
Base Amount Total incl. Tax
1. Total Cost this C/O minus retaina e $ 11,200.00 $ 11,636.80
2. Total Cost Previous C/O $ 20,460.00 $ 21,508.94
3. Ori final Contract Amount $ 435,000.00 $ 473,715.00
4. Revised Contract Amount incl tax & retainage $ 506,885.94
This change order constitutes full and complete compensation for all labor, equipment, materials, overhead, profit, any and all
indirect costs, and time adjustment to perform the above described changes. All other costs are non-compensible.
CITY OF AUBURN
CONTRACT CHANGE ORDER AGREEMENT NO. _5_
Contract No., Project No. and Project Title:
0704,CP0-608A GAME FARM PARK
SOCCER FIELD RENOVATION
Contractor:
Inspector:
Project Manager:
City Engineer:
Approved by:
Date
Date
Date
Date
Mayor, City ofAuburn Date
i-
~ .K
November ?cl, ?0{}
Uarvl !~'aUCr
nir~ctctr f arks and T~ecreation
?5 11'est I~'lan St
Aubt.rrn. ~~•'
fl)/: Additional Fillmatcrals f`or'outsidc of'fietd areas,
UCGlr; ~1r. Fahcr,
As per ycx~r reyucst, I have revic~tird the proposal front TF Sahli, !'ot• the cbant~e for
additional tilt import materials aClllerL~~ 5llb`~l'adrr alter elimination nt~asphalt walkrva~'s
:areas ~~n the (eamc: Farm Park Soccer t~ictd Renovation. rafter adelitictnal rc:~•iew of the
proposal, verilicatictn c~1' impart materai<tls. T rewmmcnd the aceeptancre cif TF Sah}i's
proposal tier tht; adclitionll'i~>pirn materials to achieve subgrade elevations cyusicje of tlcld
areas ~':he~~c aspht~lt path~~•ays were eliminated.
TF Sahfi imported tiff materials in the areas where designed asphalt }artih~~'~l~'s ~iei-c
eliminated from the prajert to hrin`, th~tsc areas tcf proper suh`~radc, and finish ~r~tdcs.
1. It~rnb~~al of'~~~alk~'`ay5 ryas. done to allt~w ttic~ s to irri~~atinn m~rinlincw, a'Iad
reduce cut c~#`berm areas tm the west side of'the fields..
2. Vo udditc~nal .time extension can the pc•ojoct.
! ;cec:rrrz;;.nd the ttt.eeptancc o1'the modific~ttctn prupi~sal h.' TF Sahli, till n;ater•ials
within the scope of'~~•ork iUr Cart~c Farrn !'ark `Soccer H•ield Henuv~ttion.
Sinccrcl~;;
51;~ 1,:,.a~nds~c~rpi; Architecture
~, ~~ .
.~
f:rik J. Sncct, ASL~1, EtL..A (h'<itct
i ill \lxrrai:., 1."t ~r~ ~a • J.a I'.u•r I ti' .\ 1 .u,1h~.;~,r lirhiien:u-r