Loading...
HomeMy WebLinkAbout2288 1 REBOLIITION NO. 2 2 8 8 2 3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MP,YOR AND CITY CLERK OF THE CITY 4 OF AUBURN TO EXECUTE AMENDMENT NO. 2 TO CONTRACT FOR PROFESSIONAL ENGINEERING SERVICES BETWEEN THE CITY AND GRAY & 5 OSBORNE, INC. RELATING TO STREET IMPROVEMENT NO. 287. 6 THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, IN A 7 REGULAR MEETING DULY ASSEMBLED, HEREWITH RESOLVES AS FOLLOWS: g Section 1. The Mayor and City Clerk of the City of 9 Auburn, Washington, are hereby authorized to execute Amendment 10 No. 2 to Contract for Professional Engineering Services 11 between the City and GRAY & OSBORNE, INC. relating to Street 12 Improvement No. 287. Amendment No. 1 was authorized by 13 Resolution No. 2181 dated March 18, 1991. A copy of the 14 pmendment is attached hereto, designated as Exhibit "A" and . 15 incorporated by reference in this Resolution. 16 gection 2. The Mayor is hereby authorized to implement 17 such administrative procedures as may be necessary to carry 18 out the directives of this legislation. 19 DATED and SIGNED this 16th day of March, 1992. 20 21 CITY OF AUBURN 22 23 24 25 M A Y 0 R 26 Resolution No. 2288 March 9, 1992 Page 1 1 2 3 ATTEST: 4 5 Robin Wohlhueter, 6 City Clerk 7 8 9 10 APPROVED AS TO FORM: ll iv 12 13 Stephen R. Shelton, - City Attorney 14 15 16 17 18 19 20 21 22 23 24 25 26 Resolution No. 2288 March 9, 1992 Page 2 , CITY OF AUBURN KING COUNTY WASHINGTON AMENDMENT NO. 2 TO CONTRACT FOR PROFESSIONAL ENGINEERING SERVICES STREET IMPROVEMENT #287 T.I.B. NO. 8-1-105(23) AUBURN WAY SOUTH (SR-164) AT ACADEMY DRIVE INTERSECTION GRAY & OSBORNE, INC. Consulting Engineers Seattle-Yakima, Washington Page 1 of 3 Resolution No. 2288 Exhibit "A" Y AMENDMENT NO. 2 CONTRACT FOR , PROFESSIONAL ENGINEERING SERVICES Thi~~ A,mendment o. 2 to the„ existing Contrct for Professional Engineering Services, entered into the ~_A-day of 19911, by the City of Auburn, King County, Washington, hereinafter called the CITY, or OWNER, and Gray & Osborne, Inc., Consulting Engineers, Seattle, Washington, hereinafter called the ENGINEER. WITNESSETH: That there now exists between the CITY and the ENGINEER a Contract for "Professional Engineering Services" for the planning and preparation of Plans, Specifications, and Contract Documents for the Project described as "Street Improvement #287", which Contract provides therein for the Engineering Services under Article II, "Objectives and Scope of Work." WHEREAS: The CITY is desirous to have the ENGINEER perform additional work as provided under Article XI: Extra Work. Now, therefore, in consideration of the mutual covenants and agreements herein contained, the parties hereto mutually agree to as follows: Those parts of Article II, "Objectives and Scope of Work", as shown on pages 2, 3, and 4 of the original contract document, and Exhibit A of said March 5, 1990, Contract for Professional Engineering Services is herewith amended to include the following described additional tasks of work to be accomplished at the direction of the CITY, together with a method of compensation. ARTICLE II OBJECTIVE AND SCOPE OF WORK The following is a list of additional services to be furnished by the ENGINEER which will be augmented by the ENGINEER upon written authorization of the City of Auburn. 1. Prepare new bid documents to include construction drawings and specification to segregate out the construction of the 24-inch storm drain (comprehensive storm drain) from the road construction project. Attend meeting with City to discuss the separation of this work (24-inch storm drain) as a separate bid project. Prepare a separate engineering cost estimate for this schedule of work. 2. Design and prepare storm drainage revisions for an "overflow/bypass" storm drain pipeline in and along Academy Drive which connects the new storm line to an existing line approximately 175 feet away. Show on new bid documents (see item 1 above). 3. Revise existing roadway contract documents, to include construction drawings, specification, and cost estimates, to indicate the construction of the 24-inch storm "by others" and show as "existing". 4, Prepare new and revised legal description for frontage road easement acquisition. 5. Redesign frontage road (ingress/egrees) to accommodate for new easement revision (see item 4). Provide new concepts and design for lots fronting SR-164 (south of Academy Drive). 6. Prepare 50 sets of additional project plans and specifications for separating project into two separate schedules of work. 7. Provide two (2) additional sets of permanent mylars per State Dept. of Transportation request. 8. Authorize our sub-consultant Kittleson and Associates to provide additional traffic analysis and signalization options in regards to traffic movement at Auburn Way South and Academy Drive. Page 2 of 3 Resolution No. 2288 Exhibit "A" AMENDMENT NO. 2 - Continued . ' For services furnished under Article II (as noted above and herein), the total cost of additional qngineering services for additional engineering services shall not exceed $12,779.58. The fee shall be computed on an hourly basis being 2.5415 times the payroll cost of the ENGINEER for each of its employees assigned to the project. The ENGINEER's direct expenses are defined as the actual out-of-pocket costs to the ENGINEER for all expenses incurred directly on the project, other than the payroll costs. Such direct expenses shall include, but not be limited to necessary transportation costs, including mileage at the rate of twenty four cents ($.24), per mile when the ENGINEER's own automobiles are used, meals and lodging, laboratory tests and analysis. Secretarial. accountinQ. bookkeeniniz, telenhone, tvviniz. nrintinQ. un to $150, and bindina of ten (10) copies of nlans and snecifications or renorts. and FEE are included in the navroll costs and multinlier utilized. 2(a) An itemized breakdown of additional costs associated with providing the additional services as reference in Article II-(1) thru II-(6) above are as follows: Hours Discinline Reauired Rate Amount Project Manager 8...................... $35.00.......................... $280.00 Project Engineer ...........................................20.........................29.00............................580.00 Design Engineer 80......................... 22.00......................... 1,760.00 Draf ting 120 15.00 1,800.00 Subtotal, Direct Salary Costs $4,420.00 Indirect Costs @ 121.21 5,357.48 Total Labor Costs $9,777.48 Fee @ 15% :........................................................................................................................1,466.62 Subtotal, Direct & Indirect Labor 11 244 10 Indirect Expenses: Mileage, etc ...........................................................51.82 Superior Reprographics 648.78 Kittleson & Associates ..................................700.00 Subconsultants @ 10% of (648.78 + 700.00) 134.88 Subtotal, indirect expenses ........................................................................................1,535.48 TOTAL ESTIMATED INCREASES THIS ADDENDUM NO. 2:...... $12,779.58 IN WITNESS WHEREOF, the parties hereto have executed this Contract Amendment as of the day and year first above written. CITY OF AUBURN ATTEST: , _ . By ; Title Ma.yor ' ATTE T: City Clerk 1 B APPROVED AS TO FORM: ~ Title V (SEAL) G Y& OSBO , INC. City Attorney By , ` Principal Page 3 of 3 Resolution No. 2288 Exhibit "A" STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) I, Robin Wohlhueter, the duly appointed, qualified City Clerk of the City of Auburn, a Municipal Corporation and Code City, situate in the County of King, State of Washington, do hereby certify that the foregoing is a full, true and correct copy of Resolution No. 2288 of the resolution of the City of Auburn, entitled "A RESOLUTION." I certify that said Resolution No. 2288 was duly passed by the Council and approved by the Mayor of the said City of Auburn, on the 16th day of March A.D., 1992. Witness my hand and the official seal of the City of Auburn this April 16, 1992, A.D. Robin Wohlhueter City Clerk City of Auburn ,