HomeMy WebLinkAbout06-12-1995PUBLIC WORKS COIVIMITTEE MINUTES JUNE 12, 1995
I. CALL TO ORBER
The meeting was called to order at 5:35 p.m. Those in attendance were Mayor Booth,
Committee Chairman Rich Wagner. Council/Committee member Don Kurle and
Council/Committee member Pat Burns. Staff in attendance were Public Works Director
Frank A. Curfie, City Engineer Dennis Dowdy, Senior Engineer Dennis Selle and, Utility
Planning Engineer Nass Diallo, Utilities Engineer Dwight Holobaugh, Traffic Engineer
Steve Mullen, Finance Director Victor Thompson, City Attorney Michael Reynolds,
Traffic Engineer Brian Dusseault, and Water Quality Compliance Officer Chris Thorn.
Guests in attendance were Attorney at Law Tom Monimer, and Cathy Carr of C.C.I.
II. ISSUES
A, RESOLUTION NO, 2651 - ADOPTING THE 1996-2001 REVISIONS AND
EXTENSIONS OF THE COMPREHENSIVE STREET PROGRAM
Dennis Dowdy, City Engineer, introduced the 1996-2001 revisions of the Comprehensive
Street Program.
Councilmember Wagner initiated discussion about several projects and changes in
priorifization since last year.
Specific questions about 17th Street SE/"A" Street SE signal {901, previously referred to
as 601) and 15th Street NE/'D" Street NE signal modification (902) being added. Both
projects are recently eligible for Hazard Elimination (H.E.S.) funding and were added.
Only the most recent three {3) years of accidents are included for projects where federal or
state grant funds are sought.
"M" Street SE, East Main Street to Auburn Way South (384A) should be moved to later
in the six {6) year program. This is a concurrency-related project and the committee feels
it is not necessarily a high priority and could be moved lower on the schedule.
52nd Street NE/South 277th - Auburn Way North to West Valley Highway (392) should
be funded at a much lower rate and the City staff should continue to seek lead role from
the County to manage design and construction since the majority of the segment will soon
be annexed into the City. The rationale for adding this project this year is that Kent
intends to build a five (5) lane arterial that will be open to traffic by 1999 with three (3)
lanes paved. By 2001, Kent intends to pave the other two (2) lanes. Since Kent has now
cleared the majority of hurdles w build this project from Auburn Way North to Kent
Kangley, Auburn's portion becomes more urgent.
PUBLIC WORKS COMMITTEE MINUTES JUNE 12, 1995
PAGE 2 OF 3
Predicated on the above corrections being made prior to City Council meeting, Public
Works Committee recommended approval to the Council at their June 26, 1995 meeting.
Hl. CONSENT
A. AWARD BID FOR PR 541, CONTRACT 94-12, 1995 STORM AND WATER
IMPROVEMENTS TO GARY HARPER CONSTRUCTION ON THEIR LOW
BID OF ONE HUNDRED FOUR THOUSAND NINE HUNDRED FIVE
DOLLARS AND EIGHTY-FIVE CENTS(S104,905.85)
City Engineer Dennis Dowdy presented the award bid for PR 541. The Public Works
Committee recommended approval to Council at their June 26, 1995 meeting.
B. STREET DELAY AGREENIENT FOR 657 2ND STREET NW, RESOURCE
PROPERTIES, LTD., FOR A PORTION OF "H' STREET NW AND 2ND
STREET NW
City Engineer Dennis Dowdy presented a Street Delay Agreement tBr 657 2nd Street.
The Public Works Committee recommended approval
C. RIGHT-OF-WAY USE PERMIT APPLICATION #12-95 FROM THE MAIN
STREET SANDWICH COMPANY
The Public Works Committee expressed concern about consent Items C and D that at any
time in the future it may consider termination based on future competing interest. Based
· on that concern, staff agreed to bring these two issues to the next committee meeting with
an appropriate condition specified.
D. RIGHT-OF-WAY USE PERMIT APPLICATION #13-95 FROM THE
RAINBOW CAFE
See Consent Item "C".
E. PERMISSION TO ADVERTISE FOR PR 513, 94/95 SIDEWALK PROGRAM.
The Public Works Committee recommend approval to Council at their June 26, 1995
meeting.
IV. INFORMATION OR DISCUSSION
A. COST OF WATER SERVICE STUDY REPORT - UPDATE
Cathy Cart of C.C.I. discussed with the Public Works Committee the status of the Water
Service Study Report; in order to provide reliable information. the 1992 and 1993
PUBLIC WORKS COMMITTEE MINUTES JUNE 12, 1995
PAGE 3 OF 3
information must be downloaded to provided a three (3) year history. Cathy Carr of
C.C.I. will be returning to the Public Works Committee in one month to provide the
updated information. A draft copy of her report was provided for future discussions.
The Executive Session began at 6:45 p.m.
V. ADJOURNMENT
There being no further business to come before the Public Works Committee, the meeting was
adjourned at 7:30 p.m.
LS/cr
REF. E:NMINUTES\95PW6-1 (H:XENGINEERXE95\E95-58 I)