I. CALL TO ORDER
CITY OF AUBURN
PUBLIC WORKS COMMITTEE
MAY 29, 2007
APPROVED MINUTES
Chairman Rich Wagner called the meeting to order at 2:00 pm in Conference Room #3, located on
the second floor of Auburn City Hall, 25 West Main Street, Auburn, Washington. Committee
members present were: Chairman Rich Wagner, Vice-Chair Roger Thordarson, and Member Bill
Peloza. Also present during the meeting were: Mayor Peter B. Lewis, City Engineer/Assistant
Director Dennis Selle, Assistant City Engineer Ingrid Gaub, Senior Project Engineer Bill Helbig,
Utilities Engineer Dan Repp, Traffic Engineer Laura Philpot, Transportation Planner Joe,
Engineering Aid Megan Robel, Transportation Planner/Grants Manager Tiffin Goodman, Utility
Maintenance Engineer Gary McConnell, Construction Manager Larry Dahl, Development Review
Engineer Correne Auer, Senior Planner Jeff Dixon, City Attorney Dan Heid, Dept. Secretary
Kimberly Powell.
I1. CONSENT AGENDA
A. APPROVAL OF MINUTES
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
approve the Public Works Committee minutes for May 14, 2007. Motion carried.
B. VEHICLE SURPLUS
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
recommend Council approve surplus of the vehicle. Motion carried.
C. PERMISSION TO ENTER INTO CONSULTANT AGREEMENT AG-C-296 WITH CASNE
ENGINEERING, INC. FOR ELECTRICAL ENGINEERING SERVICES RELATED TO
PROJECT NO. CP0744, STANDBY GENERATOR STUDY
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
recommend Council authorize Consultant Agreement No. AG-C-296 with Casne Engineers, Inc.
Motion carried.
D. PERMISSION TO ENTER INTO CONSULTANT AGREEMENT NO. AG-C-301 WITH BROWN
AND CALDWELL FOR ENGINEERING SERVICES RELATED TO THE COMPREHENSIVE
SEWER PLAN UPDATE
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
recommend Council authorize Consultant Agreement No. AG-C-301 with Brown and Caldwell.
Motion carried.
E. RIGHT-OF-WAY USE PERMIT NO. 07-19, AUBURN ACE HOLDINGS FOR PROJECT ACE
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
approve Right-of-Way Use Permit No. 07-19 with the conditions of approval recommended by
staff. Motion carried.
Public Works Committee Minutes May 29, 2007
APPROVED MINUTES
F. RIGHT-OF-WAY USE PERMIT NO. 07-20, ICON MATERIAL HAULING FOR 3RD RUNWAY
Director Dowdy provided a brief explanation of the ROW use permit application and the
proposed conditions associated with it. Chairman Wagner expressed concerns about noise
impacts related to night work and he asked Mr. Thomas from Icon Materials about the noise
levels of the back up alarms on their trucks and other equipment. Mr. Thomas explained that
they have permission to use strobe lights in lieu of back up alarms during night time operation,
beginning at dusk. The hauling associated with this ROW user permit will take approximately
90 nights. Mr. Thomas further explained that to help with the noise levels, they will only have
one piece of machinery operating to load the trucks, and that there will be supervision on site at
all times. Mr. Thomas said that Icon has purchased all new equipment and that they are the
lightest trucks available, and they will be using all of their own trucks; no outside contractors.
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
approve Right-of-Way Use Permit No. 07-20 with the conditions of approval recommended by
staff. Motion carried,
III. ISSUES
A. RESOLUTION NO. 4121, FIXES A TIME FOR A PUBLIC HEARING ON JULY 2, 2007, FOR
VACATION OF A PORTION OF "I" STREET NE
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
recommend that Council adopt Resolution No. 4121. Motion carried.
B. RESOLUTION NO. 4196, GATES, GATES & GATES
Public Works Director Dowdy explained the agreement to the Committee, stating that it requires
that concrete pavement be put in, but that there is mitigation included to compensate Mr. Gates
to pay the difference between asphalt and concrete, which will be determined by separate
quotes. Chairman Wagner questioned the wetlands and how the rates were calculated. Public
Works Director Dowdy explained that this was an estimated cost at the time of the verbal
agreement, and that Mr. Gates will receive enough credits from both parcels which he is
agreeing that the City can use to pay for the City project to mitigate the wetlands on the new
parcel. Public Works Director Dowdy further explained that the City will be performing the
wetland mitigation project on city owned property on a separate schedule from the A Street
project being performed by the developer.
It was moved by Vice-Chair Thordarson, seconded by Member Peloza, that the Committee
recommend that Council adopt Resolution No. 4196. Motion carried.
IV. DISCUSSION AND INFORMATION
A. PORT OF SEATTLE AND AUBURN "I" STREET NE REAL ESTATE EXCHANGE
AGREEMENT
Senior Planner Dixon explained that the City has been studying the street network in the
northeast Auburn area for some time. Based on findings from the completed EIS a preferred
roadway alignment was chosen. This vacation and real estate exchange agreement is to help
with ultimately achieving that network. The "I" Street ROW has been undeveloped since 1989
and the draft agreement is attached for review. City Engineer/Assistant Director Selle showed
the Committee, on a map, the three pieces of property that the City is receiving in exchange for
Page 2
Public Works Committee Minutes Mav 29, 2007
APPROVED MINUTES
the portion of "I" Street that is proposed to be vacated. Chairman Wagner asked if this
agreement conflicts with any previous Interlocal agreements with the Port of Seattle, to which
Senior Planner Dixon responded that it does not.
B. SUNNDALEN CONDOS DEVELOPMENT AGREEMENT
Chairman Wagner deferred this item to the June 11, 2007, meeting if necessary.
C. PROJECT GRANT STATUS UPDATE
Transportation Planner/Grants Manager Goodman reviewed the Grant Status Update with the
Committee Members.
Item 1 - A Street NW Phase 1
Chairman Wagner asked if "Transportation Community and System Preservation Program" was
a State program. Transportation Planner/Grants Manager Goodman explained that it is a
Federal program and is usually earmarked by Congress.
Item 4 - BNSF Railroad/East Valley Highway Pedestrian Undercrossing Proiect
Chairman Wagner asked why this project is still on hold. Senior Project Engineer Helbig
explained that Burlington Northern is looking at a 3~d rail option and that option would make the
current preferred alternative of constructing an underpass not feasible with the clearances and
grade requirements. Chairman Wager agreed that the City should not spend more money on
the design of this alternative if there are huge unknowns related to the railroad's plans. Mayor
Lewis asked staff to schedule a meeting with him to review our options.
D. KERSEY III DEVELOPMENT OFFSITE ROAD CONSTRUCTION IMPACTS
Assistant City Engineer Gaub handed out a sheet explaining the anticipated closure impacts of
Offsite improvements related to the Kersey III, Divisions 1 and 2 developments. Assistant City
Engineer Gaub explained in detail each option and the City's options and traffic impacts. The
Committee discussed timeframes and road closure locations. Mayor Lewis questioned the
safety during this time and the issue of school being in service. The Committee concurred that
closure of Kersey Way and Oravetz at the same time would be acceptable as long as the work
along Kersey is completed by November 1, 2007, or that the closure of Kersey Way be delayed
until March, 2008 when weather would not interfere with the work. City Engineer/Assistant
Director Selle explained that the City has a process for approval of traffic control that will
include notification of the public of the closures. The Committee does not want East Valley
Highway construction work underway during either of the closures for Kersey or Oravetz.
Oravetz Road is expected to be closed to traffic during the summer break and is required to be
opened before school is back in session in September.
E. CAPITAL PROJECT STATUS REPORT
Item 37 - M Street Reconstruction
Chairman Wagner questioned the "closed to August" with the concern that it could go into
September. Senior Project Engineer Helbig stated that everything is going according to plan,
and it should only be closed until August, not during.
Page 3
Public Works Committee Minutes May 29, 2007
APPROVED MINUTES
OTHER DISCUSSION
1. Member Peloza made a comment that on Cemetery Road the center line channelization has
faded off.
2. Member Peloza received a complaint from a citizen that due to trees in the landscaped area
in front of Les Schwab that it is difficult to see the traffic signal at Auburn Way South and F
Street SE. Staff will review.
3. On A street SE just south of Main Street there is no lane delineation until 1St Street SE. City
Engineer/Assistant Director Selle stated that staff will look into this.
V. ADJOURNMENT
There being no further business to come before the Public Works Committee, the meeting was
adjourned at 3:33 p.m.
Approved this 11t", day of June, 2007.
Rich Wagner
Chairman
~~
Kim a ly Powell
Public Works Dep ent Secretary
Page 4