ORDINANCE NO. 4 9 6 9
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, AUTHORIZING THE ACCEPTANCE OF A GRANT FROM THE
TRANSPORTATION IMPROVEMENT BOARD FOR THE RECONSTRUCTION OF '~A"
STREET SW, 3RD TO MAIN.
WHEREAS, the City Council of the City of Auburn must
adopt and approve all appropriations by Ordinance pursuant to
Chapter 35A.33 RCW; and
NOW, THEREFORE, THE CITY COUNCIL OF
WASHINGTON, DO ORDAIN AS FOLLOWS:
~ Pursuant to Chapter 35A.33 RCW, the City
Council hereby approves expenditure and appropriation of a
9rant from ~he Transportation Improvement Board (TIB) which
for the reconstruction of UA" Street SW, 3rd to
THE CITY OF AUBURN,
will b~ used
Main, in the amount of $761,000 with $190,000 local matchin9
funds from the 102 Gas Tax Fund and authorizes the Mayor to
execute an Urban Design Prospectus between the City and the
Transportation Improvement Board, a copy of which is attached
hereto as Exhibit "A" and is incorporated herein by reference.
Ordinance No. 4969
May 7, 1997
Page 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
~ The Mayor is hereby authorized to implement
such administrative procedures as may be necessary to carry
out the directions of this legislation.
~ This Ordinance shall take effect and be in
force five (5) days from and after its passage, approval and
publication, as provided by law.
INTRODUCED:
ATTEST:
CHARLES A. BOOTH
MAYOR
Robin Wohlhueter,
City Clerk
pPROVED AS TO FORM:
olds,
City Attorney
Published:
Ordinance No. 4969
May 7, 1997
Page 2
,Urban Arterial Trust Account (UATA) , l 8- .(. )-~
Urban Design Prospectus ' ForT,.Useon,.
General Information
Lead Agency
City of Auburn
Project Name & Termini Length in Miles
A Street SW (3rd Street SW to Main Street) .88 Total
Functional Classification Federal Route Number
(Entire project must be on the Statewide Functional Classification System)
Principal Minor __ Collector ~( 1069 - 007
Contact Person Telephone Number (206~ 804-5(371
Fax Number f206'~ 931-3053
Jack Locke
E-mail Address Du blic,?.~cl .euburn.wa.~8
Description of Proposed Improvements
· Attach a legible vicinity map(8.5" xll "), showing project limits.
· Attach a sketch of the proposed roadway section (8.5" x 11 '), tight of way to dght of way, conforming to applicable design
standards.
· Attach a copy, or portion of, the current agency-approved SLx Year Transportation Improvement Program and/or Transportation
Plan. This project must be included in the approved Transportation Improvement Program and/or approved Transportation Plan.
· Describe the type of work 131armed for this project in the space below. How will it improve the existing conditions. If necessa~,
attach additional sheets. Be specific. Identify deviations needed.
If the project includes new signalization, list the warrant(s) the signal(s) meet.
Identify and estimate costs of sound walls, wetland mitigation, hazardous materials cleanup & other unusual mitigation items.
The project will reconstruct the streets in this vicinity, providing adequate structural section and enlarging curb
radii to accommodate transit buses. The project will provide full-width sidewalks to ADA standards, along with
curb, gutter, and City Master Planned utility upgrades necessary to improve this vicinity of the City's central
business district. Input from transit agencies is required and completion of 3rd Street SW grade crossing street
pre-design report.
TIB Form lg0-030 Page 1 of 8
Revised 06/10~96
/Urban Arterial Trust Account (UATA)
Urban Design Prospectus
Project Cost Estimate
Round all figures to the nearest dollar
Total
Predesign Phase Environmental Studies Design Study Predesign Cost
Total
Design Phase Special Studies~ Design Engineering Right of Way Design Cost
Estimate 129,500 0 129,500
Contract Amount3 Other2 Construction Total
Construction Phase Engineering Construction Cost
Estimate 761,600 60,900 822,500
TOTAL PROJECT COST 952,000
1. Value Engineering, Environmental, or Other Special Studies.
2. Work performed by the local agencies own forces and/or negotiated contracts with
Utilities & Railroads. Give explanation and dollar amounts for the 'other" work.
3. Include a cost estimate breakdown of contract items of work. (Engineer's Estimate)
4. Enter Local Matching Ratio used in calculations 20%
A. TOTAL ENGINEERING (Design Engineering + Construction Engineering) ........... 190.400
B. MAXIMUM ELIGIBLE ENGINEERING (25% X Contract Amount) .......................... 190.400
C. NON-ELIGIBLE ENGINEERING COSTS (A - B) ( If less than 0, enter 0) .............. 0
D. TOTAL ELIGIBLE PROJECT COSTS (Total Project Cost- C) ............................... 952.000
E. LOCAL MATCHING FUNDS[(Local Matching Ratio4x D) + C] ............................... 190.400
If there is an increase in the Total Project Cost,
use the amount from Line N of Page 3 (Design Phase Increase Worksheet)
F. UATA FUNDS (Total Project Cost - E) .................................................................... 761.600
G. UATA FUNDS LISTED WHEN PR(~JECT WAS SELECTED FOR FUNDING ....... 761.600
H. BALANCE (G - F) ( Surplus is +, Deficit s - ) ................................................... 0
TIB Form 190-030 Page 2 of 8
Revised 06/10~96
Urban Arterial Trust Account (UATA)
Urban Design Prospectus
TIB Urban Design Phase Increase Worksheet
COMPLETE THIS FORM ONLY IF REQUESTING AN INCREASE IN TOTAL TIB FUNDS
DATE
AGENCY
PROJECT
TERMINI
FISCAL YEAR PROJECT SELECTED -
A. Application Submittal Total Project Costs .................................................................
B. Application Submittal Total TiB Project Costs ..........................................................
C. Application Submittal TIB Matching Ratio ( B/A ) ....................................................
D. Design Phase Total Project Cost Submitted ............................................................
E. Total Project Cost Increase (D-A) ..........................................................................
F. Ineligible costs (rAN, landscaping, engineering, etc.) ................................................
G. Design Phase Total Eligible Project Cost Submitted ( D-F ) ....................................
H. Eligible Project Cost Increase ( G-A ) .......................................................................
[. Eligible Project Percent Increase ( H/A )xl00 .......................................................
J. Increase factor for TIB Portion (1.0 - [ [ / 100 ] ); (minimum = 0.5) .........................
K. Adjusted Project Increase in TIB Funds ( CxHxJ ) .................................................
L. Adjusted Percentage Increase in TIB funds per policy ( K/B ) ...............................
M. Total Project TIB Funds Allowed at Design Review Phase ( B+K ) ..........................
N. Total Local Funds at Design Review Phase ( D-M ); (Enter thisamounton Page2, LineE)..
O. Adjusted Local Matching Ratio at Design Review Phase ( N/D ) ...........................
P. Adjusted TIB Matching Ratio at Design Review Phase ( MID ) ..............................
Q. Request is submitted for an increase in TIB funds of $ ( Agency Supplied)2 ..........
R. % Increase in TIB Funds Requested ( P/B )xl00 .....................................................
(1) If Item Q. is more than $300,000 or Item R. is more than 10% above the application estimate a
TIB subcommittee must review the project pdor to Design Phase approval.
(2) If an increase is requested then a breakdown of the reasons and dollars must accompany the
written request. The justification should address the total project increase.
TIB Form 190-030 Page 3 of 8
Revised 06/10/96
Urban Arterial Trust Account (UATA)
Urban Design Prospectus
Project Funding Analysis
· Round all figures to the nearest dollar
· Use ACTUAL Predesign Phase Funds when calculating Estimated Total Project Cost
· Shaded Areas forTIB Use Only
Predesign Phase Cost
Environmental Total
Study Design Study Total Predesign Predesign Local Predesign Cost
UATA Funds UATA Funds UATA Funds Funds (UATA & Local)
Approved
Actual Required
Estimated Design Phase Cost
Special Studies Design Engineering Right of Way Total Total
UATA Funds UATA Funds UATA Funds Design Design Design Cost
UATA Funds Local Funds (UATA & Local)
-0- 103,600 -0- 103,600 25,900 129,500
Estimated Construction Phase Cost
Construction Construction Construction Total Total Construction
Contract Other Engineedng Construction Construction
UATA Funds UATA Funds UATA Funds UATA Funds Local Funds Cost
(UATA & Local)
605,360 -0- 52,640 658,000 164,500 822,500
Estimated Total Project Cost
Predesign UATA Design Construction Project Total Project Cost
Funds (Actual) UATA Funds UATA Funds UATA Funds Local Funds (UATA & Local)
103,600 658,000 761,600 190,400 952,000
TIB Form 190-030
Revised 06/10/g6 Page 4 of 8
Idrban Arterial Trust Account (UATA)
Urban Design Prospectus
Funding Sources
Local match is considered to be eligible in-kind contributions and all funds other than Transportation Improvement Board
funds. The local matching ratio may not be less than that shown on the application. List all funding sources, pdvate or
3ublic entity, and the amount of funds pledged.
SoUrce Pdvate or Public
Local Gas Tax Public $190,400
$ 190,400
List all other agencies and/or pdvate groups involved in the project. Descdbe their involvement.
Key part of access to transit station. Part of our Downtown Plan and circulation program. Street needs
reconstruction to carry RTA and King County Metro bus traffic.
1) Downtown Plan Advisory Committee
2) RTA
3) King County Metro
TIB Form 190-030
Revised 06/10/96 Page 5 of 8
/I Idrban Arterial Trust Acc.ount (UATA)
Urban Design Prospectus
Demand for UATA Funds
List future demand for UATA Funds in six month increments, January to june and JulYto December.
Be~in with the current pedod. Include predesign Funds in the DeSil in Phase cOlumn~
Time Period Design Phase Right of Way Construction Total UATA Funds
Jan - June 1997
July - Dec 1997 $ 50,000 $ 50,000
Jan - June 1998 $ 53,600 $ 100,000 $ 153,000
July - Dec 1998 $ 558.000 $ 558,000
Jan - June
July - Dec
Jan - June
July - Dec
Jan - June
July - Dec
Jan - June
July - Dec
Jan - June
July - Dec
Jan - June
July - Dec
TOTAL $ 103,600 $ 658,000 $ 761,600
TIB Form 190-030 Page 6 of 8
Revised 06/10/96
/,Urban Arterial Trust Account (UATA)
Urban Design Prospectus
Proposed Project Schedule
Design Phase
TIB Design Phase Approval ................................................................... 5 / 97
Local and/or Private Funding Certification ............................................. 5 / 97
Meeting With Utilities .............................................................................. 8 / 97
Utility and/or Railroad Agreements
Type of Environmenta~ Document ................................................ ~ ......... DNa;
(ELS, CE, FA, Declaration of Non-Significance, Air Quality Conformity)
Value Engineering Study (If Required) ................................................. N/A
Draft Environmental Document Circulated ............................................ 10 / 97
Public Involvement Process .................................................................. 8 / 97
Final Environmental Document Circulated ............................................ 12 / 97
Right of Way Plans Completed .............................................................
Number of Parcels Involving Major Impact ............................................
Number of Parcels Involving Minor Impact ............................................ -
Parcel Appraisal Completed .................................................................
Parcel Negotiation Completed ..............................................................
Condemnation Ordinance(If Needed) ................................................... --
Right of Way Acquisition Completed ..................................................... -
Construction Phase
TIB Construction Phase Approval ........................................... i ............. 5 / 98
Contract Advertisement ........................................................................ 5 / 98
Contract Award ..................................................................................... 6 / 98
Contract Completed ............................................................................... 12 / 90
Month/Year
Month/Year
Month/Year
Month/year
Month/year
Month/year
Month/Year
Month/Year
Month/year
Month/Year
Month/Year
Month/Year
Month/Year
Month/Year
Month/Year-
Month/Year
Month/Year
TIB Form 190-030
Revised 06/10~96
Page 7 of 8
/4Jrban Arterial Trust Acc.ount (UATA)
Urban Design Prospectus
AGENCY CERTIFICATION
Certification is hereby given that Local and/or Private Matching Funds and Other Funds
associated with the D_eosJ_~ of the project are available to coordinate with the proposed
project development.
[] YES [] NO
Certification is hereby given that Local and/or Private Matching Funds and Other Funds
associated with the Total Pro!act are available to coordinate with the proposed project
development.
I~ YES [] NO
NOTE
Attach executed agreements with Joint Agencies and/or Private Sources for Projects that contain
funding from sources other than the Lead Agency.
If Local Matching Funds cannot be certified at this time, the Lead Agency has one year after Board
Approval of this prospectus, to provide written certification of the pledged Local and/or Private
Funding.
If the project is within a non-attainment area, the Lead Agency certifies compliance with all
requirements of the State and Federal Clean Air Act.
All right of way required for this project shall be acquired in accordance with WAC chapter 468-
100.
The Agency certifies that the project is consistent with the Growth Management Act, High
Capacity Transportation Act, Commute Trip Reduction Law, Transportation Demand
Management Programs, Americans with Disabilities Act, where applicable.
This Project has been reviewed by the Legislative Body of the Administering Agency or its
designee, and is consistent with the Agency Comprehensive Plan for Community Development.
[/ ~ead Agency
Signature of Authorized Agent
Si~ned
TIB Form 190-030
Revised 06/10/96
Page 8 of 8
PflOdEC~T
LOCATION
..... ~...?.... ....
'A' ST~W'
(l=r'c~n WEST MA~N to ~-d ~ ~'W)
¥3~¥
h
~ z
--
z
~ OO
mo
~Z
oZ
~OZ
APPROVI~D BY CI'Pf EN~INI[~I~ DATE COMMERCIAL & INDUSTRIAL
STREET SECTION
CITY OF AUBURN~ WASHINGTON - DEPAETM£NT OF PUBLIC WORKS SPECIAL DETAIL - "A" ST SW
Urban Arterial Trust Account (UA TA)
Project Agreement for Design Proposal
Lead Agency
City of Auburn
Project Number
8-'1-105(026)-1
Project Title and Description
Authority Number
A Street SW
3rd Street SW to Main Street
97200381
Total Amount Authorized
$103,600
Autherization to Proceed Effective From
June 24, '1997
IN CONSIDERATION of the allocation by the Transportation Improvement Board of Urban Arterial Trust Account (UATA) funds to the proiect
and in the amount set out above, the agency hereby agrees that as condition precedent to payment of any UATA funds allocated at any time
to the above referenced project; it accepts and will comply with the terms of this agreement, including the terms and conditions set forth in
RCW 47,26; the applicable ruJes and regulations of the Transportation Improvement Board, and all representations made to the
Transportation improvement Board upon which the fund allocation was based; all of which are familiar to and within the knowledge of the
agency and incorporated herein and made a part of this agreement, although not attached. The officer of the agency(les), by the signature(s)
below, hereby certifies on behalf of the agency that local matching funds and ether funds represented te be committed to the project will be
available as necessary to implement the projected developmect of the project as set forth in the DESIGN proposal prospectus, acknowledges
that funds hereby authorized are for the development of the construction proposal as defined by Chapter 126, Laws of 1973, 1st Ex. Sess.,
and is subject to immediate cancellation by the Transportation improvement Board if the project's development is delayed in relation to the
schedule presented to, and accepted by, the Board at the time of project authorization.
Projects in cieen air non-attainmeet areas are subject to air quality conformity requirements as specified in RCW 70.94. The lead agency
certifies that the project meets all applicable Clean Air Act requirements.
IN CONSIDERATION of the promises and performance of the stated conditions by the agency, the Transportation improvement Board hereby
agrees to pay the agency from UATA funds allocated, and not otherwise, for its eligible costs during the ensuing quarter year not to exceed
the amount specified. Such obligation to pay UATA funds extends only to project cost incurred after the date of the Board's alfucation funds
and authodzatlon to proceed with the project except as provided by the Board rules on projects that require a value engineering study pdor to
approval of the design proposal prospectus.
Lead Agency
Signature of Ma~od Chairman Date
Transportation Improvement Board
~" - . 7/~'/~:~
TIB Form 1904728
Revised 01/97