ORDINANCE NO. 4982
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, AUTHORIZING THE ACCEPTANCE OF A GRANT FROM THE
TRANSPORTATION IMPROVEMENT BOARD FOR THE CONSTRUCTION OF
CERTAIN ELEMENTS OF THE AUBURN TRANSIT CENTER.
WHEREAS, the City Council of the City of Auburn must
adopt and approve all appropriations by Ordinance pursuant to
Chapter 35A.33 RCW; and
NOW, THEREFORE, THE CITY COD-NCIL OF THE CITY OF AUBURN,
WASHINGTON, DO ORDAIN AS FOLLOWS:
~ Pursuant to Chapter 35A.33 RCW, the City
Council hereby approves expenditure and appropriation of a
grant from the Transportation Improvement Board (TIB) which
will be used for the construction of certain elements of the
Auburn Transit Center, in the amount of $1,999,980 with
$10,300,200 matching funds from the Regional Transit Authority
and King County Department of Transportation and authorizes
the Mayor to execute an Urban Design Prospectus between the
City and the Transportation Improvement Board, a copy of which
is attached hereto as Exhibit "A" and is incorporated herein
by reference.
Ordinance NO. 4982
June 5, 1997
Page 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
~ The Mayor is hereby authorized to implement
such administrative procedures as may be necessary to carry
out the directions of this legislation.
~ This Ordinance shall take effect and be in
force five (5) days from and after its passage, approval and
publication, as provided by law.
ATTEST:
Robin Wohlhueter,
City Clerk
Michael J. Reynolds,
City Attorney
Published:
t ,!
Ordinance No. 4982
June 5, 1997
Page 2
9P-105(003)-1
Transportation improvement Account (TIA) TIB, Proje,~ Number
Urban Design Prospectus
General Information
Lead Agency Legislative District
City of Auburn 31
Project Name & Termini Length in Miles
Auburn Transit Hub N/A
Functional Classification Federal Route Number
(Entire project must be on the Statewide Functional Classification System)
N/A
Principal __ Minor __ Collector
Contact Person and address Telephone Number
Jack Locke, 25 West Main Street, Auburn, WA 98001 (253) 804-50711
Description of Proposed Improvements
· Attach a legible vicinity map (8.5" xl 1").
· Attach a sketch of the proposed roadway section (8.5" x 11"), right of way to right of way, conforming to applicable
design standards.
· Attach a copy of the current agency-approved Transportation Improvement Program and/or Transportation Plan. This
project must be included in the approved Transportation Improvement Program and/or approved Transportation Plan.
· Describe the type of work planned for this proiect in the space below. How will it improve the existing conditions, if
Necessary, attach additional sheets.
· If the project includes signalization, list the warrant(s) the signal(s) meet.
· Identify and estimate costs of sound walls, wetland mitigation, hazardous material cleanup & other unusual mitigation
items.
Following is a description of improvements that will be developed by the participating agencies: RTA, KC DOT,
and City of Auburn:
· Structured parking area
· Bus hub parking area
· Rail station area
· South parking lot
· Restrooms/pavilion
· Grade separated pedestrian crossing
· Off-site traffic mitigation costs
· Main StreetJC Street improvements
Exhibit "^' - Ordinance No. 4982
TIB Form 190-052 Adopted: June 16, 1997 Page I of;'
Revised 05/96
Transportation Improvement Account (TIA)
Urban Design Prospectus ,
Project Cost Estimate
= Round all figures to the nearest dollar~
Environmental Studies Design Study Total
Predesign Phase Predesign Cost
(Complete Only if Predesign Phase was aplxoved by the TIB)
Design Phase Special Studies~ Design Engineering Right of Way Total
Design Cost
50,000 1,440,000 2,000,000 3,490,000
Contract Amount Other 2 Construction Total
Construction Phase Engineering Construction Cost
8,233,~45 576,355 8,810,000
TOTAL PROJECT COST 12,3oo,0o0
1. Value Engineering, Environmental, or Other Special Studies.
2. Work performed by the local agencies own forces and/or negotiated contracts with Utilities & Railroads (Identify work).
3. Use Local Matching Ratio used for the application. If the Total Project Cost has increased, use the Local Match Funds determined
from page 3 for the entry on this line.
A. TOTAL ENGINEERING (Design Engineering + Construction Engineering) ........... 2.016.355
B. MAXIMUM ELIGIBLE ENGINEERING (25% x Contract Amount) ........................... 2.058.411
C. NON-ELIGIBLE ENGINEERING COSTS (A - B) (if less than 0, enter 0) ...............
D. TOTAL ELIGIBLE PROJECT COSTS (Total project Cost - C) ............................... 12.300,000
E. LOCAL MATCHING FUNDS [(Local Matching Ratio3 x D) + C] .............................. 10.300.020
F. TIA FUNDS (Total Project Cost - E) ........................................................................ 1.999.980
G. TIA FUNDS LISTED WHEN PROJECT WAS SELECTED FOR FUNDING ...........
H. BALANCE (G - F) (Surplus is +, Deficit is - ) ........................................................... +20
Exhibit "A" - Ordinance No. 4982
TIB Form190-052 Adopted: June 16, 1997 Page2of7
Revised 05/96
Transportation Improvement Account (TIA)
Urban Design Prospectus'
Project Funding Analysis
· Round all figures to the nearest dollar
· Use ACTUAL Predesign Phase Funds when calculating Estimated Total Project Cost
· Shaded Areas forTIB Use Only
Predesign Phase Cost
Environmental Total
Study Design Study Total Predesign Predesign Predesign Cost
TIA Funds TIA Funds TIA Funds Local Funds (TIA & Local)
Approved
Actual Required
Estimated Design Phase Cost
Total
Special Studies Design Engineering Right of Way Total Design Design Design Cost
TIA Funds TI,a, Funds TIA Funds TIA Funds Local Funds (TIA & Local)
8,130 234,144 325,200 567,474 2,922,526 3,490,000
Estimated Construction Phase Cost
Construction Construction Construction Total Total Construction
Contract Other Engineering Construction Construction Cost
TIA Funds TIA Funds TIA funds TIA Funds Local Funds (TIA & Local)
1,338,791 93~715 1,432,506 7,377,494 8,810,000
Estimated Total Project Cost
Total Predesign Total Total Total Total Total
TIA Funds Design Construction Project Local Funds Project Cost
TIA Funds TIA Funds TIA Funds (TIA & Local)
567,474 1,432,506 1,999,980 10,300,020 12,300,000
Exhibit "A" - Ordinance No. 4982
Adopted: June 16, 1997
TIE} Form 190-052 Page 3 of 7
Revised 05/96
Tr,~nsportetion Improvement Account (TIA)
Urban Design Prospectus'
Funding Sources
Local match is considered to be eligible in-kind contributions and all funds other that Transportation Irnprovement Account
(TIA) funds or Urban Arterial Trust Account (TIA) funds. The local matching ratio may not be less than that shown on the
application. List all funding sources, private or public entity, and the amount of funds pledged.
Source Private or Public AmOunt of FUnds
RTA Public 8,700,000
KC DOT Public 1,600,000
$10,300,000
List all agencies and/or private groups involved in the project. Descdbe their involvement.
List all agencies and/or private groups involved in the project. Describe their involvement.
RTA will be the primary sponsor of the project and will be responsible for construction and operation of the
commuter rail station and major project elements,
King County DOT will fund and operate the major portion of the bus hub and the bus hub portion of the project.
City of Auburn, using TIA funds, will assist in the construction of parking, street improvements adjacent to the
transit center, and other off-site improvements as required.
Preliminary elemental design and budgets have been prepared to ensure that available funds can construct a
complete transit center. Final distribution of funds and pementage of participation by agencies in the various
cost elements will be determined prior to the beginning of construction phase. Auburn's TIA grant elemental
participation will be submitted prior to request for design funds.
Exhibit "A" - Ordinance No. 4982
TIB Form190-052 Adopted: June 16, '1997 Page4of7
Revised 05~96
Transportation Improvement Account (TIA)
Urban Design Prospectus'
Demand for TIA Funds
L st demand fo~T A FUndS n s X m0nih ncrements JanuarY t~ J~ and~U Yto Decemberi I~clude predesign
i
Funds in ~he DeS gn p~ase co umn. .
Time Period Design Phase Right of Way Construction Total TIA Funds
July-Dec 1997 65,400 65,400
Jan-June 1998 84,800 84,800
July-Dec 1998 92,074 200,000 292,074
Jan-June 1999 125,200 1,000,000 1,125,200
July-Dec 1999 432,506 432,506
TOTAL 242,274 325,200 1,432,506 1,999,980
Exhibit "A" - Ordinance No. 4982
TIB Form190-052 Adopted: June 16, 1997 Page5of7
Revised 05/96
Transportation Improvement ,A~ount (TIA)
Urban Design Prospectus'
Proposed Project Schedule
Design Phase
TIB Design Phase Approval ................................................................... June 1997
Local and/or Private Funding Certification ............................................. July 1997
Meeting with Utilities ..............................................................................
Utility and/or Railroad Agreements .........................
Type of Environmental Involvement .................
(ELS, CE, EA, Declaration of Non-Significance, Air Quality Conformity)
Value Engineering Study (If Required) ..................................................... June 1998
Draft Environmental Document Circulated.
Public Involvement Process ................................................................... July 1997
Final Environmental Document Circulated .............................................
Right of Plans Completed .......................................................................
Parcels Involving Major Impact ............................................................... 4
Parcels Involving Minor Impact ...............................................................
Parcel Appraisal Completed ................................................................... July 1997
Parcel Negotiation Completed ................................................................ October 1997
Condemnation Ordinance(If Needed) ....................................................
Right of Way Acquisition Completed ....................................................... November 1998
Month/Year
Month/Year
Month/Year
Month/Year
_Type
Month/Year
Month/Year
Month/Year
Month/Year
Month/Year
Number
Number
Month/Year
Month/Year
Month/Year
Month/Year
Construction Phase
TIB Construction Phase Approval ............................................................ Janua~ 1999
Contract Advertisement ........................................................................... March 1999
Contract Award ........................................................................................ ADri11999
Contract Completed ................................................................................. December 1999
Month/Year
Month/Year
Month/Year
Month/Year
TIB
Form 190-052
Revised 05/96
Exhibit "A" - Ordinance No. 4982
Adopted: June 16, 1997
Page § of 7
Transportation Improvement Account (TIA)
Urban Design Prospectus ·
AGENCY CERTIFICATION
Certification is hereby given that Local and/or Private Matching Funds and Other Funds associated
with the Design Phase of the project are available to coordinate with the proposed project
development
LYES [] NO
Certification is hereby given that Local and/or Private Matching Funds and Other Funds associated
with the Total Project are available to coordinate with the proposed project development
~YES [] NO
Attach executed agreements with Joint Agencies and/or Private Sources for Projects that contain
funding from sources other than the Lead Agency.
If Local Matching Funds cannot be certified at this time, the Lead Agency has one !/ear after Board
Approval of this prospectus, to provide written certification of the pledged Local and/or Private
Funding.
If the project is within a non-attainment area, the Lead Agency certifies compliance with all
requirements of the State and Federal Clean Air Act.
All right of way required for this project shall be acquired in accordance with WAC chapter 468-100.
The Agency certifies that the project is consistent with Growth Management Act, High Capacity
Transportation Act, Commute Trip Reduction Law, Transportation Demand Management Programs,
and Americans with Disabilities Act requirements, where applicable.
This Project has been reviewed by the Legislative Body of the Administering Agency or its Designee,
and is consistent with the Agency Comprehensive Plan for Community Development.
_ . /Le~l/Agenc~-
Signature of Mayor/Director
Date/Signed
TIB
Form 190-052
Revised 05/96
Exhibit "A" - Ordinance No. 4982
Adopted: June 16, 1997
Page 7 of 7
CITY OF AUBURN
Public Works
Engineering Division
~USTR/A~
Exhibit "A" - Ordinance No. 4982
Adopted: June 16, 1997
~."~. ~ .-' 2_ ~..'. ........ :%...~' :
.~-= ~ , ~_: . = := ~..-_..: ::~ ~"
~-,~:.~._._~ :,. .
'"':" : -'. " ~ '"
· ¢,' _;-...,.. .~_~ ' . .~': .
"'~ ~ X~. ..... ':.:---:,'" '
I
~...~-
"~ ~-i' * ~ , " k """~
:~. ~.~.. _: ~ · ~ _ .. ......... .
i - = ~: - { · ' -~ ' :~ ':'. ~{-*~"
:t i AUBU~ T~SIT HUB .... ~---: ~: , ,'