Loading...
HomeMy WebLinkAbout6212 Policy-Text Amendment #5 POLICYfTEXT AMENDMENT #5 Incorporate the City of Auburn's Six Year Capital Facilities, 2009-2014, as an element of the City of Auburn Comprehensive Plan City ofAuburn Draft Capital Facilities Plan • ~k * CITY OF ~ ~ * WASHINGT(JN DRAFT CAPITAL FACILITIES PLAN (2009 - 2014) ~ Adopted by Ordinance No.xxx, , 2008 as part of the City of Auburn Comprehensive Plan City of Auburn 25 West Main Auburn, WA 98001 (253) 931-3000 • www.auburnwa.gov City ofAuburn Draft Capital Facilities Plan • Cl Y OF ~ . ~ ~ MORE THAN YOtJ IMAGINED ~ City ofAuburn Draft Capital Facilities Plan • CAPITAL FACILITIES PLAN 2009 - 2014 TABLE OF CONTENTS Executive Summary 1 1. Introduction Purpose 7 Statutory Requirement for Capital Facilities Elements 7 Concurrency and Level of Service 8 Implementation 8 2. Goals and Policies 1. Capital Facilities Response to Growth ...............................................................................11 2. Financial Feasibility ...........................................................................................................11 3. Public Health and Environment .................................................................................13 4. Consistency With Regional Planning ...............................................:.................................13 • 3. Capitallmprovements Introduction .............................................................................................................................15 Transportation ................................................................................_........................................17 Arterial Street (102) Capital Facilities Projects ...................................................................28 Local Street (103) Capital Facilities Projects ...:.................................................................61 Street Fund (105) Capital Facilities Projects ..........................:...........................................63 Water ......................................................................................................................................67 Sanitary Sewer ........................................................................................................................99 Storm Drainage .......................................................................................................................121 Solid Waste ..............................:..............................................................................................155 Parks and Recreation ..............................................................................................................157 General Municipal Buildings ....................................................................................................195 Community Improvements .......................................................................................................203 Airport .....................................................................................................................................213 Cemetery ................................................................................................................................223 Golf Course .............................................................................................................................227 Police Department ...................................................................................................................231 Valley Regional Fire Authority .................................................................................................233 . City ofAuburn Draft Capital Facilities Plan • CITY OF ~ ~ ~ CvIORE THAN YC)t1 IMAG I N ED ~ City ofAuburn Draft Capital Facilities Plan ~ CITY OF ~ WASHINGTCJN DRAFT CAPITAL FACILITIES PLAN • (2009 - 2014) Adopted by Ordinance No.xxx, , 2008 as part of the City of Auburn Comprehensive Plan City of Auburn 25 West Main Auburn, WA 98001 • (253) 931-3000 www.auburnwa.gov City ofAuburn Draft Capital Facilities Plan ~ , CI~~ ~ • BUI?,6.-N ~ MORE TN_AN ,YOU IMAGINED ~ City ofAuburn Draft Capital Facilities Plan • CAPITAL FACILITIES PLAN 2009 - 2014 TABLE OF CONTENTS Executive Summary 1 1. Introduction Purpose 7 Statutory Requirement for Capital Facilities Elements 7 Concurrency and Level of Service 8 Implementation 8 2. Goals and Policies 1. Capital Facilities Response to Growth ...............................................................................11 2. Financial Feasibility ...........................................................................................................11 3. Public Health and Environment ..................................................•---...................................13 4. Consistency With Regional Planning .................................................................................13 • 3. Capitallmprovements Introduction .............................................................................................................................15 Transportation .........................................................................................................................17 Arterial Street (102) Capital Facilities Projects ...................................................................22 Local Street (103) Capital Facilities Projects .....................................................................55 Street Fund (105) Capital Facilities Projects ......................................................................57 Water ......................................................................................................................................61 Sanitary Sewer ........................................................................................................................93 Storm Drainage .......................................................................................................................115 Solid Waste .............................................................................................................................149 Parks and Recreation ..............................................................................................................151 General Municipal Buildings ....................................................................................................189 Community Improvements .......................................................................................................197 Airport .....................................................................................................................................207 Cemetery ................................................................................................................................217 Golf Course .............................................................................................................................220 Police Department ...................................................................................................................225 Valley Regional Fire Authority .................................................................................................227 0 City ofAuburn Draft Capital Facilities Plan • CITY F : , x . . .e.~~ ~ ~ MORE TH AN YOLJ I1vlAGI NED ~ City ofAuburn Draft Capital Facilities Plan ~ EXECUTIVE SUMMARY A capital facilities element is one of the comprehensive plan elements required by Washington's Growth Management Act (GMA). Capital facilities generally have long useful lives, significant costs and tend not to be mobile. The GMA requires that capital facilities elements include an inventory of existing capital facilities (showing locations and capacities), a forecast of future needs for such capital facilities, proposed locations and capacities of new or expanded capital facilities and at least a six-year plan to finance capital facilities with identified sources of funding. The GMA also requires that the land use element be reassessed if probable funding falls short of existing needs. This document is the City's six-year Capital Facilities Plan (CFP). The CFP, in conjunction with other City adopted documents, satisfies the GMA requirement for a Capital Facilities Element. It addresses one of the GMA's basic tenets, that is, the provision of adequate facilities to support development in accordance with locally adopted level of service standards. This CFP will enable the City to: (1) Make informed decisions about its investment of public • dollars, and (2) Make timely decisions about maintaining level of service in accordance with this CFP and other adopted plans. CAPITAL FACILITIES PLAN CONTENT This CFP consists of the following: Chapter 1. Introduction Purpose of CFP, statutory requirements, methodology. Chapter 2. Goals and Policies Goals and Policies related to the provision of capital facilities. Chapter 3. Capital Improvements Proposed capital projects, which include the financing plan and reconciliation of project capacity to level of service (LOS) standards. This CFP is a companion document to the Capital Facilities Element of the Auburn Comprehensive Plan (Chapter 5). The Capital Facilities Element of the Auburn Comprehensive Plan identifies the City's planning approach and policy framework for the provision of capital facilities. This CFP provides the background inventory, identifies proposed projects and establishes the six-year capital facilities plan for financing capital facilities. • 1 City ofAuburn Draft Capital Facilities Plan ~ GROWTH ASSUMPTIONS In planning for capital facilities, contemplation of future growth needs to be considered. The CFP is based on the following City population forecast: Year Population 2007 50,470 2008 67,005 2014 75,430 The population forecasts are based on information from the State of Washington Office of Financial Management (OFM) as well as estimates developed by the City of Auburn Planning and Community Development Department. CAPITAL COSTS OF FACILITIES Based on the analysis of capital improvements contained in this document, the cost of City- owned and managed capital improvements for 2009-2014 is summarized as follows: • T e of Facilit 2009 - 2014 Transportation - Arterial (102) $ 93,065,000 Transportation - Local (103) 13,200,000 Transportation - Street (105) 9,000,000 Water 56, 759,000 Sanitary Sewer 20,577,000 Storm Drainage 21,510,000 Parks & Recreation 26,080,600 General Municipal Buildings 1,950,000 Community Improvements 5,940,000 Airport 4,062,900 Cemetery 85,000 Golf Course 350,000 Total $ 252,579,500 • 2 City ofAuburn Draft Capital Facilities Plan ~ FINANCING FOR CAPITAL FACILITIES The financing plan for the citywide capital improvements includes: Fundin Source 2009 - 2014 Ca ital Facilit Grants 3,005,900 Airport 3,825,000 Parks & Recreation 62,304,400 Transportation User Fees / Fund Balance 1,057,000 Airport 85,000 Cemetery 550,000 Equipment Rental 20,577,000 Sewer 21,510,000 Storm Drainage . 23,459,000 Water Arterial Street Fund 4,245,500 Trans ortation Bond Proceeds 32,300,000 Water 9,544,700 Parks & Recreation 350,000 Golf Course General Fund 3,400,000 Community Improvements Municipal Parks Fund 1,811,200 Parks & Recreation Cumulative Reserve Fund 488,000 Parks & Recreation • Public Works Trust Fund 1,000,000 W ater 1,720,000 Transportation Propert Tax 13,200,000 Transportation Utility Tax 9,000,000 Transportation Miti ation/Impact Fees 9,464,400 Transportation - REET1 700,000 General Municipal Buildings 4,330,800 Parks & Recreation Community Improvements REET2 1,340,000 Communit Improvements Other Sources 6,080,900 Parks & Recreation 700,000 General Municipal Buildings 1,200,000 Community Improvements 15,330,700 Transportation Total $ 252,579,500 • 3 City ofAuburn Draft Capital Facilities Plan SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS The forecasted impacts of new capital facilities on the City's future operatin bud ets 2010-2015 ~ 9 9 ~ ) are as follows: Bud et Year: 2010 2011 2012 2013 2014 2015 Total 1 Transportation $ 11,346 $ 12,900 $ 43,315 $ 49,085 $ 102,536 $ 118,510 $ 337,692 2 Water - - - - 1,200 1,200 2,400 3 Sanitary Sewer - - - _ _ _ _ 4 Storm Drainage - - - - 2,000 2,000 4,000 5 Solid Waste - - - - _ _ _ 6 Parks and Recreation 6,000 12,000 12,000 30,000 32,000 32,000 124,000 7 Genera/ Municipal Buildings - - - - - - _ 8 Community Improvements - - - - - _ _ 9 Airport - 6,800 12,800 12,800 12,800 12,800 58,000 10 Cemetery - - - - _ _ _ 11 Go/f Course - - - - - _ _ 12 Senior Center - - - - _ _ _ • 13 Police Department - - - - - _ _ 14 Fire Department - - - - - - _ Total $ 17,346 $ 31,700 $ 68,115 $ 91,885 $ 150,536 $ 166,510 $ 526,092 . 4 City ofAuburn Draft Capital Facilities Plan . LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP Based on the proposed six-year capital projects and the projected population increase of 8,425 (12.57%), the LOS for the following City-owned public facilities will change as follows: The LOS for the following facilities will be increased as a result of the CFP. CAPITAL FACILITY LOS UNITS 2008 LOS CFP LOS Cemetery Burial P/ots per 1,000 Pop. 47.31 58.45 Communit Center Sq. Ft. per 1,000 Pop. - 464.00 General Municipal8ui/dings Sq. Ft. per 1,000 Pop. 2,743.11 2,900.91 The LOS for the following facilities will be maintained as a result of the CFP. CAPITAL FACILITY LOS UNITS 2008 LOS CFP LOS Roads Volume/Capacity Rafio "D" "D" Airport % Air Operations Support 100% 100% Sanitary Sewer Residential GPCPD (Note 1) 158.00 158.00 Storm Drainage N/A Water Residenfial GPCPD (Note 1) 236.00 23600 Community Center Sq. Ft. per 1,000 Pop. - 464.00 Note 1: GPCPD = Gallons per Customer per Day • The LOS for the following facilities will be reduced as a result of the CFP. CAPITAL FACiLITY LOS UNITS 2008 LOS CFP LOS Neighborhood Parks Acres per 1,000 Pop. 0.81 0.73 Community Parks Acres per 1,000 Pop. 3.41 3.13 Linear Parks Acres per 1,000 Pop. 0.47 0.42 Open Space Acres per 1,000 Pop. 2.97 2.64 Special Use Areas Acres per 1,000 Pop. 0.81 0.72 Golf Course Acres per 1,000 Pop. 0.27 0.24 Fire Protection Apparatus per 1,000 Pop. 0.15 0.13 City Jail Beds per 1,000 Pop. 0.81 0.72 Senior Center Sq. Ft. per 1,000 Pop. 188.03 167.04 As indicated in the chart above, a significant increase in population without a corresponding increase in the unit of ineasure (square footage, acreage, etc.), will naturally result in a reduced level of service. In some cases, the unit of ineasure will remain constant, but a greater number of people will be accessing the property resulting in a reduced level of service. For example, a park's acreage remains constant, but increased population brings more people to that park. On the other hand, other facilities such as buildings may be remodeled or expanded to keep pace with population growth. This would prevent or • minimize the reduced level of service. The impact of population growth to the level of service for facilities will vary depending on the type of facility and long range planning by the City. 5 City ofAuburn Draft Capital Facilities Plan CFP ELEMENT SOURCE DOCUMENTS ~ Documents used in preparing this Capital Facilities Plan (CFP) are principally the master plans for the various public facilities included in this CFP. These individual master plans provide detailed identification of projects and identify their (projects) proposed funding sources. City documents include: • City-wide Comprehensive Land Use Plan (2003); • City Municipal Airport Master Plan Update (2001-2020); • City Comprehensive Water Plan (2001); • City Comprehensive Transportation Plan (1997) and Six Year Transportation Improvement Program (2009-2014); • City Comprehensive Drainage Plan (2002); • City Comprehensive Sewer Plan (2001); • City 2009-10 Biennial Budget and 2007 Annual Financial Report; and, • Master plan update for parks, as well as numerous other planning and financial documents. All documents are available for public inspection at the City of Auburn. • • 6 City ofAuburn Draft Capital Facilities Plan • CHAPTER 1 INTRODUCTION PURPOSE The Capital Facilities Plan (CFP) is a 6-year plan (2009-2014) for capital improvements that support the City of Auburn's current and future growth. In this plan, funding for general government projects is identified. To maintain consistency with individual master and utility comprehensive plans, applicable projects in the 6-year window of those master/utility plans are included in this CFP. The CFP also identifies LOS standards, where applicable, for each public facility. STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS RCW 36.70A.070(3)(d) requires that the comprehensive plan capital facilities element include "a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes." RCW 36.70A.070(3)(e) requires that all capital facilities have "probable funding" to pay for capital facility needs, or else the City must "reassess the land use element." In addition, the capital facilities element must include the location and capacity of existing • facilities, a forecast of future needs, and their proposed locations and capacities. The State Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation facilities, police and fire protection facilities. The GMA also seeks the selection of level of service standards for capital facilities. As a result, public facilities in the CFP should be based on quantifiable, objective measures of capacity such as traffic volume, capacity per mile of road and acres of park per capita. In some instances, though, level of service may best be expressed in terms of qualitative statements of satisfaction with a particular public facility. Factors that influence local level of service standards include, but are not limited to, community goals, national and local standards, and federal and state mandates. To be effective, the CFP must be updated on a regular basis. State GMA guidelines suggest that the CFP be updated at least every two years. In 2007, the City transitioned to a biennial budget. With this in mind, the City will follow these guidelines and update the CFP every two years, incorporating the capital facilities improvements in the City's biennial budget process. • 7 City ofAuburn Draft Capital Facilities Plan CONCURRENCY AND LEVEL OF SERVICE • Concurrency The GMA requires that jurisdictions have certain capital facilities in place or available within a specified time frame when development occurs. This concept is called concurrency. Under the GMA, concurrency is required for transportation facilities, and is recommended by the State for certain other public facilities, namely potable water and sanitary sewer. Concurrency has a direct relationship to level of service. The importance of concurrency to capital facilities planning is that development may be denied if it reduces the level of service for a capital facility below the locally adopted minimum. Explanation of Level of Service As indicated earlier, the GMA requires that level of service be established for certain transportation facilities for the purposes of applying concurrency to development proposals. The State GMA guidelines recommend the adoption of level of service standards for other capital facilities to measure the provision of adequate public facilities. Typically, measures of level of service are expressed as ratios of facility capacity to demand (i.e., actual or potential users). Table 1-1 lists generic examples of level of service measures for some capital facilities: TABLE 1-1 Sample Level of Service Measurements Type of Facility Sample Level of Service Measure • General Municipal8uildings Square feet per 1,000 population Parks Acres per 1,000 population - Roads and Streets Ratio of actual volume to design capacity Sewer/Water Gallons per customer per day The need for capital facilities is largely de#ermined by a community's adopted LOS standards and whether or not the community has formally designated capital facilities, other than transportation, as necessary for development to meet the concurrency test. The CFP itself is therefore largely influenced by the selection of the level of service standards. Level of service standards are measures of the quality of life of the City. The standards should be based on the City's vision of its future and its values. IMPLEMENTATION Implementation of the CFP requires constant monitoring and evaluation. The CFP is sensitive to funding and revenue availability and therefore needs to be constantly monitored against variations in available resources. To facilitate its implementation, the CFP should be kept current. • 8 City ofAuburn Draft Capital Facilities Plan . Update of Capital Facilities Pian Perhaps the most desirable way to keep the CFP current is to update it regularly so the six- year plan is a rolling CFP. Again, the State recommends that the CFP be updated at least biennially. The City of Auburn will seek to update the CFP biennially in conjunction with the budget process. Future updates will consider: A. Revision of population projections, including annexations; B. Update of inventory of public facilities; C. Update of costs of public facilities; D. Update of public facilities requirements analysis (actual level of service compared to adopted standards); E. Update of revenue forecasts; F. Revise and develop capital improvement projects for the next six fiscal years; and, G. Update analysis of financial capacity. Amendments to the CFP, including amendments to level of service standards, capital projects, and/or the financing plan sources of revenue are all actions that can keep the CFP current and relevant to City decision-making. ~ • 9 City ofAuburn Draft Capital Facilities Plan • CITY OF . . . :r • MOR.E THAlal'YOU IMAGINED ~ 10 City ofAuburn Draft Capital Facilities Plan • CHAPTER 2 GOALS AND POLICIES This chapter identifies goals and policies specific to the City's provision of capital facilities. Goal 1 Provide a variety of responses to the demands of growth on public facilities. Policy 1.1 Establish land use patterns that optimize the use of public facilities. Policy 1.2 Provide additional public facility capacity when existing facilities are used to their maximum level of efficiency (consistent with adopted standards for level of service). Policy 1.3 Encourage development where new public facilities can be provided in an efficient manner. Policy 1.4 Exempt the following from the concurrency management program: 1.4.1 Development vested by RCW 19.26.095, 58.17.033 or 58.17.170. 1.4.2 Development that creates no added impact on public facilities. 1.4.3 Expansions of existing development that were disclosed and tested for concurrency as part of the original application. • Goal 2 Provide needed public facilities that are within the ability of the City to fund or within the City's authority to require others to provide. Policy 2.1 Establish level of service standards that are achievable with the financing plan of this Capital Facilities Plan. Policy 2.2 Base the financing plan for public facilities on realistic estimates of current local revenues and external revenues that are reasonably anticipated to be received by the City. Policy 2.3 Match revenue sources to capital projects on the basis of sound fiscal policies. 2.3.1 The City shall continue to fund utility costs through utility enterprise funds, based on user fees and grants. Public facilities included in utilities are sewer, solid waste, storm drainage, and water. 2.3.2 Where feasible pursue joint venture facility construction, construction timing, and other facility coordination measures for City provided facilities, as well as with school districts and other potential partners in developing public facilities. 2.3.3 The City shall continue to assist through direct participation, LIDs and payback agreements, where appropriate and financially feasible. Where funding is available, the City may participate in developer initiated facility extensions or improvements, but only to the extent that the improvements benefit the broader public interest, • and are consistent with the policies of this Capital Facilities Plan. 11 City ofAuburn Draft Capital Facilities Plan Policy 2.4 If the projected funding is inadequate to finance needed public facilities and utilities based on adopted level of service standards and forecasted growth, ~ the City will do one or more of the following to achieve a balance befinreen available revenue and needed public facilities: 2.4.1 Lower the level of service standards; 2.4.2 Increase the amount of revenue from existing sources; 2.4.3 Adopt new sources of revenue; 2.4.4 Require developers to provide such facilities at their own expense; and/or 2.4.5 Amend the Land Use Element to reduce the need for additional public facilities. Policy 2.5 Both existing and future development will pay for the costs of needed capital improvements. 2.5.1 Ensure that existing development pays for capital improvements that reduce or eliminate existing deficiencies, and pays for some or all of the cost to replace obsolete or worn out facilities. Existing development may also pay a portion of the cost of capital improvements needed by future development. Existing development's payments may take the form of user fees, charges for services, special assessments and taxes. 2.5.2 Ensure that future development pays a proportionate share of the cost of new facilities which it requires. Future development may • also pay a portion of the cost to replace obsolete or worn-out facilities. Future development's payments may take the form of voluntary contributions for the benefit of any public facility, impact fees, mitigation payments, capacity fees, dedications of land, . provision of public facilities, and future payments of user's fees, charges for services, special assessments and taxes. Policy 2.6 The City will determine the priority of public facility capital improvements using the following criteria as general guidelines. Any revenue source that cannot be used for the highest priority will be used beginning with the highest priority for which the revenue can legally be expended. 2.6.1 Projects that eliminate hazardous conditions. . 2.6.2 Refurbishment of existing facilities that contribute to achieving or maintaining standards for adopted level of service. 2.6.3 New or expanded facilities that reduce or eliminate deficiencies in level of service for existing demand. 2.6.4 New or expanded facilities that provide the adopted level of service for new development and redevelopment during the next six fiscal years. 2.6.5 Capital improvements that significantly reduce the operating cost of providing a service or facility, or otherwise mitigate impacts of public facilities on future operating budgets. • 12 City ofAuburn Draft Capital Facilities Plan ~ 2.6.6 Capital improvements that contribute to stabilizing and developing the economy of the City. 2.6.7 Project priorities may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility are financially feasibte prior to constructing the facility. Goal 3 Protect public health, environmental quality, and neighborhood stability and viability through the appropriate design and installation of public facilities. Policy 3.1 Promote conservation of energy, water and other natural resources in the location and design of public facilities. Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever combined sewers may be discovered. Policy 3.3 Practice efficient and environmentally responsible maintenance and operating procedures. Policy 3.4 The siting, design, construction and improvement of all public buildings shall be done in full compliance with the Americans with Disabilities Act (ADA). Policy 3.5 Promote economic and community stability and growth through strategic investments in public facilities and public private/partnerships. • Goal 4 Make the Capital Facifities Plan consistent with other elements of the comprehensive plan, and - to the extent feasible - with other city, county, regional and state adopted plans. Policy 4.1 Ensure that the growth and development assumptions used in the Capital Facilities Plan are consistent with similar assumptions in other elements of the comprehensive plan. Policy 4.2 Coordinate with non-city providers of public facilities on a joint program for maintaining applicable level of service standards, concurrency requirements, funding and construction of public facilities. • 13 City of Auburn Draft Capital Facilities Plan ~ w~ I"TY . ' ~ MOOOOFF ~ - ~ M0RE THAN YO'tJ IMAG~INED ~ ~ 14 City ofAuburn Draft Capital Facilities Plan • CHAPTER 3 CAPITAL IMPROVEMENTS 1. INTRODUCTION This CFP includes City capital improvement projects, and the financing plan to pay for those projects. It also contains the inventory of existing City facilities, and identifies level of service standards, where applicable. Each type of City public facility is presented in a separate subsection that follows a standard format. Throughout this section, tables of data are identified with abbreviations that correspond to the type of facility: For example, Table W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds to the name of the type of facility. 1. Narrative Summarv This is an overview of the data, with sections devoted to Current Facilities, Level of Service, Capital Facilities Projects and Financing, and Impact on Future Operating Budgets. 2. Inventorv of Facilities (Table X-1) • This is a list of existing capital facilities, including the name, capacity (for reference to level of service), and location. This table also includes any proposed capital projects and the . planned inventory total as of December 31, 2014. 3. Capital Proiects and Financinq Plan (Table X-2, X-2A and X-213) This is a list of capital improvements that identifies existing deficiencies, identifies facilities needed for future growth, and identifies the repairing or replacing of obsolete or worn out facilities through December 31, 2014. Each list shows the proposed financing plan followed by individual worksheets showing the project detail. 4. Impact on Future Operatinq Budqets (Table X-3) This is a list of new capital projects and the forecasted impacts on the City's future operating budgets (2010 - 2015). • 15 City ofAuburn Draft Capital Facilities Plan • CITY F ~ IRN U MORE THAN YOL1 I MAGINED ~ 16 City ofAuburn Draft Capital Facilities Plan • TRANSPORTATION Current Facilities Roadwavs: The City's roadway system consists of a network of limited access freeways and 216 miles of arterial, collector, alleys and focal streets. Table T-1 "Auburn Corridor Level of Service" includes the most current Level of Service (LOS) of each arterial roadway segment and the most current LOS of each signalized and un-signalized intersection. Transit: Metro and Sound Transit provide transit service to the Auburn area. Auburn is currently served by nine Metro routes, two Metro-operated Sound Transit routes, and one Pierce Transit-operated Sound Transit route. Six park and ride facilities, with a total of 1,127 parking spaces, also serve Auburn. The Sound Transit "Sounder" commuter rail system, running between Tacoma and Seattle, runs through the Auburn station located at 23 A Street SW. The Sounder makes eight stops daily during both the morning and evening commutes, as well as providing limited weekend, holiday and special event schedules. Level of Service (LOS) Washington's Growth Management Act (GMA) requires service level standards for both arterials and transit routes. The GMA requires that each jurisdiction's Level of Service (LOS) standards be coordinated within the region and be supported by local ordinance, but the standards and the • methods used are up to the local jurisdictions. Under GMA, the focus is on the perFormance of the whole road system, not on individual intersections or roadways. Level of service standards are a tool to help keep the transportation system in balance with the needs of future population growth and development. . A methodology and set of standards have been drafted for the City of Auburn Comprehensive Plan. The standards help determine concurrency (i.e., balance) between transportation and land use elements of the City's Comprehensive Plan, as required by GMA. The City has four choices if it finds the standards cannot be met. • Modify the land use plan, placing tighter controls on the amount and type of development to minimize traffic. • Construct additional transportation facilities to support increased travel demand from new development. • Transportation Demand Management (TDM) measures. • Relax the LOS standards. The City can accept lower level of service standards to encourage further growth and minimize the need for additional transportation facilities. • 17 City ofAuburn Draft Capital Facilities Plan The Transportation Land Use Balance will be monitored through the City's Concurrency Management System as part of the State Environmental Policy Act (SEPA). Transportation • concurrency will be evaluated for key facilities and on a system-wide basis. By having system- wide and facility-based roadway LOS standards, the City of Auburn can define preliminary capacity needs. The City and WSDOT can then begin to plan corridor studies that will define the characteristics and location of a particular roadway improvement. At the project level, the State Environmental Policy Act (SEPA) process will continue to guide the more specific planning and analysis efforts. Uses of Level of Service Standards As measures of transportation system effectiveness, level of service standards can help jurisdictions identify where and when transportation impravements are needed, and when development or growth will affect system operation. Level of service provides a standard below which a transportation facility or system is not considered adequate. Level of service standards can be used to evaluate the impact of proposed developments on the surrounding road system. They can assure that all developments are served by a safe, efficient and cost-effective road system. They can also be used to identify problems, suggest remedial actions, and apportion costs between public and private sources. LOS standards are a cornerstone in the development of equitable traffic impact fee systems, which makes development pay some of the costs for improvements to the transportation infrastructure. In July 2001, the City implemented a traffic impact fee. The purpose of the fee is to mitigate traffic impacts more equitably while making the costs of development more predictable to developers. In 2007, the City implemented phase one of a new transportation impact fee to • address the impacts of heavy truck usage on the City's transportation system. The City studied the impacts of truck-dependent land uses and determined that the current transportation impact fees do not fully address the impacts of such uses on the city's truck routes and other truck- - related transportation infrastructure. Measuring Transportation System PerFormance Arterial Corridor Link Level. The level of service for roadway segments or links is analyzed with two primary purposes in mind. First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate areas of congestion within a transportation network--leading to the development of a long-range transportation facilities plan. Traffic forecasts from the model will be analyzed to determine where capacity improvements should be considered. Second, arterial corridor LOS analysis is used to assess concurrency or if facilities are meeting the LOS standards. The City of Auburn uses traditional engineering methodology to assess arteriat corridor LOS. Roadway travel volumes are compared to roadway capacity to develop a ratio known as volume-to-capacity (V/C). The volume-to-capacity ratios relate directly to measure of level of service standards. Table T-2A shows the relationships between LOS, V/C ratios, peak hour, and free flow speed on an arterial. • 18 City ofAuburn Draft Capital Facilities Plan ~ Table T-2a V/C Ratio Ranges as they relate to LOS Volume to Capacity Percent of free-flow speed LOS (ratio range) (peak hour) A .50 and below 90% or greater B .60 to . 69 70% - 90% C .70 to .79 50% D .80 to.89 40% E .90 to.99 30% F 1.00 and above 25% or less There are six levels of service on a scale of A to F. LOS A represents the best operating conditions, and LOS F the worst. The characteristics of the six levels of service are summarized in Table T-2B, below. Table T-2b Definition of Arterial Level of Service (LOS) Level of Service A- describes primarily free flow operations at average travel speeds, usually about 90 percent of the free flow speed for the arterial class. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Stopped delay at signalized intersections is minimal. Level of Service B- represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free flow speed for the arterial class. The ability to maneuver within the traffic stream is only slightly restricted and stopped delays are not bothersome. Drivers are not generally subjected to appreciable tension. Level of Service C- represents stable conditions; however, ability to maneuver and change lanes in mid bock location may be more restricted than in LOS B, and longer queues and/or adverse signal coordination may contribute to lower average travel speeds of about 50 percent of the average free flow speed for the arterial class. Motorists will experience tension while driving. - Level of Service D- borders on a range in which small increases in flow may cause substantial increases in approach delay and, hence, decreases in arterial speed. This may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free flow speed. Level of Service E- characterized by significant approach delays and average travel speeds of one-third the free flow speed or lower. Such operations are caused by some combination of adverse progression, high signal density, extensive queuing at critical intersections, and inappropriate signal timing. Level of Service F- characterizes arterial flow at extremely low speeds below one-third to one-quarter of the free flow speed. Intersection congestion is likely at critical signalized ocations, with resultant high approach delays. Adverse progression is frequently a contributor to this condition. Source: 1985 Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington, D.C. 1985, page 11-4 The LOS scale has been adopted by the Institute of Transportation Engineers, the Transportation Research Board, and by most jurisdictions throughout the country. The scale is also accepted and generally understood by the public and elected officials. ~ 19 City ofAuburn Draft Capital Facilities Plan Levei of Service Standards for Capacitv and Conqestion - The LOS standards shown in Table T-2c apply to the facility's location and its functional classification. Specific details of the level of • service methodology are provided in the City of Auburn Transportation Plan (2007). Table T- 2c Draft Roadway Capacity/Congestion LOS Standards Roadway/lntersection Maximum V/C Ratio/LOS Arterial Corridor (Capacity) "D" for each arterial link, except for collector residentia/ arterials which are "C" Si nalized Intersection "D" Unsignalized Intersection "D" Relationship to Concurrencv Manaqement - Concurrency involves matching public facilities and new development. The GMA extends concurrency to transportation facilities by requiring that new development be served by adequate roads and public transportation service, and that development is not permitted to cause these transportation facilities to operate below level of service standards that are adopted by local governments in their comprehensive plans. Capital Facilities Projects and Financing • The City's transportation facilities include projects totaling $115,265,000. Tables T-2, T-2A and T-213 show the proposed financing plan followed by individual worksheets showing the project detail. - Impact on Future Operating Budgets As Table T-3 shows, operating budget impacts of $337,692 are forecasted for transportation facilities during the six years 2010 - 2015. Concurrency (Adequate Public Facilities) In compliance with the GMA, adequate transportation system facilities must be available within six (6) years of the time of occupancy and use of new development. ~ 20 City ofAuburn Draft Capital Facilities Plan • TABLE T- 1 Auburn Corridor Level of Service . . D • d• i • . d, s 2005 1 Auburn Way North 15th St NE Northern City l.imits D D" 2 Auburn Way North East Main St. 15th St NE E E' 3 Auburn Way South East Main St. "M" St SE E E' 4 Auburn Way South "M" St SE Eastern City Limits E D' 5 M St./Harvey Auburn Way North East Main St. E E* 6 M St./Harvey East Main St Auburn Way South D C' 7 Evergreen Way Lakeland Hilis Way Kersey Way D Future 8 37th St NE/NW West Vailey Hwy "I" St. NE D D* 9 15th St NE/NW West Valley Hwy Auburn Way North F"' F' 10 Auburn Ave /"A" St SR 18 Southern City Limits D C* 11 Main St West Valley Hwy "R" St D B" 12 15th St SW West Valley Hwy "C" St SW D C" 13 "C" St SW Ellingson SR 18 D D' 14 West Valley Hwy Northern Ciiy Limits Southern City Limits E E" 15 S 277th St Frontage Rd. 108th Ave SE E E' 16 "R" St./Kersey Way Auburn Way South/ 17th. St SE Southern City Limits D C" • 17 Lake Tapps Parkway East Valley Hwy. 182nd Ave E D A" 18 "A: St SW/NW/ "B" St NW 4`h St NW S 277th St D B" 19 Sth St NE/Lea Hill Rd. Auburn Way North 132nd Ave SE E E" 20 ~"D" St NW/Emerald Downs Dr S S 277th St 15th St. NW D A" - 21 I"I" St NE S 277th St Harvey Rd D B" 22 ~ 132nd Ave SE SE 282nd St 5E 312th St D B" - 23 1124th Ave SE SE 282nd St SE 320th. St D B*' 24 I104th Ave SE/SE 304th St 8th St NE 132nd Ave SE D C" 25 +105th Place SE/107th Place SE/ Lea Hiil Rd 124th Ave SE D C" ISE 320th St 26 Lakeland Hills Way SE Lake Tapps Parkway Oravetz Rd D B" 27 129th St SE/Riverwalk Dr. A Street SE Auburn Way South D C" - 28 ~ 108th Ave SE/112th Ave. SE S 277th St SE 304th St D B" 29 49th St NW B St NW S 277th St D Future 30 "R" St SE/Auburn Black Diamond Rd 8th St NE SR 18 D B" 31 17th St SE "A" St SE Auburn Way South D D*' 32 41 st St SE/Ellingson Rd "A" St SE Western City Limits E E'" 33 Lakeland Hills Way SE/Oravetz Rd East Valley Hwy. Kersey Way E E" 34 3`d St SW/Cross St "C" Street Auburn Way South D C" Corridor segments within Downtown Auburn may operate at LOS E in accordance with the Auburn Downtown Plan. All other arterial and coilector corridors must operate at LOS D or better, unless otherwise indicated in Table 2-2. *LOS calculated from 2005 traffic counts, using the Highway Capacity Manual methodology. • "LOS estimated using the City's traffic model. Total travel time in the eastbound direction cannot exceed 1000 seconds for this corridor to meet the LOS standard. 21 City ofAuburn Draft Capital Facilities Plan TABLE T- 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING • TRANSPORTATION - ARTERIAL STREET 2009 2010 2011 2012 2013 2014 Total TIP# Caaacitv Proiects: 1 'A' Street NW, Phase 1 Capital Costs 2,350,000 4,643,000 3,192,000 - - - 10,185,000 Funding Sources: Arteriai Street Revenue - - - - - - _ Grants 1,480,000 4,463,000 3,192,000 - - - 9,135,000 Traffic Impact Fees 370,000 180,000 - - - - 550,000 Other (Developer) 500,000 - - - - - 500,000 2 Citywide Intelligent Transportation System Capital Costs 388,600 - - - - - 388,600 Funding Sources: Arterial Street Revenue - - - - - - _ Grants 361,800 - - - - - 361,800 Traffic Mitigation Fees 26,800 - - - - - 26,800 Other - - - _ 4 'I' Street NE Corridor Capital Costs 5,000 5,000 460,000 1,020,000 4,280,000 - 5,770,000 Funding Sources: Arterial Street Revenue - - - - - _ _ Grants - - Traffic Impact Fees 5,000 5,000 - - - - 10,000 Other (Developers) - - 460,000 1,020,000 4,280,000 - 5,760,000 5 'M' Street Grade Separation Capital Costs 527,500 4,572,500 7,627,000 7,866,700 5,150,000 - 25,743,700 Funding Sources: • Arterial Street Revenue - 150,000 - - - - 150,000 Grants - 3,633,500 6,627,000 4,192,100 4,120,000 - 18,572,600 Traffic Impact Fees 527,500 789,000 1,000,000 1,161,400 1,030,000 - 4,507,900 Other (Other Agencies) - - - 2,513,200 - - 2,513,200 6 South 277th-AWN to Green River Bridge Capital Costs - 325,000 2,725,000 - - - 3,050,000 Funding Sources: Arterial Street Revenue - - - _ Grants - - 1,362,500 - - - 1,362,500 Traffic impact Fees - 100,000 - - - - 100,000 Other(Developers) - 225,000 1,362,500 - - - 1,587,500 8 'A' Street NW, Phase 2 Capital Costs - 200,000 1,200,000 1,250,000 - - 2,650,000 Funding Sources Arterial Street Revenue - - - - Grants - - 1,038,000 1,081,300 - - 2,119,300 Traffic Impact Fees - 200,000 162,000 168,700 - - 530,700 Other (Developers) - - - - _ _ _ 9 'D' Street NW, 37th to 44th Capital Costs - - - - 200,000 200,000 400,000 Funding Sources Arterial Street Revenue - - - - - _ _ Grants - - - - 160,000 160,000 320,000 Traffic Impact Fees - - - - 40,000 40,000 80,000 10 'F' Street SE, 4th to AWS Capital Costs 200,000 999,500 - - - - 1,199,500 Funding Sources: Arterial Street Fund - - _ Grants - 780,000 - - - - 780,000 Traffic Impact Fees 200,000 219,500 - - - - 419,500 • 22 City of Auburn Draft Capital Facilities Plan • TABLE T- 2 (continued) 11 'M' Street NE, E. Main to 8th Capital Costs 150,000 - 805,000 1,800,000 - - 2,755,000 Funding Sources: Arterial Street Fund - - - - - - _ Grants - - 644,000 1,500,000 - - 2,144,000 Traffic Impact Fees 150,000 - 161,000 300,000 - - 611,000 12 Grade-Separated Crossing of BNSF Railyard Capital Costs - - - - - 1,000,000 1,000,000 Funding Sources Arterial Street Fund - - - - - - _ Grants - - - - _ _ Other (Developers) - - - - - 1,000,000 1,000,000 13 Kersey Way from Oravetz to the southern Citylimit Capital Costs 200,000 5,000 750,000 1,500,000 11,000,000 - 13,455,000 Funding Sources: Arterial Street Fund - - - - 500,000 - 500,000 Grants - - 625,000 1,200,000 9,000,000 - 10,825,000 Traffic Impact Fees 200,000 5,000 125,000 300,000 1,000,000 - 1,630,000 Other (Developers) - - - - 500,000 - 500,000 15 8th Street NE Widening Capital Costs - - 450,000 1,000,000 - - 1,450,000 Funding Sources: Arterial Street Revenue - - 90,000 200,000 - - 290,000 Grants - - 360,000 800,000 - - 1,160,000 Traffic Impact Fees - - - - - - _ 16 49th Street NE from Auburn Way North to M Street NE Capital Costs - 850,000 1,150,000 - - - 2,000,000 Funding Sources: • Arterial Street Revenue - - - _ Grants Other (Developer) - 850,000 1,150,000 - - - 2,000,000 17 Harvey Rd. 8 8th St. NE Intersection Improvements Capital Costs 1,758,500 - - - - - 1,758,500 Funding Sources: Arterial Street Revenue - - - - - - - Grants - PWTF 1,720,000 - - - - - 1,720,000 Traffic Impact Fees 38,500 - - - - - 38,500 20 Auburn Way South and M Street SE Intersection Improvements Capital Costs 100,000 650,000 - - - - 750,000 Funding Sources: Arterial Street Fund 100,000 - - - - - 100,000 Grants - 520,000 - - - - 520,000 Traffic Mitigation Fees - 130,000 - - - - 130,000 24 Academy Drive Multi-Use Trail Capital Costs - - - 150,000 425,000 425,000 1,000,000 Funding Sources: Arterial Street Fund - - - 150,000 42,500 42,500 235,000 Grants - - - - 382,500 382,500 765,000 Other - - - - _ _ _ 28 Lea Hill Road and 8th Street NE Bridge Widening Study Capital Costs - 200,000 - - - - 200,000 Funding Sources: Arterial Street Fund - - Grants - - _ Traffic Impact Fees - 200,000 - - - - 200,000 Subtotal. Capacitv Proiects: • Capital Costs 5,679,600 12,450,000 18,359,000 14,586,700 21,055,000 1,625,000 73,755,300 23 City of Auburn Draft Capital Facilities Plan TABLE T- 2 (continued) 2009 2010 2011 2012 2013 2014 Total • TIP# Non-Caoacitv Proiects: 3 Aubum Way Corridor Improvements Capital Costs - - 818,700 3,000,000 - - 3,818,700 Funding Sources: Arterial Street Revenue - - 110,000 600,000 - - 710,000 Grants - - 708,700 2,400,000 - - 3,108,700 Other - - - - - _ _ 7 15th St SW Reconstruction Capital Costs - - - 375,000 3,000,000 - 3,375,000 Funding Sources: Arterial Street Fund - - - 75,000 500,000 - 575,000 Grants - - - 300,000 2,500,000 - 2,800,000 Other - - - - - _ 14 West Valley Hwy Improvements Capital Costs 150,000 3,480,000 1,220,000 - - - 4,850,000 Funding Sources: Arterial Street Revenue - - - - - - _ Grants 125,000 2,875,000 - - - - 3,000,000 Traffic Mitigation Fees 25,000 605,000 - - - - 630,000 Other(TBD) - - 1,220,000 - - - 1,220,000 18 8th Street NE/R Street NE Traffic Signal Capital Costs 541,000 - - - - - 541,000 Funding Sources: Arterial Street Fund 400,500 - - - - - 400,500 Grants 140,500 - - - - - 140,500 Other - - _ 19 Auburn Way North / 1st Street NE Signai Improvements Capital Costs - 200,000 - - - - 200,000 Funding Sources: • Arterial Street Fund - 40,000 - - - - 40,000 Grants - 160,000 - - - - 160,000 Other - - _ 21 C Street NW and West Main Street Capital Costs - - - 100,000 500,000 - 600,000 Funding Sources: Arterial Street Fund - - - 20,000 100,000 - 120,000 Grants - - - 80,000 400,000 - 480,000 Other - - - _ _ _ _ 23 BNSF / E. Valley Hwy. Pedestrian Underpass Capital Costs - - - - - 4,800,000 4,800,000 Funding Sources: Arterial Street Fund - - - - - _ . Grants - - - - - 4,550,000 4,550,000 Other (Other Agencies) - - - - - 250,000 250,000 25 R Street Corridor Study Capitai Costs - 50,000 - - - - 50,000 Funding Sources: Arterial Street Fund - 50,000 - - - - 50,000 Grants - - _ Other ~ 24 City ofAuburn Draft Capital Facilities Plan • TABLE T- 2 (continued) 2009 2010 2011 2012 2013 2014 Total TIP# Non-Capacitv Proiects: 27 41st St SE and A Street SE Access Management Study Capital Costs 50,000 - - - - - 50,000 Funding Sources: Arterial Street Fund 50,000 - - - - - 50,000 Grants - - - - - - - Other - - - ' - - " 29 So. 277th, Wetland Mitigation Capital Costs 25,000 25,000 25,000 25,000 25,000 - 125,000 Funding Sources: Arterial Street Fund 25,000 25,000 25,000 25,000 25,000 - 125,000 Grants - - - ' - - " Other - - - ' ' - " i 30 Citywide Pedestrian Crossing Program Capital Costs - 100,000 - 100,000 - 100,000 300,000 Funding Sources: Arterial Street Fund - 100,000 - 100,000 - 100,000 300,000 Grants - - - ' - ' " Other - - - - ' ' 31 Citywide Roadway Safety Infrastructure Improv. Capital Costs 200,000 - 200,000 - 200,000 - 600,000 Funding Sources: Arterial Street Fund 200,000 - 200,000 - 200,000 - 600,000 Grants - - ' ' ' - " • Other - - - - ' ' ' Subtotal, Non-Capacitv Proiects: Capital Costs 966,000 ~ 3,855,000 2,263,700 3,600,000 3,725,000 4,900,000 19,309,700 SUMMARY: CAPITAL COSTS Capacity Projects 5,679,600 12,450,000 18,359,000 14,586,700 21,055,000 1,625,000 73,755,300 Non-Capacity Projects 966,000 3,855,000 2,263,700 3,600,000 3,725,000 4,900,000 19,309,700 Total Costs 6,645,600 16,305,000 20,622,700 18,186,700 24,780,000 6,525,000 93,065,000 FUNDING SOURCES: Arterial Street Fund (102) 775,500 365,000 425,000 1,170,000 1,367,500 142,500 4,245,500 Grants 2,107,300 12,431,500 14,557,200 11,553,400 16,562,500 5,092,500 62,304,400 PWTFL 1,720,000 - - - - - 1,720,000 Traffic Impact Fees 1,491,000 1,698,500 1,448,000 1,930,100 2,070,000 40,000 8,677,600 Traffic Mitigation Fees 51,800 735,000 - - - - 786,800 Other (OtherAgencies) - - - 2,513,200 - 250,000 2,763,200 Other (Developers) 500,000 1,075,000 2,972,500 1,020,000 4,780,000 1,000,000 11,347,500 Other (TBD) - - 1,220,000 - - - 1,220,000 Total Funding 6,645,600 16,305,000 20,622,700 18,186,700 24,780,000 6,52 ,000 93,065,000 ' Mitigatron agreements, impacf fees, contributions, other agencies, other funds • 25 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds i Project Title: A Street NW, Phase 1(3rd St. NW to 14th St. NW) TIP # 1 Project No: C207a0 Project Type: CapaCity Project Manager: Helbig Description: Construct a multi-lane arterial from 3rd St. NW to 14th St. NW. This project will improve mobility and is tied to corridor development. It is consistent with the Comprehensive Plan and contributes to the compfetion of a north/south arteriai corridor. The project length is approximately three-quarters of a mile. The City purchased ROW from the northern property owner. If the property develops, some or a portion of those funds may be reimbursed to the City (total cost was $251,000). Progress Summary: Pre-design was completed prior to 2007. Final design will be completed in 2009 along with the environmental process. it is anticipated that significant ROW purchase will begin in 2009. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $17,568. BUdg@t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget _ Budget Amendmenfs _ Adjusted Budget ACtlVlty: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestrrc[ed Street Revenue 327,424 - - - 327,424 Grants (Fed,State,Local) 220,145 750,000 1,480,000 4,463,000 1,850,145 REET _ _ _ _ _ Traffic lmpacf Fees 378,340 50,000 370,000 180,000 798,340 OtherSources 381,000 - 500,000 881,000 Total Funding Sources: 1,306,909 200,000 2,350,000 4,643,000 3,856,909 Capital Expenditures: Design 666,946 200,000 275,000 80,000 1,147,946 RightofWay 258,963 - 2,075,000 1,371,000 2,333,963 Constiuction 381,000 - 3,192,000 381,000 Total Expenditures: 1,306,909 200,000 2,350,000 4,643,000 3,856,909 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - _ Grants (Fed,Sfate,Local) 3,192,000 - - - 9,135,000 REET - _ Traffic Impact Fees - - - - 550,000 Other Sources - - 500,000 Total Funding Sources: 3,192,000 - - - 10,185,000 Capital Expenditures: Design - - - - 355,000 Right of Way - - - - 3,446,000 Construction 3,192,000 - - 6,384,000 Total Expenditures: 3,192,000 - - - 10,185,000 Grants I Other Sources: Other funds includes developer contributions, ROW dedications, and construction completed by others. Some • of "other" doliars shown never go through the City. Approximately $4 Million of Grants is still unsecured. 26 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Citywide Intelligent Transportation System (ITS) PHASE 2 TIP # 2 Project No: C307b0 Project Type: CapaCity Project Manager: Nutter Description: This project includes interconnect and coordination for traffic signals in the city. The project also includes traffic management cameras, fiber optic interconnect and related hardware along Auburn Way North and So. 277th St. corridors. Other corridors that may be connected as funding allows are 15th Street NE/NW; Harvey Road/M Street and 37th Street NE/NW. This project is the second phase of the Intelligent Transportation System building off of Phase 1, which included SR164 (Auburn Way South). It is important to note that additional staff time outside of regular business hours to monitor traffic on the cameras associated with events at the amphitheater is reimbursed by the Muckleshoot Tribe. Progress Summary: Phase 1 was completed in 2006. Construction wiil be approximately 50% complete by end of 2008. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5000. In addition, staff time will be required upon completion of the project to monitor the system. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget - Budget Amendments - Adjusted Budgef ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) - 350,000 361,800 - 711,800 REET - - - - - Traffic Mitigation Fees - 25,000 26,800 - 51,800 Other Sources 29,977 113,023 - - 143,000 Total Funding Sources: 29,977 488,023 388,600 - 906,600 Capital Expenditures: Design 29,977 113,023 - - 143,000 Right of Way - - - - - Construction 375,000 388,600 - 763,600 Total Expenditures: 29,977 488,023 388,600 - 906,600 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) - - - - 361,800 REET - - - - - Traffic Mitigation Fees - - - - 26,800 Other Sources - - - - - TotalFunding Sources: - - - - 388,600 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 388,600 TotalExpenditures: - - - - 388,600 . Grants / Other Sources: Grant funding is secure and includes federal earmark and CMAQ funding. Other funding is PWTF loan. 27 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: I Street NE Corridor (40th St. NE to 52nd St. NE) TIP # 4 Project No: c415a0 Project Type: CapaCity Project Manager. TBD Description: The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan Environmentai Impact Study. A portion of the ROW and Construction will be developer funded. The cross section will likely be a 5-lane arterial per the city's Comprehensive Plan. The project length is approximately three-quarters of a mile. This project may be split into two phases. Phase 1 would be 40th Street NE to 45th Street NE. Phase 2 would be 45th Street NE to 52nd Street NE (S. 277th Street). Progress Summary: This project is development driven, the project has been delayed due to the delay of the nearby pending development. The City has budget available to coordinate as needed and look for grant funding/partnership opportunities. If grant funds are availabie prior to 2011, a budget amendment will be required to accept the funding. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $17,568. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue 11,827 11,827 Grants (Fed,State,local) _ _ _ REET _ _ _ Tra((ic Impact Fees - - 5,000 5,000 10,000 Other _ Total Funding Sources: 11,827 - 5,000 5,000 21,827 Capital Expenditures: Design 10,957 - 5,000 5,000 15,957 Right o/WaY 870 - - - 870 Construction _ _ _ _ Total Expenditures: 11,827 - 5,000 5,000 16,827 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue _ Grants (Fed, State, Local) REET _ _ _ _ _ Traffic Impact Fees 10,000 Other 460,000 1,020,000 4,280,000 - 5,760,000 Total Funding Sources: 460,000 1,020,000 4,280,000 - 5,770,000 Capital Expenditures: Design 460,000 - - - 470,000 Right of Way - 1.020,000 - - 1,020,000 Construction - - 4,280,000 - 4,280,000 Total Expenditures: 460,000 1,020,000 4,280,000 - 5,770,000 Grants I Other Sources Developer Funding. The City will continue to look for grant funding opportunities. • 28 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Pian, 2009-2014 Special Revenue Funds Project Title: M Street Grade Separation (E. Main to Auburn Way So.) TIP # 5 Project No: C201a0 Project Type: CapaCity Project Manager: JaCOb SWeeting Description: Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks. Project also includes construction of the bypass and road connection between M Street SE and Auburn/Black Diamond Road. Progress Summary: The pre-design has been completed. The full design is beginning in 2008 and wili continue through 2011. Design work includes the lengthy environmental process and coordination with BNSF. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $21,827. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - 150,000 - _ Grants (Fed.State,Local) - 122,500 - 3,633,500 122,500 REET - - - - - Traf(ic Impact Fees 245,309 127,500 527,500 789,000 900,309 Other - - - - Total Funding Sources: 245,309 250,000 527,500 4,572,500 1,022,809 Capital Expenditures Design 245,309 250,000 527,500 1,100,000 1,022,809 Rightof Way - - - 3,472,500 - Construction - - - - Total Expenditures: 245,309 250,000 527,500 4,572,500 1,022,809 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2074 Funding Sources: Unrestricted Street Revenue - - - - 150,000 Grants (Fed,State,local) 6,627,000 4,192,100 4,120,000 - 18,572,600 REET - - - - - Traffic Impact Fees 1,000,000 1,161,400 1,030,000 - 4,507,900 Other - 2,513,200 - 2,513,200 Total Funding Sources: 7,627,000 7,866,700 5,150,000 - 25,743,700 Capital Expenditures: Design 249,700 - - - 1,877,200 Rightof Way 4,635,000 - - - 8,107,500 Construction 2,742,300 7,866,700 5,150,000 - 15,759,000 Total Expenditures: 7,627,000 7,866,700 5,150,000 - 25,743,700 ~ ran s er ources: un ing pa ners inc u e o o ea e, o o acoma. bNbF, FbE, an more. un ing or is projec is on y pa ia y secured. 29 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: South 277th (AWN to Green River Bridge) TIP # 6 Project No: C222a0 Project Type: CapaCity Project Manager: TBD Description: This project includes major widening on S. 277th Street, including the addition of three lanes, one westbound and two eastbound, plus a Class 1 trail. The project length is nine-tenths of a mile. The final configuration wiil include three lanes eastbound and two lanes westbound. Progress Summary: The majority of this roadway is currentiy in City of KenYs jurisdiction. Because the property served from the roadway is in the City of Auburn, the plan is to annex this portion of the roadway from Kent into the Gity of Auburn. The majority of this project is expected to be completed by developers. Future Impact on Operating Budget: Theannual maintenance costs for this project is estimated to be $10,541. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtlVity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue 19,085 - - - 19,085 Grants (Fed, State, Local) - _ REET _ _ Traffic lmpact Fees - - - 100,000 - Other - - - 225,000 - Total Funding Sources: 19,085 - - 325,000 19,085 Capital Expenditures: Design 18,510 - - 325,000 18,510 Right of Way 575 - - - 575 Construction _ Total Expenditures: 19,085 - - 325,000 19,085 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Streef Revenue - _ Grants (Fed,Sfate.local) 1,362,500 - - - 1,362,500 REET - _ Traffic Impact Fees - - - - 100,000 Other 1,362,500 - - - 1,587,500 Total Funding Sources: 2,725,000 - - - 3,050,000 Capital Expenditures: Design - - - - 325,000 Right of Way 318,800 - - - 318,800 Construction 2,406,200 - - - 2,406,200 Total Expenditures: 2,725,000 - - - 3,050,000 Grants / Other Sources: Developer funds or in kind services. The granf funding anticipated is not secured. • 30 City ofAuburn Draft Capital Facilities Plan . ARTERIAL STREET FUND (102) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: A Street NW, Phase 2(W. Main to 3rd St. NW) TIP # 8 Project No: cpxxxx Project Type: CapaCity , Project Manager: TBD Description: Construct a multi-lane arterial from W. Main to 3rd St. NW. This project will connect A Street NW, Phase 1 to the Sound Transit Station and the Central Business District. This project may end up being funded in all or part by developers. The project length is one fifth of a mile. Progress Summary: It is anticipated that the Parking Garage being constructed by the Auburn Regional Medical Center will complete a portion of this project in 2008. Future Impact on Operating Budget: The annual maintenance costforthis project is estimated to be $1,405. Budget: 200e YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments • Adjusted Budget - - - - ACtI V Ity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) - - - - - REET - - - - - Tra(fic /mpact Fees - - - 200,000 - Other 150,000 - - 150,000 Total Funding Sources: - 150,000 - 200,000 150,000 Capital Expenditures: Design - - - 200,000 - Right of Way - - - - - Consfruction 150,000 - - 150,000 Totai Expenditures: - 150,000 - 200,000 150,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) 1,038,000 1,081,300 - - 2,119,300 REET - - - - - Traffic Impact Fees 162,000 168,700 - - 530,700 Other - - - - - Total Funding Source!$: 1,200,000 1,250,000 - - 2,650,000 Capital Expenditures: Design - - - - 200,000 Right o(Way 1,200,000 - - - 1,200,000 Construction 1,250,000 - - 1,250,000 Total Expenditures: 1,200,000 1,250,000 - - 2,650,000 • Grants I Other Sources: Anticipated developer contributions (cash or in kind services). Grant funding shown is unsecured. 31 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capifal Faciiities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds ~ Project Titie: D Street NW (37th St. NW to 44th St. NW) TIP # 9 Project No: Cpxxxx Project Type: Capacity Project Manager: TBD Description: Construct a four-lane arterial per the city Comprehensive Plan. It will improve north/south mobility. This project is tied to potential future development and will complete a major north/south arterial from Ellingson to S. 277th Street. The project length is approximately 0.42 miles. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $14,054. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - Grants (Fed, State, Local) REET Traffic lmpact Fees Other Totai Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted Street Revenue _ _ _ Grants (Fed, State, Local) - - 160,000 160,000 320,000 REET _ _ _ Tra/fic Impacf Fees - - 40,000 40,000 80,000 Other _ Total Funding Sources: - - 200,000 200,000 400,000 Capital Expenditures: Design - - 200,000 200,000 400,000 Right of Way _ _ _ Construction Total Expenditures: - - 200,000 200,000 400,000 Grants / Other Sources: Grant Funding shown is unsecured. • 32 ~ City ofAuburn Draft Capital Facilities Plan• • ARTERIAL STREET FUND (102) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: F Street SE (4th St. SE to Auburn Way So.) TIP # 10 Project No: Cpxxxx Projeet Type: CapaClty Project Manager: TBD Description: The F Street SE project includes pavement reconstruction, installation of curbs, gutters, an 8-foot wide sidewalk on both sides, parking on one side, and a center tum-lane, as well as crash attenuation at the supports for the BNSF railroad bridge. This project improves mobility and safety and provides an altemate route to mitigate traffic impacts during construction of the M Street SE Grade Separation project. The project length is approximately 0.3 miles. The streetscape will match the newly constructed West Main Street and be consistent with improvements already constructed. Progress Summary: This project will be a detour route for the M Street Grade Separation construction and therefore will need to be done prior to the construction of M Street Grade Separation. Future impact on Operating Budget: The annual maintenance cost for this project is estimated to be $851. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendmenfs - • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed,State,local) - - - 780,000 - REET - - - - - Traffic Impact Fees - - 200,000 219,500 200,000 Other - - Total Funding Sources: - - 200,000 999,500 200,000 Capital Expenditures: Design - - 200,000 - 200,000 Right of Way - - - 60,000 - Construction - - - 939,500 - Total Expenditures: - - 200,000 999,500 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed, State, Local) - - - - 780,000 REET - - - - - Traffic Impact Fees - - - - 419,500 Other - - - - - Total Funding Sources: - - - - 1,199,500 Capital Expenditures: Design - - - - 200,000 Right oiWay - - - - 60,000 Construction - - - 939,500 Total Expenditures: - - - - 1,199,500 • Grants / Other Sources: Grant funding is unsecured. 33 City of Auburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: M Street NE (E. Main St. to 8th St. NE) TIP # 11 Project No: Cpxxxx Project Type: CapaCity Project Manager: TBD Description: Widen M Street NE to 4 lanes, install curbs, gutters, sidewalks. The project length is approximately half a mile. The northern , portion (4th Street NE to 8th Street NE) may be accomplished in conjunction with the 8th and Harvey intersection improvement project. Numerous issues are under consideration as part of this study and may include changes to the description as shown. Also, the comprehensive transportation plan update will include additional analysis of this project. Progress Summary: Pre-design wili be done in 2009 to refine project scope, alignment, and cost. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $3,514. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - Grants (Fed, State, Local) REET _ _ _ TraNic Impact Fees - - 150,000 - 150,000 Other - - _ _ Total Funding Sources: - - 150,000 - 150,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - - _ _ _ Construction Total Expenditures: - - 150,000 - 150,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - _ _ Grants (Fed, State, Local) 644,000 1,500,000 - - 2,144,000 REET - _ _ Traffic Impact Fees 161,000 300,000 - - 611,000 Other - _ _ Total Funding Sources: 805,000 1,800,000 - - 2,755,000 Capital Expenditures: Design - - - - 150,000 Right of Way 480,000 - - - 480,000 Construction 325,000 1,800,000 - 2,125,000 Total Expenditures: 805,000 1,800,000 - - 2,755,000 Grants / Other Sources: Grant funding is unsecured. • 34 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Grade-Separated Crossing of BNSF Railyard TIP # 12 Project No: cpxxxx Project Type: Capacity Project Manager: TBD Description: This project consists of a grade-separated crossing of the BNSF Railyard, either from SR-18 to 6th Street SE or from 15th Street SW to A Street SE. The first alternative would entail realigning the SR-18 eastbound ramp, grade separating the main north/south line and the Stampede Pass line, and connecting to 6th Street SE. The second alternative would provide a new corridor from 15th Street SW to A Street SE in the vicinity of 12th Street SE and 17th Street SE, either via an overpass or underpass of the BNSF Railyard. This project improves traffic flow significantly due to the potential development of the BNSF yard as an intermodal freight facility. Progress Summary: Future Impact on Operating Budget: Not scheduled for completion until after 2013. BUdget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance • Adopted Budget = Budget Amendments Adjusted Budget Activity: 2008 YE 2009 Year End Total Project Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total _ Cost Unrestricted Street Revenue - - - - ' - - - - - - - Grants (Fed, State, Local) REET - - - - - ' Traffic Impact Fees - - - - - - Other - - - - - 32,000,000 Total Funding Sources: - - - - - 32,000,000 Capital Expenditures: Design - - - - - 3,500,000 Right of Way - - - - - 4,000,000 Construction - - - 24,500,000 Total Expenditures: • - - - - 32,000,000 Forecasted Project Cost: Total Expenditures 2011 2012 2013 2014 2009-2014 Beyond 2014 Funding Sources Unrestrrcted Street Revenue - - - - - - - - - - ' ' Grants (Fed, State, Local) REET - - - - ' - Traffic Impact Fees - - - - ' - Other - - - 1,000,000 1,000,000 31,000,000 Total Funding Sources: - - - 1,000,000 1,000,000 31,000,000 Capital Expenditures: Design - - - 1,000,000 1,000,000 2,500,000 Right of Way - - - - - 4,000,000 Construction - - 24,500,000 • Total Expenditures: - - - 1,000,000 1,000,000 31,000,000 Grants / Other Sources: 35 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: Kersey Way from Oravetz to the Southern City limit TIP # 13 Project No: Project Type: CapaCity Project Manager: TBD Description: This project will widen the existing roadway from 2 lanes (1 in each direction) to 4 lanes (2 in each direction). The project will also include left turn lanes at intersections and a non-motorized traii on the west side of the roadway. It is necessary to complete a pre- design to determine more accurate cost figures. The project length is approximately two miles. Progress Summary: It is anticipated that a pre-design will begin in the winter of 2008 and then completed in early 2009. The City will look for funding opportunities beginning in 2010. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $14,056. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budgel Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - Grants (Fed,State,LocaQ _ REET - _ _ _ _ Traffic Impact Fees 50,000 200,000 5,000 250,000 Other - - Total Funding Sources: - 50,000 200,000 5,000 250,000 Capital Expenditures: Design - 50,000 200,000 5,000 250,000 Right o/ Way - - _ _ _ Construction - - _ Total Expenditures: - 50,000 200,000 5,000 250,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - 500,000 - 500,000 Grants (Fed, State, Local) 625,000 1,200,000 9,000,000 - 10,825,000 REET - - _ _ _ TraHiclmpactFees 125,000 300;000 1,000,000 - 1,630,000 Other - 500,000 500,000 Total Funding Sources: 750,000 1,500,000 11,000,000 - 13,455,000 Capital Expenditures: Design 750,000 - - - 955,000 Rightof Way - 1,500,000 - - 1,500,000 Construction - 11,000,000 11,000,000 Total Expenditures: 750,000 1,500,000 11,000,000 - 13,455,000 Grants / Other Sources: Other funding is Traffic Impact Fees and developer contributions. • 36 City of Auburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: 8th Street NE Widening (Pike Street to R Street NE) TIP # 15 Project No: Cpxxxx Project Type: CapaCity Project Manager: TBD Description: Add eastbound lane to Southside of 8th Street NE. Currently the lane exists from M Street NE and drops as a right turn only lane at the intersection of 8th Street NE and Pike Street. This would extend the lane to R Street NE where it would then be a right turn only lane onto R Street NE southbound. This is a planning level cost estimate. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $851. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusfed Budgef - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - - - - - - Grants (Fed, State, Local) REET - - - - - Tra!lic Impact Fees - - - - - Other - - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - RightofWay - - - - - Construction - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue 90,000 200,000 - - 290,000 Grants (Fed, State, Local) 360,000 800,000 - - 1,160,000 REET - - - - ' Traffic Impact Fees - - - - - Other - - - - Total Funding Sources: 450,000 1,000,000 - - 1,450,000 Capital Expenditures: Design 150,000 - - - 150,000 Right of Way 300,000 - - - 300,000 Construction - 1,000,000 1,000,000 Total Expenditures: 450,000 1,000,000 - - 1,450,000 • Grants / Oiher Sources: Grant funding is unsecured. 37 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) CapitaF Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • ProjectTitle: 49th Street NE from Auburn Way North to M Street NE TIP # 16 Project No: Cpxxxx Project Type: CapaCity Project Manager: TBD Description: Construct easUwest corridor from Auburn Way North to M Street NE. The existing 49th Street NE extends westerly to B Street NE. This project also includes a traffic signal at the intersection of Auburn Way North and 49th Street NE. This roadway was evaluated and recommended in the NE Special Planning Area. It is anticipated that this will be constructed by future development. It is approximately 3/4 of a mile in length. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,306. BUdg@t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - Grants (Fed, State, Local) REET Traffic Mitigation Funds - - - _ _ Other - 850,000 Total Funding Sources: - - - 850,000 - Capital Expenditurer. Desrgn - - - 200,000 200,000 Right of Way - - - 650,000 650,000 Construction - _ Total Expenditures: - - - 850,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricfed Street Revenue _ Grants (Fed,S7ate,Local) REET Traffic Mitigation Funds - _ Other 1,150,000 - 2,000,000 Total Funding Sources: 1,150,000 - - - 2,000,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - 650,000 Construction 1,150,000 - 1,150,000 Total Expenditures: 1,150,000 - - - 2,000,000 Grants ! Other Sources: Future Development is expecied to fund and construction this project. • 38 City of Auburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Intersection Improvements, Harvey Rd. 8 8th St. NE TIP # 17 Project No: cp0611 Project Type: CapaCity Project Manager: Jacob Sweeting Description: Add one eastbound through/right turn lane on 8th Street NE approaching Harvey Road. Modify traffic signals and traffic channelization to accommodate the new lane. The additional lane will improve traffic delays and vehicle queuing at the intersection of Harvey Road and 8th Street NE in all directions. This project will reconstruct M Street NE from 4th Street NE to 8th Street NE, a segment of roadway approximately 0.3 miles in length with four travel lanes. The reconstruction will fix the existing poor pavement condition and fill in any gaps in the sidewalk network. Progress Summary: Design is anticipated to be approximately 50°/a complete at the end of 2007. Design and property acquisition will be completed in 2008. Construction anticipated in 2009. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $703. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) - - - - _ " REET - - - _ _ Traffic Impact Fees 15,500 184,500 38,500 - 238,500 PWTF - 80,000 1,720,000 - 1,800,000 Total Funding Sources: 15,500 264,500 1,758,500 - 2,038,500 Capital Expenditures: Design 15,500 214,500 - - 230,000 Right of Way - 50,000 - - 50,000 Construction 1,758,500 - 1,758,500 Total Expenditures: 15,500 264,500 1,758,500 - 2,038,500 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue Grants (Fed.State,Local) REET _ Traffic Impacf Fees - - - - 38,500 PWTF - - - - 1,720,000 TotalFunding Sources: - - - - 1,758,500 Capital Expenditures: Design _ Right of Way _ Construction - - - - 1,758,500 Total Expenditures: - - - - 1,758,500 • Grants / Other Sources: Capacity Improvement eligible for traffic impact fees. Other funding is Public Works Trust Fund Loan 39 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Ptan, 2009-2014 Special Revenue Funds • Project Title: Auburn Way South and M Street SE Intersection Improvements TIP # 20 Project No: Cpxxxx Project Type: CapaCity Project Manager: TBD Description: Construct a westbound to northbound right turn lane at the intersection of Auburn Way South and M Street SE. This project would also improve the turning radius at this same corner allowing drivers to make a safe right turn on red (after stopping and yielding to oncoming vehicles). Currently the intersection geometry has necessitated the City placing a legal restriction on this movement. Progress Summary: Future impact on Operating Budget: The annual maintenance cost for this project is estimated to be $703. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendmenfs Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unresfricted Street Revenue - - 100,000 - 100,000 Grants (Fed, State, Local) - - - 520,000 - REEl - - - _ _ Traf(ic Mitigation Funds - - - 130,000 130,000 Other _ Total Funding Sources: - - 100,000 650,000 230,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - 130,000 - Consfruction - - 520,000 - Total Expenditures: - - 100,000 650,000 100,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - 100,000 Grants (Fed,State,Local) - - - - 520,000 REET _ Traffic Mitigation Funds - - - - 130,000 Other _ TotalFunding Sources: - - - - 750,000 Capitai Expenditures: Design - - - - 100,000 Rightol Way - - - - 130,000 Construction - - - 520,000 Total Expenditures: - - - - 750,000 Grants / Other Sources: Grant funding unsecured. • 40 City of Auburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Academy Drive Multi-Use Trail TIP # 24 Project No: Cpxxxx Project Type: Non-Motorized Trail (Capacity) Project Manager: TBD Description: This project will use existing right-of-way to repair the damaged roadbed to a usable multi-use trail on Academy Drive from the Green River Road to Auburn Way South. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,680. BUdgOt: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget - Budget Amendments • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total , Unrestricted Street Revenue - - - - - Grants (Fed, State, Local) REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - Total Funding Sources: - - - - - Capital Expenditures: Design Right o/Way - - - - - Construction - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - 150,000 42,500 42,500 235,000 Grants (Fed,State.Local) - - 382,500 382,500 765,000 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - Total Funding Sources: - 150,000 425,000 425,000 1,000,000 Capital Expenditures: Design - 150,000 - - 150,000 Right oi Way - - - _ _ Construction - 425,000 425,000 850,000 Total Expenditures: - 150,000 425,000 425,000 1,000,000 • Grants / Other Sources: 41 City of Auburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: Lea Hill Road and 8th Street NE Bridge Widening Study TIP # 28 Project No: cpxxxx Project Type: Capacity Project Manager: TBD Description: Review the feasibility, capacity benefits, and required scope to widen Lea Hill Road and 8th Street NE Bridge or identify other means to gain needed vehicular capacity. Progress Summary: Future Impact on Operating Budget: This study will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - - Activity: . • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed,State,local) REET - - - - - Traffic Impact Fees - - - 200,000 - Other - - - Total Funding Sources: - - - 200,000 - Capital Expenditurer. Design - - - 200,000 - Right o/Way - - - - - Construcfion Total Expenditures: - - - 200,000 - Forecasted Project Cost: . Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed, State, Local) REET _ Traffic Impact Fees - - - - 200,000 Other - - - Total Funding Sources: - - - - 200,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - TotalExpenditures: - - - - 200,000 Grants / Other Sources • 42 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: AUbUPiI W8y COYfidOf IlYlpl'OV@I'Yl@IItS (4th Street NE to 4th Street SE) TIP # 3 Project No: c409a0 Project Type: Non-CapaCity Project Manager: TBD Description: This project is based on a pre-design study and is intended to improve pedestrian accessibility, appearance, and link the downtown area along Auburn Way South between 4th St NE and 4th St SE. This project may include some pavement repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in 2007. Although this was considered a temporary fix, the scope has been modified to account for the pavement work. The project length is approximately a half mile. Progress Summary: The pavement portion has been minimized due to the work comp{eted in 2007 under the Arterial Pavement Preservation Program. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue 78,251 - - - 78,251 Grants (Fed, State, Local) - - - - - REET - - - - - Tral(ic Impact Fees - - - - - Other Sources Total Funding Sources: 78,251 - - - 78,251 Capital Expenditures: Design 78,251 - - - 78,251 Right of Way - - - - - Construction - - - - Total Expenditures: 78,251 - - - 78,251 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sfreet Revenue 110,000 600,000 - - 710,000 Grants (Fed, State, Local) 708,700 2,400,000 - - 3,108,700 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - Total Funding Sources: 818,700 3,000,000 - - 3,818,700 Capital Expenditures Design 678,700 - - - 618,700 Right of Way 200,000 - - - 200,000 Construction 3,000,000 - - 3,000,000 Total Expenditures: 818,700 3,000,000 - - 39818,700 • Grants / Other Sources: Grant funding is not secured. 43 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: 15th Street SW Reconstruction TIP # 7 Project No: cpxxxx Project Type: Non-CapaCity Project Manager: TBD Description: This project was originally scoped to include pavement preservation. The pavement preservation component could still be combined with this project, but is aiso eligible for the Arterial Pavement Preservation Program. This project should look to improve the railroad crossing grades as well as the vertical sight distance to the interurban trail to the west of the tracks. The cost estimate listed below is planning level cost. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Acfual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtI V Ity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - Grants (Fed,State,Local) REET Traffic Mitigation Funds Other Total Funding Sources: Capital Expenditures: Design Right o(Way Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Streef Revenue - 75,000 500,000 - 575,000 Grants (Fed, State, Local) - 300,000 2,500,000 - 2,800,000 REET _ _ _ _ _ Traffic Mitigafion Funds Other _ _ Total Funding Sources: - 375,000 3,000,000 - 3,375,000 Capital Expenditurer. Design - 375,000 - - 375,000 Right of Way - _ _ _ _ Construction - - 3,000,000 - 3,000,000 Total Expenditures: - 375,000 3,000,000 - 3,375,000 Grants / Other Sources: • 44 City ofAuburn Draft Capital Facilities Plan ~ ARTERIAL STREET FUND (102) Capita4 Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Titie: West Valley Hwy Improvements (SR18 to West Main Street) TIP # 14 Project No: CpXXXX Project Type: Non-Capacity Project Manager: TBD Description: Widen roadway to accommodate a two way left turn lane; install a traffic median to prohibit traffic from driving into on coming lanes; add curb, gutter, and storm drainage; repair failing roadway surface; install sidewalk along the east side of the roadway; install illumination; accommodate bicycle usage with 3 foot shoulder on both sides of the roadway; and install a new traffic signal at and improve the intersection of West Main Street and West Valley Highway. This project wili improve efficiency, safety, and driving comfort, as well as reduce the amount of time maintenance staff has to spend doing temporary repairs that do not last. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments Adjusted Budget - - - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - - - Grants (Fed, State, Local) - - 125,000 2,875,000 125,000 REET - - - - - Traf/ic Mitigation Fees - - 25,000 605,000 630,000 Other - - Total Funding Sources: - - 150,000 3,480,000 755,000 Capital Expenditures: Design - 150,000 150,000 - 300,000 RighfolWay - - - - - Construction - - 3,480,000 Total Expenditures: - 150,000 150,000 3,480,000 300,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed, State, Local) - - - - 3,000,000 REET - - - - - Traf(ic Mitigation Fees - - - - 630,000 Other 1,220,000 - - 1,220,000 Total Funding Sources: 1,220,000 - - - 4,850,000 Capital Expenditures: Design - - - - 150,000 Right of Way - - - - - Construction 1,220,000 - 4,700,000 Total Expenditures: 1,220,000 - - - 4,850,000 Grants / Other Sources: TIB Grant (secured). The other funding source is to be determined. • 45 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: 8th Street and R Street NE Traffic Signal TIP # 18 Project No: cp0701 Project Type: Non-CapaCity Intersection improvement Project Manager: Vondrak Description: This project includes the construction of new traffic signal at the intersection of 8th Street NE and R Street NE. Intersection improvements will include crosswalks and pedestrian signals. This project was selected on accident history, surrounding land uses, and pedestrian flow patterns. Progress Summary: The design is anticipated to be started in 2007, with construction scheduled for 2009. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,643. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtlVity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - 400,500 - 400,500 Grants (Fed, State, Local) 24,534 84,925 140,500 - 249,959 - REET _ _ _ _ _ Traffic Impact Fees Other - _ _ Total Funding Sources: 24,534 84,925 541,000 - 650,459 Capital Expenditures: Design 24,534 84,925 - - 109,459 Righf of Way - - 15,000 - 15,000 Construction - - 526,000 - 526,000 Total Expenditures: 24,534 84,925 541,000 - 650,459 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - 400,500 Grants (Fed.State,Local) - - - - 140,500 REET _ Traffic Impact Fees Olher _ Total Funding Sources: - - - - 541,000 Capital Expenditures. Design _ Right of Way - - - - 15,000 Consfruction - - - - 526,000 Total Expenditures: - - - - 541,000 Grants / Other Sources: Intersection & Corridor Safety Grant • 46 City of Auburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds ProjectTitle: Auburn Way North / 1st Street NE Signal Improvements TIP # 19 Project No: cpxxxx Project Type: Non-CapaCity Project Manager: TBD Description: Add left tum phasing to the north and south bound directions including new mast arms to accommodate the necessary length. Replace damaged signal poles. New controller and vehicle detection, modify signal heads. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ • Adjusted Budget - - _ _ Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - - 40,000 - Granfs (Fed, State, Local) - - - 160,000 - REET _ _ Traffic lmpact Fees Other _ _ Total Funding Sources: - - - 200,000 - Capital Expenditures: Design - - - 15,000 - Righf of Way _ _ Construction - - - 185,000 Total Expenditures: - - - 200,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 i Funding Sources: Unresfricted Street Revenue - - - - 40,000 Grants (Fed, State, Local) - - - - 160,000 REET _ Traffic Impact Fees Other Total Funding Sources: - - - - 200,000 Capital Expenditures: Design - - - - 15,000 Right of Way _ Construction - - - - 185,000 Total Expenditures: - - - - 200,000 • Grants ! Other Sources: Grant funding unsecured. 47 City ofAuburn Draft Capital Facilities Plan 1 ~ ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: C Street NW and West Main Street TIP # 21 Project No: cpxxxx Project Type: Non CBpaCity Project Manager: TBD Description: Reconstruct intersection at C Street NW and West Main Street. Project would include a new traffic signal and modifications to the turning radii at each corner to help fadilitate vehicular movements. The new traffic signal would allow for protected left turn phasing for northbound and southbound left turn movements. This would also provide additional safety related to the railroad pre-emption. Progress Summary: Future Impact on Operating Budget: There will be no impact to the maintenance budget. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget - - - - Accivicy: ~ 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - 50,000 - - 50,000 Grants (Fed,State,Local) - - _ _ REET TraNic Impact Fees - - - - - Other - _ Total Funding Sources: - 50,000 - - 50,000 Capital Expenditures: Design - 50,000 - - 50,000 Right ol Way - - _ Construction - - Totaf Expenditures: - 50,000 - - 50,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - 20,000 100,000 - 120,000 Grants (Fed, State, Local) - 80,000 400,000 - 480,000 REET - - - _ _ Traffic Impact Fees - - - - - Other - - - _ _ Total Funding Sources: - 100,000 500,000 - 600,000 Capital Expenditures: Design - 100,000 - - 100,000 Right of Way - - 150,000 - 150,000 Construction - - 350,000 - 350,000 Total Expenditures: - 100,000 500,000 - 600,000 Grants ! Other Sources: • 48 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Tit1e: BNSF/E. Valley Highway Pedestrian Underpass TIP # 23 Project No: c229a0 Project Type: NOn-CapaCity Project Manager: TBD Description: Project to construct an undercrossing of the BNSF Railroad in conjunction with a pedestrian bridge to allow a safe, direct, attractive non-motorized access between neighborhoods in the City of Pacific and schools in the City of Auburn. Progress Summary: The design is on hold. Funding source is most likely a federal earmark. Gurrently this project is on hold pending some. discussions with BNSF RR. They are in the process of planning for a third rail which would significantly impact the design. Future Impact on Operating Budget: ne annual maintenance cost for this project is estimated to be $240. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue 53,895 - - - 53,895 Grants (Fed, State, Local) 170,353 - - - 170,353 REET - - - - - Traffic Impact Fees Other - - - - - Total Funding Sources: 224,248 - - - 224,248 Capital Expenditures: Design 224,248 - - - 224,248 Right of Way - - - - - Construction - - - Total Expenditures: 224,248 - - - 224,248 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Grants (Fed,State,Local) - - 4,550,000 4,550,000 REET - - - - - Traffic Impact Fees - - - - - Other - - - 250,000 250,000 Total Funding Sources: - - - 4,800,000 4,800,000 Capital Expenditures: Design - - - 750,000 750,000 Right of Way - - - 50,000 50,000 Construction - - - 4,000,000 4,000,000 Total Expenditures: - - - 4,800,000 4,800,000 • Grants I Other Sources: KC Open Space Bond and High Speed Rail Safety Money. 49 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capitai Facilities Pian • Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Titie: R Street Corridor Study TIP # 25 Project No: Cpxxxx Project Type: Non-Capacity Project Manager: TBD Description: This corridor defining study wilt examine two segments of R Street and identify improvements for future capacity, safety, and other elements. This effort will identify a corridor vision and include ail the necessary public involvement. This project is identified in the Comprehensive Plan. The first segment is from the intersection of 8th Street NE and R ST NE to approximately 4th ST SE. The second segment is from the intersection of 17th ST SE and R ST SE to approximately 37th ST SE: Progress Summary: Future Impact on Operating Budget: This study will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget - - - _ ACtI V Ity: • 2008 YE 2009 Year End Funding Sources: Priorto 2008 Estimate 2009 Budget 2010 ProjectTotal Unrestricted Street Revenue - - - 50,000 - Grants (Fed, State, Local) _ REET TraNic Impact Fees Other _ Total Funding Sources: - - - 50,000 - Capital Expenditures: Design - - - 50,000 - Right of Way _ _ Construction - Total Expenditures: - - - 50,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - 50,000 Grants (Fed, State, Local) _ REET Traffic lmpact Fees _ Other Total Funding Sources: - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way _ Construction - - _ Total Expenditures: - - - - 50,000 Grants / Other Sources: • 50 City ofAuburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: 41st Street SE and A Street SE Access Management Study TIP # 27 Project No: cpxxxx Project Type: Safety (Non-Capacity) Project Manager: TBD Description: Study the area from 37th Street SE to the White River on A Street SE including 41 st Street SE from D Street SE to C Street SE. The study to should review the safety and access needs of the traveling public and the adjacent properties. Progress Summary: Pre-design will be done to refine project scope, alignment, and cost. Future Impact on Operating Budget: This study will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget ACtivity: 2008 YE 2009 Year End Funding Sources: Priorto 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - 50,000 - 50,000 Grants (Fed, State, Local) - - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - TotalFunding Sources: - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - Total Expenditures: - - 50,000 - 50,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - 50,000 Grants (Fed,State,Local) - - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - Total Funding Sources: - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - Total Expenditures: - - - - 50,000 • Grants / Other Sources: 51 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Tite: South 277th - Wetland Mitigation TIP # 29 Project No: c410a0 Project Type: Non-CapaCity Project Manager: Nutter Description: Wetland mitigation for the 277th Street Grade Separation project. Progress Summary: This is a 10-year obligation, which began in 2004. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget _ _ ACtI V Ity: . 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue 67,775 25,000 25,000 25,000 117,775 Grants (Fed,Sta(e,Local) - _ _ _ _ REET _ TraNic lmpacf Fees Other _ _ _ _ Total Funding Sources: 67,775 25,000 25,000 25,000 117,775 Capital Expenditures: Design 30,210 10,000 10,000 10,000 50,210 Right of Way - _ _ _ _ Construction 37,565 15,000 15,000 15,000 67,565 Total Expenditures: 67,775 25,000 25,000 25,000 117,775 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue 25,000 25,000 25,000 125,000 Grants (Fed, State, Local) _ _ _ _ _ REET TraHic Impact Fees Other _ _ _ _ Total Funding Sources: 25,000 25,000 25,000 - 125,000 Capital Expenditures: Design 10,000 10,000 10,000 - 50,000 Right of Way _ _ _ _ _ Construction 15,000 15,000 15,000 - 75,000 Total Expenditures: 25,000 25,000 25,000 - 125,000 Grants ! Other Sources: • 52 City of Auburn Draft Capital Facilities Plan • ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Citywide Pedestrian Crossing Program TIP # 30 Project No: Cp0627 Project Type: Non-Capacity (Annual) Project Manager: TBD Description: This project provides for pedestrian safety studies at various locations citywide. Projects are prioritized annually based on safety issues and pedestrian demands. This is an annuat level of effort project used to fund small pedestrian safety studies and improvement projects. Progress Summary: Pedestrian enhancements were constructed on 3rd Street NW near the post office in 2005. Both I Street NE and East Main crossings have been completed. 21 st Street SE is anticipated to be completed by the end of 2008. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - 100,000 - 100,000 200,000 Grants (Fed, State, Local) - - - - _ " REET Traffic Impact Fees - - - - - Other - - - - - Total Funding Sources: - 100,000 - 100,000 200,000 Capital Expenditures: Design - 10,000 - 10,000 20,000 Right o(Way - - - - - Construction - 90,000 - 90,000 90,000 Total Expenditures: - 100,000 - 100,000 110,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - 100,000 - 100,000 300,000 Grants (Fed, State, Local) - - - - - REET Traffic Impact Fees Other - - Total Funding Sources: - 100,000 - 100,000 300,000 Capital Expenditures: Design - 10,000 - 10,000 30,000 Right of Way - - - - - Construction 90,000 - 90,000 270,000 Total Expenditures: - 100,000 - 100,000 300,000 • Grants / Oiher Sources: 53 City ofAuburn Draft Capital Facilities Plan ARTERIAL STREET FUND (102) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: Citywide Roadway Safety Infrastructure Improvements TIP # 31 Project No: Cp102a Project Type: Non-Capacity (Safety) Project Manager: Various Description: This project provides for infrastructure improvements to enhance traffic safety. Projects are prioritized annually based upon field studies. Progress Summary: 2009 project will be guardrail along Kersey Way. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. BUdg2t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Street Revenue - - 200,000 - 200,000 Granfs (Fed, State, Local) - - _ _ _ REET Traffic Impact Fees Other - _ _ _ Total Funding Sources: - - 200,000 - 200,000 Capital Expenditures: Design - - 15,000 - 15,000 Right o/Way - - _ _ _ Construcfion - - 185,000 - 185,000 Total Expenditures: - - 200,000 - 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue 200,000 - 200,000 - 600,000 Granfs (Fed, State, Local) - - _ _ _ REET TraNic Impact Fees Other - _ Total Funding Sources: 200,000 - 200,000 - 600,000 Capital Expenditures: Design 15,000 - 15,000 - 45,000 Right of Way - _ _ _ _ Construction 185,000 185,000 555,000 Total Expenditures: 200,000 - 200,000 - 600,000 Grants / Other Sources: • 54 City ofAuburn Draft Capital Facilities Plan • TABLE T- ZA CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION - LOCAL STREET 2009 2010 2011 2012 2013 2014 Total Caaacitv Proiects: Norte - Non-Capacitv Prolects: 1 Local Street improvement Program Capital Costs 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Funding Sources: Local Street Fund - - - - - - - PropeRy Tax 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Sales Tax - - - - - - - Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Total Costs 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 FUNDING SOURCES: Local Street Fund - - - - - - - • Property Tax 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Sales Tax Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - Total Funding 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 • 55 City ofAuburn Draft Capital Facilities Plan LOCAL STREET FUND (103) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Title: Local Street Improvement Program Project No: Various TIP #37 Project Type: Non-Capacity Project Manager: WlCkstrom Description: This program was created after passage of Proposition 1 on the November'04 ballot, setting the City's property tax levy limits and creating a dedicated local street fund to be used solely for local street improvements. The program will consist of a number of different contracts focused on the preservation of local streets (unclassified streets) within the City of Auburn. These contracts will include work such as crack sealing, asphalt patching, pre-leveling, asphalt overlays and roadway reconstruction. The property tax {evy lift that was voted in in 2004 will be used to repay the bonds that are anticipated to complete the program. Progress Summary: This program has successfully completed overlays in 2005, 2006, 2007, and is , on track to complete overlays in 2008. In 2009 and 2010 the program will begin tackling the streets that require a compiete reconstruction because the street surface and underlying base has failed. Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Local Street Fund 25,000 15,000 - - 40,000 PropertyTax 1,582,673 810,000 2,200,000 2,200,000 4,592,673 - Utility Mitigation 450,000 225,000 - - 675,000 Bond Proceeds - _ _ Other 2,655,000 1,545,000 - - 4,200,000 Total Funding Sources: 4,712,673 2,595,000 2,200,000 2,200,000 9,507,673 Capital Expenditures: Design 240,000 440,000 300,000 300,000 980,000 Right olWay - _ _ _ _ Conshuction 4,472,673 2,155,000 1,900,000 1,900,000 8,527,673 Total Expenditures: 4,712,673 2,595,000 2,200,000 2,200,000 9,507,673 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Local Street Fund - _ _ _ _ Property Tax 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Ufility Mitigation - _ _ _ _ Bond Proceeds Ofher - _ _ _ _ Total Funding Sources: 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Capital Expenditures: Design 300,000 300,000 300,000 300,000 1,800,000 Righf of Way - _ _ _ _ Construction 1,900,000 1,900,000 1,900,000 7,900,000 11,400,000 Total Expenditures: 2,200,000 2,200,000 2,200,000 2,200,000 13,200,000 Grants / Other Sources: • 56 City of Auburn Draft Capital Facilities Plan • TABLE T- 2B CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION - STREET FUND 2009 2010 2011 2012 2013 2094 Total Capacitv Proiects: None - Non-Capacitv Proiects: 1 Annual Arterial Street Preservation Capital Costs 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 Funding Sources Local Street Fund - - - - - - - Property Tax - - - - - - _ UtilityTax 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 Bond Proceeds - - - - - - - 2 Annual Arteriai Crack Seal Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Utility Tax 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Bond Proceeds - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - • Non-Capacity Projects 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 Total Costs 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 FUNDING SOURCES: Street Fund - - - - - - - Properiy Tax - - - - - - - UtilityTax 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 Bond Proceeds - - - - - - - Total Funding 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000 • 57 City ofAuburn Draft Capital Facilities Plan STREET FUND (105) _ Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds • Project Titie: Annual Arterial Street Preservation Project No: VBPIOUS TIP #35 Project Type: Non-Capacity Project Manager: NEW Project Manager Description: implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These projects may include overlays, rebuilds, spot repairs, or a combination of these. It is anticipated that this program will be funded through bond proceeds that will be repaid by the 1% utility tax that was adopted by Council in 2008. Progress Summary: This program is being expanded from previous years. Prior years this program provided approximately $675,000 from the REET funding to go towards the purpose of preserving classified streets. Future Impact on Operating Budget: None BUdg¢t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Street Fund - Properry Taz - - _ _ _ Utility Tax - - 1,400,000 1,400,000 1,400,000 • REET2 _ _ _ Bond Proceeds - - _ _ _ Total Funding Sources: - - 1,400,000 1,400,000 1,400,000 Capital Expenditures: Design - - 50,000 50,000 50,000 Right of Way - - _ _ _ Construction - - 1,350,000 1,350,000 1,350,000 Total Expenditures: - - 1,400,000 1,400,000 1,400,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources Street Fund _ Property Tax - - _ _ _ Utility Tax 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 REET2 - - _ _ _ Bond Proceeds - Total Funding Sources: 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 Capital Expenditures: Design 50,000 50,000 50,000 50,000 300,000 Right of Way - - _ _ _ Construction 1,350,000 1,350,000 1,350,000 1,350,000 8,100,000 Total Expenditures: 1,400,000 1,400,000 1,400,000 1,400,000 8,400,000 Grants / Other Sources: • 58 City ofAuburn Draft Capital Facilities Plan • STREET FUND (105) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Special Revenue Funds Project Title: Annual Arterial Crack Seal Program Project No: Various TIP #36 Project Type: Non-Capacity Project Manager: NEW Project Manager Description: Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing the cracks will prolong the life of the pavement by stopping water from draining into the subbase of the road. Progress Summary: Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 20086 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Street Revenue - - - - - Ufility Tax - - 100,000 100,000 100,000 - REET - - - - - Bond proceeds - - - - - Total Funding Sources: - - 100,000 100,000 100,000 Capital Expenditures: Design - - 10,000 10,000 10,000 Right of Way - - - - - Construcfion - - 90,000 90,000 90,000 Total Expenditures: - - 100,000 100,000 100,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Street Revenue - - - - - Utility Tax 100,000 100,000 100,000 100,000 600,000 REET - - - - - Bond proceeds - - - - - Total Funding Sources: 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 Right of Way - - - - - Construction 90,000 90,000 90,000 90,000 540,000 Total Expenditures: 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: • TABLE T-3 59 City ofAuburn Draft Capital Facilities Plan SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS • Pro'ect: 2010 2011 2012 2013 2014 2015 Total 1 A Street NW, Phase t $ - $ - $ 17,568 $ 17,568 $ 17,568 $ 17,568 $ 70,272 2 CitywidelTSProject 5,000 5,000 5,000 5,000 5,000 5,000 30,000 3 Auburn Way Conidor Improvements _ _ _ _ _ _ _ 4 I Street ME Corridor - - - - 17,568 17,568 35,136 5 M Street Grade Separation - - 21,827 21,827 43,654 6 S 277th-AWN to Green River eridge - - 10,541 10,541 10,541 10,541 42,164 7 15th Street SW-Reconstruction _ _ _ _ _ 8 A Street NW, Phase 2 1,405 1,405 1,405 4,215 g D Street NW, 37th to 44th - - - - - 14,054 14,054 10 F Sheet SE, 4th to A WS - 851 851 851 851 851 4,255 11 M Street NE, E. Main to 8th - - - 3,514 3,514 3,514 10,542 12 Grade Separated Crossing of BNSF Railyard - - - - - - - 13 KerseyWaylmprovements - - - - 14,056 14,056 28,112 74 W Valley Hwy Improvements _ _ _ _ 15 8th Street NE Widening - - - 851 851 851 2,553 16 49th Street NE, AWN to M Street NE _ - 2,306 2,306 2,306 2,306 9,224 17 Harvey & Sth Street NE 703 703 703 703 703 703 4,218 18 8th Street NE /R Street NE Signa! 5,643 5,643 5,643 5,643 5,643 5,643 33,858 19 Auburn Way N& lst Street NE Signal _ _ _ _ _ _ _ 20 Auburn Way S& M Street SE Imp. - 703 703 703 703 703 3,515 21 C Street NW $ W Main Street _ _ _ _ _ _ _ 23 BNSF / E Valley Hwy Pedestrain 240 240 - - - - - Underpass 24 Academy Drive Multi-Use Trail 1,680 1,680 25 R Street Corridor Study _ _ 26 Metro Shuttle 27 41st Street SE 8 A Street SE Study 2$ Lea Hill 8 8th ST NE Bridge Widening Study - - - - - - - 29 S 277th-Wetland Mitigation 30 Citywide Pedestrian Crossing Program 31 Citywide Roadway Safety Infrastructure lmprov. - - - - - - - 35 .4nnual Arterial Pavement Preservafion (Fund 105) - - - - - - - 36 .4nnua! Arterial Crack Seal Program (Fund 105) - - - - - - - 37 Loca/ Street (mprovement Program (Fund 103) - - - - - - - Total $ 11,346 $ 12,900 $ 43,315 $ 49,085 $ 102,536 $ 118,510 $ 337,692 • 60 City ofAuburn Draft Capital Facilities Plan . WATER Current Facilities The City of Auburn water utility provides water supply, treatment, transmission, storage, distribution, and service connections to in-City residences and businesses. The City also provides water to one adjacent city and two water districts. The water system consists of wells and springs for source, chlorination stations and aeration for treatment, pump stations and pipelines for transmission, and steel and concrete enclosed reservoirs for storage. Table W-1, "Facilities Inventory", lists the facilities along with their current capacities and approximate locations. Level of Service (LOS) Fhe City's Comprehensive Water Plan summarizes the design criteria for the City's water distribution system. Capital Facilities Projects and Financing The City of Auburn's water system anticipates five capacity projects in the amount of •$9,080,000, and nineteen non-capacity projects totaling $47,679,000, for a 6-year planning expectation total of $56,759,000. The financing plan is shown in Table W-2 followed by individual worksheets showing the project details. The capacity projects will increase water supply quantities, storage, and distribution for growth of retail customers. The non-capacity projects will provide for pipeline improvements and replacements, delivery pressure improvements, water quality enhancements, comprehensive and resource management planning, pump station upgrades, telemetry system improvements, and meter upgrades. Impact on Future Operating Budgets As Table W-3 shows, operating budget impacts of $2,400 are forecasted for water supply and distribution facilities during the six years 2010 - 2015. • . 61 City of Auburn Draft Capital Facilities Plan TABLE W-1 • Facilities Inventory Water Facilities , r . CAPACITY FACILITY WATER RIGHT (MGD - max rate) LOCATION Water Supply: Coal Creek Springs Certificate 857 9. 70<2.52>* 3401 Stuck River Dr West Hill Springs Claim (1973 File Date) 0.9 1900 - 15th St NW ext. Well 9 Certificate 3560-A 3.17 1130 "M" 3t SE We/l 2 G1-00277 C 3.46 519 "K" St NE Well 3A G1-23629 C 4.03 401- 37th St SE Well 38 (Included Above) (Included Above) 401- 37th St SE Well 4 G1-20391 C 4.03 950 25th Street SE Well 5 G1-23633 C 1.44 5530 James Ave SE Well 5A (lncluded Above) (Included Above) 5401 Evergreen Way We/l 58 (Included Above) (Inc/uded Above) West end of 62nd Ct SE Well 6 (Supplemental to Wells 1, 2, 3A, 38, 4) 5.04 (SUpp/emental) 519 "K" St NE Well 7 (Supplemental fo Wells 1, 2, 3A, 38, 4) 5.04 (SUpp/emental) 403 "E" Sf NE Supp/y Total (MGD) 26.73 Available for Use 24.21 ` Denotes deduction of 1,750 gpm (Qi/2,824 ac-fUyr) to comply with the provisions of the Muckleshoot-Auburn Stipulated Agreement. • CAPACITY FACILITY (MG) LOCATION SERVICE AREA Storape Facilities: Valley Reservoir 1 5.0 2004 Auburn Way S Valley Service Area V2lley Reservoir 2 3.6 32115 - 105th Place S Valley Service Area Academy Reservoir 8A 1.0 5002 Auburn Way S Academy Servrce Area Academy Reservoir 88 1.5 5002 Auburn Way S Academy Service Area Lea Hill Reservoir 4A 1.0 30502 - 132nd Ave SE Lea Hill Service Area Lea Hrll Reservoir 48 1.5 30502 - 132nd Ave SE Lea Hill Service Area Lakeland HillS Reservoir 5 1.0 1118 57th P/ace SE Lakeland Hills Svc Area Storage Tofal (MG) 14.6 • 62 City ofAuburn Draft Capital Facilities Plan • TABLE W-1 (continued) Facilities Inventory Water Facilities CAPACITY FACILITY (GPM) LOCATION Booster Pump Stations: Academy 1: 2 pumps 800 2004 Auburn Way S Academy 2: 2 pumps 1,500 2004 Auburn Way S Green River: 4 pumps 4,680 29621 Green River Rd SE Intertie: 7 pumps 4,830 30502 132nd Ave SE Lea Hill: 3 pumps 2,100 10406 Lea Hill Rd SE Lakeland Hills: 6 pumps 3,200 1118 57th Place SE Jannsen's Addition: 1 pump 100 3600 8lock Lemon Tree Lane Game Farm Park: 2 pumps 1,050 2401 Stuck River Drive CAPACITY Primary Valve FACILITY (PSI - Inlet/Outlet) LOCATION Pressure Reducinp Stations: • Serves Valley Pressure Zone: Howard Road CCF #1091-1 82165 Howard Road Howard Road CCF By-Pass #1011 - Howard Road (eypass) 25th Street SE #1910-1 (Offline) - 25th Street SE & K Street SE Riverwalk #1111-2 90150 27th St. SE & 27th Place SE - Riverwa(k #1111-1 109155 Riverwalk Dr SE & Howard Road Serves Lea Hill: Lea Hill #512-1 80150 304th St. SE West of 112th Ave. Lea Hill #412-1 90145 SE 298th Place & 109 Ave. SE Lea Hill #512-2 87145 304th St. SE West of 108th Ave. Lea Hill #611-1 165165 Lea Hill Rd. S.E. Lea Hill #611-2 140165 Lea Hill Rd. & 106 Place Lea Hill #611-3 145160 Lea Hill Rd. & 107 Place Lea Hill #411-1 94155 104th Ave SE (South of 303rd Road) Lea Hill #411-2 86140 SE 304th Place & SE 101 st Place Lea Hill #512-3 N/C 300 Block & 108th Ave SE Amber View North #711-1 150165 105th Place SE & 320th place Amber View North #711-2 142160 106th Place SE Near Reservoir 2 Serves Academy: Auburn Way South #1011-3 130180 2003 Auburn Way South Auburn Way South #1114-1 130180 4500 Auburn Way South Serves Jannsen Addition: Jannsen #1216-1 72158 6100 elock & 35th Wa SE • 63 City ofAuburn Draft Capital Facilities Plan TABLE W-1 (continued) Facilities Inventory • Water Facilities Serves Lakeland Hills: Lakeland Hills #1410-2 125162 Nathan Avenue & High/and Drive Lakeland Hills #1309-1 105155 Mill Pond Drive @ Oravetz Road Lakeland Hills #1410-1 N/C 51st St. SE east of Mill Pond Loop Lakeland Hills #1409-3 84155 Mill Pond Drive &Lakeland Hi/ls Way Lakeland Hills #1510-1 N/C Lake/and Hrlls Way & Evergreen Way Lakeland Hills #1409-2 120156 47th SE &Lakeland Hills Way Lakeland Hills #1310-1 130155 Mill Pond Dr. & Mill Pond Loop Lakeland Hills #1410-3 82155 Quincy Ave N of 53rd St SE Lakeland Hills #1409-1 N/C Oravetz & Lakeland Hil/s Way Lakeland Hills #1409-4 95170 Lakeland Hills Way & Lakeland Hills Lp Lakeland Hills #1410-4 103150 4900 Block & Mill Pond Drive Lakeland Hills #1509-1 174160 Terrace View Lower (6170) Lakeland Hills #1509-2 160173 Terrace View Middle (5960) Lakeland Hills #1509-3 • 138147 Terrace View Upper (5810) Lakeland Hills #1509-4 230170 Terrace View & Alexander Place SE N/C - Normally Closed CAPACITY FACIUTY (GPM) LOCATiON Treatment: • Howard Road CCTF 5,250 2104 Howard Street Fulmer Field CCTF 9,900 1113 5th St NE Chlorination Stations: Coal Creek Sprrngs Station 2,400 (gravity feed) 3401 Stuck River Drive West Hil! Springs Station 625 (gravity feed) 1900 15th Street NW WeU 4 2,600 950 25th Street SE Well 5B 600 1100 63rd Street SE Well 5A 180 5401 Olive Avenue SE BRi4UNWQ'.SATELL:ITE FACILITY CAPACITY LOCATION Water SupplV: Braunwood Satellite #1 0.03 MGD 4501 47th St SE Storape Facilities: Braunwood Satellite 1 0.03 MG 4501 47th St SE Booster Pump Stations: Braunwood: 3 Pumps 2.0 GPM 4501 47th St SE • 64 City ofAuburn Draft Capital Facilities Plan ~ TABLE W-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING WATER DIVISION 2009 2010 2011 2012 2073 2014 Total Capacitv Proiects: 1 Lea Hill Booster Pump Station Capital Costs - - 100,000 1,080,000 - - 1,180,000 Funding Sources: Water Fund - - 100,000 80,000 - - 180,000 PWTFL - - - 1,000,000 - - 1,000,000 2 Lakeland Hills High Zone Reservoir Capital Costs - - 50,000 250,000 2,500,000 - 2,800,000 Funding Sources: Water Fund - - 50,000 250,000 2,500,000 - 2,800,000 3 Arterial Utility Improvements Capital Costs 500,000 500,000 300,000 300,000 300,000 300,000 2,200,000 Funding Sources: Water Fund 500,000 500,000 300,000 300,000 300,000 300,000 2,200,000 4 Lakeland Hills Booster Pump Station Capital Costs 500,000 900,000 - - - - 1,400,000 Funding Sources: Water Fund 500,000 - - - - - 500,000 Bond Proceeds - 900,000 - - - - 900,000 5 Academy Booster Pump Station . Capital Costs 500,000 1,000,000 - - - - 1,500,000 Funding Sources: Water Fund 500,000 - - - - - 500,000 Bond Proceeds - 1,000,000 - - - - 1,000,000 Subtotal, Capacitv Proiects: Capital Costs 1,500,000 2,400,000 450,000 1,630,000 2,800,000 300,000 9,080,000 Non-Capacitv Proiects 6 Annual Repair & Replacements Capital Costs 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 Funding Sources: Water Fund 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 7 SCADA (Telemetry) Upgrades Capital Costs 168,000 - 58,000 - - - 226,000 Funding Sources: Water Fund 168,000 - 58,000 - - - 226,000 8 Water Resources Protection Program Capital Costs - - 450,000 19,000 20,000 21,000 510,000 Funding Sources: Water Fund - - 450,000 19,000 20,000 21,000 510,000 9 Water Reservoir Safety Improv. Project. Capital Costs - - 50,000 50,000 50,000 50,000 200,000 Funding Sources: Water Fund - - 50,000 50,000 50,000 50,000 200,000 10 Blow-off Installation on Deadend Mains Capital Costs - - 50,000 - - - 50,000 Funding Sources: Water Fund - - 50,000 - - - 50,000 11 Well 5 Upgrade Capitai Costs - - 725,000 - - - 725,000 • Funding Sources: - - - - - Water Fund 725,000 725,000 65 City ofAuburn Draft Capital Facilities Plan TABLE W-2 (continued) 2009 2010 2011 2012 2013 2014 Total . Non-Caoacitv Proiects: 12 Comprehensive Water Plan Capital Costs 40,000 - - - - - 40,000 Funding Sources: Water Fund 40,000 - - - 40,000 13 Les Gove Waterline Repiacement Capital Costs 2,100,000 900,000 - - - - 3,000,000 Funding Sources: Water Fund 2,100,000 - - - - - 2,100,000 Bond Proceeds - 900,000 - - 900,000 14 SOS Utility Improvements Capital Costs 500,000 500,000 300,000 300,000 300,000 300,000 2,200,000 Funding Sources: Water Fund 500,000 - 300,000 300,000 300,000 300,000 1,700,000 Bond Proceeds - 500,000 - - - 500,000 15 Vactor Waste Solids Handling Facility Capital Costs - - 300,000 - - - 300,000 Funding Sources: Water Fund - - 300,000 300,000 16 Maintenance and Operations Expansion Capital Costs - - 350,000 400,000 - - 750,000 Funding Sources: Water Fund - 350,000 400,000 - 750,000 17 Weli 4 and Intertie Pump Station Improvements Capital Costs - - 300,000 - - - 300,000 Funding Sources: Water Fund - 300,000 - 300,000 18 Facilities Evaluation Study Capital Costs - - 80,000 - - - 80,000 • Funding Sources: Water Fund 80,000 - ' 80,000 19 M&O Satellite Facilities Capital Costs - - - - 50,000 50,000 100,000 Funding Sources Water Fund - 50,000 50,000 100,000 20 Lea Hill PRV Station Replacements Capital Costs - - 100,000 80,000 - 180,000 Funding Sources: Water Fund - - - 100,000 80,000 - 180,000 21 Water Supply Charges Capital Costs - 500,000 32,300,000 - - - 32,800,000 Funding Sources Water Fund - 500,000 - - - - 500,000 Bond Proceeds - - 32,300,000 - - - 32,300,000 22 Well Inspection and Redevelopment Program Capital Costs 500,000 500,000 - - - - 1,000,000 Funding Sources: Water Fund 500,000 - - - - - 500,000 Bond Proceeds - 500,000 - - - - 500,000 23 AWS Sanitary Sewer Replacement - Phase 3 Capital Costs 968,000 - - - - - 968,000 Funding Sources: WaterFund 968,000 - - - - - 968,000 24 City Nall Annex Lease Capital Cosls - 250,000 250,000 250,000 250,000 250,000 1,250,000 Funding Sources: Water Fund - 50,000 250,000 250,000 250,000 250,000 1,050,000 Bond Proceeds - 200,000 - - - 200,000 Subtotal, Non-Caaacitv Proiects: Capital Costs 4,776,000 3,150,000 35,713,000 1,619,000 1,250,000 1,171,000 47,679,000 • 66 City ofAuburn Draft Capital Facilities Plan . TABLE W-2 (continued) SUMMARY: CAPITAL COSTS CapacityProjects 1,500,000 2,400,000 450,000 1,630,000 2,800,000 300,000 9,080,000 Non-Capacity Projects 4,776,000 3,150,000 35,713,000 1,619,000 1,250;000 1,171,000 47,679,000 Total Costs 6,276,000 5,550,000 36,163,000 3,249,000 4,050,000 1,471,000 56,759,000 FUNDING SOURCES: Water Fund 6,276,000 1,550,000 3,863,000 2,249,000 4,050,000 1,471,000 19,459,000 Bond Proceeds - 4,000,000 32,300,000 - - - 36,300,000 PWTFL - - - 1,000,000 - - 1,000,000 Total Funding 6,276,000 5,550,000 36,163,000 3,249,000 4,050,000 1,471,000 56,759,000 • • 67 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Lea Hili Booster Pump Station Project No: cp0801 Project Type: Capacity (Expansion) Project Manager: TBD Description: Increase the pumping capacity to provide the Maximum Daily Demand (MDD) for the Lea Hill service area. Required to minimize the storage required in the Lea Hiil service area and to meet future MDD. Progress Summary: Future Impact on Operating Budget: No significant impact; this station will replace the existing pump station. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budgef ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - Grants (Fed,Sfate,Local) PWTFL Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: _ Forecasted Project Cosfi Total 2017 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 100,000 80,000 - - 180,000 Granfs (Fed, State, Local) - _ _ PWTFL - 1,000,000 - - 1,000,000 Other - _ Total Funding Sources: 100,000 1,080,000 - - 1,180,000 Capital Expenditures: Design 100,000 80,000 - - 180,000 Right ol Way - _ _ Construction - 1,000,000 - - 1,000,000 Total Expenditures: 100,000 1,080,000 - - 1,180,000 Grants I Other Sources: . • 68 City ofAuburn Draft Capital Facilities Plan ~ WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Lakeland Hills High Zone Reservoir Construction Project No: Cpxxxx Project Type: Capacity (Expansion) Project Manager: TBD Description: Construct a new total capacity of 2.65 million gallon reservoir on a tract of land next to Francis Court cul-de-sac in the Lakeland Hills service area. Progress Summary: Future Impact on Operating Budget: Project will require routine inspections by water operations staff. The annual maintenance cost is estimated to be approximately $1,200. BUdget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,LocaO - - - - - - PWTFL - - - - - Other - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Righf of Way - - - - - Construction - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2008-2014 Funding Sources: Unrestricted Water Revenue 50,000 250,000 2,500,000 - 2,800,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - TotalFunding Sources: 50,000 250,000 2,500,000 - 2,800,000 Capital Expenditures: Design 50,000 50,000 - 100,000 Right o(Way - 200,000 - - 200,000 Construction - - 2,500,000 2,500,000 Total Expenditures: 509000 250,000 2,500,000 - 29800,000 Grants / Other Sources: • 69 City of Auburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Arterial Utility Improvements Project No: cpxxxX Project Type: Capacity Improvements) Project Manager. TBD Description: Water main improvements in coordination with arterial street improvements. Progress Summary: Future Impact on Operating Budget: No siqnificant impact BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 500,000 500,000 500,000 Grants (Fed, State, Local) _ _ _ Bond Proceeds Other Total Funding Sources: - - 500,000 500,000 500,000 Capital Expenditurer. Design - - 50,000 50,000 100,000 Right of Way _ _ _ Construction - - 450,000 450,000 900,000 Total Expenditures: - - 500,000 500,000 1,000,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 300,000 300,000 300,000 300,000 2,200,000 Grants (Fed, State, Local) _ _ _ _ _ Bond Proceeds Other _ _ _ Total Funding Sources: 300,000 300,000 300,000 300,000 2,200,000 Capitat Expenditures: Design 100,000 Right of Way _ _ _ _ _ Construction 300,000 300,000 300,000 300,000 2,100,000 Total Expenditures: 300,000 300,000 300,000 300,000 2,200,000 Grants / Other Sources • 70 City of Auburn Draft Capital Facilities Plan • WATER FUND (430) Capital Faciiities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Lakeland Hills Booster Pump Station Project No: Cpxxxx Project Type: CapaCity Project Manager: ~ TBD Description: Increase the pump station capacity to meet fire flow requirements per 2002 Comp Plan. Progress Summary: Future Impact on Operating Budget: No siqnificant Impact BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unresfricted Water Revenue - - 500,000 500,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - 900,000 - Other - - - - - Total funding Sources: - - 500,000 900,000 500,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - - - - - Consfruction - - 350,000 900,000 350,000 Total Expenditures: - - 500,000 900,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue - - - - 500,000 Grants (Fed,Stafe,Loca/) - - - - - Bond Proceeds - - - - 900,000 Other - - - - - Total Funding Sources: - - - - 1,400,000 Capital Expenditures: Design - - - - 150,000 Right of Way - - - - - Construction - - - - 1,250,000 Total Expenditures: - - - - 1,400,000 Grants ! Other Sources: 0 71 City of Auburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Academy Booster Pump Station Project No: Cpxxxx Project Type: Capacity Project Manager: TBD ~ Description: To construct a new booster pump station to meet fire flow demands. Progress Summary: Future Impact on Operating Budget: No siqnificant Impact BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 500,000 500,000 Grants (Fed, State, Local) _ _ _ Bond Proceeds - - - 1,000,000 - Other _ _ Total Funding Sources: - - 500,000 1,000,000 500,000 Capital Expenditures: Design - - 150,000 - 150,000 Right ol Way _ _ _ Construction - - 350,000 1,000,000 350,000 Total Expenditures: - - 500,000 1,000,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue - - - - 500,000 Grants (Fed, State, Local) _ Bond Proceeds - - - - 1,000,000 Other Total Funding Sources: - - - - 1,500,000 Capital Expenditures: Design - - - - 150,000 Right of Way _ Construction - - - - 1,350,000 Total Expenditures: - - - - 1,500,000 Grants / Other Sources: ~ 72 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Annual Repair & Replacements Project No: rphydr, rpsrvc, rpvlve Project Type: Non-Capacity (R&R) Project Manager: Val'i0us Description: Funding set aside for replacing water lines as determined by the Water Utility. Projects will be coordinated with the Local Street Program and other utility projects. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue 577,783 1,300,000 500,000 500,000 2,377,783 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 577,783 1,300,000 500,000 500,000 2,377,783 Capital Expenditures: Design - 200,000 75,000 75,000 275,000 Right of Way - - - - - Construction 577,783 1,100,000 425,000 425,000 2,102,783 Total Expenditures: 577,783 1,300,000 500,000 500,000 2,377,783 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 500,000 500,000 500,000 500,000 3,000,000 Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 500,000 500,000 500,000 500,000 3,000,000 Capital Expenditures: Design 75,000 75,000 75,000 75,000 450,000 Right of Way - - - - - Construction 425,000 425,000 425,000 425,000 2,550,000 Total Expenditures: 500,000 500,000 500,000 500,000 3,000,000 Grants / Other Sources: • 73 City of Auburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan . Six Year Capitai Facilities Plan, 2009-2014 Enterprise Funds Project Title: SCADA Upgrades Project No: C524a0 Project Type: Non-Capacity (Improvements) Project Manager: Lee Description: The Supervisory Control and Data Acquisition (SCADA also known as the "Telemetry" system) is in need of upgrading. The existing system, based on an independent SCADA Assessment Study and the vuinerability study, has numerous obsolete components and does not allow control of the Sewer and Storm Utility stations. Upgrading the portion of the system utilizing antiquated equipment, while maintaining the portions of equipment that are compatible with the newer technologies availabte seems to be the logical course of action. The new system will utilize an open architecture so the City is no longer reliant on one vendor for repairs and maintenance. RFP was sent in 2006 and construction began in 2007. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget - Budget Amendmenfs _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 405,000 168,000 - 573,000 Grants (Fed, State, Local) - - _ _ _ PWTFL Other - - - _ _ Total Funding Sources: - 405,000 168,000 - 573,000 Capital Expenditures: Design - - - _ _ Right of Way - - - - _ Construction - 405,000 168,000 - 573,000 Total Expenditures: - 405,000 168,000 - 573,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 58,000 - - - 226,000 Grants (Fed, State, Local) - _ PWTFL Other - _ Total Funding Sources: 58,000 - - - 226,000 Capital Expenditures: Design - _ Right o(Way - _ Construction 58,000 - - - 226,000 Total Expenditures: 58,000 - - - 226,000 Grants ! Other Sources: • 74 City of Auburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Water Resources Protection Program Project No: C10130 Project Type: Non-Capacity (Improvements) Project Manager: Thorn Description: Water Resource Protection Program will identify potential hazards, identify actions and begin the implementation program to protect the city's water resources. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - ~ Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 130,000 - - 130,000 Grants (Fed,State,Local) - - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 130,000 - - 130,000 Capital Expenditures: Design - 130,000 - - 130,000 Right of Way - - - - - Construction - - - - - Total Expenditures: - 130,000 - - 130,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted WaterRevenue 450,000 19,000 20,000 21,000 510,000 Grants (Fed,Sfate,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 450,000 19,000 20,000 21,000 510,000 Capital Expenditures: Design - - - - - Rrght olWay - - - - - Construction 450,000 19,000 20,000 21,000 510,000 Totai Expenditures: 450,000 19,000 20,000 21,000 510,000 Grants / Other Sources: • 75 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Water Reservoir Safety Improvement Project Project No: CP0622 Project Type: Non-Capacity (Improvements) Project Manager: Thorn Description: There may be required security upgrades to the existing water utility facilities, based on an independent Vulnerability Assessment Study. Included with the security upgrades are upgrades to tank safety equipment, based on safety report. Progress Summary: Future Impact on Operating Budget: Any impacts to the operating budget will be analyzed and calculated once the scope is identified. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget ACtI Vlty: • 2008 YE 2009 Year End Funding Sources: Priorto 2008 Estimate 2009 Budget 2010 Budget Project Totai Unrestricted Water Revenue - 50,000 - - 50,000 Grants (Fed, State, Local) - - _ PWTFL _ Other - _ Total Funding Sources: - 50,000 - - 50,000 Capital Expenditures: Design - _ _ Right of Way - - _ Construction - 50,000 - - 50,000 Total Expenditures: - 50,000 - - 50,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 50,000 50,000 50,000 50,000 200,000 Grants (Fed,Stafe.Local) - _ _ _ _ PWTFL _ _ Other - _ _ _ _ Total Funding Sources: 50,000 50,000 50,000 50,000 200,000 Capital Expenditures: Design - _ _ _ _ Right o(Way - _ _ _ _ Construction 50,000 50,000 50,000 50,000 200,000 Total Expenditures: 50,000 50,000 50,000 50,000 200,000 Grants I Other Sources: • 76 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Blow-Off Installation on Deadend Mains Project No: CP0623 Project Type: Non-Capacity (Improvements) Project Manager: TBD Description: Identify and install all deadend mains with a blow-off assembly or hydrant to improve water quality and fire flow capability via routine flushing program. Progress Summary: Future Impact on Operating Budget: No significant impact, although it will require visits by water distribution staff to flush mains as part of the deadend main flushing program. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2070 Budget Project Total Unrestricted Water Revenue - 25,000 - - 25,000 Grants (Fed,Sfate,Local) - - - - _ - PWTFL Other - - _ Total Funding Sources: - 25,000 - - 25,000 Capital Expenditures: Design - - _ Right of Way - - _ Construction 25,000 - 25,000 Total Expenditures: - 25,000 - - 25,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 50,000 - - - 50,000 Grants (Fed, State, Local) - _ PWTFL - - - - - Other - - - _ Total Funding Sources: 50,000 - - - 50,000 Capital Expenditures: Design - _ Right of Way - _ Construction 50,000 - - - 50,000 Total Expenditures: 50,000 - - - 50,000 Grants / Other Sources: • 77 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Well 5 Upgrade Project No: CP0624 Project Type: Non-Capacity (Improvements) Project Manager: Lamothe Description: Construct a new weli facility that will meet current electrical and safety codes. The facility will require emergency backup power and disinfection capability. Progress Summary: ~ Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendmenfs _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue 54,000 548,100 - - 602,100 Granfs (Fed, State, Local) - - _ PWTFL Other - - _ Total Funding Sources: 54,000 548,100 - - 602,100 Capital Expenditures: Design - 348,100 - - 348,100 Right of Way - - _ Construction 54,000 200,000 - 254,000 Total Expenditures: 54, 548,100 - - 602,100 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 725,000 - - - 725,000 Grants (Fed, State, Local) - _ PWTFL Other - _ Totai Funding Sources: 725,000 - - - 725,000 Capital Expenditures: Design - _ Right of Way - - - - _ Construction 725,000 - - - 725,000 Total Expenditures: 725,000 - - - 725,000 Grants / Other Sources: • 78 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Comprehensive Water Plan Project No: CP0704 Project Type: Non-Capacity (improvements) Project Manager: Lamothe Description: Update Comprehensive Water Plan as required by Washington State Department of Heaith. Progress Summary: Plan update in progress Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 420,000 40,000 - 460,000 Grants (Fed,State,Locaf) - - - - - - PWTFL - - - - - Other - - - - Total Funding Sources: - 420,000 40,000 - 460,000 Capital Expenditures: Design - 420,000 40,000 - 460,000 Right o/ Way - - - - - Construction - - - - - Total Expenditures: - 420,000 40,000 - 460,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted WaterRevenue - - - - 40,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Ofher - - - - - Total Funding Sources: - - - - 40,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - - Total Expenditures: - - - - 40,000 Grants / Other Sources: • 79 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Les Gove Waterline Replacement Project No: CP0762 Project Type: Non-Capacity (R&R) Project Manager: DUndson Description: This project will replace aging waterlines in the area northwest of Les Gove Park. The area extends from 9th Street SE to 5th Street SE between D Street SE and K Street SE. Approximately 10,000 linear feet of old cast iron waterlines 2 to 6 inches in size will be replaced with new 8 inch waterlines. The existing waterlines are deteriorated and prone to leaking or breaking. Replacing the existing lines will improve fire flow and reduce maintenance needs and water losses. This project will be completed ahead of the SOS Overlay Program. Progress Summary: Future Impact on Operating Budget: ' BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ ~ Budget Amendments _ Adjusted Budget ACtI V lty: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 295,800 2,100,000 2,395,800 Grants (Fed, State, Local) - _ _ _ _ Bonds - - - 900,000 - Other - _ _ _ _ Total Funding Sources: - 295,800 2,100,000 900,000 2,395,800 Capital Expenditures: Design - 295,800 - 295,800 Right of Way - _ _ _ _ Consfruction - - 2,100,000 900,000 2,100,000 Total Expenditures: - 295,800 2,100,000 900,000 2,395,800 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue - - - - 2,100,000 Grants (Fed, State, Local) _ Bonds - - - - 900,000 Other _ Total Funding Sources: - - - - 3,000,000 Capital Expenditures: Design _ Right o/ Way Construction - - - - 3,000,000 Totai Expenditures: - - - - 3,000,000 Grants / Other Sources: • 80 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: SOS Utility Improvements Project No: cp103a Project Type: Non-Capacity (R&R) Project Manager: TBD Description: This project will consist of replacing aging waterlines in coordination with the SOS Program. Projects include replacement of mains in those areas identified in the proposed 2009 and 2010 SOS Program. Future CFPs are based on the following assumptions: Progress Summary: Future Impact on Operating Budget: No siqnificant Impact BUdget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 500,000 500,000 Grants (Fed, State, Local) - - - - - - Bond Proceeds - - - 500,000 - Other - - - - - Total Funding Sources: - - 500,000 500,000 500,000 Capital Expenditures: Design - - 50,000 50,000 50,000 Right of Way - - - - - Construction - - 450,000 450,000 450,000 Total Expenditures: - - 500,000 500,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 300,000 300,000 300,000 300,000 1,700,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - 500,000 Other - - - - - Total Funding Sources: 300,000 300,000 300,000 300,000 2,200,000 Capital Expenditures: Design 100,000 100,000 100,000 100,000 500,000 Right olWay - - - - - Construction 200,000 200,000 200,000 200,000 1,700.000 Total Expenditures: 300,000 300,000 300,000 300,000 2,200,000 Grants / Other Sources: • 81 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Vactor Waste Solids Handling Facility Project No: Cpxxxx Project Type: Non-Capacity (Improvements) Project Manager: TBD Description: Acquisition of land and construction of a facility where vactor waste solids can be deposited. In conjunction with storm and sanitary and possibly Aigona and Pacific. Progress Summary: Future Impact on Operating Budget: Upon completion of the project, due to increased efficiencies, there should be a decrease over the current operating expense. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestncted Water Revenue - Granfs (Fed, State, Local) Bond Proceeds - - - - - Other Total Funding Sources: Capital Expenditures: Design Right olWay Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 300,000 - - - 300,000 Granfs (Fed,State.Local) - _ Bond Proceeds Other - _ Total Funding Sources: 300,000 - - - 300,000 Capital Expenditures: Design 50,000 - - - 50,000 Right of Way - _ Construction 250;000 - - - 250,000 Total Expenditures: 300,000 - - - 300,000 Grants / Other Sources: • 82 City ofAuburn Draft Capital Facilities Plan ~ WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Maintenance and Operations Expansion Project No: Project Type: Non-Capacity (Improvements) Project Manager. TBD Description: Funds allocated to remodel the existing M&O building into a more functionai and maintainable facility. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Totai Unrestricfed Water Revenue - - - - Grants (Fed,Stafe,Local) - - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - - - - Capital Expenditures: Design - - - - Righto(Way - - - - Construcfion - - - - Total Expenditures: - - - - - Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 350,000 400,000 - 750,000 Grants (Fed,State,Locai) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 350,000 400,000 - - 750,000 Capital Expenditures: Design 150,000 - - 150,000 Right of Way - - - - Construction 200,000 400,000 - 600,000 Total Expenditures: 350,000 400,000 - - 750,000 Grants / Other Sources: • 83 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Well 4 and Intertie Pump Station Improvements Project No: C512a0 Project Type: Non-Capacity (Improvements) Project Manager: Lamothe Description: Construct a new building at the Well 4 site to house a diesel-fueled standby generator, new hypochlorite disinfection equipment, and restroom facilities accessible from inside and outside the building. Determine the cost and feasibility of installing standby power to the Lea Hill Booster Pump Station. Progress Summary: Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Sudget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Wafer Revenue - 623,300 - - 623,300 Grants (Fed, State, Local) - _ _ PWTFL _ Other - _ Total Funding Sources: - 623,300 - - 623,300 Capital Expenditures: Design - 623,300 - - 623,300 Right of Way - _ _ Consfruction - _ _ Total Expenditures: - 623,300 - - 623,300 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue 300,000 - - - 300,000 Grants (Fed, State, Local) - _ PWTFL Other - _ Total Funding Sources: 300,000 - - - 300,000 Capital Expenditures: Design - _ Right of Way - _ Construction 300,000 - - - 300,000 Total Expenditures: 300,000 - - - 300,000 Grants / Other Sources: • 84 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Facilities Evaluation Study Project No: CpXxXX Project Type: Non- Capacity (Improvements) Project Manager: TBD Description: Conduct a comprehensive study to catalog and assess the condition of existing facilities and infrastructure including sources, reservoirs, pump stations, pressure reducing station, interties and metering stations. Progress Summary: Future Impact on Operating Budget: Budg@t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budgef Amendments - Adjusted Budget - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 50,000 - - 50,000 Grants (Fed,Stafe,Local) - - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 50,000 - - 50,000 Capital Expenditures: Design - 50,000 - - 50,000 Right o/Way - - - - - Construction - - - - - Total Expenditures: - 50,000 - - 50,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted Water Revenue 80,000 - - - 80,000 Granfs (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 80,000 - - - 80,000 Capital Expenditures: Design 80,000 - - - 80,000 Right of Way - - - - - Construcfion - - - - - Total Expenditures: 80,000 - - - 80,000 Grants / Other Sources: • 85 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: M&O Satellite Facilities Project No: Cpxxxx Project Type: Non-Capacity (Improvements) Project Manager: TBD Description: Construction of satellite facilities to support M&O operationai activities including vactor waste solids transfer. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unresbicted Wafer Revenue - Grants (Fed, State, Local) PWTFL Other Total Funding Sources: Capital Expenditures Design Right of Way Constructron Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Water Revenue - - 50,000 50,000 100,000 Grants (Fed,State,Local) - - - _ _ PWTFL Other - - _ _ _ Total Funding Sources: - - 50,000 50,000 100,000 Capital Expenditures: Design - - 50,000 50,000 100,000 Right of Way - - - _ _ Construction _ _ Totat Expenditures: - - 50,000 50,000 100,000 Grants / Other Sources: . 86 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Lea Hill PRV Station Replacements Project No: Cpxxxx Project Type: Non-Capacity (R&R) Project Manager: TBD Description: Replace various station components including vaults, valves and lids at six pressure reducing stations. Progress Summary: Planned Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: - - - - 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - 20,000 - - 20,000 Grants (Fed,State,Locaf) - - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 20,000 - - 20,000 Capital Expenditures: Design - 20,000 - - 20,000 Right o(Way - - - - - Construction - - - - - Total Expenditures: - 20,000 - - 20,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unresfricted Water Revenue - 100,000 80,000 - 180,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 100,000 80,000 - 180,000 Capital Expenditures. Design - - - - - Right of Way - - - - - Construction - 100,000 80,000 - 180,000 Total Expenditures: - 100,000 80,000 - 180,000 Grants / Other Sources • 87 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Water Supply Charges Project No: CPxxXx Project Type: Non-Capacity (improvements) Project Manager: TBD Description: This project will provide financing to purchase water from adjacent purveyors to meet projected demand. Progress Summary: Planned Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 500,000 - Grants (Fed,Stafe,Local) _ _ Bond Other _ _ Total Funding Sources: - - - 500,000 - Capital Expenditures: Water Supply Charges - - - 500,000 - Right of Way _ _ Construction Total Expenditures: - - - 500,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unresfricted Water Revenue - - - - 500,000 Grants (Fed, State, Local) - _ Bond 32,300,000 - - - 32,300,000 Other - Total Funding Sources: 32,300,000 - - - 32,800,000 Capital Expenditures: Water Supply Charges 32,300,000 - - - 32,800.000 Right o! Way - _ Construction - Total Expenditures: 32,300,000 - - - 32,800,000 Grants / Other Sources: • 88 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital'Faciiities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Well inspection and Redevelopment Program Project No: CPxxxx Project Type: Non-Capacity (Improvements) Project Manager. TBD Description: This program will develop a well maintenance and rehabilitation process to keep protection wells operating near or at their design capacity. Progress Summary: Planned Future Impact on Operating Budget; None i BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: - - - - 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 500,000 500,000 Grants (Fed,Stale,Local) - - - - _ - Bond - - - 500,000 - Other - - - _ _ Total Funding Sources: - - 500,000 500,000 500,000 Capital Expenditures: Design - - 100,000 100,000 100,000 Righto(Way - - - - - Construction - - 400,000 400,000 400,000 Total Expenditures. - - 500,000 500,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted Water Revenue - - - - 500,000 Grants (Fed, State, Local) - Bond - - - - 500,000 Other - - - - - Total Funding Sources: - - - - 1,000,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - 800,000 Total Expenditures: - 1,000,000 Grants / Other Sources: • 89 City ofAuburn Draft Capital Facilities Plan WATER FUND (430) Capital Facilities Plan Six Year Capitai Facilities Plan, 2009-2014 Enterprise Funds • Project Title: AWS Sanitary Sewer Replacement - Phase 3 Project No: C504a0 (R Street SE Utility Improvements) Project Type: Non-Capacity (Improvements) Project Manager: TBD ' Description: To replace aging water mains. Progress Summary: Planned Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - Adjusted Budget - - - - ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Water Revenue - - 968,000 - 968,000 Grants (Fed,State,Local) - - - - _ Bond Other - - - Total Funding Sources: - • 968,000 - 968,000 Capital Expenditures: Design - - - _ _ Right of Way - - - - - Construction - - 968,000 - 968,000 Total Expenditures: - - 968,000 - 968,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unresiricted Water Revenue - - - - 968,000 Grants (Fed,Sfate,Local) - - - - - Bond - - - - - Other - - - - - Total Funding Sources: - - - - 968,000 Capital Expenditures: Design - - - - - Righf of Way _ Construction - - - - 968,000 Total Expenditures: - - - - 968,000 Grants / Other Sources: • 90 City ofAuburn Draft Capital Facilities Plan • WATER FUND (430) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: City Hall Annex Lease Project No: CPxxxx Project Type: Non-Capacity Project Manager. TBD Description: The capital lease for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: BUdget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: a 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricfed Water Revenue - - - 50,000 - Grants (Fed,Stafe,Local) - - - - - - Bond - - - 200,000 - Other - - - - - Total Funding Sources: - - - 250,000 - Capital Expenditures Capital Lease - - - 250,000 - Right of Way - - - - - Construction - - - - - Total Expenditures: - - - 250,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricfed Water Revenue 250,000 250,000 250,000 250,000 1,050,000 Grants (Fed, State, Local) - - - - - Bond - - - - 200,000 Other - - - - - Total Funding Sources: 250,000 250,000 250,000 250,000 1,250,000 Capital Expenditures: Capital Lease 250,000 250,000 250,000 250,000 1,250,000 Right of Way - - - - - Consfruction - - - - - Total Expenditures: 250,000 250,000 250,000 250,000 1,250,000 Grants ! Other Sources: • 91 City ofAuburn Draft Capital Facilities Plan TABLE W-3 • Impact on Future Operating Budgets WATER Pro'ect: 2010 2011 2012 2013 2014 2015 Total 1 Lea Hill Booster Pump $ _ $ _ $ _ $ _ $ _ $ _ $ 2 Lakeland Hills High Zone 1,200 1,200 2,400 Reservoir - 3 Arterial Utility Improvements _ _ 4 Lakeland Hills Booster Pump Station - " " ' - - $ Academy Booster Pump Station g Annual Repair/Replacements 7 SCADA Upgrades $ Water Resources Proteciion Proqram ~ - - - - 9 Water Reservoir Safety lmprovement Project - " - " - 10 Blow-off Installations, Dead End Mains ~ - " - - ' 11 WellS Upgrade _ _ _ _ _ _ _ • 12 Comprehensive Water Plan 13 Les Gove Waterline Replacement 14 SOS Utility Improvements 15 Vactor Waste Solids Handling Facility - - ' - ' - 16 Maintenance and Operations Expansion - " ' ' - - 17 Well 4 and lntertie Pump Station Improvements - - - ' 18 Facilities Evaluation Study 19 M 8 O Sate//ite Facilities 20 Lea Hill PRV Station Rep/acements ~ - - - - 21 Water Supp/y Charges 22 Well Inspection and Redevelopment Program - - - ' - 23 AWS Sanitary Sewer Replacement - Phase 3 - ' ' - 24 City Hall Annex Lease _ Total $ - $ - $ - $ - $ 1,200 $ 1,200 $ 2,400 • 92 City ofAuburn Draft Capital Facilities Plan • SANITARY SEWER Current Facilities The City's sanitary sewer service area encompasses approximately 28-square miles which are primarily within the City limits, but includes a total of approximately 1/2 square mile within Auburn's Proposed Annexation area (PAA). The City contracts with King County for sewage treatment and disposal. The City's Sanitary Sewer Utility is responsible for the collection and transmission of wastewater to the King County trunk lines. The City's current inventory of approximately 180 miles of sewer lines serves the City's sewer service area. Table S-1, Facilities Inventory, lists the sewage collection and transmission facilities along with their capacities and locations. Level of Service (LOS) The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level of service (LOS), or design criteria, for the City's sewage collection system. These standards represent the average quantities of sewage that the system must accommodate, for residential, industrial, and commercial development. . Capital Facilities Projects and Financing Investments in the City's sewage collection facilities include primarily non-capacity improvements and replacement projects. Anticipated replacements include three existing pump stations, replacement of aging sewer pipes and manholes in conjunction with arterial and local street improvements, and replacement of pipe identified through the sewer program's condition assessment process. Anticipated improvements include an upgrade of the City's SCADA network, and upgrades and additions to the utility's maintenance facilities. Total 6-year costs for the seventeen projects total $20,577,000. Table S-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There is no operating budget revenue impacts forecasted for sanitary sewer facilities during the six years 2010 - 2015. • 93 City ofAuburn Draft Capital Facilities Plan TABLE S-1 • Facilities Inventory Sewage Facilities CAPACITY FACILITY (MGD) LOCATION Pump Stations: 8th Street 0.26 J Street NE & 8th Street NE 22nd Street 0.79 22nd Street SE & Riverview Drive Area 19 0.47 Lake Tapps Pkwy E& West of 72nd Street SE D Street 0.58 D Street NE & Auburn Way N Dogwood 0:29 Dogwood Street SE 1500 & 15th Street SE Ellingson 0.72 41st Street SE & East of A Street SE F Street 0.86 F Street SE & 17th Street SE North Tapps 0.73 Lake Tapps Pkwy E& West of 176th Avenue E Peasley Ridge 0.36 S 320th Street & 53rd Avenue S R Street 0.14 R Street NE & 6th Street NE Rainier Ridge 0.29 125th Place SE & South of SE 318th Way Rainier Shadows 0.72 124th Avenue SE & SE 306th Place Riverside 0.58 8th Street NE & 104th Avenue SE ~ Terrace View 0:94 E Valley Hwy E& North of Terrace View Dr SE Valley Meadows 0.18 4th Street SE & V Street SE White Mountain Trails 0.18 SE 292nd Street & West of 118th Ave SE FACILITY Pipe Size LOCATION River Crossinqs: Inverted Syphon 8& 12 Inch Green River & 26th Street NE 8th Street Bridge 14 Inch Green River & 8th Street NE . 94 City ofAuburn Draft Capital Facilities Plan • TABLE S-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING , SANITARY SEWER DIVISION 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: None Non-Capacitv Proiects: 1 Sewer Facility Improvements Capital Costs 500,000 400,000 100,000 100,000 100,000 100,000 1,300,000 Funding Sources: Sewer Fund 500,000 400,000 100,000 100,000 100,000 100,000 1,300,000 2 SOS Utility Improvements Capital Costs 500,000 500,000 300,000 300,000 300,000 300,000 2,200,000 Funding Sources Sewer Fund 500,000 500,000 300,000 300,000 300,000 300,000 2,200,000 3 Arterial Street Utility Improvements Capital Costs 400,000 400,000 300,000 300,000 300,000 300,000 2,000,000 Funding Sources: Sewer Fund 400,000 400,000 300,000 300,000 300,000 300,000 2,000,000 4 Lea Hill Pump Station Decommissioning Capital Costs 125,000 - - - - - 125,000 Funding Sources: • Sewer Fund 125,000 - - - - - 125,000 5 SCADA (Telemetry) Upgrades Capital Costs 167,000 - 65,000 - - - 232,000 Funding Sources: Sewer Fund 167,000 - 65,000 - - - 232,000 6 Vactor Waste Solids Handling Faciiity Capital Costs - - 100,000 200,000 - - 300,000 Funding Sources: Sewer Fund - - 100,000 200,000 - - 300,000 7 Sanitary Sewer Repair 8 Replacement Capital Costs 900,000 100,000 1,200,000 160,000 1,300,000 170,000 3,830,000 Funding Sources: Sewer Fund 900,000 100,000 1,200,000 160,000 1,300,000 170,000 3,830,000 8 Ellingson Pump Station Replacement Capital Costs 600,000 1,100,000 100,000 - - - 1,800,000 Funding Sources: Sewer Fund 600,000 1,100,000 100,000 - - - 1,800,000 9 Dogwood Pump Station Replacement Capital Costs 150,000 150,000 1,500,000 - - - 1,800,000 Funding Sources: Sewer Fund 150,000 150,000 1,500,000 - - - 1,800,000 10 Miscellaneous Pump Station Repair & Replacement Capital Costs - - 200,000 2,000,000 - - 2,200,000 Funding Sources: Sewer Fund - - 200,000 2,000,000 - - 2,200,000 . 95 City of Auburn Draft Capital Facilities Plan TABLE S- 2 (continued) • 11 Sanitary Sewer Ring and Cover Repiacement Capital Costs - - 80,000 80,000 80,000 80,000 320,000 Funding Sources SewerFund - - 80,000 80,000 80,000 80,000 320,000 12 Les Gove Area Improvements Capital Costs 610,000 10,000 - - - - 620,000 Funding Sources: SewerFund 610,000 10,000 - - - - 620,000 Non-Caaacitv Proiects: 13 8th St NE and Harvey Rd/M St NE Improvements Capital Costs - - - - 150,000 - 150,000 Funding Sources: Sewer Fund - - - - 150,000 - 150,000 14 Maintenance and Operations Facility Expansion Capital Costs - - 350,000 400,000 - - 750,000 Funding Sourcex Sewer Fund - - 350,000 400,000 - - 750,000 15 M&O SATELLITE FACILITIES Capital Costs - - - 100,000 100,000 - 200,000 Funding Sources: Sewer Fund - - - 100,000 100,000 - 200,000 16 Power Generators Capital Costs 500,000 1,000,000 - - - - 1,500,000 • Funding Sources: Sewer Fund 500,000 1,000,000 - - - - 1,500,000 17 City Hall Annex Lease Capital Costs - 250,000 250,000 250,000 250,000 250,000 1,250,000 Funding Sources: SewerFund - 250,000 250,000 250,000 250,000 250,000 1,250,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - Non-Capacity Projects 4,452,000 3,910,000 4,545,000 3,890,000 2,580,000 1,200,000 16,977,000 Total Costs 4,452,000 3,910,000 4,545,000 3,890,000 2,580,000 1,200,000 20,577,000 FUNDING SOURCES: Utility Funds (Sewer) 4,452,000 3,910,000 4,545,000 3,890,000 2,580,000 1,200,000 16,977,000 PWTFL - - - - _ _ Other(MIT) - - - - _ _ _ Totai Funding 4,452,000 3,910,000 4,545,000 3,890,000 2,580,000 1,200,000 20,577,000 ~ 96 City ofAuburn Draft Capital Facilities Plan . SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Sanitary Sewer Facility Improvements Project No: Cpxxxx Project Type: Non-Capacity Project Manager: Elwell Description: This particular program includes proposed projects, primarily upgrades to pump stations, which do not have an approved Project Management Plan or are not accounted for elsewhere in the Capital Facilities Plan. Typical projects may include pump station backup power upgrades, general pump station safety improvements, and force main upgrade. Progress Summary: Future Impact on Operating Budget: Improvements to the system should result in somewhat lower operational costs in addition to greater reliability. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - 8udget Amendments - - - - ~ Adjusted Budget - - - - ACtivity: (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - - 500,000 400,000 500,000 Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - - 500,000 500,000 500,000 Capital Expenditures: Design - - 40,000 40,000 40,000 Right olWay - - - - - Construction - - 460,000 360,000 460,000 Total Expenditures: - - 500,000 400,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 100,000 100,000 100,000 100,000 1,300,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 100,000 100,000 100,000 100,000 1,300,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 120,000 Right ol Way - - - - - Construction 90,000 90,000 90,000 90,000 1,180,000 Total Expenditures: 100,000 100,000 100,000 100,000 1,300,000 Grants / Other Sources: • 97 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) , Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: SOS Utility Improvements Project No: cpxxxx Project Type: Non CapaCity Project Manager: TBD Description: Sewer line replacement in coordination with SOS improvements. Progress Summary: Ongoing Future Impact on Operating Budget: No significant Impact Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: ~ 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricfed Sewer Revenue N/A - 500,000 500,000 500,000 Grants (Fed, State, Local) - - - _ _ PWTFL Other - - _ _ Total Funding Sources: - - 500,000 500,000 500,000 Capital Expenditures: Design - - 50,000 50,000 50,000 Right of Way - - - _ _ Construction - - 450,000 450,000 450,000 Total Expenditures: - - 500,000 500,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 300,000 300,000 300,000 300,000 2,200,000 Grants (Fed, State, Local) - - _ _ _ PWTFL Other - _ _ _ _ Total Funding Sources: 300,000 300,000 300,000 300,000 2,200,000 Capital Expenditures: , Design 80,000 50,000 80,000 80,000 420,000 Right of Way - - - _ _ Construction 220,000 220,000 220,000 220,000 1,780,000 Totai Expenditures: 300,000 300,000 300,000 300,000 2,200,000 Grants I Other Sources: • 98 City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Arterial Street Utility Improvements Project No: Cpxxxx Project Type: Non CapaClty Project Manager: TBD Description: Sewer line replacement in coordination with Arterial Transportation improvements. Progress Summary: Ongoing Future Impact on Operating Budget: No significant Impact BUdg@t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - Adjusted Budget - - - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue N/A 25,000 400,000 400,000 425,000 Grants (Fed, State, Local) - - - - - _ PWTFL Other - Total Funding Sources: - 25,000 400,000 400,000 425,000 Capital Expenditures: Design - 25,000 50,000 50,000 125,000 Right o(Way - - - - _ Construction - 350,000 350,000 350,000 Total Expenditures: - 25,000 400,000 400,000 425,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 300,000 300,000 300,000 300,000 2,000,000 Grants (Fed,Sta[e,Loca/) - - - - - PWTFL Other - - _ Total Funding Sources: 300,000 300,000 300,000 300,000 2,000,000 Capital Expenditures: Design 80,000 80,000 80,000 80,000 420,000 Right o(Way - - _ _ _ Construction 220,000 220,000 220,000 220,000 1,580,000 Total Expenditures: 300,000 300,000 300,000 300,000 2,000,000 Grants / Other Sources: • 99 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Lea Hill Pump Station Decommissioning Project No: cp0724 & cp0756 Project Type: Non-Capacity (Improvements) Project Manager. Sweeting Description: This project allows two existing City wastewater pump stations to be decommissioned. Gravity sewer lines have been extended from the two existing stations to the Verdana Pump Station (under construction) which has been designed to pump sewage from the two existing stations as well as the new Verdana (aka "Bridges") development. Progress Summary: At the end of 2008, the work should be substantially complete, with the remaining work consisting of the removal/demolition of the existing pump stations, salvage of equipment, etc. Future Impact on Operating Budget: No significant impact. While two stations are to be removed, a larger station will require maintenance and operations attention. BudgOt: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budge[ ACtI V ity: • 2008 YE 2009 Year End Funding Sources: Rrior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted SewerRevenue 517,500 740,660 125,000 - 1,383,160 Grants (Fed, State, Local) - - - _ _ PWTFL Other - Total Funding Sources: 517,500 740,660 125,000 - 1,383,160 Capital Expenditures: Design 50,500 - - - 50,500 Right o(Way - - - _ _ Construction 467,000 740,660 125,000 - 1,332,660 Totai Expenditures: 517,500 740,660 125,000 - 1,383,160 Forecasted Project Cost: Total 2017 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue - - - - 125,000 Grants (Fed,State.Local) _ PWTFL Other _ Total Funding Sources: - - - - 125,000 Capital Expenditures: Design _ Right ol Way _ Construction - - - - 125,000 Total Expenditures: - - - - 125,000 Grants / Other Sources: • 100 City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: SCADA Upgrades Project No: C524a0 Project Type: Non-Capacity (Improvements) Project Manager. Lee Description: The Supervisory Control and Data Acquisition (SCADA also known as the "Telemetry" system) is in need of upgrading. The existing system, based on an independent SCADA Assessment Study and the vulnerability study, has numerous obsolete components and does not aliow control of the Sewer and Storm Utility stations. Upgrading the portion of the system utilizing antiquated equipment, while maintaining the portions of equipment that are compatible with the newer technologies available seems to be the logical course of action. The new system will utilize an open architecture so the City is no longer reliant on one vendor for repairs and maintenance. RFP was sent in 2006 and construction began in 2007. Progress Summary: Future Impact on Operating Budget: No significant impact. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - • Budget Amendments - - - - Adjusted Budget activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted SewerRevenue 44,020 720,746 167,000 - 931,766 Grants (Fed,State,LocaQ - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 44,020 720,746 167,000 - 931,766 Capital Expenditures: Design 44,020 138,478 - - 182,498 Right o(Way - - - - - Construction - 582,268 167,000 - 749,268 Total Expenditures: 44,020 720,746 167,000 - 931,766 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricfed Sewer Revenue 65,000 - - - 232,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Ofher - - - - - Total Funding Sources: 65,000 - - - 232,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Consfruction 65,000 - - - 232,000 Totai Expenditures: 65,000 - - - 232,000 Grants / Other Sources: • 101 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Vactor Waste Solids Handling Facility Project No: cpxxxx Project Type: Non CapaCity Project Manager: TBD Description: Acquisition of land and construction of a facility where vactor waste solids can be deposited. (In conjunction with storm and possibiy Algona and Pacific. Progress Summary: Not initiated Future Impact on Operating Budget: The facility should reduce operating costs by reducing King County fees and reducing travel time to the King County Facility. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - - - Adjusted Budget - - - - Activity: . 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - - - - - Grants (Fed, State, Local) - - - - - PWTFL Other Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right ol Way - - - - Construcfion - - - - - Totai Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 100,000 200,000 - - 300,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 100,000 200,000 - - 300,000 Capital Expenditures: Desrgn 100,000 100,000 - - 200,000 Right of Way - - - - Construction - 100,000 - - 100,000 Total Expenditures: 100,000 200,000 - - 300,000 Grants / Other Sources: • 102 ' City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Ellingson Pump Station Replacement Project No: Cpxxxx Project Type: Non Capacity Project Manager: TBD Description: Project to replace the Ellingson Pump Station. Progress Summary: Initiation Stage Future Impact on Operating Budget: The project should decrease maintenance costs compared to the existing pump station. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - - - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - 100,000 600,000 1,100,000 700,000 Grants (Fed, State, Local) - - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 100,000 600,000 1,100,000 700,000 Capital Expenditures Design - 100,000 150,000 50,000 250,000 Righto(Way - - 30,000 - 30,000 Construction - - 420,000 1,050,000 420,000 Total Expenditures. - 100,000 600,000 1,100,000 700,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted Sewer Revenue 100,000 - - 1,800,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 100,000 - - - 1,800,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - 30,000 Construction 100,000 - - - 1,570,000 Total Expenditures: 100,000 - - - 1,800,000 Grants / Other Sources: • 103 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds ~ Project Title: Dogwood Pump Station Replacement Project No: CpXxxX Project Type: Non Capacity Project Manager: TBD Description: Project to replace the Dogwood Pump Station. Progress Summary: Initiation Stage Future impact on Operating Budget: , The project should decrease maintenance costs compared to the existing pump station. Budget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - - - Adjusted Budget , - - - - ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - 100,000 150,000 150,000 250,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Ofher - - - - - Total Funding Sources: - 100,000 150,000 150,000 250,000 Capital Expenditures: Design - 100,000 100,000 50,000 200,000 Right of Way - - - - - Consfruction - 50,000 100,000 50,000 Total Expenditures: - 100,000 150,000 150,000 250,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: UnresfrictedSewerRevenue 1,500,000 - - - 1,800.000 Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 1,500,000 - - - 1,800,000 Capital Expenditures: Design 20,000 - - - 170,000 Right of Way - - - - - Construction 1,480,000 - - - 1,630,000 Total Expenditures: 1,500,000 - - - 1,800,000 Grants / Other Sources: • 104 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Sanitary Sewer Repair 8 Repiacement Project No: cpxxxx Project Type: Non-Capacity (Repair and Replacement) Project Manager: Elwell Description: Repair and replace broken sewer mains and other facilities. These lines will be identified through television inspection and routine cleaning. This particular program includes proposed projects which do not have an approved Project Management Plan, or are not associated with the SOS or other transportation improvements. Anticipated projects include bi-annual, stand- alone, repair and replacement projects for sewer lines which are broken, misaligned, "bellied" or otherwise require an inordinate amount of maintenance effort or present a risk of backup or trench failure. 2. Repair and replacement of sewer manhole rings and covers. Progress Summary: Ongoing Future Impact on Operating Budget: This should decrease the operating budget by correcting the problems that require operations attention. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - • Budget Amendments - - - - Adjusted Budget Activity: (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue N/A 1,680,000 900,000 100,000 2,580,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 1,680,000 900,000 100,000 2,580,000 Capital Expenditures: Design - 368,000 50,000 - 418,000 Right of Way - - - - - Consfruction N/A 1,312,000 850,000 100,000 2,162,000 Total Expenditures: - 1,680,000 900,000 100,000 2,580,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 1,200,000 160,000 1,300,000 170,000 3,830,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: 1,200,000 160,000 1,300,000 170,000 3,830,000 Capital Expenditures: Design 100,000 125,000 100,000 135,000 510,000 Right o(Way - - - - - Construction 1,100,000 35,000 1,200,000 35,000 3,320,000 Total Expenditures: 1,200,000 160,000 1,300,000 170,000 31830,000 Grants ! Other Sources: • 105 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Miscellaneous Pump Station Repair & Replacement Project No: Cpxxxx Project Type: Non CapaCity Project Manager. TBD Description: Project to replace/repair aging pump stations. Progress Summary: Initiation Stage • Future Impact on Operating Budget: The project should decrease maintenance costs compared to the existing pump stations. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments Adjusted Budget - - - - Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestncted Sewer Revenue - Grants (Fed,Stafe,Local) PWTFL Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted SewerRevenue 200,000 2,000,000 - - 2,200,000 Grants (Fed, State, Local) - - - - _ PWTFL Other - - _ Total Funding Sources: 200,000 2,000,000 - - 2,200,000 Capital Expenditures: Design 200,000 100,000 - - 300,000 Right of Way - - _ Construction - 1,900,000 - - 1,900,000 Total Expenditures: 200,000 2,000,000 - - 2,200,000 Grants / Other Sources: • 106 City ofAuburn Draft Capital Facilities Plan ~ SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Titie: Sanitary Sewer Ring and Cover Replacement Project No: cpxxxx Project Type: Non-Capacity (Repair and Replacement) Projeci Manager: Elwell Description: Replacement of rings and covers throughout the City which have been identified as loose, rattling, or otherwise unstable or unusable. Progress Summary: Ongoing Future Impact on Operating Budget: No significant impact Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance • Adopted Budget Budget Amendments Adjusted Budget - - Activity: (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue N/A - - - - Grants (Fed, State, Local) - - - - - ' PWTFL - - - - - Other - - - - - Total Funding Sources: Capital Expenditures: Design - - - - - Right of Way - - - - - Construction N/A - - - - Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue 80,000 80,000 80,000 80,000 320,000 Grants (Fed,State,Local) - - - _ _ PWTFL Other - - - _ _ Total Funding Sources: 80,000 80,000 80,000 80,000 320,000 Capital Expenditures: Design 20,000 20,000 20,000 2o,ooo 80,000 Right of Way - - - - - Construction 60,000 60,000 60,000 60,000 240,000 Total Expenditures: 80,000 80,000 80,000 80,000 320,000 ~ Grants / Other Sources: 107 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan ~ Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Les Gove Area Improvements Project No: Cp0762 Project Type: Non CapaClty Project Manager: Dunsdon Description: Sewer line replacement in coordination with SOS improvements and other utility work in that area. Progress Summary: Design Phase Future Impact on Operating Budget: The replacement of aging sewer pipe will reduce maintenance and assessment needs and decrease the risk of emergency repair. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments Adjusted Budget - - - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unresfricted Sewer Revenue N/A 75,000 610,000 10,000 685,000 Grants (Fed,State,LocaQ - - - _ _ PWTFL Other - - - _ _ Total Funding Sources: - 75,000 610,000 10,000 685,000 Capital Expenditures: Design - 75,000 10,000 - 85,000 Right of Way - - - _ _ Construction - - 600,000 10,000 600,000 Total Expenditures: - 75,000 610,000 10,000 685,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue - - - - 620,000 Grants (Fed, State, Local) _ PWTFL Other _ Total Funding Sources: - - - - 620,000 Capital Expenditures: Design - - - - 10,000 Righto(Way _ Construction - - - - 610,000 Total Expenditures: - - - - 620,000 Grants / Other Sources: • 108 City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: 8th St NE and Harvey Rd/M St NE Improvements Project No: cp0611 Project Type: NOn CapaCity Project Manager: Sweeting Description: Sewer line replacement in coordination with street and intersection improvements in that area. Progress Summary: Design Phase Future Impact on Operating Budget: The replacement of aging sewer pipe will reduce maintenance and assessment needs and decrease the risk of emergency repair. BUdgCt: 2008 YTD Actual 2009 08 Budget . Budget Expenditures Budget Balance • Adopted Budget - - - - Budget Amendments Adjusted Budget ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total - Unrestricted Sewer Revenue N/A 25,000 - - 25,000 Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 25,000 - - 25,000 Capital Expenditures: Design - 25,000 - - 25,000 Right ol Way - - - - - Construction - - - - Total Expenditures: - 25,000 - - 25,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted SewerRevenue - - 150,000 - 150,000 Grants (Fed, State, Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - - 150,000 - 150,000 Capital Expenditures: Design - - 10,000 - 10,000 Right olWay - - - - - Construction - - 140.000 - 140,000 Total Expenditures: - - 150,000 - 150,000 • Grants / Other Sources: 109 City ofAuburn Draft Capital Facilities Plan SEWER FUND (431) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Maintenance and Operations Facility Expansion Project No: cpxxxx Project Type: Non-Capacity (Improvements) Project Manager: TBD Description: Funds allocated to expand the existing M&O building into a more functionai and maintainable facility. Progress Summary: Initiation Stage Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - Grants (Fed,State,Locaq PWTFL Other Total Funding Sources: Capital Expenditures: Design Right ol Way Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted SewerRevenue 350,000 400,000 - - 750,000 Grants (Fed,State,local) - _ _ PWTFL Other - _ _ Total Funding Sources: 350,000 400,000 - - 750,000 Capital Expenditures: Design 150,000 50,000 - - 200,000 Right of Way - _ _ Construction 200,000 350,000 - - 550,000 Total Expenditures: 350,000 400,000 - - 750,000 Grants / Other Sources: • 110 City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: M&O SATELLITE FACILITIES Project No: cpxxxx Project Type: Non-Capacity Project Manager: TBD Description: Construction of satellite facilities to support M&O operational activities including vactor waste solids transfer. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments Adjusted Budgef - - - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sewer Revenue - - - - - Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - Right olWay - - - - Cons[ruction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue - 100,000 100,000 - 200,000 Grants (Fed,State,Local) - - - - - PWTFL - - - - - Other - - - - - Total Funding Sources: - 100,000 100,000 - 200,000 Capital Expenditures: Design - 50,000 - 50,000 Right ol Way - 50,000 - 50,000 Construction - 100,000 - 100,000 Total Expenditures: - 100,000 100,000 - 200,000 Grants / Other Sources: • 111 City ofAuburn Draft Capital Facilities Plan ' SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Power Generators Project No: Cpxxxx Project Type: Non-CapaCity Project Manager: TBD Description: To provide back-up power for all sewer pump stations. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtiVity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total UnresirictedSewerRevenue - - 500,000 1,000,000 500,000 Grants (Fed, State, Local) - - _ _ _ PWTFL Other _ _ _ Total Funding Sources: - - 500,000 1,000,000 500,000 Capital Expenditures: Design - - 50,000 50,000 100,000 Right o/Way _ _ Construction - 450,000 950,000 1,400,000 Total Expenditures: - - 500,000 1,000,000 500,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sewer Revenue - - - - 1,500,000 Grants (Fed,State,Loca!) _ PWTFL Other _ Total Funding Sources: - - - - 1,500,000 Capital Expenditures: Design - - - 100,000 Right of Way _ Construcfion - - - 1,400,000 Total Expenditures: - - - - 1,500,000 Grants / Other Sources: • 112 City ofAuburn Draft Capital Facilities Plan • SEWER FUND (431) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: City Hall Annex Lease Project No: CPxxxx Project Type: Non-Capacity Project Manager: TBD Description: The capital lease for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments . • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted SewerRevenue - - - 250,000 Grants (Fed,Stale,Local) - - - _ _ PWTFL _ _ Other Total Funding Sources: - - - 250,000 - Capital Expenditures: Capita/ Lease - - - 250,000 - Right of Way - - - _ _ Construction _ _ Total Expenditures: - - - 250,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted SewerRevenue 250,000 250,000 250,000 250,000 1,250,000 Grants (Fed, State, Local) - - - _ _ PWTFL Other - - - _ _ Total Funding Sources: 250,000 250,000 250,000 250,000 1,250,000 Capital Expenditures: Capital Lease 250,000 250,000 250,000 250,000 1,250,000 Right of Way - - _ _ _ Construcfion - - _ _ _ Total Expenditures: 250,000 250,000 250,000 250,000 1,250,000 Grants / Other Sources: • 113 City ofAuburn Draft Capital Facilities Plan • ClTl OF ~ . ~ MORE T'HAN YCJU IMAGINED ~ 114 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE Current Facilities The City's storm drainage service area encompasses the municipal boundaries of the City. For management purposes the service area is divided into sixty drainage sub-basins. The City's drainage system consists of a combination of closed conveyance pipes and open ditch conveyance facilities, with five pumping stations. Table SD-1 Facilities Inventory lists the facilities along with their current capacities and location. Level of Service (LOS) The City's Comprehensive Drainage Plan summarizes the level of service (LOS), or design criteria, for the City's storm drainage system. Generally, these standards represent a 25- year/24-hour design storm capacity within the sixteen drainage sub-basins. Capital Facilities Projects and Financing The City's storm drainage facilities include three categories of projects: (1) developer participation capacity project totaling $150,000, which primarily represent developer participation projects to support new development; (2) pipeline and surface conveyance projects • totaling $9,870,000; and (3) retention, detention, and water quality non-capacity projects totaling $11,490,000, which primarily represent detention and retention facilities improvements and upgrades. Total six-year costs for the three categories of projects are $21,510,000. Table SD-2 shows the proposed financing plan followed by individual worksheets showing the project detail. _ Impact on Future Operating Budgets As Table SD-3 shows, operating budget impacts of $4,000 are forecasted for storm drainage facilities during the six years 2010 - 2015. • 115 City of Auburn Draft Capital Facilities Plan TABLE SD-1 Facilities invento • ry Storm Drainage Facilities CAPACtTY Feet of Feet of FACILITY Acres Pipeline Open Channels LOCATION Drainage Basins: A 484 22,200 1,200 See City of Auburn's AA 408 22,000 24,000 Comprehensive Drainage AAA 296 Plan, Aug. 2002 B 861 52,800 0 BB 11 1,400 0 BBB 68 " C 835 51,500 2,300 CC 227 * * CCC 991 D 168 12,700 6,000 DD 231 * • DDD 58 E 657 71,500 14,300 EE 588 * * EEE 287 F 83 5,900 0 • FF 409 * * G 135 12,700 0 GG 190 8,800 1,700 H 555 24,300 2,100 - HH 419 0 0 HV 66 8,400 0 I 241 34,000 2,600 11 304 0 0 J 257 2,200 0 JJ 1,158 K 266 14,000 1,000 KK 391 0 0 L 87 21,500 600 L L 189 LS 1,137 M 553 4,500 0 MM 332 0 0 N 122 900 0 NN 549 NNN 175 O 176 25,200 11,300 00 1,401 P 190 6,300 2,100 PP 110 PPP 161 3,200 6,500 QQ 334 9,300 3,000 • 116 City ofAuburn Draft Capital Facilities Plan • TABLE SD-1 (continued) Facilities Inventory Storm Drainage Facilities R 46 7,100 0 RR 249 S 266 16,000 5,700 SS 326 T 692 TT 135 9,300 1,000 U 361 U U 471 V 552 11,600 15,000 W 65 8,600 0 W W 70 X 32 * * XX 777 YY 324 YYY 105 0 0 Z 57 8,700 0 ZZ 950 ZZZ 243 0 0 Total 21,881 476,600 100,400 • * Insufficient data in basin Insufficient data due to recent accexation of basin FACILITY (GPM) LOCATION Pump Stations: A Street SE Pump Station #1 5,300 5000 block A Street SE A Street SE Pump Station #2 1,380 A Street SE near SR-18 and BNRR overpass Auburn Way S Pump Station #3 1,000 Auburn Way S near SR-18 and BNRR overpass Brannan Park Pump Station #4 20,200 Brannan Park Emerald Corp. Park Pump Station 6,500 C Street NE near 42nd Street • 117 City ofAuburn Draft Capital Facilities Plan TABLE SD-2 - CAPITAL FACI • LITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: 1 Developer Participation Capital Costs - - 50,000 - 100,000 - 150,000 Funding Sources: Storm Fund - - 50,000 - 100,000 - 150,000 2 E Basin Ditch Improvements Capital Costs - - 75,000 300,000 - - 375,000 Funding Sources: Storm Fund - - 75,000 300,000 - - 375,000 3 21st St. SE &'M' St. SE (BC-22 Modified) Capital Costs - - 75,000 425,000 - - 500,000 Funding Sources: Storm Fund - - 75,000 425,000 - - 500,000 4 North Central Storm Pond (GHI-9) Capital Costs - - - 275,000 1,000,000 2,000,000 3,275,000 Funding Sources: Storm Fund - - - 275,000 1,000,000 2,000,000 3,275,000 5 15th Street Culvert Replacement (cp0638) Capital Costs - - - 50,000 - - 50,000 Funding Sources: Storm Fund - - - 50,000 - - 50,000 Other _ _ _ _ 6 Downtown Storm Water Quality Facility Capital Costs - - 300,000 500,000 800,000 - 1,600,000 • Funding Sources: Storm Fund - - 300,000 500,000 800,000 - 1,600,000 7 17th St. SE &'M' St. SE (c504a0) Capital Costs - - - 25,000 - - 25,000 _ Funding Sources: Storm Fund - - - 25,000 - - 25,000 8 AWS Sanitary Sewer Replacement - Phase 3 Capital Costs 770,000 - - - - - 770,000 Funding Sources: Storm Fund 770,000 - - - - - 770,000 9 Arterial Utility Improvements Capital Costs 300,000 400,000 300,000 300,000 300,000 300,000 1,900,000 Funding Sources: Storm Fund 300,000 300,000 300,000 300,000 300,000 300,000 1,800,000 Bond Proceeds - 100,000 - - - - 100,000 10 Local Storm Drainage Improvements Capital Costs 200,000 200,000 100,000 100,000 100,000 100,000 800,000 Funding Sources: Storm Fund 200,000 200,000 100,000 100,000 100,000 100,000 800,000 Bond Proceeds - - _ _ _ _ _ 11 17th Street improvements Capital Costs - - 230,000 270,000 - - 500,000 Funding Sources: Storm Fund - - 230,000 270,000 - - 500,000 12 AWS and Hwy 18 Improvements Capital Costs 75,000 - - - - - 75,000 Funding Sources: Storm Fund 75,000 - - - - - 75,000 Subtotal. Capacitv Proiects: • Capital Costs 1,345,000 600,000 1,130,000 2,245,000 2,300,000 2,400,000 10,020,000 118 City ofAuburn Draft Capital Facilities Plan ~ TABLE SD-2 (continued) 2009 2010 2011 2012 2013 2014 Total Non-Capacitv Projects: 13 Regulatory Improvements Capitai Costs 50,000 50,000 50,000 50,000 50,000 50,000 300,000 Funding Sources: Storm Fund 50,000 50,000 50,000 50,000 50,000 50,000 300,000 14 Storm Facility Retrofit Program Capital Costs - - 50,000 50,000 50,000 50,000 200,000 Funding Sources: Storm Fund - - 50,000 50,000 50,000 50,000 200,000 15 SCADA (Telemetry) Upgrades Capital Costs 162,000 - 58,000 - - - 220,000 Funding Sources: Storm Fund 162,000 - 58,000 - - - 220,000 16 Pipeline Repair I Replacements Capital Costs 200,000 200,000 100,000 100,000 100,000 100,000 800,000 Funding Sources: Storm Fund 200,000 - 100,000 100,000 100,000 100,000 600,000 Bond Proceeds - 200,000 - - - - 200,000 17 Airporf Storm Pond Rehabilitation Capital Costs - - - 100,000 - - 100,000 Funding Sources: Storm Fund - - - 100,000 - - 100,000 18 White River Storm Pump Station Replacement Capital Costs 500,000 1,500,000 - - - - 2,000,000 • Funding Sources: Storm Fund 500,000 500,000 Bond Proceeds - 1,500,000 - - - - 1,500,000 19 Vactor Waste Solids Handling Facility Capital Costs - - 100,000 200,000 - - 300,000 Funding Sources: Storm Fund - - 100,000 200,000 - - 300,000 20 SOS Utility Improvements Capital Costs 500,000 700,000 300,000 300,000 300,000 300,000 2,400,000 Funding Sources: Storm Fund 500,000 - 300,000 300,000 300,000 300,000 1,700,000 Bond Proceeds - 700,000 - - - - 700,000 21 M Street NE/Harvey Road & 8th Street Capital Costs 100,000 - - - - - 100,000 Funding Sources: Storm Fund 100,000 - - - - - 100,000 22 l.es Gove Neighborhood Improvement Capital Costs 350,000 20,000 - - - - 370,000 Funding Sources: Storm Fund 350,000 20,000 - - - - 370,000 23 Maintenance 8, Operations Expansion Capital Costs - - 350,000 400,000 - - 750,000 Funding Sources: Storm Fund - - 350,000 400,000 - - 750,000 24 Maintenance 8 Operations Satellite Facilities Capital Costs - - - 100,000 100,000 - 200,000 Funding Sources: • Storm Fund - - - 100,000 100,000 - 200,000 119 City ofAuburn Draft Capital Facilities Plan TABLE SD-2 (continued) • 2009 2010 2011 2012 2013 2014 Total Non-Capacitv Proiects: 25 West Valley Highway Improvements Capital Costs - - 1,500,000 - - - 1,500,000 Funding Sources: Storm Fund - - 1,500,000 - - - 1,500,000 26 Peasley Canyon Culvert Replacement Capital Costs 1,000,000 - - - - - 1,000,000 Funding Sources: Storm Fund 1,000,000 - - - - - 1,000,000 27 City Haii Annex Lease Capital Costs - 250,000 250,000 250,000 250,000 250,000 1,250,000 Funding Sources: Storm Fund - 250,000 250,000 250,000 250,000 250,000 1,250,000 Subtotat. Non-Capacitv Proiects: Capital Costs 2,862,000 2,720,000 2,758,000 1,550,000 850,000 750,000 11,490,000 SUMMARY: CAPITAL COSTS Capacity Projects 1,345,000 600,000 1,130,000 2,245,000 2,300,000 2,400,000 10,020,000 Non-Capacity Projects 2,862,000 2,720,000 2,758,000 1,550,000 850,000 750,000 11,490,000 Total Costs 4,207,000 3,320,000 3,888,000 3,795,000 3,150,000 3,150,000 21,510,000 FUNDING SOURCES: Storm Fund 4,207,000 820,000 3,888,000 3,795,000 3,150,000 3,150,000 19,010,000 Bond Proceeds - 2,500,000 - - - - 2,500,000 Total Funding 4,207,000 3,320,000 3,888,000 3,795,000 3,150,000 3,150,000 21,510,000 • 120 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Developer Participation Project No: cp432a Project Type: Capacity (Expansion) Project Manager. TBD Description: Funding set aside for upsizing storm lines being installed by developers. These funds will be expended when developers install storm lines according to City code where larger lines are required as predetermined by the Storm Drainage Comprehensive Plan. Progress Summary: Future Impact on Operating Budget: Impact cannot be determined until the specific developer projects are identified. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments ' Adjusted Budget • Activity: - - - (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue 45,000 50,000 - - 95,000 Grants (Fed,State,LocaQ - - - - - Bond Proceeds - - - - ' Other - - - - - Totai Funding Sources: 45,000 50,000 - - 95,000 Capital Expenditures: Design - ' - - - ' Righf of Way - - - - ' Consfruction 45,000 50,000 - 95,000 Total Expenditures: 45,000 50,000 - - 95,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 50,000 - 100,000 - 150,000 Grants (Fed, State, Local) - - - - ' Bond Proceeds - - - - ' Other - - - - ' Total Funding Sources: 50,000 - 100,000 - 150,000 Capital Expenditures: Design - - - - ' Right of Way - - - - ' Construcfion 50,000 - 100,000 - 150,000 Total Expenditures: 50,000 - 100,000 - 150,000 Grants / Other Sources: • 121 City ofAuburn Draft Capital-Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: E Basin Ditch Improvement Project No: cpxxx Project Type: Capacity (Improvement) Project Manager: TBD Description: Capacity improvement to the excising downstream ditch serving the "Downtown Area". Project scope to be considered with the Auburn Environmental Park. The E Basin Ditch that is being considered for improvements runs north from 6th St NW to approximately 20th St NW to parallel with the Interurban Trail Progress Summary: Future Impact on Operating Budget: Annual maintenance cost is estimated to be approximately $2,000. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtivity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - Grants (Fed,State,LocaQ Bond Proceeds Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 75,000 300,000 - - 375,000 Grants (Fed, State, Local) - _ _ Bond Proceeds Other - _ _ Total Funding Sources: 75,000 300,000 - - 375,000 Capital Expenditures: Design 75,000 50,000 - - 125,000 Right of Way - _ _ Construction - 250,000 - 250,000 Total Expenditures: 75,000 300,000 - - 375,000 Grants 1 Other Sources: • 122 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Titte: 21st Street SE &'M' Street SE Project No: Cpxxx Project Type: Capacity (Expansion) Project Manager: TBD Description: Construct conveyance improvement to 21 st Street SE in-lieu of on-site infiltration on school district property. Extend new conveyance line from 21st Street SE to 25th Street SE. Flow contributed to 21st Street Infiltration Facility. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - ~ Adjusted Budgef - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sform Revenue - - - - - Grants (Fed,State.Local) Bond Proceeds Other Total Funding Sources: - - - - - Capital Expenditures: Design Righto(Way - - - - - Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 75,000 425,000 - - 500,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Other - - _ Total Funding Sources: 75,000 425,000 - - 500,000 Capital Expenditures: Design 75,000 - - - 75,000 Right of Way - - _ Construction - 425,000 - - 425,000 Total Expenditures: 75,000 425,000 - - 500,000 Grants / Other Sources: • 123 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds ~ Project Title: North Central Storm Pond Project No: cpxxx Project Type: Capacity (Expansion) Project Manager: TBD Description: Capacity project to provide regional storm water detention at the Crista Ministries property. Progress Summary: Future Impact on Operating Budget: No significant impact. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ,activity: ~ 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - Grants (Fed, State, Local) Bond Proceeds Other Total Funding Sources: Capital Expenditures: Design Right ol Way Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - 275,000 1,000,000 2,000,000 3,275,000 Grants (Fed, State, Local) - - _ _ _ Bond Proceeds Other - - _ _ _ Total Funding Sources: - 275,000 1,000,000 2,000,000 3,275,000 Capital Expenditures: Design - 275,000 100,000 100,000 475,000 Right ol Way - - - _ _ Construction - - 900,000 1,900,000 2,800,000 Total Expenditures: - 275,000 1,000,000 2,000,000 3,275,000 Grants / Other Sources: i 124 City ofAuburn Draft Capital Facilities Plan . STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: 15th Street NW Culvert Replacement Project No: cp0638 Project Type: Non-Capacity (Improvement) Project Manager: AndersOn Description: This project will construct a new crossing culvert under 15th Street NW in order to improve flow within Mill Creek and allow for enhanced fish passage along Mill Creek Corridor. Progress Summary: Public Works Department is assigning a project manager to the project for design in 2006. Construction, dependent on funding, is slated for Fall 2007. There is a$400,000 obligated Ciry match required for the grant funding. Closing cost for 2009. Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget • ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 365,000 - - 365,000 Grants (Fed, State, Local) - 95,200 - - 95,200 - Other - - _ _ Total Funding Sources: - 460,200 - - 460,200 Capital Expenditures: Design - - _ Righf of Way - - _ Consfruction - 460,200 - 460,200 Total Expenditures: - 460,200 - - 460,200 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - 50,000 - - 50,000 Grants (Fed,State,local) - - _ Other - - _ Total Funding Sources: - 50,000 - - 50,000 Capital Expenditures: Design - _ _ Right of Way - _ _ Construction 50,000 - - 50,000 Total Expenditures: - 50,000 - - 50,000 Grant Sources: US Fish & Wildlife Service, other non-secured grant sources • 125 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Pian • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Downtown Storm Water Quality Facility Project No: C518a0 Project Type: Capacity (Expansion) Project Manager: TBD Description: Storm drainage water quality pond, and pump station to serve downtown drainage basin. Project is located on Clay Street. Progress Summary: Project is in the pre-design stage, moving into the environmental permitting process. Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue 11,756 50,000 - - 61,756 Granfs (Fed, State, Local) - - - - _ _ Bond Proceeds Other - - - - _ Total Funding Sources: 11,756 50,000 - - 61,756 Capital Expenditures: Design 11,756 50,000 - - 61,756 Right of Way - - - - - Construcfion - - _ Total Expenditures: 11,756 50,000 - - 61,756 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unresfricted Storm Revenue 300,000 500,000 800,000 - 1,600,000 Grants (Fed, State, Local) - - - - - Bond Proceeds Other - - - - _ Total Funding Sources: 300,000 500,000 800,000 - 1,600,000 Capital Expenditures: Design 50,000 100,000 100,000 - 250,000 Right of Way - - - - - Construction 250,000 400,000 700,000 - 1,350,000 Total Expenditures: 300,000 500,000 800,000 - 1,600,000 Grants / Other Sources: • 126 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: 17th Street SE &'M' Street SE Project No: c504a0 Project Type: Capacity (Improvement) Project Manager: Lee Description: New conveyance improvement within 'M' Street SE from 17th Street SE to 21 st Street SE. Flow contributes to the 21 st Street Infiltration Facility. Closing cost in 2009. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricfed Storm Revenue - 250,000 - - 250,000 Grants (Fed, State, Local) - - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - 250,000 - - 250,000 Capital Expenditures: Design - 20,000 - - 20,000 Right of Way - - - - - Construction - 230,000 - - 230,000 Total Expenditures: - 250,000 - - 250,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unrestricted Storm Revenue - 25,000 - - 25,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - ' Other - - - - - Total Funding Sources: - 25,000 - - 25,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 25,000 - - 25,000 Total Expenditures: - 25,000 - - 25,000 Grants I Other Sources: • 127 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: AWS Sanitary Sewer Replacement - Phase 3 Project No: C504a0 (R Street SE Utility Improvements) Project Type: Capacity (Improvement) Project Manager: Lee Description: New conveyance improvement within 21 st Street from K Street SE to R Street SE, then south on R Street to 25th Street SW. Flow contributed to 21st Street Infiltration Facility. Closing cost in 2009. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 900,000 770,000 - 1,670,000 Grants (Fed,State,Local) - - _ _ _ 8ond Proceeds Other - - _ _ Total Funding Sources: - 900,000 770,000 - 1,670,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - _ _ _ Construction - 850,000 770,000 - 1,620,000 Total Expenditures: - 900,000 770,000 - 1,670,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - - - - 770,000 Grants (Fed, State, Local) _ Bond Proceeds Other _ Total Funding Sources: - - - - 770,000 Capital Expenditures: Design _ ' Right of Way _ Construction - - - - 770,000 Totai Expenditures: - - - - 770,000 Grants / Other Sources: • 128 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Arterial Utility Improvements Project No: Cpxxxx Project Type: Capacity Project Manager: TBD Description: Storm drainage conveyance improvements in coordination with arterial street improvements. Progress Summary: Future Impact on Operating Budget: No significant impact Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusfed Budget • Activity: - - - - 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unresfricted Sform Revenue - - 300,000 300,000 300,000 Grants (Fed,State,Loca1) - - - - - - Bond Proceeds - - - 100,000 100,000 Other - - - - Total Funding Sources: - - 300,000 400,000 400,000 Capital Expenditures: Design - - 30,000 40,000 30,000 Right of Way - - - - - Construction - - 270,000 360,000 270,000 Total Expenditures: - - 300,000 400,000 300,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sform Revenue 300,000 300,000 300,000 300,000 1,800,000 Grants (Fed, State, Local) - - - - - 8ond Proceeds - - - 100,000 Other - - - - - Total Funding Sources: 300,000 300,000 300,000 300,000 1,900,000 Capital Expenditures: Design 100,000 100,000 100,000 100,000 470,000 Right of Way - - - - - Construction 200,000 200,000 200,000 200,000 1,430,000 Total Expenditures: 300,000 300,000 300,000 300,000 1,900,000 Grants I Other Sources: • 129 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Titie: Local Storm Drainage Improvements Project No: cpxxxx Project Type: Capacity (Improvement) Project Manager: TBD Description: This project includes various unidentified storm drainage improvements. Progress Summary: Future Impact on Operating Budget: No significant Impact Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - 200,000 200,000 200,000 Grants (Fed, State, Local) - - - _ _ Bond Proceeds Other - - _ _ _ Total Funding Sources: - - 200,000 200,000 200,000 Capital Expenditures: Design - - 30,000 30,000 30,000 Right of Way - - - _ _ Construction - - 170,000 170,000 170,000 Total Expenditures: - - 200,000 200,000 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sourcer. Unrestricted Storm Revenue 100,000 100,000 100,000 100,000 800,000 Grants (Fed, State, Local) - - _ _ _ 8ond Proceeds - - - _ _ Other - - _ _ _ Total Funding Sources: 100,000 100,000 100,000 100,000 800,000 Capital Expenditures: Design 20,000 20,000 20,000 20,000 140,000 Right of Way - - _ _ _ Constructron 80,000 80,000 80,000 80,000 660,000 Total Expenditures: 100,000 100,000 100,000 100,000 800,000 Grants ( Other Sources: • 130 City of Auburn Draft Capital Facilities Plan ~ STORM DRAINAGE FUND (432) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: 17th Street Storm Improvement Project No: Cpxxxx Project Type: Capacity (Replacement) Project Manager: Description: Construct conveyance improvement to 17th Street SE as part of Metro realignment project. Replace existing conveyance line from B Street SE to K Street SE. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - ~ Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - - Grants (Fed,State,Locaq - - - - - Bond Proceeds - - - - - Other Total Funding Sources: Capital Expenditures: Design Right o(Way - - - - Construction Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 230,000 270,000 - - 500,000 Granfs (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 230,000 270,000 - - 500,000 Capital Expenditures: Design 80,000 - - - 80,000 Right oI Way 100,000 - - - 100,000 Construction 50,000 270,000 - - 320,000 Total Expenditures: 230,000 270,000 - - 500,000 Grants / Other Sources: . 131 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: AWS and Hwy 18 Improvements Project No: CpxxXx Project Type: CapaCity Project Manager: Carlaw Description: Reconfigure the existing local conveyance system to deliver additional flow to the existing storm pump station and reduce flows into the gravity mainline. The pump station currently discharges to the mainline at a point downstream where there is greater capacity. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendmenfs _ Adjusted Budget Activity: • (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestncted Storm Revenue - - 75,000 - 75,000 Grants (Fed, State, Local) _ _ _ Bond Proceeds Other _ Total Funding Sources: - - 75,000 - 75,000 Capital Expenditures Design _ _ _ Right of Way - - _ _ _ Construction - - 75,000 - 75,000 Total Expenditures: - - 75,000 - 75,000 Forecasted Project Cost: Total 2011 2012 2013 2014 . 2009-2014 Funding Sources: Unrestricted Storm Revenue - - - - 75,000 Grants (Fed,State,Loca!) _ Bond Proceeds Other _ Total Funding Sources: - - - - 75,000 Capital Expenditures: Design _ Right of Way _ Construction - - - - 75,000 Total Expenditures: - - - - 75,000 Grants / Other Sources: • 132 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Regulatory Improvements Project No: CpXXxx - Project Type: Non-Capacity Project Manager: Carlaw Description: Storm Drainage Comprehensive Plan revisions or regulatory responses. Storm Drainage Comprehensive Plan to be updated in 2007. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - Adjusted Budget - - - - • Activity: (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 250,000 50,000 50,000 300,000 6rants (Fed,State,LocaQ - - - - ' - Bond Proceeds - - - - Ofher - - - - ' Total Funding Sources: ~ - 250,000 50,000 50,000 300,000 Capital Expenditures: Design - 250,000 50,000 50,000 300,000 Right of Way - - - - - Construcfion - - - - - Total Expenditures: - 250,000 50,000 50,000 300,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 50,000 50,000 50,000 50,000 300,000 Granfs (Fed,Sfate,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 50,000 50,000 50,000 50,000 300,000 Capital Expenditures: Design 50,000 50,000 50,000 50,000 300,000 Right of Way - - - - ' Construction - - - - ' Total Expenditures: 50,000 50,000 50,000 50,000 300,000 Grants I Other Sources: • 133 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Storm Facility Retrofit Program Project No: C406a0 Project Type: Non-Capacity (Improvement) Project Manager: TBD Description: Annuai program to improve function and aesthetics of two existing storm ponds. Two ponds to be identified for 2007 and the following years. 2005 Project - C SURiverwalk Storm Pond Progress Summary: Future Impact on Operating Budget: None BUdgBt: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: ~ (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue 197,745 200,000 - - 397,745 Grants (Fed,Sfate,Local) - _ _ Bond Proceeds Other - _ _ Total Funding Sources: 197,745 200,000 - - 397,745 Capital Expenditures: Design 34,796 50,000 - - 84,796 Right of Way - _ _ Construction 162,949 150,000 - - 312,949 Total Expenditures: 197,745 200,000 - - 397,745 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 50,000 50,000 50,000 50,000 200,000 , Grants (Fed, State, Local) - _ _ _ _ Bond Proceeds Ofher - _ _ _ _ Total Funding Sources 50,000 50,000 50,000 50,000 200,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 40,000 Righto/Way - _ _ _ _ Construction 40,000 40,000 40,000 40,000 160,000 Total Expenditures: 50,000 50,000 50,000 50,000 200,000 Grants / Other Sources: • 134 City of Auburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: SCADA (Telemetry) Upgrades Project No: c524a0 Project Type: Non-Capacity (Improvement) Project Manager: Lee Description: The Supervisory Control and Data Acquisition (SCADA, also known as the "Telemetry" system) is in need of upgrading. The existing system, based on an independent SCADA Assessment Study and the vulnerability study, has numerous obsolete components and does not allow control of the Sewer and Storm Utility stations. Upgrading the portion of the system utilizing antiquated equipment, while maintaining the portions of equipment that are compatible with the newer technologies availabie seems to be the logical course of action. The new system will utilize an open architecture so the City is no longer reliant on a single vendor for repairs and maintenance. RFP was sent in 2006 and construction began in 2007. Progress Summary: Future Impact on Operating Budget: None . BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior tp2008 Estimate 2008 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 172,000 162,000 - 334,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - 172,000 162,000 - 334,000 Capital Expenditures: Design - 172,000 - - 172,000 Right of Way - - - - - Construction - - 162,000 - 162,000 Total Expenditures: - 172,000 162,000 - 334,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 58,000 - - - 220,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 58,000 - - - 220,000 Capital ExpendiWres Design - - - - - Right o( Way - - - - - Construction 58,000 - - - 220,000 Total Expenditures: 58,000 - - - 220,000 Grants / Other Sources: • 135 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: ' Pipeline Repair & Replacement Program Projeci No: c515a0 Project Type: Non-CapaCity Project Manager: TBD Description: Projects identified as those requiring replacement of existing infrastructure. These projects support street repairs and other utility replacement programs, requiring coordination. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtivity: • (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue 105,821 - 200,000 305,821 Grants (Fed, State, Local) - - _ _ _ _ Bond Proceeds - - - 200,000 - Other - - _ _ _ Totai Funding Sources: 105,821 - 200,000 200,000 305,821 Capital Expenditures: Design 105,821 - 20,000 20,000 125,821 Right of Way - _ _ Construction - - 180,000 180,000 180,000 Total Expenditures: 105,821 - 200,000 200,000 305,821 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unresfricted Storm Revenue 100,000 100,000 100,000 100,000 600,000 Grants (Fed, State, Local) - _ _ _ _ Bond Proceeds - - - - 200,000 Other - - _ _ _ Total Funding Sources: 100,000 100,000 100,000 100,000 800,000 Capitai Expenditures: Design 20,000 20,000 20,000 20,000 120,000 Right of Way - - _ _ _ Construction 80,000 80,000 80,000 80,000 680,000 Total Expenditures: 100,000 100,000 100,000 100,000 800,000 Grants / Other Sources: • , 136 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Airport Storm Pond Rehabilitation Project No: Cpxxxx Project Type: Non Capacity (Improvement) Project Manager: TBD Description: This project will reconstruct the water fowl netting currently placed over top of the ponds. The existing netting is deteriorating, and the current design of the supporting suspension system does not allow for the proper maintenance of the four ponds. The project will include a new design to allow for future maintenance considerations. Progress Summary: Future Impact on Operating Budget: Upon completion of the project,.due to increased efficiencies, there should be a decrease over the current operating expense. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budgef • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - - - Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - 100,000 - - 100,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - _ Total Funding Sources: - 100,000 - - 100,000 Capital Expenditures: Design - 25,000 - - 25,000 Right of Way - - - - - Construction - 75,000 - - 75,000 Total Expenditures: - 100,000 - - 100,000 Grants I Other Sources: • 137 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capi#al Facilities Plan, 2009-2014 Enterprise Funds • Project Title: White River Pump Station Replacement Project No: CpXxXx Project Type: Non Capacity (Replacement) Project Manager: TBD Description: The existing storm water pumping station built in 1981, is in need of replacement. A recent conditions assessment of all five storm water pumping stations indicates that this building is in a very poor condition and should be demolished. The current pumping capacity is marginal to meet the pumping demand. The replaced pump station will incorporate water quality mitigation to remove floatable debris, thereby improving discharge to the White River and preserving the pumps. Long term maintenance issues such as pump replacemenUservicing, electrical deficiencies and lack of potable water service can be addressed through construction of a new station. Progress Summary: Future Impact on Operating Budget: No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - 500,000 - 500,000 Grants (Fed, State, Local) - - - _ _ BondProceeds - - - 1,500,000 - Other - - _ _ _ Total Funding Sources: - - 500,000 1,500,000 500,000 Capital Expenditures: Design - - 50,000 300,000 50,000 Right o/Way - - _ _ _ Construction - - 450,000 1,200,000 450,000 Total Expenditures: - - 500,000 1,500,000 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricfed Storm Revenue - - - - 500,000 Grants (Fed,Stafe,Local) _ BondProceeds - - - - 1,500,000 Other _ Total Funding Sources: - - - - 2,000,000 Capitai Expenditures: Design - - - - 350,000 Right o(Way _ Construction - - - - 1,650,000 Total Expenditures: - - - - 2,000,000 Grants I Other Sources: • 138 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Vactor Waste Solids Handing Facility Project No: Cpxxxx Project Type: Non Capacity (Expansion) Project Manager: TBD Description: Progress Summary: Future Impact on Operating Budget: Upon completion of the project, due to increased efficiencies, there should be a decrease over the current operating expense. Budget: 2008 YTD Actuai 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - - - Grants (Fed,State,Locaq - - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right o(Way - - - - - Construction - - - - - Total Expenditures: - - - • - Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: lJnrestricted Storm Revenue 100,000 200,000 - - 300,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 100,000 200,000 - - 300,000 Capital Expenditures: Design 100,000 - - - 100,000 RightofWay - - - - - Construction - 200,000 - - 200,000 Total Expenditures: 100,000 200,000 - - 300,000 Grants / Other Sourcex • 139 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Tite: SOS Utility improvements Project No: cpxxxx Project Type: NOn CapaCity Project Manager: TBD Description: Storm drainage conveyance improvements in coordination with SOS improvements. Approximately 10,780 lineal fee in 2009- 20103 Progress Summary: Future Impact on Operating Budget: No significant Impact Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - eudget Amendments _ Adjusted Budget - - - - Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unresfricted Storm Revenue - - 500,000 500,000 Grants (Fed, State, Local) - - - _ _ Bond Proceeds - - - 700,000 - Other - - - _ _ Total Funding Sources: - - 500,000 700,000 500,000 Capital Expenditures: Design - - 50,000 70,000 50,000 Right ot Way - - - _ _ Construction - - 450,000 630,000 450,000 Total Expenditures: - - 500,000 700,000 500,000 Forecasted Project Cost: Total ' 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 300,000 300,000 300,000 300,000 1,700,000 Grants (Fed, State, Local) - - - _ _ Bond Proceeds - - - - 700,000 Other - - - _ _ Total Funding Sources: 300,000 300,000 300,000 300,000 2,400,000 Capital Expenditures: Desrgn 100,000 100,000 100,000 100,000 520,000 Right of Way - - - _ _ Construction 200,000 200,000 200,000 200,000 1,880,000 Total Expenditures: 300,000 300,000 300,000 300,000 2,400,000 Grants I Other Sources: • 140 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Faciiities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: M Street NE/Harvey Road & 8th Street Project No: cp0611 Project Type: Non Capacity (improvement) Project Manager: Sweeting Description: The project will replace the existing deteriorated brick manholes associated with the street project. Progress Summary: Design is continuing. Construction in 2009. Future Impact on Operating Budget: . No significant impact. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget ~ Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 15,000 100,000 - 115,000 Grants (Fed, State,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - 15,000 100,000 - 115,000 Capital Expenditures: Design - 15,000 - - 15,000 Right of Way - - - - - Construction - - 100,000 - 100,000 Total Expenditures: - 15,000 100,000 - 115,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - - - - 100,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Ofher - - - - - Total Funding Sources: - - - - 100,000 Capital Expenditures: Design Right oiWay - - - - - Consfruction - - - - 100,000 Total Expenditures: - - - - 100,000 Grants ! Other Sources: • 141 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Faciiities Pian Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Titie: Les Gove Neighborhood Improvement Project No: Cp0762 Project Type: Non-Capacity Project Manager: Dunsdon Description: This project will repiace portions of the old drainage system at locations within the overall neighborhood improvement project. A new conveyance improvement will also be installed in 5th Street SE from F Street to G Street. Progress Summary: Design is continuing. Construction in 2009 & 2010. Future Impact on Operating Budget: No signiflcant impact. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget ACtivlty: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - 30,000 350,000 20,000 380,000 Grants (Fed,Stafe,Local) - - - _ _ Bond Proceeds Other - - _ _ Total Funding Sources: - 30,000 350,000 20,000 380,000 Capital Expenditures: Design - - _ _ _ Right of Way - 5,000 5,000 Construction - 25,000 350,000 20,000 375,000 Total Expenditures: - 30,000 350,000 20,000 380,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - - - - 370,000 Grants (Fed, State, Local) _ Bond Proceeds Other _ Total Funding Sources: - - - - 370,000 Capital Expenditures: Design _ Right of Way Consfruction - - - - 370,000 Total Expenditures: - - - - 370,000 Granls I Other Sources: • 142 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan ' Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Maintenance and Operations Expansion Project No: Cpxxxx Project Type: Non-Capacity (improvement) Project Manager: TBD Description: Funds allocated to remodel the existing M&O building into a more functional and maintainable facility. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - - - Grants (Fed,State.Local) - - - - - - Bond Proceeds - - - - - Other Total Funding Sources: Capital Expenditures: Design Righto/Way - - - - - Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 350,000 400,000 - - 750,000 Granfs (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 350,000 400,000 - - 750,000 Capital Expenditures: Design 150,000 100,000 - - 250,000 Right o( Way - - - - - Construction 200,000 300,000 - - 500,000 Total Expenditures: 350,000 400,000 - - 750,000 Grants ( Other Sources: • 143 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: M&0 Satellite Facilities Project No: CpXXXX Project Type: Non-Capacity (Improvement) Project Manager: TBD Description: Construction of satellite facilities to support M&O operational activities including vactor waste solids transfer. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendmenfs - Adjusted Budget - - - - Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Sform Revenue - Grants (Fed, State, Local) Bond Proceeds - - - - - Other - - - - Total Funding Sources: Capital Expenditures: Design Right of Way - - - - - Consfruction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue - 100,000 100,000 - 200,000 Grants (Fed,State,Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - 100,000 100,000 - 200,000 Capital Expenditures: Design - 25,000 - - 25,000 Righf of Way - - - - - Conshuction - 75,000 700,000 - 175,000 Total Expenditures: - 100,000 100,000 - 200,000 Grants / Other Sources: • 144 City ofAuburn Draft Capital Facilities Plan . STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds ProjectTitle: West Valley Highway improvements Project No: Project Type: NOn-CapaCity Project Manager. TBD Description: Storm Drainage improvements associated with Street project. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget - - • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - - - Grants (Fed,Stafe,Local) - - - - - Bond Proceeds - - - - ' Other - - - - ' Total Funding Sources: - - - • - Capital Expenditures: Design - - - - - Right o/Way - - - - - Construction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 1,500,000 - - - 1,500,000 Granfs (Fed, State, Local) - - - - - Bond Proceeds - - - - ' Other - - - - - Total Funding Sources: 1,500,000 - - - 1,500,000 Capital Expenditures: Design 200,000 - - - 200,000 Right ofWay - - - - ' Construction 1,300,000 - - - 1,300,000 Total Expenditures: 1,500,000 - - - 1,500,000 Grants / Other Sources: • 145 City ofAuburn Draft Capital Facilities Plan STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capitat Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Peasley Canyon Culvert Replacement Project No: Cpxxxx Project Type: NOn-CapaClty Project Manager. TBD Description: This is a replacement of the existing Mill Creek culvert underneath Peasley Canyon Road. Recent roadway settlements and subsequent low flow inspection of the culvert has revealed that there are severe structural deficiencies in the corrugated culvert. The replaced culvert will be designed to current environmental requirements for fish passage. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total UnrestrictedSformRevenue - - 1,000,000 - 1,000,000 Grants (Fed,State,Local) - - - _ _ Bond Proceeds Ofher - - _ _ _ Total Funding Sources: - - 1,000,000 - 1,000,000 Capital Expenditures: Design - - 150,000 - 150,000 Right o/Way - - - _ _ Construction - - 850,000 - 850,000 Total Expenditures: - - 1,000,000 - 1,000,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Sform Revenue - - - - 1,000,000 Grants (Fed, State, Local) _ Bond Proceeds Other _ Total Funding Sources: - ' - - - 1,000,000 Capital Expenditures: Design - - - - 150,000 Right of Way _ Construction - - - - 850,000 Totai Expenditures: - - - - 1,000,000 Grants ! Other Sources: ~ 146 City ofAuburn Draft Capital Facilities Plan • STORM DRAINAGE FUND (432) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: City Hall Annex Lease Project No: CPxxxx Project Type: Non-Capacity Project Manager: TBD Description: The capital lease for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: Impacts to the operating budget will be analyzed and calculated once the timing of expenses is determined. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusfed Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Storm Revenue - - - 250,000 - Grants (Fed, State, Local) - - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - - - 250,000 - Capital Expenditures: Capital Lease - - - 250,000 - Right of Way - - - - - Construction - - - - - Total Expenditures: - - - 250,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Storm Revenue 250,000 250,000 250,000 250,000 1,250,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: 250,000 250,000 250,000 250,000 1,250,000 Capital Expenditures: Capital Lease 250,000 250,000 250,000 250,000 1,250,000 Right of Way - - - - - Construction - - - - - Total Expenditures: 250,000 250,000 250,000 250,000 1,250,000 Grants / Other Sources: • TABLE SD-3 147 City ofAuburn Draft Capital Facilities Plan Impact on Future Operating Budgets • STORM DRAINAGE Pro'ect: 2009 2010 2011 2012 2013 2014 Total 1 Deve/oper Participation $ - $ - $ - $ _ $ _ g _ $ _ 2 E Basin Ditch Improvements - - - - 2,000 2,000 4,000 3 21st St. SE 8 M St. SE 4 N. Central Storm Pond 5 15th Street Culvert Replacement 6 Downtown Storm Wafer Quality Facility 7 17th St. SE and M Sf. SE 8 A WS Sanitary Sewer Repiacement - Phase 3 9 Arterial Utility Improvements 10 Local Storm Orainage Improvements 11 17th Sfreef lmprovements 12 AWS and Hwy 18 Improvements 13 Regulatory Improvements 14 Storm Facility Retrofit Program - - - _ _ _ _ • 15 SCADA (Telemetry) Upgrades 16 Pipefine Repair/Replacement 17 Airport Storm Pond Rehabilitation 18 White River Storm Pump Station Rehabilitation 19 Vactor Waste Sofids Handling Facility 20 SOS Utility Improvements 21 M Street NE/Harvey Road & Sth , Street 22 Les Gove Neighborhood Improvement 23 Maintenance 8 Operations Expansion 24 Maintenance 8 Operations Satellite Facilities 25 West Valley Highway Improvements 26 Peasley Canyon Culvert Replacement 27 City Hall Annex Lease _ _ _ Total $ - g - $ - $ - $ 2,000 $ 2,000 $ 4,000 . • 148 City ofAuburn Draft Capital Facilities Plan • SOLID WASTE Current Facilities The City of Auburn no longer has recycle drop stations facilities. The City now provides curbside service through a vendor who handles the disposal. • ~ 149 City ofAuburn Draft Capital Facilities Plan . ~ CI.TY OF u IRN • 1VlORE TH1-1N YO[J IMAGI NED ~ 150 City of Auburn Draft Capital Facilities Plan • PARKS AND RECREATION Current Facilities The City of Auburn's park system consists of a total of 567.57 acres of neighborhood and community parks, special use areas, open space, and linear parks (trails). The 150-acre Auburn Municipal Golf Course is identified as a separate public facility in this report, and is not included in the Parks and Recreation inventory. Table PR - 1"Facilities Inventory" lists all park and recreation land in the City's park system along with their current capacity and location. Level of Service (LOS) The current LOS provided by the City's park system represents the current inventory of City- owned park acres divided by the 2008 City population of 67,005. This equates to .80 acres per 1,000 population for neighborhood parks, 3.40 acres per 1,000 population for community parks, 0.47 acres for linear parks, 2.96 acres for open space, and .81 acres for special use areas. The proposed LOS provided by the City's park system represents the planned 2014 inventory of City-owned park acres divided by the 2014 projected City population of 75,430. This equates to 0.71 acres per 1,000 population for neighborhood parks, 3.13 acres per 1,000 population for • community parks, 0.42 acres per 1,000 population for linear parks, 2.63 acres per 1,000 population for open space, and 0.71 acres per 1,000 population for special use areas. Capital Facilities Projects and Financing Parks and Recreation facilities include 25 capital projects at a cost of $26,080,600. Table PR - 2a shows the proposed financing plan followed by individual worksheets showing the project detaiL Impact on Future Operating Budgets As Table PR - 3 shows, operating budget impacts of $124,000 are forecasted for parks and recreation facilities during the six years 2010 - 2015. • TABLE PR-1 151 City ofAuburn Draft Capital Facilities Plan Facilities Inventory Parks and Recreation, Land • CAPACITY FACILITY (Acres) LOCATION Neighborhood Parks: Existinq Inventory Auburndale Park 10.00 31700 108th NE Ballard Park 0.70 37th & R Street SE Cameron Park 3.90 Lemon Tree Lane & Academy Drive Cedar Lane Park 8.30 25th & K Street SE Dykstra Park 1.70 1533 22nd Avenue NE Forest Villa mini-park 0.20 17th & Fir Street SE Gaines Park 1.40 11th NW & W Valley Highway lndian Tom Park 0.40 6th & Henry Road NE Lakeland Hills Park 5.00 5401 Olive Avenue SE Rotary Park 4.00 27th & Alpine Street SE Shaughnessy Park 3.50 21st & Hemlock SE Scootie Brown Park 1.70 8th & Henry Road NE Terminal Park 1.20 12th & C Street SE Jornada Park 1.90 1440 U Court NW Auburndale 2 Park 9.30 29700 118th Street SE Vi!lage Square 1.07 310th St SE @ 120th Ave Total Neighborhood Parks 54.27 Proposed Capacrtv Projects: • None - Total Proposed Capacity Projects - 2014 Projected Inventory Total - Neighborhood Parks - 54.27 Community Parks Existinp Inventory Brannan Park 21.70 26th & M Street NE Veteran's Memorial Park 8.50 Park Avenue & Auburn Way N Fenster/Green River Access 13.40 10520 Auburn/Black Diamond Road Fulmer Field 5.00 5th & K Street NE Game Farm Park 53.00 3226 V Street SE Game Farm Wilderness Park 20.00 2401 SE Stuck River Road GSA Park 6.60 C Street SW & 15th SW Isaac Evans Park 14.90 29627 Green River Road NE Les Gove Park 20.50 11 th & Auburn Way S Mill Pond 4.00 600 Oravetz Road O/son Canyon Farmstead 15.00 28728 Green River Road Roegner Park 21.60 601 Oravetz Road Lea Hill Park 9.00 SE 319th & 124th Street SE Sunset Park 15.00 1306 69th Street SE Tofal Community Parks 228.20 TABLE PR-1 (continued) . 152 City ofAuburn Draft Capital Facilities Plan • Proposed Capacitv Proiects: Lakeland Hills Communify Park 8.00 Total Proposed Capacity Projects 8.00 2014 Projected Inventory Total - Community Parks - 236.20 Linear Parks: Existinq Inventorv: Interurban Trail 25.40 Lakeland Hills Trail 2.30 5401 Olive Avenue SE White River Trail 4.10 Total Lrnear Parks 31.80 Proposed Capacitv Proiects: None - Total Proposed Capacity Projects - 2014 Projected Inventory Total - Linear Parks - 31.80 Special Use Areas: Exisfinq Inventory: Bicentennial Park 1.40 SR-18 & Aauburn Way S Centennial Viewpoint Park 0.70 600 Mountain View Drive City Hall Plaza 0.90 25 W Main Clark Plaza 0.20 15th & Auburn Way N • Downtown mini-mall 0.10 E. Main & B Street SE Mountain View Cemetery 50.00 2020 Mountain View Drive Pioneer Cemetery 0.80 8th & Auburn Way N Slaughter Memorial 0.20 3100 Auburn Way N Total Special Use Areas 54.30 Proposed Capacitv Proiects: None - Total Proposed Capacity Projects - 2014 Projected Inventory Total - Special Use Areas - 54.30 Open Space Areas: Existinq Inventorv: Clark Properfy 25.00 1600 Oravetz Road Game Farm Open Space 87.00 2400 SE Stuck River Road Golf Course Open Space 42.00 29639 Green River Road Olson Canyon Open Space 45.00 28728 Green River Road Tota! Open Space Areas 199.00 Proposed Capacitv Proiects: None - Total Proposed Capacity Projecfs - 2014 Projected Inventory Total - Open Space Areas - 199.00 • 153 City ofAuburn Draft Capital Facilities Plan TABLE PR-2A • CAPITAL FACILITIES PLAN PROJECTS AND FINANCING PARKS and RECREATION (Municipal Parks Construction Fund) 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: 1 Park AcquisitionslDevelopment Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Municipal Park Fund - - - _ _ _ Grants (Fed,State,Local) Bond Proceeds - - - _ _ _ _ Other 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Subtotal, Capacity Projects: Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Non-Caaacitv Proiects: 2 Les Gove Park Improvements Capital Costs - 400,000 - - - - 400,000 Funding Sources: Municipal Park Fund - 250,000 - - - - 250,000 Grants (Fed,State,Locai) - 75,000 - - - - 75,000 REET - _ Other - 75,000 - - - - 75,000 3 Brannan Park Fence and Bleachers Capital Costs 87,000 - - - - - 87,000 Funding Sources: • Municipai Park Fund 21,700 - - - - - 21,700 Grants (Fed,State,Local) 58,000 - - - - - 58,000 Other 7,300 - - - - - 7,300 4 Issac Evans Park Capital Costs - - 170,000 - - - 170,000 Funding Sources: • Municipai Park Fund - - 75,000 - - - 75,000 Grants (Fed,State,Local) - - 75,000 - - - 75,000 REET _ _ Other - - 20,000 - - - 20,000 5 Jacobsen Tree Farm Site Plan Capital Costs 30,000 - 6,000,000 - - - 6,030,000 Funding Sources: Municipai Park Fund 30,000 - - - - - 30,000 Grants (Fed,State,Local) - - 2,000,000 - - - 2,000,000 Other - - 4,000,000 - - - 4,000,000 6 Fulmer Park Improvements Capital Costs - - 185,000 - - - 185,000 Funding Sources: Municipal Park Fund - - 50,000 - - - 50,000 Grants (Fed,State,Local) - - 50,000 - - - 50,000 REET _ _ Other - - 85,000 - - - 85,000 7 Auburn Community Center Capital Costs 7,037,200 2,546,600 - - - - 9,583,800 Funding Sources: Municipal Park Fund - - _ REET 1 3,583,800 - - - - - 3,583,800 Bond Proceeds 2,453,400 2,546,600 - - - - 5,000,000 Other Funds 1,000,000 - - - - - 1,000,000 • 154 City ofAuburn Draft Capital Facilities Plan . TABLE PR-2A (continued) Non-Caaacitv Proiects: 2009 2010 2011 2012 2013 2014 Total 8 Auburn Activity Center Capital Costs - - - - 3,318,800 1,225,800 4,544,700 Funding Sources: Municipal Park Fund - - - - _ _ _ REET _ _ Bond Proceeds - - - - 3,318,900 1,225,800 4,544,700 Other Funds - - - - _ _ _ 9 Veteran's Park Improvements - Phase 1& 2 Capitai Costs - - 50,000 50,000 - - 100,000 Funding Sources: Municipal Park Fund - - 50,000 50.000 - - 100,000 Grants (Fed,State,Local) - - - - _ REET Other - 10 Olson Canyon Farm Restoration Capital Costs 179,300 - - - - - 179,300 Funding Sources: Municipal Park Fund - _ Grants (Fed,State,Locai) - _ REET 1 147,000 - - - - - 147,000 Other 32,300 - - - - - 32,300 11 Auburn Environmental Park Capital Costs 976,000 - - - - - 976,000 Funding Sources: Municipal Park Fund - Grants (Fed,State,Local) 488,000 - - - - - 488,000 Bond Proceeds - _ • Cumulative Reserve Fund 488,000 488,000 Other 12 Shaughnessy Park Improvements Capitai Costs 100,000 - - - - - 100,000 Funding Sources: Municipal Park Fund - _ - Grants (Fed,State,Local) - _ Other 100,000 - - - - - 100,000 13 Rotary Park Improvements Capital Costs - - 30,000 - - - 30,000 Funding Sources Municipal Park Fund - - 30,000 - - - 30,000 Grants (Fed,State,Local) - - - _ Olher - - _ _ _ . _ 14 Misc. Parks Improvements Capitat Costs 25,000 - 50,000 100,000 50,000 300,000 525,000 Funding Sources: Municipal Park Fund 25,000 - - - - 200,000 225,000 Grants (Fed,State,Local) - - - - - 100,000 100,000 Other - - 50,000 100,000 50,000 - 200,000 15 Cameron Park Capital Costs - - - 55,000 - - 55,000 Funding Sources: Municipal Park Fund - - - 55,000 - - 55,000 Grants (Fed,State,Local) - - - - _ Other - - - _ _ 16 Game Farm Park Capital Costs - - - 100,000 80,000 - 180,000 Funding Sources: Municipal Park Fund - - - 100,000 80,000 - 180,000 • Grants (Fed.State,local) - - - - - - - Other 155 City ofAuburn Draft Capital Facilities Plan TABLE PR-2A (continued) Non-Capacitv Proiects: 2009 2010 2011 2012 2013 2014 Total • 17 Gaines Park Capital Costs - - - - 9,500 - 9,500 Funding Sources: Municipal Park Fund - - - - 9,500 - 9,500 Grants (Fed,State,Local) - - - - - - _ Other 18 Roegner Park Capital Costs - - - 130,000 - - 130,000 Funding Sources: Municipal Park Fund - - - 65,000 - - 65,000 Grants (Fed,State,Local) - - - 65,000 - - 65,000 Other - - - - - - _ 19 White River Trail Extension Capital Costs 270,300 - - - - - 270,300 Funding Sources: Municipat Park Fund - - - - - - _ Grants (Fed,State,Local) 252,300 - - - - - 252,300 Bond Proceeds - - - - - - _ Other 18,000 - - - - - 18,000 20 Auburndale Park Capital Costs - - 25,000 100,000 - - 125,000 Funding Sources Municipal Park Fund - - 25,000 - - - 25,000 Grants (Fed,State,Local) - - - 50,000 - - 50,000 Other - - - 50,000 - - 50,000 21 Auburndale Park il Capital Costs - 20,000 100,000 - - - 120,000 Funding Sources: • Municipal Park Fund - 10,000 50,000 - - - 60,000 Grants (Fed,State,Local) - 10,000 50,000 - - - 60,000 Other - - - - _ 22 Centennial Viewpoint Park Capital Costs - - - - 35,000 - 35,000 Funding Sources: Municipal Park Fund - - - - 35,000 - 35,000 Grants (Fed,State,Local) - - - - - - - Other - - - - - _ _ 23 BPA Trail Lea Hill Capital Costs 20,000 25,000 300,000 100,000 100,000 100,000 645,000 Funding Sources: Municipal Park Fund - - - - - 100,000 100,000 Grants (Fed,State,Local) - - 150,000 - - - 150,000 Other 20,000 25,000 150,000 100,000 100,000 - 395,000 24 Lakeland Park #4 Capital Costs - - - - - 600,000 600,000 Funding Sourcex Municipal Park Fund - - - - - 300,000 300,000 Grants (Fed,State,Local) - - - - - 300,000 300,000 Other - - - - - _ _ 25 Williams Pipeline Trail Capital Costs - - - - - 400,000 400,000 Funding Sources: Municipal Park Fund - - - - - 200,000 200,000 Grants (Fed,State,Local) - - - - - 200,000 200,000 Other - - - - - _ _ • 156 City ofAuburn Draft Capital Facilities Plan . TABLE PR-2A (continued) 2009 2010 2011 2012 2013 2014 Total SUMMARY: CAPITAL COSTS Capacity Projects 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Non-Capacity Projects 8,724,800 2,991,600 6,910,000 635,000 3,593,400 2,625,800 25,480,600 Total Costs 8,824,800 3,091,600 7,010,000 735,000 3,693,400 2,725,800 26,080,600 FUNDING SOURCES: Municipal Park Fund 76,700 260,000 280,000 270,000 124,500 800,000 1,811,200 Grants (Fed,State,Local) 798,300 85,000 2,325,000 115,000 - 600,000 3,923,300 Bond Proceeds 2,453,400 2,546,600 - - 3,318,900 1,225,800 9,544,700 REET 1 3,730,800 - - - - - 4,330,800 Cumulative Reserve Fund 488,000 - - - - - 488,000 Other 1,277,600 200,000 4,405,000 350,000 250,000 100,000 5,982,600 Total Funding 8,824,800 3,091,600 7,010,000 735,000 3,693,400 2,725,800 26,080,600 ~ • 157 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund ~ Project Title: Park Acquisitions/Development Project No: CpXXXX Project Type: CapaCity Project Manager: Faber Description: Land acquisitions to occur based on demand and deficiencies including trails and corridors. 2009 budget includes purchase of Fenster 1 b project (Smith property) adjacent to Fenster 1a. This parcel is critical for proper levee setback hydraulic functions. Progress Summary: Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipa! Parks Construction Fund - _ _ Grants (Fed,State,local) - 130,000 - - 130,000 _ Bond Proceeds - - _ _ _ REET - _ _ _ Other - 130,000 100,000 100,000 230,000 Total Funding Sources: - 260,000 100,000 100,000 360,000 Capital Expenditures: ' Design - _ _ _ _ Right ot Way - - _ Construction - 260,000 100,000 100,000 460,000 Total Expenditures: - 260,000 100,000 100,000 360,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund _ Grants (Fed, State, Local) Bond Proceeds REET - _ _ _ _ Other 100,000 100,000 100,000 100,000 600,000 Totai Funding Sources: 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: ~ Design - _ _ _ _ Right o(Way - - _ _ _ Construction 100,000 100,000 100,000 100,000 600,000 Totai Expenditures: 100,000 100,000 100,000 100,000 600,000 Grants / Other Sources: King County Conservation Futures Grant, King Conservation District Fund, Prop 2(100,000 per year). , • 158 City of Auburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Les Gove Park Improvements Project No: CpXXXX Project Type: NOn-CapaCity Project Manager: Wuotila Description: Project to include reptacement of existing playground with "Boundless" Inclusive Playground suitable for those with disabilities. Demolish existing Les Gove Building and Restroom facility and replace with new restroom facility and replace with new facility. This improvement will provide for increased visibility of children by guardians as well as a siate of the art playground for kids of all abilities. Progress Summary: Future Impact on Operating Budget: No increases are expected; operations remain constant. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - 250,000 - Grants (Fed,State,Locaq - - - 75,000 - Bond Proceeds - - - - - REET - - - - - Other - - - 75,000 - Total Funding Sources: - - - 400,000 - Capital Expenditures: Design - - - - - Right ol way - - - - - Consfruction - - - 400,000 - Total Expenditures: - - - 400,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - - 250,000 Grants (Fed,State,Local) - - - - 75,000 Bond Proceeds - - - - - REET - - - - - Other - - - - 75,000 Total Funding Sources: - - - - 400,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Consfruction - - - - 400,000 Total Expenditures: - - - - 400,000 • Grants I Other Sources: "Other" is Parks Impact Fee Fund 159 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Brannan Park Fence and Bleachers Project No: Cpxxxx Project Type: Non CapaClty Project Manager: WuOtila Description: This project,will be a 1:2 grant match This project proposes to use grants and King County matching funds to make field improvements (fencing, bleachers and turf renovations) to Field #4, and, capital funds for fencing of Field #3. Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget , Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - 21,700 - 21,700 Grants (Fed,State,Loca!) - - 58,000 - 58,000 _ Bond Proceeds - - _ _ _ REET _ _ _ Other - - 7,300 - 7,300 Total Funding Sources: - - 87,000 - 87,000 Capitaf Expenditures: Design - - _ _ _ Right of Way - - _ _ _ Construction - - 87,000 - 87,000 Total Expenditures: - - 87,000 - 87,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - - 21,700 Grants (Fed,State,LocaQ - - - - 58,000 Bond Proceeds _ REET _ Other - - - - 7,300 Total Funding Sources: - - - - 87,000 Capital Expenditures: Design _ Right of Way Construction - - - - 87,000 Total Expenditures: - - - - 87,000 Grants / Other Sources: Youth Sports Facility Grant wili use match by Auburn Youth Soccer Association listed as "Other" • 160 City ofAuburn Draft Capital Facilities Plan 0 MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Issac Evans Park Project No: Cpxxxx Project Type: Non capacity Project Manager: WuOt1a Description: Repair trail throughout park, develop reforestation plan. Future Impact on Operating Budget: Increased mowing and utilities- $6,000 Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - Grants (Fed, State, Local) - - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - - - - - Capitai Expenditures Design - - - - - Right of Way - - - - - Conshuction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municrpal Parks Construction Fund 75,000 - - - 75,000 Grants (Fed, State, Local) 75,000 - - - 75,000 Bond Proceeds - - - - - REET - Other 20,000 - - - 20,000 Total Funding Sources: 170,000 - - - 170,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 170,000 - - - 170,000 Total Expenditures: 170,000 - - - 170,000 • Grants / Other Sources: "Other" is from impact Fee Fund 161 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Jacobsen Tree Farm Site Plan Project No: cp0609 Project Type: Non-CapaCity Project Manager: Faber Description: Coordinate with Auburn Schooi District on Master Site Plan for this 29 acre site. This project site was annexed into the City and the project is contingent on City Councii direction. Lea Hill area is deficient in park activities. Progress Summary: Future Impact on Operating Budget: No significant impact due to master plan. Future park development will result in maintenance and utility expenses undeterminable at this time. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendmenfs _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construcfion Fund - - 30,000 - 30,000 Grants (Fed, State, Local) _ _ _ Bond Proceeds REET Other _ _ _ Total Funding Sources: - - 30,000 - 30,000 Capital Expenditures: Design - - 30,000 - 30,000 Right of Way _ _ _ Consfruction _ _ _ Totai Expenditures: - - 30,000 - 30,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipa! Parks Construction Fund - - - - 30,000 Grants (Fed,State,Loca/) 2,000,000 - - - 2,000,000 Bond Proceeds - _ REET - _ Other 4,000,000 - - - 4,000,000 Total Funding Sources: 6,000,000 - - - 6,030,000 Capital Expenditures: Design 100,000 - - - 130,000 Right of Way - _ Construction 5,900,000 - - - 5,900,000 Total Expenditures: 6,000,000 - - - 6,030,000 Grants / Other Sources: "Other" is potential trade of Lea Hill Park to GRCC for development funds. • 162 City ofAuburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capitai Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Fulmer Park Improvements Project No: Cpxxxx Project Type: Non-CapaCity Project Manager: Wuotila Description: Develop Master Plan for additional parking and park amenities on land exchanged with the Water Utility, and construct planned improvements. Progress Summary: Future Impact on Operating Budget: Increased maintenance of approximately $10,000 annually BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments - . Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed,State.Local) Bond Proceeds REET Other Total Funding Sources: Capital Expenditures: Design Right oi Way Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund 50,000 - - - 50,000 Grants (Fed,Sfate,Local) 50,000 - - - 50,000 Bond Proceeds - _ REET - _ Other 85,000 - - - 85,000 Total Funding Sources: 185,000 - 185,000 Capital Expenditures: Design - _ Right of Way - - - - _ Construction 185,000 - - - 185,000 Total Expenditures: 185,000 - - - 185,000 • Grants / Other Sources: "Other" is Parks Impact Fee fund 163 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Faailities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund . Project Title: Auburn Community Center Project No: Cp0607 Project Type: NOn-CapaCity Project Manager: Bur'ke Description: Construction of a new Community Center and associated site improvements at Les Gove Park. Progress Summary: Schematic design is complete. Currently in design development. Future Impact on Operating Budget: Bud et: g 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusfed Budget ACtiVlty: 2008 YE 2009 Year End • Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed, State, Local) - - - _ _ Bond Proceeds - 2,453,400 2,546,600 2,453,400 REET 1 2,700 1,097,400 3,583,800 - 4,683,900 Other - 1,000,000 - 1,000,000 Totai Funding Sources: 2,700 1,097,400 7,037,200 2,546,600 8,137,300 Capital Expenditures: Design 2,700 817,500 168,000 33,000 988,200 Construction (MACC) - 279,900 6,869,200 2,513,600 7,149,100 Total Expenditures: 2,700 1,097,400 7,037,200 2,546,600 8,137,300 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund _ Grants (Fed, State, Local) _ Bond Proceeds - - - - 5,000,000 REET 1 - - - - 3,583,800 Other - - - - 1,000,000 Total Funding Sources: - - - - 9,583,800 Capital Expenditures: Design - - - - 201,000 Construction (MACC) - - - 9,382,800 Total Expenditures: - - - - 9,583,800 Grants / Other Sources: • 164 City ofAuburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Auburn Activity Center Project No: Cpxxxx Project Type: Non-CBpaCity Project Manager: Burke Description: Construction of a new Community Center and Activity Center (gym) at Les Gove Park. (Note: assumes NO phasing) Progress Summary: Schematic design is complete. Currently in design development. Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipa! Parks Construction Fund - Grants (Fed, State, Local) - - Bond Proceeds _ REET 1 - 593,800 - - 593,800 Other Total Funding Sources: - 593,800 - - 593,800 Capital Expenditures Desrgn - 593,800 - - 593,800 Construction (MACC) _ Total Expenditures: - 593,800 - - 593,800 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund _ Grants (Fed, State, Local) - - _ _ _ BondProceeds - - 3,318,900 1,225,800 4,544,700 REET1 - - _ _ _ Other _ _ _ Total Funding Sources: - - 3,318,900 1,225,800 4,544,700 Capitai Expenditures: Design - - 699,000 155,700 854,700 Construction (MACC) - 2,619,900 1,070,100 3,690,000 Total Expenditures: - • 3,318,900 1,225,800 4,544,700 Grants / Other Sources: • 165 City of Auburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Veteran's Park Improvements - Phase 1& 2 Project No: CpXXXx Project Type: Non-Capacity Project Manager: Wuotila Description: Phase 1(2009): Add new concrete pathways along parking lot and overlay existing parking lot. This project is referred to in the Parks, Arts and Recreation Plan. Phase 2(2010): Replace existing concrete paths, add a climbing toy with safety surfacing, upgrade spray pool or expand playground, improve irrigation coverage, selective tree removal and turf renovation. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actuai 2009 08 Budget , Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed,State,Local) Bond Proceeds REET Ofher Total Funding Sources: Capital Expenditures: Design Right olWay Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund 50,000 50,000 - - 100,000 Grants (Fed, State, Local) - _ _ Bond Proceeds REET Other - _ _ Total Funding Sources: 50,000 - - 100,000 Capital Expenditures: Design - _ _ Right of Way - _ _ Construction 50,000 50,000 - - 100,000 Total Expenditures: 50,000 50,000 - - 100,000 Grants 1 Other Sources: . 166 City ofAuburn Draft Capital Facilities Plan ~ MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Olson Canyon Farm Restoration Project No: cp0715 Project Type: Non Capacity Project Manager: Cosgrove Description: Project is restoration and preparation for public use of the Mary Olson Farm. A Washington State Heritage Capitaf Projects grant has been awarded, $245,000. It will be used to fully restore the farmhouse, inside and out (2007, 2008 & 2009) and other buildings and landscape. The grant is awarded to the Museum (non-profit) and as such will not show up on the city's records. The cash match provided by the city will be used for design and construction of public parking, restrooms and other parks amenities. Upon completion of the parking, restrooms and park amenities, the Farm will be approximately 90% complete and available for public use. Progress Summary: Ciry Match, 2009:used for design of parking and restroom, action pending transfer of parcei of land from County to city. Construction project put out to bid in late 2009. 2010: construction on these projects should be compiete. Non-profit grant, 2008: exterior of house reconstructed, interior designed. 2009; 75% interior construction complete, landscape restoration in progress. ' Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund 11,700 - - - 11,700 Grants (Fed.State,LocaQ - _ Bond Proceeds - - - - - REET 1 - 54,000 147,000 - 207,000 Other - - 32,300 - 32,300 Total Funding Sources: 11,700 54,000 179,300 245,000 Capital Expenditures: Design 11,700 24,000 20,000 - 55,700 Right of Way - - - - - Construction - 30,000 159,300 - 189,300 Total Expenditures: 11,700 54,000 179,300 - 245,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - - Grants (Fed,State,Loca!) Bond Proceeds _ REET 1 - - - - 147,000 Other - - - - 32,300 Total Funding Sources: - - - - 179,300 Capital Expenditures: Design - - - - 20,000 Right ol Way _ Construction - - - - 159,300 Totai Expenditures: - - - - 179,300 • Grants ! Other Sources: Park Mitigation 167 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Auburn Environmental Park Project No: c412a0 Project Type: Non-Capacity Project Manager: Nix Description: The Auburn Environmental Park (AEP) Project seeks to create vegetated open space within an urbanized area, which will provide many mutual benefits. The park will provide opportunities for local economic development, water quality improvement, storm water detention, flood control, fish and wildlife enhancement, visual resource, public education and passive recreation, including walking trails and bird viewing amenities. Progress Summary: The City has been awarded $578,000 grant from IAC and will require City match. The amount funded from the Cumulative Reserve fund will only be transferred as funds are required to match the grant award. Future Impact on Operating Budget: Upon completion of the construction that will consist of improvements and wetland enhancement, there will be a need for management and maintenance. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adop[ed Budget - , Budget Amendments _ Adjusted Budget - - - - Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - - _ Grants (Fed,Stafe,Local) - 80,000 488,000 - 568,000 . Bond Proceeds - - - - _ REET - - - _ _ Cumulative Reserve Fund - 80,000 488,000 - 568,000 Other 756,900 - - - 756,900 Total Funding Sources: 756,900 160,000 976,000 - 1,892,900 Capital Expenditures: Design 168,400 - 300,000 - 468,400 Right of Way 588,500 - - - 588,500 Construction - 160,000 676,000 - 836,000 Total Expenditures: 756,900 160,000 976,000 - 1,892,900 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Consfruction Fund _ Grants (Fed, State, Local) - - - - 488,000 Bond Proceeds - - - - - REET _ Cumulative Reserve Fund - - - 488,000 Other _ Total Funding Sources: - - - - 976,000 Capital Expenditures: Design - - - - 300,000 Right of Way _ Construction - - - - 676,000 Total Expenditures: - - - - 976,000 Grants / Other Sources: Interagency Committee for Outdoor Recreation (IAC) $578,000 • 168 City ofAuburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Faciiities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Shaughnessy Park Improvements Project No: CPxxxx Project Type: Non-Capacity Project Manager: Faber Description: Based on the completed Master Plan, coordinate improvements with neighborhood, Muckleshoot Tribe and service club(s). Improvements will include new playground, improved entrance, soccer/baseball field development, hard court improvements and new loop trail. Future Impact on Operating Budget: increased mowing and utilities- $6,000 BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: - - - 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - - - - - - - - Grants (Fed, State, Local) Bond Proceeds - - - - - REET - - - - - Other - - 100,000 - 100,000 Total Funding Sources: - 100,000 - 100,000 Capital Expenditures: Design - - - - - RightolWay - - - - - Construction - - 100,000 - 100,000 Totai Expenditures: - - 100,000 - 100,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - - - Granfs (Fed,State,Locaq - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - 100,000 Total Funding Sources: - - - - 100,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 100,000 Total Expenditures: - - - - 100,000 • Grants / Other Sources: Muckleshoot Tribe, Mitigation 169 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Titie: Rotary Park Improvements Project No: Cp0807 Project Type: Non-Capacity Project Manager: Faber Description: Based on completed Master Plan, coordinate improvements with neighborhood and Rotary Club of Auburn to add walking path (2011), new playground, irrigation, landscaping and signage to Rotary Park (2008). Future Impact on Operating Budget: Increased mowing and utilities- $6,000 BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget - - - - Activity: . 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - 25,000 - - 25,000 Grants (Fed,Stafe,Local) - - - - - Bond Proceeds - - - - - REET - - - - - Other - 25,000 - - 25,000 Total Funding Sources: - 50,000 - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 50,000 - - 50,000 Total Expenditures: - 50,000 - - 50,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund 30,000 - - - 30,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: 30,000 - - - 30,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 - - - 30,000 Total Expenditures: 30,000 - - - 30,000 Grants / Other Sources: Auburn Rotary • 170 City of Auburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund ProjectTitle: Misc. Parks Improvements Project No: Cpxxxx Project Type: Non-Capacity Project Manager: Faber Description: Minor park improvements including shelters, roofs, playgrounds, irrigation and restrooms as denoted in the Parks Master Plan. Progress Summary: Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - 25,000 - 25,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - - 25,000 - 25,000 Capital Expenditures: Design - - - - - Right olWay - - - - - Construction - 25,000 - 25,000 Total Expenditures: - - 25,000 - 25,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - 200,000 225,000 Grants (Fed, State, Local) - - - 100,000 100,000 Bond Proceeds - - - - - REET - - - - - Other 50,000 100,000 50,000 - 200,000 Total Funding Sources: 50,000 100,000 50,000 300,000 525,000 Capital Expenditures Design - - - - - Right of Way - - - - - Consfruction 50,000 100,000 50,000 300,000 525,000 Total Expenditures: 50,000 100,000 50,000 300,000 525,000 • Grants / Other Sources: Parks Impact Fee Funds 171 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund ~ Project Title: Cameron Park Project No: Cpxxxx Project Type: NOn-CBpaCity Project Manager: Wuotila Description: Add landscaping to park as a buffer for housing and at play structure, and split raii fencing at play structure. The project is identified in the adopted 2005-2010 Parks Improvement Plan. Future Impact on Operating Budget: None BUdget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed, State, Local) Bond Proceeds REET Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: Forecasted Project Cost: Total ' 2011 2012 2013 2014 2009-2014 Funding Sources: ' Munrcipal Parks Construction Fund - 55,000 - - 55,000 Grants (Fed, State, Local) - - _ ' Bond Proceeds REET ' Other - - _ Total Funding Sources: - 55,000 - - 55,000 Capital Expenditures: Design - - _ Right of Way - - _ Construction - 55,000 - - 55,000 Total Expenditures: - 55,000 - - 55,000 Grants / Other Sources: • 172 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Game Farm Park Project No: Cpxxxx Project Type: Non-capacity Project Manager: WuOtlla Description: Add signage to the park and provide trail improvements. Project is programmed in the 2005 adopted six-year Parks Improvement Plan. Future Impact on Operating Budget: • None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef - Budget Amendments - Adjusted Budget • Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - - - Grants (Fed,State,Local) - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - - - - Capital Expenditures: Desrgn - - - - - Right of Way - - - - - Construction - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - 100,000 80,000 - 180,000 Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - 100,000 80,000 - 180,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 100,000 80,000 - 180,000 Total Expenditures: - 100,000 80,000 - 180,000 • Grants / Other Sources: 173 City of Auburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Gaines Park Project No: Cpxxxx Project Type: Non-CapaClty Project Manager: Wuotila Description: Develop Horticulture Plan for the Park as indicated in the 2005-2010 Parks Improvement Plan. Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - _ Grants (Fed, State, Local) Bond Proceeds REET Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - 9,500 - 9,500 Grants (Fed, State, Local) _ _ _ Bond Proceeds REET _ _ _ Other Total Funding Sources: - - 9,500 - 9,500 Capital Expenditures: Design - - 9,500 - 9,500 Right of Way _ _ _ ' Construction Total Expenditures: - - 9,500 - 9,500 Grants / Other Sources • 174 City ofAuburn Draft Capital Facilities Plan ~ MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Roegner Park Project No: Cpxxxx Project Type: Non-capacity Project Manager: Wuotila Description: This project requires trail system maintenance, play structure replacement and riverbank stabilization. Future Impact on Operating Budget: None Budget: 2008 YTD Actuat 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budgef Amendments - . Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipa( Parks Construction Fund - - Gran(s (Fed,State,Local) - - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - - - - Capital Expenditures Design - - - - - Righ1 of Way - - - - - Construction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Municipal Parks Construction Fund - 65,000 - - 65,000 Grants (Fed.State,Local) - 65,000 - - 65,000 Bond Proceeds - - - - - REET - - - - - Other - - - - - Total Funding Sources: - 130,000 - - 130,000 Capital Expenditures: Design - - - - - Right o/ Way - - - - - Construction - 130,000 - - 130,000 Total Expenditures: - 130,000 - - 130,000 • Grants / Other Sources: State Conservation Grant and Prop. 2 fund 175 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: White River Trail Extension Project No: cp0745 Project Type: NOn CBpaClty Project Manager: WuOtila Description: This project will construct the last leg of the White River Trail before it reaches the City of Pacific. It requires a 1:1 grant match from the Washington Wildlife and Recreation Program and use of the 1989 Open Space Bond issue fund, as well as money from the City's own Fund 102 for Pedestrian crossings Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopfed Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total , Municipal Parks Construction Fund - - - _ _ Grants (Fed,State,Local) - - 252/,300 - 252,300 _ Bond Proceeds 9,200 28,500 - - 37,700 REET - _ _ _ Other - - 15,000 - 18,000 Total Funding Sources: 9,200 28,500 270,300 - 308,000 Capital Expenditures: Design 9,200 28,500 - - 37,700 Right of Way - - _ _ _ Construction - - 270,300 - 270,300 Total Expenditures: 9,200 28,500 270,300 - 308,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund _ Grants (Fed, State, Local) - - - - 252,300 Bond Proceeds _ REET _ Other - - - - 18,000 Total Funding Sources: - - - - 270,300 Capital Expenditures: Design _ Right o/ Way _ Construction - - - - 270,300 Total Expenditures: - - - - 270,300 Grants 1 Other Sources: W WRP Grant (75K), 1989 Open Space Bond Fund (98.3K), Auburn Fund 102 (18K). • 176 City ofAuburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Auburndale Park Project No: Cpxxxx Project Type: Non Capacity Project Manager: Wuotila Description: Develop a Master Plan for the Park in 2011; install an irrigation system, new play structure and improve signage in 2012. Future Impact on Operating Budget: Utilities would increase by $2,000 BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipai Parks Construcfion Fund - Granfs (Fed,State,Local) - - - - - Bond Proceeds REET Other Total Funding Sources: - - - Capital Expenditures: Design Right of Way Constructron Total Expenditures: - _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund 25,000 - - - 25,000 Grants (Fed,State,Local) - 50,000 - - 50,000 Bond Proceeds - - - - _ REET _ Other - 50,000 - - 50,000 Total Funding Sources: 25,000 100,000 - - 125,000 Capital Expenditures: Design 25,000 - - - 25,000 Right of Way - - _ Construction 100,000 - - 100,000 Total Expenditures: 25,000 100,000 - - 125,000 • Grants / Other Sources: Grant from State Recreation and Conservation matched with service club donation 177 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Pian • Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Auburndale Park II Project No: CpXxXX Project Type: Non Capacity ' Project Manager: Wuotila Description: Develop a Master Plan in 2010; improve the existing trail system and install signage and play structure. Future Impact on Operating Budget: Increased utility costs of $2,000 BUdget: 2008 YTD Actuai 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget - - - _ Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - 10,000 - Grants (Fed, State, Local) - - - 10,000 - Bond Proceeds - - - _ _ REET Other - - _ _ Total Funding Sources: - - - 20,000 Capital Expenditures: Design - - - 20,000 - Right of Way _ _ Construction _ _ Total Expenditures: - - - 20,000 - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municrpal Parks Construction Fund 50,000 - - - 60,000 Grants (Fed,State,LocaQ 50,000 - - - 60,000 Bond Proceeds - _ REET Other - _ Total Funding Sources: 100,000 - - - 120,000 Capital Expenditures: Design - - - - 20,000 Right of Way - _ Construction 100,000 - - - 100,000 Total Expenditures: 100,000 - - - 120,000 Grants / Other Sources: King County Youth Sports Facility Grant • 178 City of Auburn Draft Capital Facilities Plan • MUNICIPAL PARKS CONSTRUCTION FUND (321) Capitai Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Centennial Viewpoint Park Project No: Cpxxxx Project Type: Non capacity Project Manager: Wuotila Description: Develop a landscape plan for the park and remove antenna from building. Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budgef _ Budget Amendments _ • Adjusted Budget Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed, State, Local) Bond Proceeds REET Other Total Funding Sources Capital Expenditures: Design Right of Way Construction Total Expenditures: Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - 35,000 - 35,000 Granfs (Fed,State,LocaQ _ _ _ Bond Proceeds REET Other _ _ _ Total Funding Sources: - - 35,000 - 35,000 Capital Expenditures: - Design - - 7,500 - 7,500 Right of Way _ _ _ Construction - - 27,500 - 27,500 Total Expenditures: - - 35,000 - 35,000 • Grants / Other Sources: 179 City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Pian Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: BPA Trail Lea Hill Project No: CpXXXx Project Type: Non capacity Project Manager: Wuotlla Description: Develop a feasibility/due diligence Study to determine the extent of issue with trail design and alignments along the BPA corridor on Lea Hill between 132nd Ave SE and 108th Ave SE, from Jacobson Tree Farm to the east line of the Auburn Golf Course. Construct the Trail in subsequent phases. Progress Summary: Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - Grants (Fed, State, Local) Bond Proceeds REET - - _ _ _ Other - - 20,000 25,000 20,000 Total Funding Sources: - - 20,000 25,000 20,000 Capital Expenditures: Design - - 20,000 25,000 20,000 Right of Way - - - _ _ Construction - - _ _ _ Total Expenditures: - - 20,000 25,000 20,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - 100,000 100,000 Grants (Fed, State, Local) 150,000 - - - 150,000 Bond Proceeds - _ REET - - - _ _ Other 150,000 100,000 100,000 - 395,000 Total Funding Sources: 300,000 100,000 100,000 645,000 Capital Expenditures: Design - - - - 45,000 Rrght of Way - - _ _ _ Construction 300,000 100,000 100,000 100,000 600,000 Total Expenditures: 300,000 100,000 100,000 100,000 645,000 Grants / Other Sources: "Other" is King County Prop. 2 funds • 180 City ofAuburn Draft Capital Facilities Plan ~ MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title; Lakeland Park #4 Project No: CpXXXX Project Type: Non-capacity Project Manager: WuOtila Description: Develop a design for a dog park and construct the park. Open grassed fields, fencing, parking and visitor amenities are included in the project Progress Summary: Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Construction Fund - - - Grants (Fed,State,Local) - - - - - ' Bond Proceeds - - - - - REET Other - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right ol Way - - - - - Construction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - 300,000 300,000 Grants (Fed, State, Local) - - - 300,000 300,000 Bond Proceeds - - - - - REET - Other - - - - - Total Funding Sources: - - - 600,000 600,000 Capital Expenditures: Design - - - 30,000 30,000 Right of Way - - - - - Consfruction - - - 570,000 570,000 Total Expenditures: - - - 600,000 600,000 • Grants / Other Sources: Igl City ofAuburn Draft Capital Facilities Plan MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Williams Pipeline Trail Project No: CpXXXX Project Type: non capacity Project Manager: WuOtlla Description: Develop a design for a multi purpose trail over the Williams pipeline right-of-way, and construct the trail from Bridget Avenue SE to the White River Trail in the southeast part of the City. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Municipal Parks Constructron Fund - Grants (Fed, State, Local) Bond Proceeds REET Other Total Funding Sources: Capital Expenditures: Design Right of Way Construction Total Expenditures: _ Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Municipal Parks Construction Fund - - - 200,000 200,000 Grants (Fed,State,Locaq - - - 200,000 200,000 Bond Proceeds _ _ REET Other _ _ Total Funding Sources: - - - 400,000 400,000 Capital Expenditures: Design - - - 25,000 25,000 Righf olWay _ _ Construction - - - 375,000 375,000 Total Expenditures: - - - 400,000 400,000 Grants / Other Sources: • 182 City ofAuburn Draft Capital Facilities Plan ~ TABLE PR-3 Impact on Future Operating Budgets PARKS and RECREATION, Including MUNICIPAL PARKS CONSTRUCTION Pro'ect: 2009 2010 2011 2012 2013 2014 Total 1 Park Acquisitions $ - $ - $ - $ - $ - $ - $ - 2 Les Gove Park Improv. - - - - - - - 3 Brannon Park Fence & B/eachers - - - - - - - 4 /ssac Evans Park - - - 6,000 6,000 6,000 18,000 5 Jacobsen Tree Farm - - - - - - - . 6 Fulmer Park Improvements - - - 10,000 10,000 10,000 30,000 ' 7 Auburn Community Center - - - - - - - 8 Auburn Activity Center - - - - - - - 9 Veteran's Park Improv. - - - - - - - 10 Olson Canyon Farm Restoration - - - - - - - 11 Auburn Environmental Park - - - - - - - 12 Shaughnessy Park lmprov. - 6,000 6,000 6,000 6,000 6,000 30,000 • 13 Rotary Park Improv. 6,000 6,000 6,000 6,000 6,000 6,000 36,000 14 Misc. Park lmprovements - - - - - - - 15 Cameron Park - - - - - - - 16 Game Farm Park - - - - - - - 17 Gaines Park - - - - - - - 18 Roegner Park - - - - - - - 19 Whife River Trail Ext. - - - - - - - 20 Auburndale Park - - - - 2,000 2,000 4,000 21 Auburndale Park ll - - - 2,000 2,000 2,000 6,000 22 Centennial Viewpoint Park - - - - - - - 23 BPA Trail Lea Hill - - - - - - - 24 Lakeland Park #4 - - - - - - - 25 Williams Pipeline Trail - - - - - - - Total $ 6,000 $ 12,000 $ 12,000 $ 30,000 $ 32,000 $ 32,000 $ 124,000 • 183 City of Auburn Draft Capital Facilities Plan • CITY C~~ ~ • * - MORE THAIti1 YOU IMAGII'•1ED ~ 184 City ofAuburn Draft Capital Facilities Plan • COMMUNITY CENTER Current Facilities The City of Auburn currently does not have a community center. Level of Service (LOS) The City does not have a current LOS for a community center. The proposed LOS of 464.00 square feet per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing The proposed Community Center facility construction project will cost approximately $9,500,000. Impact on Future Operating Budgets Based on outcome of feasibility study, increased costs to the general fund may be seen. • TABLE PR-4 Facilities Inventory Community Center CAPACITY FACILITY (Square Feet) LOCATION Existing Inventory: None - Tofal Existing Inventory - Proposed Capacity Projects: New Community Center 35,000 Total Proposed Capacity Projects 35,000 2014 Projected Inventory Total 35,000 • 185 City ofAuburn Draft Capital Facilities Plan • CI1Y OF - ~ lemporAb, M'M • MORE THAN YOL.7 IMAGlNED ~ 186 City ofAuburn Draft Capital Facilities Plan • SENIOR CENTER Current Facilities The City of Auburn currently has one Senior Center. Table PR-5 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 188.03 square feet per 1,000 population is based on the existing inventory divided by the 2008 citywide population of 67,005. The proposed LOS of 167.04 square feet per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing This CFP does not include any senior center capital facilities projects during 2009 - 2014. Impact on Future Operating Budgets There are no operating budget impacts forecasted for the senior center facility during the six years 2010 - 2015. ~ TABLE PR-5 Facilities Inventory Senior Center CAPACITY FACIUTY (Square Feet) LOCATION Existing Inventory: Senior Center 12,600 808 9th Street SE Total Existing Inventory 12,600 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2014 Projected Inventory Total 12,600 ~ 187 City ofAuburn Draft Capital Facilities Plan • al I.ry~~T OF ~ C! ~ UPN • MORE THAN YOU IMAGINED ~ ~gg City of Auburn Draft Capital Facilities Plan • GENERAL MUNICIPAL BUILDINGS Current Facilities The current inventory of City government administration and operations facilities include 89,975 square feet for general government operations, 62,188 square feet for police services, and 31,673 square feet for fire protection, for a total of 183,816 square feet. Table GM - 1"Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 2,743.11 square feet per 1,000 population is based on the existing inventory divided by the 2008 citywide population of 67,005. The proposed LOS of 2,900.91 square feet per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing The City's General Municipal Building facilities include five capital projects at a cost of $1,950,000. The projects include (1) $250,000 for Equipment Rental vehicle maintenance bay, (2) $100,000 for M&O vehicle bay and storage building, (3) $200,000 VHF Radio upgrade, (4) $700,000 for M&O Expansion, and (4) $700,000 for HVAC Upgrades at City HaIL Table GM - 2 • shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets Operating budget impacts annually are not yet forecast for general municipal buildings during the six years 2010 - 2015. • 189 City ofAuburn Draft Capital Facilities Plan TABLE GM-1 Facilities Inventory • General Municipal Buildings CAPACITY FACILITY (Square Feet) LOCATION Existing Inventory: General Government: City Hall 37,700 25 W. Main Street City Maintenance & Operations Facility 25,855 1305 'C' Street SW Parks & Recreafion Admin. Facility 7,000 910 9th Street SE Street Waste Handling Facility 2,750 1305'C' Street SW Municipal Court (Justice Center) 12,200 340 E. Main Street GSA Building 4,470 2905 C Street #815 Total 89,975 Police: Headquarters (Justice Center) 24,800 340 E. Main Street Supermall substation 1,208 1101 Supermall Way Bicycle storage 300 15 N. Division Street Gun range 32,880 1600 Block 15th St. NW Seized vehicle parking sfa/ls 3,000 'C Street SW (GSA) Total 62,188 • Fire: Stations: North Station #31 12,220 1101 'D' Street NE South Sfation #32 5,200 1951 'R' Street SE GSA Station #33 9,533 2815 'C' Street SW Other Faci/ities: North Station Maint. Facility 4,700 1101 'D' Street NE Total 31,653 Tofa/ Existing lnventory 183,816 Proposed Capacity Projects: Fire Stafion tbd Community Center (see project defail, Parks & Recreation section) 35,000 Total Proposed Capacity Projects 35,000 2014 Projected Inventory Total 218,816 • 190 City ofAuburn Draft Capital Facilities Plan • TABLE GM-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING GENERAL MUNICIPAL BUILDINGS 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: 1 Vehicle Maintenance Bay Capital Costs 250,000 - - - - - 250,000 Funding Sources: Equip. Rental Fund 250,000 - - - - - 250,000 2 M&0 Vehicle Bay & Storage Capital Costs 100,000 - - - - - 100,000 Funding Sources: Equip. Rental Fund 100,000 - - - - - 100,000 3 VHF Radio System Upgrade Capital Costs 200,000 - - - - - 200,000 Funding Sources Equip. Rental Fund 200,000 - - - - - 200,000 4 Maintenance and Operations Expansion Capital Costs - - 350,000 350,000 - - 700,000 Funding Sources: Equip. Rental Fund - - - - _ Other - - 350,000 350,000 - - 700,000 • Non-Caaacitv Proiects: 5 City Hall HVAC System Upgrade Capital Costs 700,000 - 700,000 Funding Sources: General Fund - _ Grants (Fed,State,Local) - - - - - - _ REET 1 700,000 - - - - - 700,000 SUMMARY: CAPITAL COSTS Capacity Projects 550,000 - 350,000 350,000 - - 1,250,000 Non-Capacity Projects 700,000 - - - - - 700,000 Total Costs 1,250,000 - 350,000 350,000 - - 1,950,000 FUNDING SOURCES: Equip. Rental Fund 550,000 - - - - - 550,000 Grants (Fed,State,Local) - - - _ _ Other - - 350,000 350,000 - - 700,000 REET 1 700,000 - - - - - 700,000 Totai Funding 1,250,000 - 350,000 350,000 - - 1,950,000 • 191 City ofAuburn Draft Capital Facilities Plan EQUIPMENT RENTAL FUND (550) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Equipment Rental Vehicle Maintenance Bay Project No: Cp0710 Project Type: Project Manager: Description: Add additional vehicle bay at Equipment Rental shop for heavy equipment and large vehicles to improve efficiency and remove choke points. Adding a large vehicle bay with a maintenance pit will enable us to perform inspections and maintenance on more than one large vehicle at a time, and while loaded with product, ie.. sand, water, debris, sewage. Currently several hours of work have to be undone and then repeated due to our limitations. Not only is this counterproductive, but it can be catastrophic during critical operations. Progress Summary: Future Impact on Operating Budget: None Budg@t: 2005 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2008 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Equip. Renta! Revenue - 250,000 250,000 - 500,000 Grants (Fed, State, Local) _ _ _ _ _ Other _ _ TotalFunding Sources: - 250,000 250,000 - 500,000 Capital Expenditures: Design - 25,000 - - 25,000 Right of Way _ _ _ _ _ Construction - 225,000 250,000 - 475,000 Total Expenditures: - 250,000 250,000 - 500,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 250,000 Grants (Fed,State,Loca!) _ Other _ Total Funding Sources: - - - - 250,000 Capital Expenditures: Design _ Righto(Way _ Construction - - - - 250,000 Total Expenditures: - - - - 250,000 Grants / Other Sources: . 192 City ofAuburn Draft Capital Facilities Plan • EQUIPMENT RENTAL FUND (550) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Maintenance and Operations Vehicle Bay and Storage Project No: cp0710 Project Type: Project Manager: Description: Add three insuiated vehicle bays for Vactor storage to provide year-round protection. These vehicles hold large quantities of water on board at all times enabling them to be immediately dispatched in the event of an emergency. This requires them to be protected from freezing temperatures. Draining their large tanks each day would cause a dispatch delay whiie refilling, that could result in extraordinary damage to public and private property in an emergency situation. Enclose existing bays to provide necessary weather protection for street sweepers, sanding, and snow plow equipment. Construct storage shed to facilitate removal of portable containers, improving space utilization and traffic flow thoughout M&O. Progress Summary: Future Impact on Operating Budget: None BUdg@t: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - ACtivity: 2008 YE 2008 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Equip. Rental Revenue - 100,000 100,000 - 200,000 Grants (Fed, State, Local) - - - - - - Other - - - - - Total Funding Sources: - 100,000 100,000 - 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Conshuction - 100,000 100,000 - 200,000 Total Expenditures: - 100,000 100,000 - 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 100,000 Grants (Fed, State, Local) - - - - - Other - - - - - Total Funding Sources: - - - - 100,000 Capital Expenditures: Design - - - - - Right o( Way - - - - - Construction - - - - 100,000 Total Expenditures: - - - - 100,000 Grants I Other Sources: • 193 City ofAuburn Draft Capital Facilities Plan EQUIPMENT RENTAL FUND (550) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: VHF Radio System Upgrade Project No: Project Type: Project Manager: Description: Replace existing phone system based VHF radio system with a repeater based system, the existing system is dependant on the phone company lines to transmit and if during an event the phone system stops working our radio system does not work. The proposed system is a stand alone repeater based system with back-up power that we will control all links of the communication, with this system even if a repeater stops working we will only have a reduced level of service in that area. Progress Summary: Future Impact on Operating Budget: None, plus we will no longer be paying for the phone company lease lines to operate the radio. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget Budget Amendments Adjusted Budget ACtivity: • (Previous 2 vrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 20010 Budget Project Total Unrestricfed Equip. Renta/ Revenue - - 200,000 - 200,000 Grants (Fed, State, Local) - - - _ PWTFL Other - - - _ _ Total Funding Sources: - - 200,000 - 200,000 Capital Expenditures: Design - - - _ _ Right of Way - - - _ _ Construction - - 200,000 - 200,000 Total Expenditures: - - 200,000 - 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Equip. Renfal Revenue - - - - 200,000 Grants (Fed, State, Local) _ PWTFL Other _ Total Funding Sources: - - - - 200,000 Capital Expenditures: Design _ Right o( Way _ Construction - - - - 200,000 Total Expenditures: - - - - 200,000 Grants / Other Sources: • 194 City ofAuburn Draft Capital Facilities Plan • EQUIPMENT RENTAL FUND (550) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Maintenance and Operations Expansion Project No: Cpxxxx Project Type: Non-Capacity (Improvement) Project Manager: TBD Description: Funds allocated to remodel the existing M&O building into a more functional and maintainable facility. Progress Summary: Future Impact on Operating Budget: None, plus we will no longer be paying for the phone company lease lines to operate the radio. Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - - - - Budget Amendments - - - - • Adjusted Budget - - - - Activity: (Previous 2 Yrs) 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 20010 Budget Project Total Unrestricfed Street Revenue - Grants (Fed, State, Local) PWTFL Other Totai Funding Sources: Capital Expenditures: Design Right of Way - - - - - Construction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unreslricted Street Revenue - - - - - Grants (Fed,Sfate,Local) - - - - - PWTFL - - - - - Ofher 350,000 350,000 - - 700,000 Total Funding Sources: 350,000 350,000 - - 700,000 Capital Expenditures: Design - - - - _ Right of Way - - _ Construction 350,000 350,000 - - 700,000 Total Expenditures: 350,000 350,000 - - 700,000 Grants ! Other Sources: Debt • 195 City ofAuburn Draft Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: City Hail HVAC System Upgrade Project No: cp0716 Project Type: NOn-CapaCity Project Manager: Torres Description: Design and implementation of upgrades to the City Hall heating, ventilating, and air-conditioning (HVAC) system. Improvements will aliow for upgrades to the controls, air distribution and air handling components. It will aiso provide a systematic, phased implementation plan that can be put in place over the next several years. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Cap. Improv. Revenue - Grants (Fed,State,Locaf) - - - _ _ REET I - - 700,000 - 700,000 Other - - - Total Funding Sources: - - 700,000 - 700,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - - Cons[ruction - - 600,000 - 600,000 Total Expenditures: - - 700,000 - 700,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Cap. Improv. Revenue Grants (Fed,State,Local) - - - - _ REET 1 - - - - 700,000 Other _ Total Funding Sources: - - - - 700,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - _ Construction - - - - 600,000 Total Expenditures: - - - - 700,000 Grants / Other Sources: • 196 . City ofAuburn Draft Capital Facilities Plan . COMMUNITY IMPROVEMENTS Current Facilities In 2002, the City entered into a 99-year lease with the Central Puget Sound Regional Transit Authority (Sound Transit) for the use of 180 parking stalls and the right to sublease the Commercial Tenant area of the transit center parking garage and retail area. Level of Service (LOS) No Level of Service for community improvement projects have been identified at this time. Capital Facilities Projects and Financing The City's proposed Community Improvements include seven capital projects at a cost of $5,940,000. Table CI-2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecast for community improvement projects annually • during the six years 2010 - 2015. • 197 City ofAuburn Draft Capital Facilities Plan TABLE CI-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING • COMMUNITY IMPROVEMENTS 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: None _ Non-Caqacitv Proiects: 1 Annual Sidewalk Improvements Capital Costs 200,000 - 200,000 - 200,000 - 600,000 Funding Sourcex Capital Improv. Fund - - - - - - _ Grants (Fed,State,Local) - - - - - _ _ REET 2 200,000 - 200,000 - 200,000 - 600,000. , 2 Traffic Calming Improvements Capital Costs 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Funding Sources: Capital Improv. Fund - - - - - _ _ Grants (Fed,State,Local) , REET 2 - - - - - - _ Other (Redflex) 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 3 Traffic Signal Improvements Capital Costs - 200,000 - 200,000 - 200,000 600,000 Funding Sources: Capital Improv. Fund - - - - - - _ Grants (Fed,State,Local) - - - - - - _ REET 2 - 200,000 - 200,000 - 200,000 600,000 ~ 4 Downtown Revitalization Capital Costs 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 Funding Sources: General Fund 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 _ Grants (Fed,State,Local) - - - - - - _ 5 Mohawks Plastics Site Mitigation Project Capital Costs 100,000 12,000 10,000 8,000 5,000 '5,000 140,000 Funding Sources: , General Fund - - - - - - _ Grants (Fed,State,Local) - - - - _ _ _ REET 2 100,000 12,000 10,000 8,000 5,000 5,000 140,000 6 M&O Satellite Facilities Capital Costs 100,000 100,000 - - - - 200,000 Funding Sources: ' Capital Improv. Fund 100,000 100,000 - - - - 200,000 Grants (Fed,State,Local) - - - - - - _ REET - - - _ 7 Gateway Program (Planning) Capital Costs 100,000 85,000 15,000 - - - 200,000 Funding Sources: General F nd. u 98 100,000 85,000 15,000 200,000 Grants (Fed,State,Local) - - - - - - _ Other • , 198 City ofAuburn Draft Capital Facilities Plan • TABLE CI-2 (continued) SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 1,200,000 1,097,000 925,000 908,000 905,000 905,000 5,940,000 Total Costs 1,200,000 1,097,000 925,000 908,000 905,000 905,000 5,940,000 FUNDING SOURCES: Capital Improv. Fund - - - - - - - General Fund 700,000 685,000 515,000 500,000 500,000 500,000 3,400,000 Grants (Fed,State,Local) - - - - - - - REET 2 300,000 212,000 210,000 208,000 205,000 205,000 1,340,000 Other (Redflex) 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Total Funding 1,200,000 1,097,000 925,000 908,000 905,000 905,000 5,940,000 • ~ . 199 City ofAuburn Draft Capital Facilities Plan CAPtTAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Citywide Sidewalk Improvements TIP #32 Project No: varies ProjectType: Non-Capacity (Semi-Annual) Project Manager: TBD Description: Project will fund sidewalk improvements to a variety of locations throughout the city. A sidewalk inventory was completed in 2004. Annual projects are selected based upon criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian corridor or "linkage", connectivity to transit services, ADA requirements, and "Save our Streets" (SOS) project locations. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Cap. Improv. Revenue - Grants (Fed,State,LocaQ _ _ _ REET 2 - - 200,000 - 200,000 Other _ _ Total Funding Sources: - - 200,000 - 200,000 Capital Expenditures: Design 20,000 - 20,000 Right oi Way _ _ _ Construction 180,000 - 180,000 Total Expenditures: - - 200,000 - 200,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Cap. Improv. Revenue Grants (Fed, State, Local) - _ _ _ _ REET 2 200,000 - 200,000 - 600,000 Other _ _ _ _ _ Total Funding Sources: 200,000 - 200,000 - 600,000 Capital Expenditures: Design 20,000 - 20,000 - 60,000 Right of Way _ _ _ _ _ Construction 180,000 - 180,000 - 540,000 Total Expenditures: 200,000 - 200,000 - 600,000 Grants / Other Sources: ~ 200 City ofAuburn Draft Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Tite: Traffic Calming Improvements TIP #33 Project No: Cpxxxx Project Type: Annual , Project Manager: TBD Description: The City's Neighborhood Traffic Calming Program was adopted by City Council in November of 2005. Staff receives complaints from citizens and then gathers data to confirm that a speeding issue and/or cut through traffic issue is present. This money is for physical improvements to the streets once all other options have been exhausted. Physical improvements may include items such as speed' humps, speed tables, chicanes, traffic circles, and median treatments. Progress Summary: Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - ~ Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Cap. lmprov. Revenue - - - - - Grants (Fed,State,Local) - - - - - - REET 2 - 200,000 - - 200,000 Other - - 200,000 200,000 200,000 Total Funding Sources: - 200,000 200,000 200,000 400,000 Capital Expenditures: Design - 20,000 20,000 20,000 40,000 Right o(Way - - - - - Construction - 180,000 180,000 180,000 360,000 Total Expenditures: - 200,000 200,000 200,000 400,000 Forecasted Project Cost Total 2011 2012 2013 2014 2009-2014 Funding Sources. Unrestricted Cap. Improv. Revenue - - - - - Grants (Fed, State, Local) - - - - - REET2 - - - - - Ofher 200,000 200,000 200,000 200,000 1,200,000 Total Funding Sources: 200,000 200,000 200,000 200,000 1,200,000 Capital Expenditures: Design 20,000 20,000 20,000 20,000 120,000 Right of Way - - - - - Constructron 180,000 180,000 180,000 180,000 1,080,000 Total Expenditures: 200,000 200,000 200,000 200,000 1,200,000 Grants I Other Sources: Redflex money transferred from General Fund. • 201 City ofAuburn Draft Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capitai Facilities Plan, 2009-2014 Capital Projects Fund • Project Title: Traffic Signal Improvements TIP #34 Project No: cpxXXx Project Type: Non-Capacity (Semi-Annual) Project Manager: VariouS Description: The City analyzes accident data and identifies locations with higher than acceptable rates. Typically these involve signal locations where volumes have grown significantly requiring signal modifications. Signals that have accident patterns that are correctable are identified and the modifications are implemented. Signals are also evaluated annually for potential capacity enhancements. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: ~ 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestiicted Cap. lmprov. Revenue - Grants (Fed,State,Local) _ _ REET 2 - - 200,000 - Other _ Total Funding Sources: - - - 200,000 - Capital Expenditures: Design - - - 20,000 - Righto(Way _ _ Construction - - 180,000 180,000 Total Expenditures: - - - 200,000 180,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Cap. Improv. Revenue Grants (Fed, State, Local) _ _ _ _ _ REET 2 - 200,000 - 200,000 600,000 Other _ _ _ _ _ Total Funding Sources: - 200,000 - 200,000 600,000 Capital Expenditures: Design 20,000 20,000 60,000 ' Righto(Way - _ _ _ _ Construction 180,000 180,000 540,000 Total Expenditures: - 200,000 - 200,000 600,000 Grants / Other Sources: • 202 City ofAuburn Draft Capital Facilities Plan ~ CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: Downtown Revitalization Project No: cp328e Project Type: Annual Project Manager: Dowdy Description: Ongoing project to purchase property, construct new buildings, and renovate existing structures. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ • Adjusted Budget - - - - ACtivity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total General Fund - 500,000 500,000 500,000 1,000,000 Granfs (Fed, State, Local) - - - _ _ - REET O(her - _ _ _ _ Total Funding Sources: - 500,000 500,000 500,000 1,000,000 Capital Expenditures: Design - 100,000 100,000 100,000 200,000 Righto/Way - - _ _ _ Construction - 400,000 400,000 400,000 800,000 Total Expenditures: - 500,000 500,000 500,000 1,000,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: General Fund 500,000 500,000 500,000 500,000 3,000,000 Grants (Fed,State,Local) - - - _ _ REET Other - - _ _ _ Total Funding Sources: 500,000 500,000 500,000 500,000 3,000,000 Capital Expenditures: Design 100,000 100,000 100,000 100,000 600,000 Righto(Way - - - _ _ Conslruction 400,000 400,000 400,000 400,000 2,400,000 Total Expenditures: 500,000 500,000 500,000 500,000 3,000,000 Grants ! Other Sources: • 203 City ofAuburn Draft Capital Facilities Plan CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund ~ Project Title: Mohawks Plastics Site Mitigation Project Project No: Project Type: Non-Capacity Project Manager: DIxo11 Description: The project consists of developing a wetland mitigation plan and conducting construction within the Auburn Environmental Park in order to compensate for approximately 1.6-acre wetland loss on the Mohawk Plastics property (Parcel # 1321049056). The project was approved under an existing agreement approved by Resolution No. 4196, June 2007. Progress Summary: The City on April 23, 2008 provided a response to the Army Corps of Engineers (Corps) March 28, 2008 letter. Subsequently, a permit application (JARPA) was submitted to the Corps on May 12, 2008. The timing of preparation of the detailed construction plans and the actuai construction is dependent on the timing of receipt of the Corps permit (approvai). It is anticipated that construction would occur in 2009. Future Impact on Operating Budget: After construction, it is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a period of years, depending on permit requirements. After the conclusion of this monitoring period, ongoing operation expenses should be minimal. Budget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - - - Adjusted Budget - - - - Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total General Fund - Grants - - - - - - Bond Proceeds - - - - - REET 2 22,800 60,000 100,000 12,000 182,800 Total Funding Sources: 22,800 60,000 100,000 12,000 182,800 Capital Expenditures Design 22,800 60,000 - - 82,800 Right of Way - - - - - Construction - - 100,000 12,000 100,000 Total Expenditures: 22,800 60,000 100,000 12,000 182,800, Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: General Fund - - - - - Grants - - - - - Bond Proceeds - - - - - REET 2 10,000 8,000 5,000 5,000 140,000 Totai Funding Sources: 10,000 8,000 5,000 5,000 140,000 Capital Expenditures: _ Design - - - _ _ Right o/ Way - - - _ - Construction 10,000 8,000 5,000 5,000 140,000 Total Expenditures: 109000 8,000 5,000 5,000 140,000 • I 204 City ofAuburn Draft Capital Facilities Plan • CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Capital Projects Fund Project Title: M&O Sateilite Facilities Project No: Cpxxxx Project Type: Non-Capacity (improvements) Project Manager. TBD Description: Construction of satellite facilities to support M&O operational activities including vactor waste solids transfer. Progress Summary: Future impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - ~ Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total Unrestricted Cap. Improv. Revenue - - 100,000 100,000 100,000 Granfs - - - - - REET - - - - - Other - - - - - Total Funding Sources: - - 100,000 100,000 100,000 Capital Expenditures: Design - - 100,000 100,000 100,000 Right of Way - - - - - Construction - - - - Total Expenditures: - 100,000 100,000 100,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources Unresfricted Cap. Improv. Revenue - - - - 200,000 Grants - - - - - REET - - - - - Other - - - - - Totai Funding Sources: - - - - 200,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - Total Expenditures: - - - - 200,000 Grants ! Other Sources: • 205 a t C aPi t a l F a c i l i t i e s P l a n CitY o.f .f Auburn Dr GENERAL FUND, Nori-Departmental Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 General Fund • Project Title: Gateway Program Project No: c221 a0 Project Type: Non-Capacity Project Manager. Description: Ongoing project to market the City and to design and initiate construction of gateways throughout the City. Gateway sign designs were developed and the first one has been completed at Peasley Canyon. Funding is needed for the next signs. Future sites in '09 include 277th at AWN, Lakeland Hilis, and Lea Hill. Progress Summary: The second gateway sign was completed at the intersection of M Street SE and Auburn Way South (SR 164). Funding is needed for the next sign. Costs my be offset by gifts and/or sponsorships. Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 OS Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Budget Project Total General Fund_98 170,042 100,000 100,000 85,000 370,042 Grants (Fed, State, Local) - - _ _ _ Other - - - _ _ Total Funding Sources: 170,042 100,000 100,000 85,000 370,042 Capital Expenditures: Design 32,077 15,000 15,000 10,000 62,077 Right of Way - - - _ _ Construction 137,966 85,000 85,000 75,000 307,966 Total Expenditures: 170,042 100,000 100,000 85,000 370,042 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: General Fund.98 15,000 - - - 200,000 Grants (Fed,State,Local) - _ Other - _ Total Funding Sources: 15,000 - - - 200,000 Capital Expenditures: Design - - - - 25,000 Right o(Way - _ Construction 15,000 - - 175,000 Total Expenditures: 15,000 - - - 200,000 Grants / Other Sources: • 206 City ofAuburn Draft Capital Facilities Plan • AIRPORT Current Facilities The City of Auburn operates the Auburn Municipal Airport, providing hangar and tie-down facilities/leasing space for aircraft-related businesses. As of 2002, there were approximately 141,000 take-offs and landings (aircraft operations) at the airport annually. Table A-1 "Facilities Inventory" lists the facilities with current capacity and location. Level of Service (LOS) The Auburn Municipal Airport Master Plan Update 2001-2020 provides a maximum runway capacity (LOS standard) of 231,000 aircraft operations annually; one take-off or landing equals one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA). The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways, holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100% of aircraft operations during any one year. By 2020 the Airport Master Plan forecasts the number of operations to be 193,189 - well below the capacity of the airport runway. Capital Facilities Projects and Financing The City's Airport facilities include five non-capacity capital projects at a cost of $4,062,900. • These projects are for facilities repairs and improvements. Table A-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table A-3 shows, operating budget impacts of $58,000 are forecasted for Airport facilities during the six years 2010 - 2015. TABLE A-1 Facilities Inventory Airport CAPACITY FACILITY # of Aircraft # of Feet LOCATION Existing Inventory: Hangars 145 400 23rd Street NE Tiedowns 214 400 23rd Street NE Air Strip 3,400 400 23rd Street NE Total Existing Inventory 359 3,400 Proposed Capacity Projects: None - _ • Total Proposed Capacity Projects - - 2014 Projected Inventory Total 359 3,400 207 City ofAuburn Draft Capital Facilities Plan TABLE A-2 CAPiTAL FACILITIES PLAN PROJECTS AND FINANCING • AIRPORT 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: None _ Non-Capacitv Proiects: 1 Airport Security Capital Costs 5,000 5,000 - - - - 10,000 Funding Sources: Airport Fund 5,000 5,000 - - - - 10,000 2 Hangar Repair Capital Costs 50,000 50,000 - - - - 100,000 Funding Sources: Airport Fund 50,000 50,000 - - - - 100,000 3 Parallel Taxiway Construction Capital Costs 2,820,900 - - - - - 2,820,900 Funding Sources AirporT Fund 70,500 - - - - - 70,500 Grants (Fed - FAA) 2,750,400 - - - - - 2,750,400 4 Taxiway Lighting and Signage Capital Costs 262,000 - - - - - 262,000 Funding Sources: Airport Fund 6,500 - - - - - 6,500 Grants (Fed - FAA) 255,500 - - - - - 255,500 • 5 General Repair & Maint. Projects Capital Costs 150,000 20,000 175,000 175,000 175,000 175,000 870,000 Funding Sources: Airport Fund 150,000 20,000 175,000 175,000 175,000 175,000 870,000 - Grants (Fed - FAA) - - - - - - _ SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 3,287,900 75,000 175,000 175,000 175,000 175,000 4,062,900 Total Costs 3,287,900 75,000 175,000 175,000 175,000 175,000 4,062,900 FUNDING SOURCES: Airport Fund 282,000 75,000 175,000 175,000 175,000 175,000 1,057,000 Grants (Fed,State,Local) 3,005,900 - - - - - 3,005,900 Total Funding 3,287,900 75,000 175,000 175,000 175,000 175,000 4,062,900 • 208 City ofAuburn Draft Capital Facilities Plan ~ AIRPORT FUND (435) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Airport Security Projects Project No: cp0713 Project Type: Project Manager: Garcia Description: Increased security identified as one of the highest priority needs for the airport in the 2005 Development Plan. Progress Summary: Future Impact on Operating Budget: None Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments Adjusted Budget ~ Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Totaf Unrestricted Airport Revenue - 51,000 5,000 5,000 56,000 Grants (Fed,State,Local) - - - - - - Other - - - - Total Funding Sources: - 51,000 5,000 5,000 56,000 Capital Expenditures Design - - - - - Righf o(Way - - - - - Construction 51,000 5,000 5,000 56,000 Total Expenditures: - 51,000 5,000 5,000 56,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Airport Revenue - - - - 10,000 Grants (Fed, State, Local) - - - - - Other - - - Total Funding Sources: - - - - 10,000 Capital Expenditures: Design - - - - - Right o( Way - - - - - Construction - - - 10,000 Total Expenditures: - - - - 10,000 Grant / Other Sources: ~ 209 City ofAuburn Draft Capital Facilities Plan AIRPORT FUND (435) Capital Facilities Plan • Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Hangars-Header Beam Evaluation, Repair 8 Replacement Project No: Cp0717 Project Type: Project Manager: GarCia Description: Evaluate and structuraliy test suspected failing header beams on hangars 2 through 8. Once the headers are identified, they will be prioritized and scheduled for replacement. Following evaluation, repair andlor repiacement will begin. Those beams in the worst condition will be repaired and/or replaced first, proceeding with less critical repairs. Progress Summary: Future Impact on Operating Budget: Bi-annual maintenance and inspection cost for this project is estimated at $6,000 per year. Maintenance includes cleaning, painting or sealing as recommended by the manufacturer. BUdg6t: 2008 YTD Actual 20.09 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments _ Adjusted Budget - - - _ Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Airport Revenue - 70,000 50,000 50,000 120,000 Grants (Fed, State, Local) - - _ _ _ Other - - _ _ Total Funding Sources: - 70,000 50,000 50,000 120,000 Capita) Expenditures: Design - - _ _ _ Right of Way - - _ _ _ Construction 70,000 50,000 50,000 120,000 Total Expenditures: - 70,000 50,000 50,000 120,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Airport Revenue - - - - 100,000 Grants (Fed, State, Local) _ Other _ Total Funding Sources: - - - - 100,000 Capital Expenditures: Design _ Right of Way _ Construction - - - - 100,000 Total Expenditures: - - - - 100,000 Grant / Other Sources: • 210 City of Auburn Draft Capital Facilities Plan • AIRPORT FUND (435) capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Parallel East Taxiway Design 8 Construction Project No: Cp0720 Project Type: Project Manager: GarCla Description: Removal of current east taxiway and replace with new taxiway which will meet current FAA design modifications. Progress Summary: Future Impact on Operating Budget: Maintenance of asphatt and repairs, est $6,800 annually Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - • Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Airport Revenue - 5,500 70,500 - 76,000 Grants (Fed,State,local) - 214,500 2,750,400 - 2,964,900 - Other - - - Total Funding Sources: - 220,000 2,820,900 - 3,040,900 Capital Expenditures: Design - 220,000 - - 220,000 Right of Way - - - - - Construction - - 2,820,900 - 2,820,900 TotalExpenditures: - 220,000 2,820,900 - 3,040,900 Forecasted Project Cost: i Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unieslricted Airport Revenue - - - - 70,500 Grants (Fed,State,Loca!) - - - - 2,750,400 Other - - - - Total Funding Sources: - - - - 2,820,900 Capital Expenditures: Design - - - - - Right of Way - - - - - Conslruction - - - - 2,820,900 TotalExpenditures: - - - - 2,820,900 Grant / Other Sources: Federal grant (FAA) i 211 City ofAuburn Draft Capital Facilities Plan AIRPORT FUND (435) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds • Project Title: Taxiway Lighting and Airport Signage Project No: cp0719 Project Type: Project Manager: GarCla Description: Update airport tighting and signage to meet current FAA standards. Progress Summary: Future Impact on Operating Budget: None BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: • 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Totai Unrestricted Airport Revenue - - 6,500 - 6,500 Grants (Fed,State,Local) - - 255,500 - 255,500 Other Total Funding Sources: - - 262,000 262,000 Capital Expenditures: Design _ _ _ Right of Way _ _ _ Construction - - 262,000 - 262,000 Total Expenditures: - - 262,000 - 262,000 Forecasted Project Cost: Totai 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Airport Revenue - - - - 6,500 Grants (Fed, State, Local) - - - - 255,500 Other Total Funding Sources: - - - - 262,000 Capital Expenditures: Design _ Right of Way _ Construction - - - - 262,000 Total Expenditures: - - - - 262,000 Grant / Other Sources: Federal grant (FAA) • 212 City ofAuburn Draft Capital Facilities Plan • AIRPORT FUND (435) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Airport Projects - General Repair & Maintenance Project No: cp435a Project Type: Project Manager: GarCia Description: Various airport projects will be identified and prioritized on an annual basis as grant funding is secured. Airport security fencing will be the primary project in 2007. Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments ~ Adjusted Budget - - - - Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Airport Revenue - 30,000 150,000 20.000 180,000 Grants (Fed, State, Local) - - _ _ _ - Other - - _ _ Total Funding Sources: - 30,000 150,000 20,000 180,000 Capital Expenditures: Design - 3,000 15,000 2,000 18,000 Right of Way - - - - _ Consbuction - 27,000 135,000 18,000 162,000 Total Expenditures: - 30,000 150,000 20,000 180,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Airport Revenue 175,000 175,000 175,000 175,000 870,000 Grants (Fed, State, Local) - - - _ _ Other - - _ Total Funding Sources: 175,000 175,000 175,000 175,000 870,000 Capital Expenditures: Design 17,500 17,500 17,500 17,500 87,000 Righf o/Way - - - _ _ Construction 157,500 157,500 157,500 157,500 783,000 Total Expenditures: 175,000 175,000 175,000 175,000 870,000 Grant / Other Sources: • 213 City ofAuburn Draft Capital Facilities Plan TABLE A-3 Impact on Future Operating Budgets • AIRPORT Pro'ect: 2009 2010 2011 2012 2013 2014 Total 1 Airport Security $ - $ - $ _ $ _ $ _ $ _ $ _ 2 Hangar/Header Evaluation, Repair & Replacement 6,000 6,000 6,000 6,000 24,000 3 Airport Master Plan - - _ _ _ _ _ 4 Parallel Taxiway Construction - 6,800 6,800 6,800 6,800 6,800 34,000 5 Taxiway Lighting & Signage 6 General Repair & Maintenance Projects - - - - - _ _ Total $ - $ 6,800 $ 12,800 $ 12,800 $ 12,800 $ 12,800 $ 58,000 ~ • 214 City ofAuburn Draft Capital Facilities Plan • CEMETERY Current Facilities The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (50 acres and four buildings) that provides burial services and related merchandise for the community. The Pioneer Cemetery is a historic cemetery which is no longer used for burial purposes. Table C-1 "Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 47.30 burial plots/niches per 1,000 population is based on the existing inventory divided by the 2008 citywide population of 67,005. The proposed LOS of 58.45 burial plots/niches per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. In addition, the cemetery will be able to offer a natural cremation garden. Capital Facilities Projects and Financing The City's Mountain View Cemetery facilities include one capital project at a cost of $85,000 for ~ repairs and maintenance. Table C-2 shows the proposed financing plan followed by an individual worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecast for the cemetery during the six years 2010 - 2015. TABLE C-1 Facilities Inventory Cemetery CAPAC ITY FACILITY # of burial plots/niches LOCATION Existing Inventory: Mountain View Cemetery 3,170 2020 Mountain View Dr. Pioneer Cemetery - 8th & Auburn Way No. Total Existing Inventory 3,170 Proposed Capacity Projects: New Development - Burial Plots 475 Memory Heights • New Development - Burial Plots 764 10th Addition Total Proposed Capacity Projects 1,239 2014 Projected Inventory Total 4,409 215 City ofAuburn Draft Capital Facilities Plan TABLE C-2 • CAPITAL FACILITIES PLAN PROJECTS AND FINANCING CEMETERY 2009 2010 2011 2012 2013 2014 Total Non-Capacitv Proiects: 1 Cemetery -Facilities Repair & Maintenance Capital Costs 20,000 - 45,000 - 20,000 - 85,000 Funding Sources: Cemetery Fund 20,000 - 45,000 - 20,000 - 85,000 Grants (Fed,State,Local) - _ _ _ _ _ _ Other SUMMARY: CAPITAL COSTS Capacity Projects - - - _ _ _ _ Non-Capacity Projects 20,000 - 45,000 - 20,000 - 85,000 Total Costs 20,000 - 45,000 - 20,000 - 85,000 FUNDING SOURCES: Cemetery Fund 20,000 - 45,000 - 20,000 - 85,000 Grants (Fed,State,Local) - _ _ _ _ _ _ Bond Proceeds - - _ _ _ ~ Total Funding 20,000 - 45,000 - 20,000 - 85,000 • 216 City ofAuburn Draft Capital Facilities Plan • CEMETERY FUND (436) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Cemetery - Facilities Repair 8 Maintenance Project No: Cp436a Project Type: Project Manager: Description: 1 1) Mausoleum Repair: Repair and replace niche and crypt fasteners which are failing. Cascadia Columbarium: Replace broken and dete(orating top caps (2009). 15K 2) New Development - Phase 1: Irrigation, top soil and sod (2009). 5K 3) New Development - Phase 2(2011). 45K 4) Repairs and Maintenance (2013). 20K Progress Summary: Future Impact on Operating Budget: Budget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget ' Budget Amendments - Adjusted Budget Activity: 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Cemetery Revenue - - 20,000 - 20,000 Grants (Fed, State, Local) - - - - Other - - - - - Total Funding Sources: - - 20,000 - 20,000 Capital Expenditures: Design - - - - ' Right of Way - - - ' ' Construction - - 20,000 - 20,000 Total Expenditures: - - 20,000 - 20,000 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Cemetery Revenue 45,000 - 20,000 - 85,000 Grants (Fed, State, Local) - - - ' - Other - - - - ' Total Funding Sources: 45,000 - 20,000 - 85,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 45,000 - 20,000 - 85,000 Total Expenditures: 45,000 - 20,000 - 85,000 Grants / Other Sources: 0 217 City ofAuburn Draft Capital Facilities Plan , • CITY O~ ~ A- _ NIORE THAN YOv IMAGINED ~ 218 City ofAuburn Draft Capital Facilities Plan • GOLF COURSE Current Facilities The City of Auburn owns and operates the 18-hole Auburn Municipal Golf Course. A PGA Class A professional is contracted to collect greens fees, operate the pro shop and snack bar, provide golf carts for rent, and offer a lesson program. Table GC-1 Facilities Inventory lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of .26 holes per 1,000 population is based on the existing inventory divided by the 2008 citywide population of 67,005. The proposed LOS of .23 holes per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing City golf course facilities include one capital project at a cost of $350,000 for rebuilding fairways and greens. Table GC-2 shows the proposed financing plan followed by an individual work sheet showing the project detail. Impact on Future Operating Budgets • There are no operating budget impacts forecast for new golf course facilities during the six years 2010 - 2015. TABLE GC-1 Facilities Inventory Golf Course CAPACITY FACILITY # of holes LOCATION Existing Inventory: Auburn Municipal Golf Course 18 29639 Green River Road Total Existing Inventory 18 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2014 Projected Inventory Total 18 . 219 City ofAuburn Draft Capital Facilities Plan TABLE GC-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING • GOLF COURSE 2009 2010 2011 2012 2013 2014 Total Capacitv Proiects: None Non-Capacitv Proiects: 1 Reconstruct Holes 1, 2, 10 Capital Costs - - - - 350,000 - 350,000 Funding Sources: Golf Course Fund - - - - - - _ Bond Proceeds - - - - 350,000 - 350,000 Other - - - - - _ _ SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects - - - - 350,000 - 350,000 Total Costs - - - - 350,000 - 350,000 FUNDING SOURCES: Golf Course Fund - - - - - - - ~ Bond Proceeds - - - - 350,000 - 350,000 REET - - - - - - - Total Funding - - - - 350,000 - 350,000 • 220 City ofAuburn Draft Capital Facilities Plan • GOLF COURSE FUND (437) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Enterprise Funds Project Title: Reconstruct Holes 1, 2, 10 Project No: cpxxxx Project Type: Project Manager: Van Description: Renovate portion of golf course, specifically holes 1, 2 and 10. Progress Summary: Future Impact on Operating Budget: This project will increase the number of rounds played throughout the course. It wilt complete all major golf renovations which began in 1988. BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget - Budget Amendments - Adjusted Budget • Activity: - - - - 2008 YE 2009 Year End Funding Sources: Prior to 2008 Estimate 2009 Budget 2010 Project Total Unrestricted Golf Revenue - - - - - Grants (Fed, State, Local) - - - - - Bond Proceeds - - - - - Other - - - - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - Total Expenditures: - - - - - Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Unrestricted Golf Revenue - - - - - Grants (Fed, State, Local) - - - - - Bond Proceeds - - 350,000 - 350,000 Other - - - - - Total Funding Sources: - - 350,000 - 350,000 Capital Expenditures: Design - - 15,000 - 15,000 Right of Way - - - - - Construction - - 335,000 - 335,000 Total Expenditures: - - 350,000 - 350,000 . Grants / Other Sources: • 221 City of Auburn Draft Capital Facilities Plan • ~ lTY OF ~ B • * MORE THAN YOU IMAGINED ~ 222 City of Auburn Draft Capital Facilities Plan • POLICE Current Facilities The City of Auburn Police Department provides a full range of law enforcement services, including jail services, to the City of Auburn. Table P-1 Facilities Inventory shows the correctional facilities inventory with the current capacity and location. Level of Service (LOS) The current LOS of .80 beds per 1,000 population is based on the existing inventory divided by the 2008 citywide population of 67,005. The proposed LOS of 0.71 beds per 1,000 population is based on the projected inventory divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing The CFP does not include any Police capital facilities projects during 2009 - 2014. Impact on Future Operating Budgets There are no operating budget impacts forecasted for jail facilities during the six years 2010 - 2015. ~ TABLE P-1 _ Facilities Inventory Police CAPACITY FACILITY (Max.Occupancy) LOCATION Existing Inventory: Auburn Correctional Facility 54 25 West Main St. Total Existing Inventory 54 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2014 Projected Inventory Total 54 ~ 223 City ofAuburn Draft Capital Facilities Plan • CITY OF U AW~ UIRN ~ MC)RE T~HAN YCJ~LJ~ I1VtAGIN~ED ~ 224 City ofAuburn Draft Capital Facilities Plan • . FIRE PROTECTION Current Facilities The Valley Regional Fire Authority provides fire protection and rescue services to a 25-square mile area which includes the City of Auburn, the City of Algona, the City of Pacific and King County Fire Protection District 31. The Valley Regionat Fire Authority operates out of four stations, which are manned 24 hours per day. The North Station #31 also serves as the department headquarters and includes a hose and training tower. Each station is assigned fire apparatus (Engines and Aid Vehicles). Table F-1 "Facilities Inventory" lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.14 fire apparatus per 1,000 population is based on the existing inventory (10 fire apparatus) divided by the 2008 citywide population of 67,005. The proposed LOS of 0.13 fire apparatus per 1,000 is based on the 2014 planned inventory (10 fire apparatus) divided by the 2014 projected citywide population of 75,430. Capital Facilities Projects and Financing The Valley Regional Fire Authority includes one capital project at a cost of $119,000 for Fire Station Facility Relocation, Enhancements & Improvements. Table F-2 shows the proposed ~ financing plan followed by an individual worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for fire protection during the six years 2010 - 2015. ~ 225 City ofAuburn Draft Capital Facilities Plan TABLE F-1 • Facilities Inventory Valley Regional Fire Authority CAPACITY FACILITY Fire Apparatus Aid Vehicles Other LOCATION Existing lnventory: Stations: North Station #31 1101 'D' Street NE, Auburn First Line 1 1 - Reserve 1 1 - South Station #32 1951 'R' Street SE, Auburn First Line 1 1 - Reserve 1 1 - GSA Station #i33 First Line 1 - - 2815 'C' Street SW, Auburn Reserve 1 - 3" Total Existing lnventory 6 4 3 Proposed lnventory Additions: None - - - Total Proposed Capacity Projects - - - 2014 Projected Inventory Total 6 4 3 • ' Bus, Reserve Van, Disaster Response Vehicle " Telesquirt . 226 City ofAuburn Draft Capital Facilities Plan 0 TABLE F-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING VALLEY REGIONAL FIRE AUTHORITY 2009 2010 2011 2012 2013 2014 Total Non-CaqacitV Proiects: 1 Fire Station Facility Relocation, Enhancements & Improvements Capital Costs 119,000 - - - - - 119,000 Funding Sources: Grants - - - - - - - Bond Proceeds - - - - - - - ImpacUMitigation Fees 119,000 - - - - - 119,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 119,000 - - - - - 119,000 Total Costs 119,000 - - - - - 119,000 FUNDING SOURCES: Cemetery Fund - - - - - - - ~ Grants (Fed,State,Local) - - - - - Bond Proceeds 119,000 119,000 Total Funding 119,000 - - - - - 119,000 ~ 227 City ofAuburn Draft Capital Facilities Plan Valiey Regional Fire Authority (653) Capital Facilities Plan Six Year Capital Facilities Plan, 2009-2014 Agency Fund • Project Title: Fire Station Facility Relocation, Enhancements & Improvements Project No: cp0639 Project Type: Project Manager: Paul BeYry Description: Continue study of other Fire station needs for VRFA. Facility improvement projects are identified and prioritized annually, and subject to delay to accommodate emergency repairs. Progress Summary: Fire mitigation and impact fees will be transferred to the Valley Regional Fire Authority to pay for design contracts for the study of fire station relocation, construction projects and faciliry improvements. Future Impact on Operating Budget: BUdget: 2008 YTD Actual 2009 08 Budget Budget Expenditures Budget Balance Adopted Budget _ Budget Amendments Adjusted Budget Activity: ~ 2008 YE 2009 Year End Funding Sources: Prior to 2007 Estimate 2009 Budget 2010 Budget Project Totai Grants _ _ Bond Proceeds _ _ _ Impact/Mitigation Fees 87,033 725,000 119,000 - 931,033 Total Funding Sources: 87,033 725,000 119,000 - 931,033 Capital Expenditures: Design 12,996 725,000 119,000 - 856,996 Right of Way _ _ _ _ _ Construction 74,037 - 74,037 Totat Expenditures: 87,033 725,000 119,000 - 931,033 Forecasted Project Cost: Total 2011 2012 2013 2014 2009-2014 Funding Sources: Grants _ Bond Proceeds lmpact/Mitigation Fees - - - - 119,000 Total Funding Sources: - - - - 119,000 Capital Expenditures: Design - - - - 119,000 Right of Way _ Construction _ Total Expenditures: - - - - 719,000 ~ 228