Loading...
HomeMy WebLinkAbout2678 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 RESOLUTION NO. 2 6 7 8 A RESOLUTION OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK OF THE CITY OF AUBURN, TO EXECUTE INTERLOCAL AGREEMENT NO. 1 BETWEEN THE CITY AND KING COUNTY WATER DISTRICT #111 FOR THE 132ND AVENUE SE INTERIM INTERTIE PROJECT. THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, IN A REGULAR MEETING DULY ASSEMBLED, HEREBY RESOLVES THAT: SECTION 1. The Mayor and City Clerk of the City of Auburn, Washington, are hereby authorized to execute Interlocal Agreement No. 1 between the City and King County Water District #111 for the 132nd Avenue SE Interim Intertie Project. A copy of said Agreement is attached hereto, denominated as Exhibit "A" and made a part hereof as though set forth in full herein. SECTION 2. The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. DATED and SIGNED this 6th day of November, 1995. CITY OF AUBURN MAYOR Resolution No. 2678 October 16, 1995 Page 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ATTEST: Robin Wohlhueter, City Clerk APPROVED AS TO FORM: Michael . lds, City Attorney Resolution No. 2678 October 16, 1995 Page 2 Interlocal Agreement No. 1 for the 132nd Avenue SE Interim Intertie Project between King County Water District #111 and the City of Auburn I. Project: Construction and operation of piping, pump station, and meter for water supply intertie facilities between the City of Auburn (Auburn), and King County Water District # 111 (District). Joint reference to Auburn and the District shall be the Participants. The project facilities are as shown on Exhibit A - Facilities Plan. II. General: A. This Interlocal Agreement (IA) is consistent with the Joint Operating Agreement (JOA) of the South King County Regional Water Association (SKCRWA) dated 26 July 1995. B. There is an immediate need to provide for additional water supply to meet the needs of the District, and meet the emergency needs of Auburn. C. Auburn has the necessary water system capacity to meet a portion of the near term, interruptable, public water supply needs of the District. The District has the necessary system capacity to meet a portion of the emergency needs of Auburn. D. Each Participant hereby identifies its authorized representative as "Manager" of the District, and as "City Engineer" of Auburn. III. Description of Project: A. The project shall consist of the construction of a 16-inch diameter transmission main on 132nd Avenue SE northerly from Auburn's Lea Hill Reservoir Site to the intersection of 132nd Avenue SE and SE 288th Street. Other facilities within the project construction include a booster pump station, meter station, and appurtenances as necessary. B. The project is intended to design, construct, and operate facilities that provide for up to 1.0 MGD, or additional as mutually agreed to by the Auburn City Council and the District Board of Commissioners, of water to be pumped from Auburn's Lea Hill Reservoir Site to the District's system. The project will provide for flow control facilities as necessary and a master meter which will be used to measure the water supplied. C. Respective ownership, maintenance, and renewal and/or replacement (r/r) responsibilities are as outlined in the following table: Facility Location Ownership, Maintenance, &RfR Pump Station, Flow Lea Hill Reservoir Site District Control, Telemetry Meter Station and 16-inch Lea Hill Reservoir Site to SE 298th Auburn Waterline Street 16-inch Waterline SE 298th Street to SE 288th Street District IV. Project Costs: The project costs are estimated as shown on Exhibit B - Project Cost. Final project costs shall be reviewed and approved by the Participants. The Participants shall maintain individual cost records on their expenses for the project. The District's engineer shall maintain total cost records for the project. V. Project Financing: The Participants shall fully finance and pay for their proportionate share as shown in Exhibit B - Project Cost. Each party shall deposit funds with the other party to perform the project work for the proposed facilities in accordance with the schedule shown in Exhibit C - Project Schedule. VI. Capacity Rights: Each of the Participants shall have capacity rights in the facilities as shown in Exhibit D - Capacity Rights. VII. Facilities Ownership: All pipelines and appurtenances shall be owned by the Participant within whose service boundary the pipeline is located. The pump station and appurtenances shall be owned by the District. The telemetry, meter station, and appurtenances shall be owned by Auburn. VIII. Operations and Maintenance: A. Each Participant shall be fully responsible for operation and maintenance including renewal and/or replacement of the facilities it owns. B. Operational parameters of the facilities shall conform to the parameters shown in Exhibit E - Project Criteria. IX. Service Charges: A. Auburn will perform a Cost of Service Study to determine the actual cost of service to its customers. It is expected that a customer classification for "wholesale" will be created, and rates for service charges shall be based on such customer classification. B. The District will provide a rate to Auburn to be applied for emergency service charges. C. Adjustments to the service charges will be made in accordance with Section 4.H of the JOA. X. Project Management: A. The Participants shall meet monthly for project coordination, or more frequently as needed. B. The District's engineer shall be the overall Project Coordinator. Assignment of responsibilities to the District's engineer shall be by agreement of the Participants' authorized representatives. C. The Participants shall be responsible for design, construction management, and commissioning of facilities to be constructed in accordance with the facilities owned. Responsibilities may be assign otherwise by agreement of the Participants' authorized representatives. XI. Conditions of Service: Auburn docs not presently have the necessary capacity to guarantee delivery of water. It is acknowledged that in the event of any failure or decreased capacity for any reason or increased demand within the retail service area of Auburn, the supply to the District may be immediately reduced or stopped under such conditions at the sole discretion of Auburn. XII. mutual Term of Duration of Agreement: A. This Inteflocal Agreement No. 1 shall remain in full force unless terminated by agreement of the Participants. XIII. Interim Stares The intent of this agreement is to provide an interim water supply to the District until the Lea Hill Intertie Project can be implemented. The Participants agree however, that if an Interlocal Agreement for the Lea Hill Intertie Project between Auburn, the District, and Covington Water District is not completed by 1 February 1996, that Auburn and the District will seek to reach agreement for an Interlocal Agreement to design and construct the necessary permanent facilities to provide the District a reliable supply of no less than 2.0 million gallons per day. It is envisioned that this would be accomplished by constructing a second Lea Hill Pump Station in Auburn, pipelines, and a permanent booster pump station in the vicinity of the Lea Hill Reservoir. In addition, Auburn will continue to pursue additional water rights to place this interim supply and future supply amounts to the District on a par with Auburn customers. All such obligations to such future Interlocal Agreement and project are conditioned on Auburn and the District reaching a mutually acceptable cost sharing arrangement on the permanent facilities, including Auburn's in-city improvements, and upon Auburn obtaining future water rights. Cost sharing will be based on design capacity (generally proportionate to volume of water contracted for). The District specifically acknowledges and agrees that failure of Auburn to obtain additional water rights in excess of any Auburn needs shall be cause for not implementing an Inteflocal Agreement to bring the District on par with Auburn customers. XIV. Amendments: A. This Interlocal Agreement No. 1 may be amended in writing by agreement signed by the Participants. B. The authorized representatives shall have authority to update exhibits attached hereto. The exhibits shall be updated and/or revised only upon written agreement signed by the Participants' authorized representatives. Updates must be ratified by Auburn's Public Works Committee of the City Council. XV. Hold Harmless: Participants agree to indemnify and hold harmless the other participant from and against any loss, cost, damage, or expense of any kind and nature arising out of injury to person or damage to property in any manner caused by negligent or omission of the individual participant in the performance of its work pursuant to or in connection with this Interlocal Agreement No. 1. IN WITNESS WHEREOF, the Participants hereto hav~ caused this Agreement to be executed by their proper Officers on the Title: Attest: Apt~ed~ ~ to~or~: City of Auburn ~,~~ By: Title: By: H:kD~RTIEUOAkIAI-I.DOC NEW 16" WATER LINE S.E. 288th STREET ~--a~oo ism .E. 299th STREET S.E. 304th STREET PUMP AND METER STATION- 1. AUBI~N: 2. AUBURN: DISTRICT: DISTRICT: DATE: AUGUST 22, 199~ EXHIBIT 'A' FACILITY PLAN SCALE 1" = 330' . n~ 0 o ~oo ~oo LU m~o ~u ~J 0 Z ,..3 'ddd~ddddddd~dd~dddd~dddddKddd~ · · ~D n "r (,.) ddddddd~dd~dddd~ddd~dddddddddd ~ ~ oooo~~oo~oooo~ooooooooo~~ ~ ~ u dddd~dddddddd~dd~dddd~ddddd~d · ~ ~ z 1.13 1.13 Z 0 ZZZZ EEEE ~ 0000000 0 ~ 0000000 0 ~ 0000000 0 ~ 0 A -I- c: 0 + + Activity Exhibit C- Project Schedule Interlocal Agreement No. 1 for 132nd Avenue SE Interim Intertie Project Cumulative Calendar Day Schedule Target Date Execute Interlocal Agreement District $20,000 deposit to Auburn Complete design Rates for service charges provided District $100,000 deposit to Auburn Award construction contract District $250,000 deposit to Auburn District $300,000 deposit to Auburn Complete construction Commissioning Final Project cost accounting Final District Balancing Payment to Auburn 0 3 60 90 100 120 180 210 210 230 260 290 15 Oct. 1995 1 May 1996 Update Approval 1. Auburn: District: 2. Auburn: District: , Dated: , Dated: , Dated: , Dated: Exhibit D - Capacity Rights to Interlocal Agreement No. 1 for 132nd Avenue SE Intertie Project Item and Description Pipeline on 132nd Avenue SE, from Lea Hill Reservoir, to 5,860 feet northerly. a. District capacity ~ 95% b. Auburn capacity ~ 5% (emergency allowance) Pump Station at Lea Hill Reservoir site. a. District capacity ~ 85% b. Auburn capacity ~ 15% (consumptive share) Meter Station at Lea Hill Reservoir site. a. District capacity ~ 95% b. Auburn capacity ~ 5% (emergency allowance) 4. All other facilities and appurtenances ~ 100% according to ownership. Update Approval 1. Auburn: , Dated: District: , Dated: 2. Auburn: , Dated: District: , Dated: Exhibit E- Project Criteria to Interlocal Agreement No. 1 for 132nd Avenue SE Intertie Project Item and Description 3. 4. 5. 6. 7. 8. Pipeline sizing per Exhibit A. No storage shall be included in the project. All storage required to enable the District to optimally utilize facilities shall be provided by the District. The flow rate is expected to be as high as 1,000 gpm whenever available supply exists. The supply available is not expected to require the existing Lea Hill Pump Station to operate above design capacity, i.e., one pump is normally to be on stand-by. Telemetry shall include low level shut-off signal from the Lea Hill Reservoir at water level elevation 558 feet. Flow rotes through the facilities shall be set for full 24 hour periods through notification to Auburn by the District on a daily basis. The District will pump the total quantity of water requested at an average flow rate such that the total quantity of water requested is pumped over a 24 hour period. The district will notify Auburn by 9:00 AM on the day previous to the day that pumping will proceed and at what rate, except in case of an emergency. Update Approval 1. Auburn: , Dated: District: , Dated: 2. Auburn: , Dated: District: , Dated: S 877TH ST KENT-KANGLEY RD SR 18 37TH ST NE 15TH ST NE ST F 15TH ST SW 17TH ST SE 21ST ST SE AUBURN WAY 29TH ST SE ELLINGSON RD 53RD ST SE EXISTING SANITARY SEWER FRANCHISE EXISTING SANITARY SEWER AND WATER FRANCHISE EXHIBIT A