Loading...
HomeMy WebLinkAbout3112 RESOLUTION NO. 3 112 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN EASEMENT AGREEMENT WITH PUGET SOUND ENERGY TO FURNISH AND INSTALL ELECTRICAL DISTRIBUTION SYSTEM FOR WORK ORDER NUMBER PSE ELECTRICAL WO. #105006212 FOR THE AUBURN MUNICIPAL AIRPORT. WHEREAS, Puget Sound Energy currently distributes electricity within the City of Auburn; and WHEREAS, the City of Auburn is making improvements and installing infrastructure for a hangar construction project at Auburn Municipal Airport; and WHEREAS, Puget Sound Energy (PSE) will be installing the underground electrical service to the hangar site; and WHEREAS, Puget Sound Energy is requesting an easement for the purpose of accessing, installation, alterations, changes, new construction and maintenance on electrical services. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, IN A REGULAR MEETING DULY ASSEMBLED, HEREWITH RESOLVES THAT: Section 1. The Mayor and City Clerk of the City of Auburn are herewith authorized to execute an Underground Conversion Agreement with Puget Resolution No. 3112 August 31, 1999 Page 1 Sound Energy to furnish and install electrical service on the new hangar site at Auburn Municipal Airport. A copy of said Easement is attached hereto and denominated as Exhibit "A" and a copy of said Agreement is attached hereto and denominated as Exhibit "B" and incorporated by reference in this Resolution. Section 2. The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. DATED and SIGNED this 7~-~'' day of September, 1999. CHARLES A. BOOTH MAYOR ATTEST: Danielle E. Daskam, City Clerk PR~O FORM: Michael J. Reynolds, City Attorney Resolution No. 3112 August 31, 1999 Page 2 RETURN ADDRESS: Puget Sound Energy, Inc. Attn: ROW Department EASEMENT (customer form) REFERENCE #: GRANTOR: GRANTEE: SHORT LEGAL: see full legal on page 2 ASSESSOR'S PROPERTY TAX PARCEL: OP. MAP NO JOB NO: For and in consideration of One Dollar ($1,00) and other valuable consideration in hand paid, Cj-f-Y' of AL~bLL--"n~ ~ ('Grantor heraIn), It's successors and assigns hereby conveys and warrants to PUGET SOUND ENERGY, INC., a Washington Corporation ("Grantee" herain), it's successors and assigns for the purposes herelnafier set forth, a nonexclusive perpetual easement over, under, along across and through the following described real property ("Property" hereIn) In Kj..ng County, Washington: SEE EXHIBIT 'A' ATTACHED HERETO AND BY THIS REFERENCE MADE A PART HEREOF. EASEMENT LOCATION: Except as may be otherwise set forth herain. Grantee's dg~hts shall be exercised upon that portion of the Property .(,the 'Easement Area' herein) there ten (10) feet In width hewn five 5) feet of such width on each side of the centeritne of Grantee's systems located as constructed or to be coniVOrieS, extended or relocated · on the Property, except those portions Of the Properly occupied by Vuildlng footings, foundations, and/or subsurface structures. 1. Purpose. Grantee shall have the right to construct, operate, maintain, repair, replace, improve, remove, enlarge. and use the Easement Area for one or more utility systems for purposes of transmission. distribution end sale of gas and electricity. together with the right of access over and across said Property to enable Grantee to exercise its dghts hereunder. As used herain, the term "systems' shall include all appurtenances and facilities as are necessary, in the judgment of Grantee, for the operation and maintenance of said systems.. 2. Grentor's Use of Easement Area. Grantor agrees not to erect any structures on said Easement Area, and further agrees not to place trees, reckaries, fences or other obstructions on the Property that would interfere with the exercise of Grantee's rights herein. DATED this 8th day of Sept:embe_z .19 99 . ~~,Nayor BY: STATE OF WASHINGTON ) ay of .199J~, be ore me, a No ry P blic in and forthe State of Washington, be the Indiv. dualgl) who executed the within and foregoing instrument. and acknowledged that ./~o me known to same as ~L.~'~ free and voluntary act and deed for the uses and purposes therein mentioned. signed the GIVEN under my hand end offi.q~P~a~ ~'l~'l~qreto affixed the d and year in this c i~cate first above written. · : ' ' : "" (Print or stamp name of Notary) "~:~ "" ', ," ~',t, .,~ My appoinlment expires cust form ] EXHIBIT "A" PUGET SOUND ENERGY EASEMENT ~,IORTHEAST CORNER OF AUBURN AIRPORT THAT PORTION OF LOT NUMBER 1 OF AUBURN SHORT PLAT NUMBER 15-81 AS RECORDED UNDER KING COUNTY AUDITOR'S FILE NUMBER 8207299002, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHERNMOST EAST CORNER OF SAID LOT NUMBER 1, THENCE NORTH 89-03-15 WEST ALONG.THE NORTH BOUNDARY OF SAID LOT NUMBER 1, A DISTANCE OF 264.89 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 00-56-45 WEST, 25.33 FEET; THENCE SOUTH 89-15-44 EAST, 250.61 FEET; THENCE SOUTH 00-44-16 WEST, 23.00 FEET; THENCE NORTH 89-15-44 WEST, 23.00 FEET; THENCE NORTH 00-44-16 EAST, 13.00 FEET; THENCE NORTH 89-15-44 WEST, 237.65 FEET; THENCE NORTH 00-56-45 EAST, 35.37 FEET TO SAID NORTH' BOUNDARY OF LOT NUMBER 1, THENCE SOUTH 89-03-15 EAST, 10.00 FEET TO THE TRUE POINT OF BEGINNING. SITUATE IN THE SOUTHWEST QUARTER OF SECTION'6, TOWNSHIP 21 NORTH, RANGE 5 EAST, W. M. PUGET SOUND ENERGY PUGET SOUND ENERGY CONSTRUCTION AND OPERATING RIGHTS AGREEMENT Between Puget Sound Energy (PSE) And City of Auburn (Property Owner/Representative) Project Name and Work Order Number: Auburn Airport, 5XX 30th St. NE, Auburn PSE Electric WO#105006212 I have read the attached information and agree to conform with all items included therein. I have reviewed the engineering layout on the-enclosed work sketch and have advised PSE's Project Manager of any changes that need to be made. I warrant that the construction route will be cleared, brought to final grade, and will be free of all obstructions. I further wan'ant that all rights-of-way, easements, and property lines have been clearly and accurately delineated along the construction route. Upon Owner / Representative signature below, PSE shall have the right to construct, operate, maintain, repair, replace, enlarge and extend the electric or gas systems to be located on Owner's property. Owner agrees to maintain a minimum of five feet horizontal clearance or greater if required by code, between the electric or gas system and buildings or other improvements on the Owner's property. I agree to inspect the project after PSE has completed its construction. If the work performed is not to my satisfaction, I will notify PSE within two weeks of Construction completion. Otherwise PSE may consider the work completed to my satisfaction. Customer Signature Date