Loading...
HomeMy WebLinkAbout3252RESOLUTION NO. 3 2 5 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE SUPPLEMENT NO. 1 TO THE STATE PARTICIPATING AGREEMENT, GCA 2196, WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION, TO PROVIDE FOR INSTALLATION OF SURVEILLANCE CONTROL AND DRIVER INFORMATION SYSTEMS WITHIN THE AREA OF CITY PROJECT NO. PR529, KNOWN AS SR18/'C' STREET SW INTERCHANGE AND 3RD STREET SW GRADE SEPARATION PROJECT. WHEREAS, the City of Auburn approved Resolution 3230 on June 19, 2000 which authorized the Mayor and City Clerk to execute a State Participating Agreement with the Washington State Department of Transportation, so that the City can provide construction services for the installation of the WSDOT's surveillance control and driver information system within the PR529, SR 18/ `C' Street SW Interchange and 3rd Street SW Grade Separation Project area at the WSDOT's expense; and WHEREAS, the original agreement authorized $89,475 and allows a 25% increase in costs without supplementing the agreement. The actual bids for construction increased the WSDOT's costs by more then 25% thus per the terms and conditions of the executed agreement, the agreement must be supplemented to authorize the additional cost of $71,640 for a total estimated reimbursement by the WSDOT of $ 161,115. Resolution No. 3252 August 14, 2000 Page 1 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN, WASHINGTON, IN A REGULAR MEETING DULY ASSEMBLED, HEREWITH RESOLVES THAT: Section 1. The Mayor and City Clerk of the City of Auburn are herewith authorized to execute Supplement No. 1 of the State Participating Agreement, GCA 2196, with the Washington State Department of Transportation. Exhibit A of the original agreement is hereby superceded and replaced by Exhiibt A-1. A copy of said Supplement No. 1 is attached hereto and denominated as Exhibit 1" and incorporated by reference into Agreement GCA 2196 entered into between the city and the Washington Sate department of Transportation. All other terms and conditions of said original agreement shall remain in full force and effect. Section 2. The Mayor is hereby authorized to implement such administrative procedures as may be necessary to carry out the directives of this legislation. Resolution No. 3252 August 14, 2000 Page 2 DATED and SIGNED this 5th day of September, 2000. CHARLES A. BOOTH MAYOR ATTEST: Danielle E. Daskam, City Clerk APPROVED AS TO FORM: Michael J. Reynolds, City Attorney Resolution No. 3252 August 14, 2000 Page 3 AGREEMENT GCA 2196 SUPPLEMENT NO. 1 - THIS AGREEMENT, made and entered into this day of , 20 , befinreen the State of Washington, Department of Transportation, acting by and through the Secretary of the Departmen# of Transportation, by virtue of Title 47 RCW, hereinafter called the "STATE" and the City of Auburn, 25 West Main, Auburn, Washington, 98001, hereinafter called the "CITY". WHEREAS, the parties referenced above hereto entered into AGREEMENT GCA 2196 on July 10, 2000 which provides for the CITY to install the SC&DI ramp metering system on the "C" Street SW Interchange/3rd St. SW Grade Separation Project, and WHEREAS, it is deemed desirable to supplement the original agreement for the increase to the cost of accomplishing the work. NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, and by virtue of RCW 47.28.140, IT IS MUTUALLY AGREED AS FOLLOWS: 1. The estimate of cost, EXHIBIT "A" in the original agreement, is hereby superseded and replaced by EXHIBIT "A-1", attached hereto and by this reference made a part of this AGREEMENT. 2. All other terms and conditions of the original agreement shall remain in full force and effect except as modified by the Supplemental Agreement. 2196-1.01.agr.doc IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT as of the day and year first above written. . CITY OF AUBURN , Charles A. Booth, Mayor 7'- lo -Q C) Date PPRO D TO FORM Michael J. Reynolds, City Attorney Date WASHINGTON STATE DEPARTMENT OF TRANSPORTATION South King Area Administrator APPROVED AS TO FORM: Attorney General ate 2196-1.01.agr.doc GCA 2196 SUPPLEMENT NO. 1 EXHIBIT A-1 ESTIMATE OF COST The City will construct for the STATE a SC&DI ramp metering system on the "C" Street SW Interchange /3rd St. SW Grade Separation Project. The work is to be done in two phases. Phase 1 consists of installing all conduit, junction boxes and foundations. Phase 2 includes an ES cabinet and equipment, a transformer, two ramp meters, induction loop vehicle detectors and all conductors. The installation of the signal standards, vehicle heads and flashing beacon will be delayed to a later date. ,~ltem y Item ProJ Un~t Unrt ~~'otal~`~~ ~ ~ ~ ~ ~ ~ ` ~ ~ ~ .c-~~~~ F-`~. C~Vpi 3 ,r- n; . ~~';;.,d....,„- F 1 Traffic Data Accumulation & Ramp Metering System 1 LS $100,000.00 $100,000 2 Directional Boring 100 SF $150.00 $15,000 Construction Subtotal - Phase 1& 2 Sales Tax @ 8.60% Subtotal' Construction Engineering @ 18.0% Contingency @ 5.0% Construction Total SR 18 Traffic Control TOTAL COST OF PROJECT Design Costs from CITY TOTAL STATE COST Notes: 1. Construction cost based on actual unit bid prices. 2196-1.01. ExhbtA-1.xls $115,000 9,890 $124, 890 22,480 6,245 $153,615 4,000 $157,615 $3,500 $161,115 GCA 2196 SUPPLEMENT NO. 1